January 2010
·
98 Reads
Yugoslav journal of operations research
The problem of determining the optimum exploitation life of machinery, namely, the optimum time for machinery and equipment replacement, represents a complex and highly responsible engineering task. Taking into consideration the situation prevailing at coal pit mines in Serbia, the tasks of this rank are very complex and difficult. To make a decision on the replacement of capital equipment and machinery, such as bucket wheel excavators within the mentioned systems, implies a management task of utmost responsibility. It requires high professional and analytical knowledge as well as reliable arguments, based on a multidisciplinary professional approach. We present their views on the problem of establishing the optimum exploitation life of bucket wheel excavators, offering an algorithm, based on dynamic programming, as a solution.