Roman Shishkov’s research while affiliated with Federal Research Centre Coal and Coal Chemistry, Russian Academy of Sciences and other places

What is this page?


This page lists works of an author who doesn't have a ResearchGate profile or hasn't added the works to their profile yet. It is automatically generated from public (personal) data to further our legitimate goal of comprehensive and accurate scientific recordkeeping. If you are this author and want this page removed, please let us know.

Publications (2)


Fig. 1. Factors influencing the geomechanical characteristics of open-underground coal seam mining technology [15]
Combined Method of Coal Mining in the Opening of Shallow Layers as a Direction of Innovative Development of Geotechnology
  • Article
  • Full-text available

January 2021

·

21 Reads

E3S Web of Conferences

·

Roman Shishkov

·

Elena Kucherova

·

In recent years, there has been a decline in the efficiency of coal mining by traditional methods. On the one hand, the volume of coal outside the contour of the cut, which is economically impractical for open-pit mining, is increasing. On the other hand, when using underground geotechnology, the cost of production exceeds the cost of performing mining operations using open geotechnology, this is due to differences in the factors of operation of the open pit and the mine. This circumstance determines the use of open-underground technology for mining coal reserves outside the contour of the open pit as an actual and promising direction. This article describes a methodological approach based on the use of technological schemes for the preparation and treatment of reserves of powerful shallow coal seams, the justification of the parameters of combined geotechnology with a coordinated and balanced development of open and open-underground mining operations with the distribution of reserves for open and open-underground mining of coal reserves beyond the limit contour of the open pit, the preparation of excavation sites directly from its workings and the coordination of production capacity and the speed of their development. Its application will increase the production capacity of the coal mining complex without additional environmental burden and will provide an increased return on investment.

Download

Justification of parameters mining and technological structure of modular mine sites in terms water disposal

January 2020

·

30 Reads

·

1 Citation

E3S Web of Conferences

The high cost of any traditional coal mines consists of many factors their operation, one which is basically drainage. In mines and sections Russia, on average, for each ton coal mined, more than 2 m3 water is pumped from mine workings to day surface. For this work, more than 10 thousand pumping units with a total installed capacity about 1 million kW are used at mining enterprises. Therefore, rational design and proper operation, in particular, drainage plants mining enterprises are important technical and economic tasks today and in future, which leads to increased production volumes and a transition to a new stage in development coal industry using new technologies. The application mining technology structure mine sites located on a coal mine is considered. The result is that at design stage it becomes possible to highlight use of water pumping measures only at stage preparatory mine workings, reducing production costs for equipment and its operation, volumetric work, mine workings for water collectors and allocation personnel from drainage site to more significant work . A comparative analysis of two options is given, in terms efficiency wastewater disposal, namely actual situation of a certain period at enterprise SUEK-Kuzbass JSC mine Taldinskaya Zapadnaya-2 and the use mine sites.