This page lists works of an author who doesn't have a ResearchGate profile or hasn't added the works to their profile yet. It is automatically generated from public (personal) data to further our legitimate goal of comprehensive and accurate scientific recordkeeping. If you are this author and want this page removed, please let us know.

Publications (2)


Automated stacker system design and development: Structural support, end-effector, and control subsystems
  • Conference Paper

April 2016

·

17 Reads

·

1 Citation

L. Edwards

·

S. Hayes

·

S. Penny

·

[...]

·

In this paper, the results of a research and development project sponsored by Nucor Steel Corporation, Marion, Ohio, is presented. This project is conducted at Michigan Technological University with the objective to design and develop an automated robotic system for precise stacking of highway signposts, while complying with the required stacking pattern as well as time constraints. The design and development is fulfilled for the three main subsystems including structural support, end-effector, and control subsystems. The completed stacker system is tested at Michigan Technological University and delivered to Nucor Steel plant to be installed at Press #2 of the production line in highway products division.


Design and development of an automated stacker for highway products of Nucor Steel Corporation

June 2015

·

78 Reads

·

2 Citations

In this paper, a robotic stacker is designed to enable precise stacking of highway sign posts produced by Nucor Steel Corporation, while complying with the required stacking pattern as well as time constraints. The Nucor Steel Corporation bar mill, located in Marion Ohio, relies heavily on manual work force in its highway products division. A highly manual process introduces many safety hazards as well as inefficiencies and inconsistencies. One hazardous position is the bundling of heavy sign posts, which are manually raked into bundles before being manually banded, and workers are at risk for overuse injuries. Moreover, the sign posts are randomly positioned within a bundle, and hence the disorganized bundle is much larger than an organized stack of the same count. Disorganized bundles also hinder further automation processes downstream the production line, such as banding and powder coating the sign posts. This paper offers a robotic stacker solution utilizing Fanuc robot manipulators, custom-built end-effectors, and programmable logic controller (PLC) integrated with human machine interface (HMI) that will result in smaller and organized stacks as compared with the current disorganized bundles, and the removal of a worker from the hazardous position in the process. Organized stacks will also allow for further downstream automation processes. This research project is to be executed at Michigan Technological University and is sponsored by Nucor Steel Corporation.

Citations (1)


... The primary reason is that the translation work itself is typically done in the form of projects [4]. The PMBOK project management manual defines a project as a temporary effort to create a unique product, service or result [5]. The result of the project can then be concrete or intangible [6]. ...

Reference:

The Influence of the Human Factor on the Success of the Localization Project of the Automated Technological Line for Wood Production
Automated stacker system design and development: Structural support, end-effector, and control subsystems
  • Citing Conference Paper
  • April 2016