... BIM provides time, cost and sustainability planning, decreases waste and enhances the general project performance. In the construction phase, compatible use of BIM technology and digital processing provide advanced management, well-organized project formation and precise distribution of information [35,40,41]. ...
... BIM (building information modeling) technologies are not used to their maximum potential. However, the development and implementation of BIM and knowledge technologies holds excellent potential for the intelligent design of buildings, and specifically when choosing materials with specific properties [9,10]. This would allow the selection of specific properties of building materials and their adaption to the needs of the building. ...
... Assakkaf [15] stated that cost for construction machinery is the second most important factor (just after the construction resources). This fact influences significantly the result of the economic condition of construction company and emphasizes the demand of the detailed cost assumption for construction machinery [16], [17]. The displaying of the consumed cost at the construction machinery operation by using S-curves is suitable mainly for conceptual managing of the construction machine, but for operational managing level also. ...
... Future analyses should also focus on the use of soundproof barriers and covers for construction machinery [12,15,24,35,38] and multicriteria optimization of own construction schedules [27,39]. There are existing studies on the layout of the construction site in connection with the main construction machines [3,4,[40][41][42][43], but very little account is taken of machine noise in the optimization [2,5,44]. It is possible to ...
... The issue of saving fuel and energy gave rise to revised standards and to further directives and measures leading to energy saving in all fields of construction (Pifko 2017;de la Cruz-Lovera et al. 2017;Lovell and Smith 2010;Bragança et al. 2010), including agriculture. This means that thermal protection must be monitored in both older and newly built premises (Zgutova et al. 2015;Gašparik and Gašparík 2012;Ruuska and Häkkinen 2016). For older premises, such measurements serve as a basis for remediation, while for newly built premises, it needs to be shown that the applicable law on energy saving has been observed and that such premises meet the updated requirements for thermal protection (Pifko and Špaček 2008;Woloszyn et al. 2009;Ortiz and Castells 2009). ...
... Figure 3 shows the construction flow and the machines used in the ice-making concrete slab. After the hardening of the concrete, 3D Laser Scanner was used to evaluate the flatness [1], [2]. ...
... Many authors deal with these topics [6][7][8][9], with work that mainly focuses on the optimisation of spatial design for construction sites and on the location and monitoring of construction materials and machines in the productive area of construction sites in relation to the efficiency of supply. ...