This page lists works of an author who doesn't have a ResearchGate profile or hasn't added the works to their profile yet. It is automatically generated from public (personal) data to further our legitimate goal of comprehensive and accurate scientific recordkeeping. If you are this author and want this page removed, please let us know.

Publications (63)


Pelatihan Pengembangan Infrastruktur Berkelanjutan Melalui Penerapan Konstruksi Ramping Skala UMKM
  • Article
  • Full-text available

April 2025

·

7 Reads

Sewagati

Cahyono Bintang Nurcahyo

·

·

·

[...]

·

Penerapan prinsip Konstruksi Ramping (Lean Construction) dalam pengembangan infrastruktur berkelanjutan merupakan langkah penting untuk mendorong efisiensi sekaligus meningkatkan daya saing UMKM Konstruksi. Hingga saat ini, penerapan Konstruksi Ramping pada skala UMKM masih menghadapi berbagai tantangan, terutama terkait minimnya pemahaman konsep dasar dan minimnya contoh aplikasi di lapangan. Jurnal ini membahas program pelatihan pengembangan infrastruktur berkelanjutan yang dirancang untuk memenuhi kebutuhan UMKM Konstruksi, dengan penekanan pada penerapan Konstruksi Ramping. Pelatihan ini dirancang untuk meningkatkan kemampuan UMKM Konstruksi dalam mengidentifikasi dan mengatasi inefisiensi dalam proyek infrastruktur, memperkenalkan Konstruksi Ramping secara sederhana dan praktis, serta membangun kapasitas dalam pengambilan keputusan berbasis data. Berdasarkan hasil pelatihan, peserta mengalami peningkatan pemahaman dan keterampilan dalam menilai pengembangan infrastruktur berkelanjutan melalui pendekatan Konstruksi Ramping. Hal ini menunjukkan bahwa penerapan Konstruksi Ramping pada skala UMKM memiliki potensi besar dalam efisiensi operasi konstruksi, guna mendorong peningkatan daya saing UMKM Konstruksi, sekaligus sebagai upaya pemenuhan Sustainable Development Goals secara global.

Download


Figure 2: Number of publications in the past decade
Figure 3: Word cloud -the identified context related to construction workers well-being in rural areas
Rural Construction Workers' Well-Being: Past Insight and Future Research Pathaways

Social sustainability, a key aspect of the Triple Bottom Line (TBL), is often overlooked in construction, especially in rural projects, leading to inequalities in well-being. Challenges like labor shortages, demanding work, rapid urban growth, and an aging workforce highlight the need for greater focus on worker well-being, which is essential for sustainable development and aligns with global goals such as the UN's Goal 3 on good health and well-being. This study employs a systematic review and content analysis to identify key areas related to the well-being of construction workers in rural projects and to highlight opportunities for future research. A comprehensive search of top-ranked journals identified 27 research papers published in the past decade, revealing a significant gap in studies on rural construction workers. Most studies inadequately address rural characteristics, often focusing on migrant workers without fully exploring the diverse aspects of well-being. The findings suggest that well-being issues among rural construction workers are under-researched, despite their critical role in project success and the broader implications for economic growth. This review calls for targeted research on rural construction worker well-being, focusing on the specific context of the case study location and evaluating the impact of well-being on construction project success.



Model Pelatihan Kelayakan Finansial dan Pasar untuk UMKM Konstruksi dan Usaha Pendukungnya

June 2024

·

45 Reads

·

1 Citation

Sewagati

Studi Kelayakan adalah salah satu tahap dalam pengembangan proyek yaitu setelah tahap ide dan penyempurnaan ide melalui riset pasar. Ketika ide pengembangan proyek akan diujudkan diperlukan suatu keputusan apakah proyek tersebut memungkinkan untuk dikembangkan. Beberapa tinjauan diantaranya adalah aspek sistem dan teknologi, operasional, legal, pasar, dan finansial. Dalam menjalankan bisnisnya, sebuah perusahaan konstruksi akan membuat pertimbangan bisnis dan proyek berdasarkan tinjauan tersebut. UMKM memiliki kepentingan untuk meningkatkan pemahaman dan memiliki kemampuan kelayakan proyek dalam hal keunggulan kinerja. Kebutuhan untuk meningkatkan pengetahuan dan ketrampilan dapat dipenuhi melalui kegiatan pelatihan dan pengembangan. Pelatihan pengabdian masyarakat dan KKN mahasiswa ini dilakukan setiap tahun oleh Laboratorium Manajemen Konstruksi DTS ITS. Untuk tahun ini adalah pelatihan pengembangan pengetahuan dan ketrampilan studi kelayakan dengan tiga fokus bahasan utama adalah kelayakan pasar, finansial, dan studi kasus penyusunan. Ada 29 peserta dari 16 UMKM konstruksi dan usaha pendukungnya di Surabaya. Sebagian besar peserta adalah project owner. Pelatihan dilaksanakan dengan model problem-based learning. Diharapkan kegiatan dapat berkelanjutan dan menghasilkan rumusan kerjasama pengabdian masyarakat dalam jangka panjang melalui terdesiminasinya keilmuan kelayakan proyek bagi UMKM konstruksi di Surabaya.



Influencing factors of sustainable highway construction

September 2023

·

1,257 Reads

·

4 Citations

E3S Web of Conferences

The triple bottom line, which consists of the three pillars of the environment, society, and economy, must be balanced to achieve sustainable development. Integrating social, economic, and environmental aspects in construction projects is still a challenge. The construction industry tends to use non-renewable and unsustainable resources with energy values contained therein. One of the infrastructures that need to be considered in the concept of sustainable development is highway infrastructure. Highway infrastructure projects are quite complex because they involve a lot of resources, require a wider location, and significantly impact the community and the government. Environmental, social, and economic issues are just a few of the persistent issues that frequently surface during highway construction. Common environmental difficulties include water and energy consumption, road landscape issues, and wildlife conservation. Social issues are common in road projects and include issues with land acquisition, relocation, and worker comfort. Instead, bid prices and production costs that are elevated as a result of the usage of eco-friendly materials could cause economic issues. This study aims to investigate the TBL factors that influence the construction of sustainable roads and highways. A literature study is carried out by searching articles related to sustainable road projects. There are seven factors and 29 sub-factors for sustainable highway development, according to the literature review. Technology, project management, ecology, materials, government, community, and value system are the seven factors. These seven elements all contribute significantly, are interrelated, and are necessary for the realization of a sustainable highway.


Assessment of airport conditions in resilience efforts: A review

September 2023

·

179 Reads

E3S Web of Conferences

Airports, as one of the important transportation infrastructures in a country or region, play a role in the distribution of goods and people. This study aims to compile variables from a literature review to assess the condition of airport natural disaster preparedness. Airports have good resilience when facing natural disasters. This study compiles literature by collecting references from various sources, including journal articles, proceedings articles, and textbooks. So, there are nine factors, such as safety, infrastructure, passenger facilities, availability and performance, operational efficiency, service quality, and environmental sustainability. and thirty subfactors in assessing airport conditions in resilience efforts.



Fuzzy Logic Method To Manage The Risks Of Oil And Gas Pipeline Projects To The Environment

August 2023

·

50 Reads

IOP Conference Series Earth and Environmental Science

Pipes are one of the supporting infrastructures that are needed in oil and gas projects. However, oil and gas pipeline construction projects have very complex risks and have a major impact on the environment. On the other hand, environmental factors are one of the risk factors for oil and gas pipeline projects with a value of 14% [2]. The existence of risk factors that are not managed properly will have a negative impact that accumulates and causes a hazard. Therefore, an affective risk analysis method is needed. The purpose of this study is to analyze the risks of oil and gas pipeline construction projects to the environment using the Fuzzy Logic method based on data obtained from questionnaires distributed to Oil and Gas Cooperation Contract Contractors operating in East Java – Indonesia. The results of the analysis show that of the 20 (twenty) risk factors, there are 2 risk factors that are at a high level, namely financial performance risk with a value of 14.9 and contractor experience risk with a risk value of 14.9 and the fuzzy logic method are considered to be used as an effective reference in decision making, this can be seen from the results of the calculation of the accuracy value which shows that the risk analysis system for the environment is accurate with an accuracy value of 0.90 which means the accuracy level is very high.


Citations (39)


... Secara khusus, UMKM Konstruksi menyumbang sekitar 12% dari total PDB di sektor konstruksi. Meskipun mempunyai peran penting bagi pertumbuhan ekonomi Indonesia, UMKM Konstruksi menghadapi banyak hambatan yang mengakibatkan perusahaan menjadi sulit untuk berkembang atau bahkan mengalami kegagalan usaha pada kondisi ekstrim [2] . ...

Reference:

Pelatihan Pengembangan Infrastruktur Berkelanjutan Melalui Penerapan Konstruksi Ramping Skala UMKM
Model Pelatihan Kelayakan Finansial dan Pasar untuk UMKM Konstruksi dan Usaha Pendukungnya

Sewagati

... The optimization carried out by Cutting Optimization Pro Software is by reusing reinforcing steel with a length that meets the remaining cutting of reinforcing steel that has been used in other parts. [16]. The result of this software is the most optimal cutting pattern of reinforcing steel that can be used in daily fabrication. ...

Perbandingan Kombinasi Pemotongan Pembesian dengan Metode Manual Bar Bending Schedule dan Tekla Structures
  • Citing Article
  • September 2023

Jurnal Teknik ITS

... This process often involves specialized ramps or cranes to move vehicles from road to rail efficiently. Delays in loading and unloading can increase costs and reduce service reliability [25]. Therefore, the integration of automation systems in this process can further improve speed and safety, making ROLA more competitive than traditional transportation methods [26]. ...

Influencing factors of sustainable highway construction

E3S Web of Conferences

... Menurut Gusti (2015), metode matriks probabilitas-dampak merupakan matriks yang digunakan untuk memetakan probabilitas terjadinya risiko dan juga dampaknya pada tujuan proyek untuk menghasilkan level prioritas risiko dari yang tertinggi hingga terendah, lalu berdasarkan Standar Nasional Indonesia IEC/ISO 31010 (BSN, 2016), kelebihan dari metode ini adalah relatif mudah digunakan dan cepat untuk menyediakan peringkat risiko dalam tingkat kepentingan yang berbeda. Variabel risiko didapatkan dari studi literatur mengenai penelitian proyek sejenis, yaitu penelitian Trisanto & Wiguna (2012) serta Hartono & Wiguna (2023), lalu dilakukan pemilihan variabel yang sesuai dengan indikator penelitian dan karakteristik proyek transmisi paket 3 Sumatera. Pengumpulan data diperoleh dari kuesioner yang telah disebarkan kepada 30 responden yang terlibat langsung dalam proyek untuk mendapatkan nilai probabilitas dan dampak dari tiap variabel risiko dan juga menggunakan data-data proyek jaringan transmisi 500 kV paket 3 Sumatera. ...

Risk Analysis on The Construction Project of The 150 KV Bangkalan High Voltage Transmission Network
  • Citing Article
  • July 2023

Journal of Economics and Business UBS

... To overcome these problems, an inclusive approach, intensive training, provision of adequate resources, and the formation of a community that cares about sustainable development are needed. [9] MATERIALS AND METHODS The Mekarsari Boarding House Construction Project is located on Jln. Letjend Suprapto Gg.1 RT.01 RW.02 Bago Village, Tulungagung District, Tulungagung Regency. ...

Model Pelatihan Kelayakan Proyek Untuk UMKM Konstruksi dalam Pengembangan Usaha
  • Citing Article
  • March 2023

Sewagati

... There has not been much discussion related to this theme, so there is still very little research that discusses it. One research that is relevant to this topic is research from Sutantio et al. (2022) which examines a dynamic model to improve the social, environmental, and economic performance of sustainable construction for high-rise housing projects in developing countries. The simulation results according to this research reveal that current construction regulations and practices are not enough to reduce negative environmental impacts. ...

A System Dynamics Model of Sustainable Construction for High rise Residential Projects in Developing Countries: Case of Indonesia

The Open Civil Engineering Journal

... It should support and not endanger the occupants during evacuation. If a building can resist fire for a long duration, the success rate of evacuation for all occupants in building will be higher (Aminulwahyu, Wiguna and Adi, 2021). In general, the building structure of Hospital X consists of solid brick which can withstand fire for two hours. ...

Weighting The Fire Protection Systems Technical Requirements to Determine Flats Reliability Against Fire Hazards
  • Citing Article
  • March 2021

Journal of Infrastructure & Facility Asset Management

... Research and analysis were conducted on each cost component so that a cash flow of investment could be prepared for each alternative scheme (Nathanael & Indryani, 2023;Tenawaheng et al., 2021). Setting health service tariffs in regional public hospitals that accommodate referral services for the National Health Insurance (JKN) must pay attention to and be guided by the limits set by the Central Government policy. ...

Analisis Sensitivitas Investasi Apartemen Begawan

Jurnal Teknik ITS

... Although there is a lot of published literature that examines site layout planning problems, most works consider data fabricated using simulations and mathematical models (Alavi and Rizk, 2017;Binhomaid, 2019;El-Rayes and Said, 2009;Fadhlan et al., 2020;Hammad et al., 2016;Kim et al., 2021;Pradana, 2021;Sanad et al., 2008;Su et al., 2012;Tsegay et al., 2023a). A model (simulation or optimization) for construction site layout planning must comply with the rules used to create it. ...

Optimasi Penataan Site Layout pada Proyek Grand Dharmahusada Surabaya dengan Metode Logika Fuzzy AHP
  • Citing Article
  • January 2021

Jurnal Teknik ITS