G. Selstead’s scientific contributions

What is this page?


This page lists works of an author who doesn't have a ResearchGate profile or hasn't added the works to their profile yet. It is automatically generated from public (personal) data to further our legitimate goal of comprehensive and accurate scientific recordkeeping. If you are this author and want this page removed, please let us know.

Publications (1)


Cost overruns on state of Washington construction contracts
  • Article

January 1992

·

18 Reads

·

58 Citations

J. Hinze

·

G. Selstead

·

J.P. Mahoney

Citations (1)


... The analysis indicates that cost and time overruns do not vary by project size. This finding contradicts previous studies [56][57][58], which have suggested that project performance typically varies with size. However, the results are consistent with those of Cantarelli et al. [59], who noted that such conflicting results may be attributed to the small sample size of large projects in their study. ...

Reference:

Cost and Schedule Performance in Higher Education Construction Projects in Saudi Arabia
Cost overruns on state of Washington construction contracts
  • Citing Article
  • January 1992