Christian Munch-Petersen's scientific contributions

Publications (3)

Conference Paper
Full-text available
Femern A/S, the Owner of the coming Fehmarnbelt Fixed Link, has built a marine field exposure site in the harbour of Roedbyhavn as a part of the preparations for the coming 17.6 km long immersed tunnel between Denmark and Germany, which will be the longest combined rail and road tunnel to date. A total of 15 large concrete blocks (2 x 1 x 0.2 m) wi...
Conference Paper
Three concrete blocks instrumented with rebars, anode ladders and other sensors have been produced and exposed to sea water in Fehmam Belt field exposure site in Roedbyhavn in Denmark. The corrosion activity on the anode ladders is continuously monitored by measurements of half-cell potentials and linear polarisation resistance. The design of the i...