September 2013
·
8 Reads
Maintenance task scheduling during mission break is described as flexible resource constraint project scheduling problem, and flexible resource constraint maintenance task scheduling model is established. Since capability level of flexible resource is different, the thesis establishes maintenance task scheduling model considering capability difference. To resolve the model, a particle swarm optimization (PSO) algorithm based on activity list is presented. At last, a case study is present.