The local reactive power control in distribution grids with a high penetration of distributed energy resources (DERs) is essential in future power system operation. Appropriate control characteristic curves for DERs support stable and efficient distribution grid operation. However, the current practice is to configure local controllers collectively with constant characteristic curves that may not be efficient for volatile grid conditions or the desired targets of grid operators. To address this issue, this paper proposes a time series optimization-based method to calculate control parameters, which enables each DER to be independently controlled by an exclusive characteristic curve for optimizing its reactive power provision. To realize time series optimizations, the open-source tools pandapower and PowerModels are interconnected functionally. Based on the optimization results, Q(V)- and Q(P)-characteristic curves can be individually calculated using the linear decision tree regression to support voltage stability and provide reactive power flexibility and potentially reduce grid losses and component loadings. In this paper, the newly calculated characteristic curves are applied in two representative case studies, and the results demonstrate that the proposed method outperforms the reference ones suggested by grid codes.
Content may be subject to copyright.
Article
Time Series Optimization-Based Characteristic Curve
Calculation for Local Reactive Power Control Using
pandapower-PowerModels Interface
Zheng Liu 1, *, Maryam Majidi 2, Haonan Wang 3, Denis Mende 1,3, and Martin Braun 1,3
1 University of Kassel, Wilhelmshöher Allee 71-73, 34121 Kassel, Germany
2 SMA Solar Technology AG, Sonnenallee 1, 34266 Niestetal, Germany
3 Fraunhofer Institute for Energy Economics and Energy System Technology, Joseph-Beuys-Straße 8, 34117 Kassel, Germany
* Correspondence: zheng.liu@uni-kassel.de
Abstract: The local reactive power control in distribution grids with a high penetration of distributed energy resources
(DERs) is essential in future power system operation. Appropriate control characteristic curves for DERs support stable
and efficient distribution grid operation. However, the current practice is to configure local controllers collectively
with constant characteristic curves that may not be efficient for volatile grid conditions or the desired targets of grid
operators. To address this issue, this paper proposes a time series optimization-based method to calculate control
parameters, which enables each DER to be independently controlled by an exclusive characteristic curve for
optimizing its reactive power provision. To realize time series reactive power optimizations, the open-source tools
pandapower and PowerModels are interconnected functionally. Based on the optimization results, Q(V)- and Q(P)-
characteristic curves can be individually calculated using the linear decision tree regression to support voltage stability
and provide reactive power flexibility and potentially reduce grid losses and component loadings. In this paper, the
newly calculated characteristic curves are applied in two representative case studies, and the results demonstrate that
the proposed method outperforms the reference ones suggested by grid codes.
Keywords: characteristic curve; optimal power flow; distribution grids; voltage stability; reactive power flexibility
1. Introduction
1.1. Motivation
Power systems worldwide are increasing in complexity due to the increasing penetration of distributed energy
resources (DERs). In Germany, the existing and to-be-implemented DER are, with the majority of 97%, installed at the
distribution and sub-transmission levels [1] that can be controlled, monitored, or analyzed by the power system
operators [2]. The rapid increase in DERs can cause power system instabilities[3] [3], such as system inertia reduction
[4], transmission congestion [5], overloading, and voltage problems [6] in distribution grids. In particular, (static)
voltage stability is one of the main concerns of the system operators [7]. This is currently largely implemented via grid
reinforcement and, operationally, via intentional stepping of transformers, voltage controller (e.g., voltage-related
redispatch), and the provision of reactive power [8]. In the past, reactive power has been supplied primarily by
conventional power plants and reactive power compensators [8]. However, the rapid development of power electronic
technologies has made it possible to utilize DER to provide reactive power. As the increasing transport distance and the
decreasing of conventional power plants in transmission grids, the available potential of the reactive power from DERs
in the high voltage (HV) grid could also be used to provide flexibility to the superordinate grid levels [9], in addition to
its common usages, e.g., for local voltage stability.
The efficiency of reactive power provision from DERs is determined by the applied control strategies. In general,
the reactive power provision can be controlled centrally and locally. Central control strategies depend on the
communication infrastructure for collecting real-time grid information, processing them, and controlling the DERs [10].
In the past few years, technological advancements and the growth of intelligent grid management and monitoring
systems have facilitated the communication capabilities of some high and medium voltage (MV) levels [11, 12]. With
central control, e.g., centralized reactive power optimization, the optimal reactive power setpoints for each DER can be
Disclaimer/Publisher’s Note: The statements, opinions, and data contained in all publications are solely those of the individual author(s) and
contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting
from any ideas, methods, instructions, or products referred to in the content.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
© 2023 by the author(s). Distributed under a Creative Commons CC BY license.
calculated in real-time to achieve objectives such as supporting the reactive power balancing at the distribution to
transmission interface or maintaining the voltages of certain buses. Unlike central strategies, local control strategies
avoid the need for a communication channel and therefore are very commonly used at medium and low voltage levels
due to simplicity, high computation efficiency, and strong reliability, which is suitable for an almost real-time response
to grid condition changes. Local controls are often realized as fast feedback control systems based on autonomous
control characteristic curves, e.g., Q(V)- (VAr-Voltage-) droop curves or Q(P)- (VAr-Watt) characteristic curves. They
can serve as a backup for failures in central control or as a bridging solution for grid operators without modern grid
monitoring systems.
As can be seen, the applied characteristic curves determine the efficiency of the local reactive power provision from
the DER. However, in almost all the German distribution grids, the characteristic curves for DERs are configured
collectively with ordinarily constant parameters suggested by grid codes, such as VDE-AR-N 4110 [13]. The
effectiveness and the benefit of the characteristic curves are limited since, most of the time, the resulting reactive power
provision does not match optimal the condition of the distribution grid. For this reason, the development of a method
to calculate an optimal characteristic curve for each DER is well worth studying.
1.2. Literature Review
In Q(P)-control mode, the proportionality factor between the target reactive power and the installed active power
is changed with increasing active power injection. As Figure 1 (a) demonstrates, during a low injection of active power,
a small amount of reactive power is provided, and with a higher injection of active power, a larger percentage of
inductive reactive power should be provided by the DER. According to the grid code VDE-AR-N 4110 [13], the Q(P)-
characteristic curve is defined by a maximum of ten break points. Grid operators specify the breakpoints to achieve
objectives while meeting the technical requirements, e.g., all the points must be located within the Q(P) operational area
defined by the grid code, see Figure 1 (c). In this paper, the generation-based signing system is used, i.e., positive
reactive power provision means that the DER is over-excited and provides capacitive reactive power (or supplies
reactive power to the grid). Table 1 lists the configurable parameters for Q(P)-characteristic curves.
0.0
Q in p.u.
P in p.u.
Q
max
Q
min
1.0
under-
excited
over-
excited
m
breakpoin ts
0.1
V in p.u.
Q in p.u.
Q
max
Q
min
under-
excited
overexcited
m
m
V
ref
breakpoin ts
V
dbd,low
V
dbd,high
0.0
0.1 0.2
-0.33
0.0 1.0
0.33
allowed Q(P)
operational area
Q in p.u.
P in p.u.
-0.1 0.1
over-exc ited
under-exc ited
(a) (b) (c)
Figure 1. Exemplary characteristic curves for DER providing reactive power (a, b) and Q(P) operational area according to
VDE-AR-N 4110 (c).
Table 1. Configurable parameters and their limitations for Q(P)-characteristic curve according to VDE-AR-N 4110 [13].
Parameter Determination/Limitation
Limits of reactive power provision:
,
Determined by grid code: [
−0.33
,
0.33
]
Limits of active power:

Determined by grid code:
 0.1
Number of breakpoints:
10
The Q(V)-control uses the local voltage information, which depends on power production and consumption in the
neighborhood, and the grid impedance at the network connection point. The corresponding reactive power provision
aims to support voltage stability, i.e., keeping voltage within a specific bandwidth. Figure 1 (b) shows a generic
characteristic curve for the Q(V)-control, where  and  are the limits of the reactive power provision defined
by grid codes. The reference voltage  denotes the voltage setpoint. At this voltage, reactive power is neither injected
(over-excited) into the power grid nor absorbed (under-excited) by the DER. The voltage , and , indicate
the voltage range. Reactive control is not executed in the voltage deviation within the dead band for efficient operation
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
of DERs, sparing the reactive power provision. The slope presents the droop of the characteristic curve. Table 2 lists
the configurable parameters for Q(V)-characteristic curves.
Table 2. Configurable parameters and their limitations for Q(V)-characteristic curve according to VDE-AR-N 4110 [13].
Parameter Determination/Limitation
Limits of reactive power provision:
,
Determined by grid code: [
−0.33
,
0.33
]
Reference voltage value:

Determined by grid operators: e.g., 1.01 p.u.
Dead band:
,,,
within bounds [
±0% ,±5% 
]
Slope:
5 16.5
Number of breakpoints:
10
To find the best configuration setting for the characteristic curves, research has been done to modify the
controllable parameter to improve the grid stability. Table 3 shows the research carried out in recent years. The
parametrization for the Q(V)- and Q(P)-characteristic curves were modified for voltage stability (VS) and power loss
minimization (PLM). However, these methods have the following constraints:
1. Evolutionary algorithms and iterative simulations were often used to obtain the proper parameters. A
generalized approach using classical optimal power flow was missing, which is more familiar to power
system engineers.
2. In these studies, the control parameters were not discussed systemically. Only one or a limited number
of parameters were considered. The others used standard settings.
3. The design of the Q(P)-characteristic curve was mentioned relatively rarely. This may make a
significant contribution to objectives with suitable configuration.
4. As mentioned in section 1.1, in addition to supporting VS and PLM, reactive power provision from
DER in distribution grids can be also used to support the reactive power balancing (provide reactive
power flexibilities) at the distribution-to-transmission interface and to enable the desired ancillary
services at the up-streamed transmission level. The corresponding characteristic curves are hence worth
studying. However, this has not been considered.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
Table 3. Modification of control parameters for local reactive power control.
article type objecti
ve

dead
band slope breakp
oint
power
factor description/comments
[14]
Q(P)
Q(V)
VS ---
--- ---
This method is used to optimize the control parameters for different grid areas separately with
heuristic approaches (Genetic algorithm (GA), Downhill-Simplex/Nelder mead, Golden Section
Search).
[15] VS --- --- --- ---
An analysis method is proposed to improve the PV hosting capacity by the modification of the power
factor (
min,
max).
[16] PLM
--- --- --- --- To reduce the power loss, the reference setpoint location is analyzed, considering the PV penetration
rate and the weather conditions.
[17] VS --- ---
--- --- The P(V)-control and the Q(V)-control are combined, considering active power curtailment.
[18]
Q(V)
PLM ---
--- ---
According to the daily clearness index and the daily variability index, the grid condition (with high
PV penetration) is classified into five types. For each grid condition type, the best dead band and
slope in terms of power loss are determined by varying over ranges.
[19] PLM
--- --- --- Particle Swarm Optimization is used to optimize the control parameter. The grid states, e.g., power
loss, are represented by revenues and measurements from DSO and customers.
[20] Q(V) VS
--- --- --- --- Using a three-phase optimal power flow, the voltage reference point of the Q(V)-curve is optimized.
[21] Q(V) VS --- ---
--- --- The use of GA is proposed to optimize the slope of the Q(V)-curve for grids with high penetration of
PV.
[22] Q(V) VS --- --- --- --- --- The steady-state voltage error is considered
[23] Q(V) VS
--- --- --- ---
Using sensitivity analysis, the setting of the dead band that satisfies the voltage maintenance standard
for two special disturbances in transmission systems is addressed.
[24] Q(V) VS ---
--- ---
The paper proposes a two stages method based on GA and ANN to adapt the control parameters of
Q(V)-curve. The ANN aims to develop a fitting function correlating the Thevenin impedance at the
PCC and optimal control parameters obtained from the GA optimization.
[25] Q(V) VS --- ---
--- The conventional Q(V)-curve is divided into multi sections to compensate for reactive power,
minimizing the power loss actively. The sections are determined by GA.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
1.3. Contribution and Organization
In our previous work [26], a method based on time series optimization was proposed. The
method utilized an artificial neural network- (ANN-) based optimization proposed by [27] to estimate
reactive power setpoints of DERs for maintaining the predefined voltage value. According to the
distribution of ANN-estimated QP-operating points for a specific period, individual Q(P)-
characteristic curves for each DER can be fitted by the polynomial regression and modified as
characteristic curves for local reactive power provision. However, the previous method has some
limitations:
1. The ANN-based time series optimization (or estimation) needs low computational
resources. Its drawbacks are obvious, i.e., it is highly subjective-dependent, and a lot
of time needs to be devoted to pre-training and parametrization. It is inefficient for
short-term time series optimization.
2. Using polynomial regression to determine the characteristic curve (a continuous
piecewise line: multiple segments connected by breakpoints) is not an efficient
method. Firstly, we need to carefully select the polynomial degree based on the data.
Secondly, the result is typically a single curve. This can make it challenging to
identify the breakpoints necessary for the characteristic curve.
3. Only the Q(P)-characteristic curve for voltage stability was considered.
4. Lack of automatization and generalization.
This method is further developed by implementing the following improvements and extensions:
1. An implemented open-source tool is applied and further developed, enabling the
users to create custom mathematical optimization models for time series
optimization in power systems. For this paper, additional models for reactive power
optimization are implemented, applied, and released in github.
2. The previous method is extended to Q(V)-characteristic curve calculations,
considering dead band settings.
3. The decision tree method is used for linear regression, with which a continuous
piecewise line can be efficiently calculated as a characteristic curve.
4. Q(P)- and Q(V)-characteristic curves for the observed grids can be individually
calculated, supporting maintaining voltage stability, reactive power flexibility
provision, loss minimization, and loading reduction.
These developments are implemented as a module with automated parametrization, calculation,
simulation, and evaluation. For this paper, comprehensive simulations are carried out, considering
voltage stability and transmission to distribution cooperation. To validate the advantages of the
optimized characteristic curves, their performance is compared to the reference ones suggested by
grid codes.
The structure of this paper is organized as follows: In Section 2, the features and functionality of
the proposed method for an individual characteristic curve calculation are described. Subsequently,
the developed tool for power system optimization is introduced in Section 3. Section 4 performs two
case studies to evaluate the proposed method. Finally, in Section 5, conclusions are drawn.
2. Characteristic Curve Calculation for Local Reactive Power Control
2.1. Method Overview
Figure 2 shows an overview of the method. In the following, the inputs, outputs, and three
calculation processes are shortly outlined.
Input Data: The grid data and modeling are performed in the pandapower [28] format. The aim
of the calculated characteristic is to address the time-varying grid condition, which is featured by the
corresponding time series. Thus, time series data for loads and generations for an interesting time
window is indispensable. Users can calculate different characteristic curves for various targets by
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
defining the curve type (Q(P) or Q(V)) and the objective, such as maintaining voltage-setpoints and
maintaining reactive power-balancing. In addition, optional parameters such as “dead band” and
“setpoints” can be configured.
Time Series Optimization: Based on the given input data, an optimal power flow problem with
reactive power-setpoints of DER as variables is solved for each time step. For this, pandapower with
PowerModels [29] provides a convenient solution. As optimization results, optimized reactive power-
setpoints of DER are calculated for each time step and form the optimized operating points.
Linear Regression: With these optimized operating points, a scatter diagram can be created
individually for each DER. The optimal Q(P) or Q(V) relationship for each DER is then approximated
using the linear decision tree regression. It is used in expectance of a better performance compared
to the conventional Q(P)- or Q(V)-characteristic curve regarding a predefined objective.
Verification and Modification: The optimized Q(P)-or Q(V)-relationships for each DER have to
pass the acceptance tests to meet the technical requirements of the grid codes; otherwise, the
coordinates (position) of some breakpoints can be modified, for avoiding steep slopes. In this case,
the regressed characteristic curve might no longer fit the operating point distribution completely and
therefore might no longer be optimal in the sense of an optimization. The final Q(P)- or Q(V)-
characteristic curve is then determined.
Output Data: A list of optimized (Q(P) or Q(V)) coordinates for DER are exported as the output
data and can be directly applied for further simulation and analysis.
Input Data
Grid Model
branch impedance
load distribution
generation and DER
Time Series
load
DER
generator
Curve Type
Q(P)
Q(V)
Objective
maintaining V-setpoints
maintaining Q-setpoints
minimizing power losses
Time Series
Optimization
Linear
Regression
Parameter Determination
modified coordinates
permitted slope
permitted Q capacity
Verification &
Modification
Formulation
variable (Q)
constraints
objective
Transform in PowerModels
grid model
setpoints
time series
Execution and Results
run optimization
convert results to
pandapower
Optional Parameters
dead band
setpoint values
control mode
Data Screening and Regression
grid model
optimal QP or QV setpoints
decision tree regression
Ouput
Data
Coordinates for Target Curve
x-coordinates (V or P)
y-coordinates (Q)
excel or json file
Q
P
Q
P
optimized
coodinates
for char.
curve
Figure 2. Overview of the proposed method for characteristic curve calculation for local reactive power
control.
In the following sections, some of the assumptions, features, and functionalities of the proposed
method are introduced in detail.
2.2. Continuous Piecewise Linear Fitting
The characteristic curve is a continuous piecewise line with breakpoints representing the
termination points of line segments. This section describes the fitting of continuous piecewise linear
functions from the optimized operating points.
For curve fitting, linear regression is usually the first algorithm that comes to mind. It is a linear
model and works effectively when the data has a linear shape. However, if the data has an aperiodic
non-linear shape and the dataset is limited, linear regression cannot capture the non-linear features.
Polynomial regression is one of the most popular choices for approximate non-linear features. To
accurately fit the data points with a polynomial curve, careful design is required, i.e., this involves
the user having a solid understanding of the data, enabling them to make informed decisions when
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
selecting the most appropriate exponents. The fitting curve is prone to overfitting if exponents are
poorly selected [30]. To find the best continuous piecewise line from the optimized operating points,
the difficulty is finding the best location of the breakpoints. Neither linear regression nor polynomial
regression can solve this problem. In this context, a machine learning algorithm “decision tree” is
used in this paper.
Decision trees are a non-parametric supervised learning method used for classification and
regression [31]. They capture the nonlinearity in the data by splitting them into smaller segments in
a way such that the sum of squared residuals is minimized. Each segment corresponds to a decision
or a leaf of the tree. One of the variants of the decision tree is called the linear tree. This implies having
linear models in the segments instead of a simple constant approximation. As a result, the linear tree
model makes the final fitting curve piecewise, continuous, locally linear, and globally non-linear,
which fits the conditions for a characteristic curve.
X1 X3 X4X2
Operting points
(samples)
Training
decision tree model
Decision tree model
Figure 3. Example for finding optimized Q(V)-relationship with linear tree model. Left: optimized
Q(V)-relationship based on resulting operating points; Right: architecture of the trained linear tree
model.
Based on the python package linear-tree [32], a fitting function for the proposed method was
developed in this paper. Figure 3 shows an example of finding the optimized Q(V)-characteristic
curve. A linear tree model is trained by the given data (blue points in Figure 3). The red piecewise
line presents the fitting characteristic, whose breakpoints (x-locations: and ) correspond to the
conditions in the tree model (right). and can be a user- defined period, e.g., [0.9, 1.0]. The
optimized y-coordinates are determined by calling the trained tree model for the inputs (,
,
,
). The losses in the plot on the right express the residuals between the operating points and the
regressed segments (red lines).
In general, the Q(V)-characteristic curve tends to divide the distribution of the voltage into two
parts, centered on . The part greater than  is called the over-voltage part ([, 1.1]), and the
part below ref refers to the under-voltage part ([0.9, ]). The curves in these two parts are normally
symmetrical according to , cf. Figure 1. However, during the operation of real distribution
systems, the span of the bus voltage distribution for a time window is often small, i.e., most of the
bus voltages can be located only in the over-voltage part or in the under-voltage part, e.g., the bus
voltages in Figure 3 are all located within the under-voltage part ([0.9,  ]). In this case, the
proposed model estimates the other part of the Q(V)-characteristic curve using the principle of
symmetry. Figure 4 shows the estimation for the calculated Q(V)-characteristic curve in Figure 3. The
fitting curves for both parts are symmetric around the -axis. Considering the grid code limits
(e.g., −0.328 p.u. < < 0.328 p. u.), they are further modified, and the final Q(V)-characteristic curve
(solid red line) is unsymmetric. It is noting that this DER provides also a small amount of inductive
reactive power ( < 0) when the voltage is lower than . It is caused by the objective function and
optimization settings and is explained in the following sections.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
If there are enough points in both over-voltage and under-voltage parts, the characteristic curve
is still calculated based on the distribution of points, and it can be asymmetrical.
over-voltage partunder-voltage part
grid code limits Q<=0.328 p.u.
grid code limits Q>=-0.328 p.u.
V
ref
= 1.0 p.u.
over-
excited
under-excited
Figure 4. Schema for symmetric estimation of Q(V)-characteristic curve.
Figure 5 suggests the suitable range for choosing the reference value  for each voltage level
without voltage controllers. For a generator-dominated grid, a reference value below 1.0 p.u.
probably would be more appropriate. In contrast, for a load-dominated grid, a reference value above
1.0 p.u. (e.g. 1.03 p.u.) might be favorable. For this paper,  = 1.0 is used in case studies.
Permissible voltage range
according to DIN EN 50160
Figure 5. Voltage band in accordance with EN 50160 without controllable transformers, adapted from
[33].
2.3. Objective Functions
As mentioned in section 1, DERs can provide reactive power for objectives like supporting
voltage stability or reactive power balancing at the grid interface. Correspondingly, the optimization
models - maintaining voltage-setpoints and maintaining reactive power-setpints – are formulated.
Maintaining Voltage-Setpoints: Grid operators want to preserve a consistent voltage profile across
all/part of the buses in the power system. The applied optimization, in this case, should help both of
them to identify the preferable set of actions and to achieve the desired profile. The objective is to
minimize the deviation of the voltage magnitude at the DER bus from a setpoint. The resulting
reactive powers enable the setup of Q-related characteristics to guarantee the resilience of local
voltage. The general formulation of the objective function and the numerical and technical constraints
are represented as follows:
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
sets:
− buses
generators (or DER)
loads
branches
variables:
∀ − voltage magnitude
∀ − voltage angle
∀
reactive power of DER
min:  = (
)
∈ 
(1)
subject to:
ac power flow
= diag(
)


(2)
branch current

→,
,
∀(, )

→,
,
∀(, )
(3)
voltage magnitude
, , ∀
(4)
voltage angle
, , ∀
(5)
gen. reactive power
, , ∀
(6)
gen. active power
= , ∀
(7)
load apparent power
= , ∀
(8)
where
 is the vector of complex voltages,
 is the complex bus admittance matrix,
is
the vector of complex power fed in by the generators (DER), and
is the vector of complex loads.
The active power of the DERs and the loads are constant, and they are formulated as equality
constraints.
is the local bus voltage magnitude at the generator bus. The quadratic objective
function, in this case, helps minimize both the positive and the negative deviations of the voltage
from the desired setpoint. Since all DERs are taken into account collectively during the optimization
process, the optimized reactive power provision of DER contributes not only to its local voltage but
to the voltages of all considered DERs. Thus, the subsequently calculated characteristic curve can be
regarded as “decentralized” or “distributed” control to some extent [34].
Considering the dead band setting, in this paper, the objective function and constraints are
modified. The predefined dead band can divide the voltage distribution into two areas, i.e., inside
the dead band and outside the dead band. DERs whose voltage is inside the dead band zone will not
provide reactive power (see step 1 in Figure 6). On the contrary, the reactive power of DERs whose
voltage is outside the dead band zone will be considered as optimization variables. For the
corresponding buses, the setpoints are set to , (e.g., 1.03) and , (e.g., 0.97) (see step 2
in Figure 6). Compared to 1.0 p.u., , (e.g., 1.03) is more approachable, and the required
reactive power is, thus, less. These modifications in steps 1 and 2 achieve a dead band setting and
save the reactive power provisions, but they also limit the optimal solution to a certain extent, i.e.,
the voltage will be regulated in a limited way.
To further save the reactive power provision, in step 3, the objective function is extended by
adding the minimization of reactive power provisions. Two sub-objectives in step 3 are connected
through coefficient and , with += 1. An analysis of different coefficient combinations is
presented in the following case studies, e.g., Figure 13.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
Optimization for one time step
Set de finition and constra int modifications
Objective funct ion
Optimization results
:  =
V

,setpoint
2
 ∈
outside
+
Q

0
2
 ∈
outside
next time step
outside
– DERs whose voltage is outside [
dbd,low
,
dbd,high
]
inside
– DERs whose voltage is inside [
dbd,low
,
dbd,high
]
Setpoint modifications
if 
>
dbd,high
:
,setpoint
=
dbd,high
∀
outside
if 
<
dbd,low
:
,setpoint
=
dbd,low
∀
outside
1
2
3
,max
=
,min
= 0 ∀
inside
,min
=
dbd,low
∀
inside
,max
=
dbd,high
∀
inside
Set:
Constra int
modifications:
v in p.u.
dbd,high
(e.g., 1.03)
dbd,low
(e.g., 0.97)
Figure 6. Modifications considering dead band setting and saving reactive power provision.
Maintaining reactive power-setpoints: The motivation for this objective is the provision of
reactive power flexibility from the distribution system to the transmission system. The deviations of
reactive power injection at the interface from a target value are minimized. It is formulated by
equation (9) (The sets, variables, and operating constraints refer to the mathematical formulation for
the objective of maintaining voltage setpoints):
min:  = ( )
(
9
Except for maintaining voltage-setpoints and reactive power-flexibility, optimization models for
power loss minimization and branch loading reduction are implemented and can be used for the
proposed method. Nevertheless, this paper only focuses on the application of the introduced
objectives.
2.5. Update Frequency
Due to the time-varying power system, it is supposed that the reactive power dispatch or the
update of the characteristic curve calculation is periodically scheduled. As the overview describes,
the optimized characteristic curve is calculated based on the given time series. If short-term time
series are used, e.g., using daily time series (day-ahead forecasting), frequent updates of control
settings are possible. However, it would be time-consuming for the grid and DER operators (in some
distribution grids, DER is still configured manually). Additionally, a short-term time series means
that only a few optimized operating points are available for characteristic curve fitting and therefore
it is susceptible to extreme values. Hence, it can be assumed that an update within these short periods
is not advisable.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
Also, medium- and long-term updates according to monthly or annual time series (e.g., the
historical data of last year) are considerable. In this case, time series deviations1, e.g., forecasting
errors or uncertainties, directly influence the distribution of optimized reactive power-setpoints for
each DER. The finally calculated characteristic curves are, anyway, approximated piecewise linear
fitting curves, and the forecast errors can be assumed to be of the order of the approximation error or
even lower and, hence, have fewer negative effects. This has been validated in [6]. With medium- and
long-term timer series, grid operators don’t have to update the characteristic curve parameter
frequently. In this paper, calculations and simulations are performed within a time window of three
months.
3. Optimization Tool: Interface between pandapower and PowerModels
To execute a time series optimization, a convenient optimization tool is required. In the past, a
variety of tools for power system analysis and optimization were published and made available, in
particular within the Open-Source community. The advantage of Open-Source software is that it
allows unlimited sharing of developments and unlimited verification of models.
3.1. pandapower and PowerModels
Pandapower [28] is a program designed to automate analysis and optimization in power systems,
utilizing a combination of the data analysis library pandas [35] and the power flow solver PYPOWER
[36]. The pandapower library validated equivalent circuit models for lines, transformers, DER,
generators, switches, etc., and provides the most commonly used static network analysis functions,
including power flow calculation, times-series simulation, short-circuit analysis, state estimation,
grid equivalent, etc. To solve the classic AC and DC optimal power flow challenges in power systems,
pandapower has integrated its element-based data structure with the power flow optimization
environment PYPOWER, dealing with cost-related optimization problems such as dispatch
optimization and load shedding. Until April 2023, there have been over 350,000 downloads of
pandapower. It has been used for various projects and investigations by grid operators and research
institutes worldwide.
PowerModels [29] is a Julia/JuMP [37, 38] package for steady-state power system optimization. It
enables computational evaluation of power system models with a focus on decoupling problem terms
from the different formulations. Core problem specifications in PowerModels are power flow,
optimal power flow, optimal transmission switching, and transmission network expansion planning.
Users interested in alternative objectives, such as the reactive power optimizations discussed in this
paper, can utilize PowerModels to build customized problem specifications.
3.3. PandaModels
As mentioned above, pandapower is becoming more and more popular for power system
analysis, but it can only deal with cost-related optimization issues. PowerModels is especially strong
in solving different power-flow formulations but doesn’t provide many pre-implemented models for
custom objectives. It can serve as the basis for further development. In this context, we have
developed an interface called PandaModels (combining pandapower and PowerModels) as described
in [39]. However, it has not yet been applied in published case studies. This interface enables a stable
and functional connection between pandapower and PowerModels, and also extends the available
models for reactive power optimization. As Figure 7 shows, a conversion from the pandapower format
to the PowerModels format is enabled by the pandapower-PowerModesl (PP-PM) converter. After the
optimization in PowerModels, the PP-PM converter transforms the optimization results back to the
original pandapower grid model, which can be used for further analysis.
1 Time series deviation: deviations between the time series used for characteristic curve calculation and the real
consumption and fed-in measured by grid operators.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
PandaModels
run custom/existing
optimzation models
JuliaPy (OPT model)
JSON file (grid para.)
JuliaPy (OPT results)
additional
OPT model bank
PM
PP
all existing models
can be called
Figure 7. General schema of PandaModels.
The most important feature of PandaModels is that it extends the optimization models. Except for
the existing PowerModels-models, the optimization model to support voltage stability, such as
equations (1)-(8), has been implemented [39]. For this paper, the optimization model for multi-
objectives as shown in Figure 6 is implemented. In addition to this, optimization models with
objectives including provision of reactive power flexibility (as described in equation (9)), power loss
reduction (as described in equation (10)), and loading reduction (as described in equation (11)) are
implemented. In (10), the total losses along a branch - are equal to the apparent power  leaving
bus minus the apparent power  arriving bus . Equation (11) shows the objective function for
branch loading reduction, which minimizes the deviation of the current of target branches (lines or
transformers) from zero. The variables and operating constraints refer to the mathematical
formulation in section 2.3.
:  =

+

(,)∈ 
(10)
:  = (
→,
0)
(,)∈ 
(11)
All of the implemented optimization models can be accessed through their corresponding
functions in pandapower. The released tutorials2 demonstrate how users can use these models to solve
optimization problems in power systems. Based on this knowledge, users can define custom
objectives by adding models in the model bank.
One of the advantageous features of PowerModels is its ability to solve multi-grid optimization
problems. This paper uses this capability to address time-series optimization for a specific grid model
by substituting the “multi-grid” component with a “multi-time step of one grid” approach, as
depicted in Figure 8. The time series configuration is compatible with the time series controller in
pandapower. Alternatively, a more direct way is that users can perform time series optimizations
iteratively through a loop.
2https://github.com/e2nIEE/pandapower/blob/develop/tutorials/pandamodels_reactive%20power%20optimiza
tion.ipynb
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
Figure 8. Modification of multi-grid optimization in a time-sequential manner for time-series
optimization
4. Case Studies
Based on the power system analysis tool pandapower with the parallel high-performance
computing solver [40], this section applies and tests the developed method with different grids and
scenarios for various objectives. In the first case study, Q(P)- and Q(V)-characteristic curves (without
dead band) are calculated for voltage stability. Subsequently, regarding the saving of unnecessary
reactive power provision, the dead band for Q(V)-characteristic curve is considered, and its effect is
analyzed. In the second case study, the proposed method is applied to support the Q-balancing or -
flexibility at the TSO-DSO interface.
As discussed before, a three-month time series for loads and DERs are used for the time series
optimization and the simulative grid operation, see Figure 9. According to [41, 42], a quarter ahead
forecasting errors are considered in the optimization phase, see Table 4, where is the actual active
power injection (DERs) or consumption (loads). The performance of the newly calculated
characteristic curves is compared to the reference ones based on time series simulations without
forecasting errors.
+
quarter ahead
forecasting errors
original time series
(three months)
proposed method
(time se ries optimization)
grid model, curve type, objective
and other inputs individually calculated
character istic c urves
grid ope ration
(time series simulation) evaluations
collectively
configured reference
character istic curves
Figure 9. Flowchart for case studies.
Table 4. Parameter for the quarter ahead forecasting error generations, according to [41, 42].
DER type Normal distribution parameters: mean; standard deviation
PV
5.1% ; 4.3%
Wind
10.8% ; 3.8%
Load
;9.3%
4.1 Characteristic Curve Calculations for Voltage Stability
In the first case study, the proposed method is applied for voltage stability by maintaining the
voltage setpoints. A real German 20 kV distribution grid 475 buses, 112 loads (total load of 12.19
MW), and 126 DERs (total nominal injection 22.61 MW, 50 DERs are controllable) of the grid
operator LEW Verteilnetz GmbH is used as the test grid, see Figure 10 (a). The time series profiles are
generated according to the local weather data from [43] in 15-min resolution over one year. To display
the advantages of individually calculated characteristic curves, conventional fixed cos- (fixed
Q(P)), Q(P)- and Q(V)-characteristics, as shown in Figure 10 (b) are considered as references.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
-0.32 8
P in p.u.
1.0
0.0
Q in p.u.
Q in p.u.
V in p.u.
0.96
1.04
-0.328
0.328
under-
excited
over-
excited
under-
excited
fixed Q(P)
Q in p.u.
V in p.u.
1.03
-0.328
0.328
over-
excited
0.97
1.070.93
under-
excited
(a) (b)
Figure 10. (a) Schematic geographic visualization of the test grid; (b) reference characteristic curves
used for evaluation.
4.1.1 Characteristic Curve Calculation and Simulations
The optimization model in section 2.3 with objective function min:  = (
1.0)
∈  is used
to minimize the deviation of DER bus voltages from 1.0 p.u. Q(V)-characteristics curves are calculated
without dead band settings. Figure 11 (a) shows the calculated Q(P)-characteristic curves for two
exemplary DERs. All optimized operating points are located within the operational area defined by
the grid code German VDE-AR-N 4110 [13]. DER A presents essentially inductive features while the
operation of DER B changes from under-excited to over-excited with increasing active power feed-in.
This significant difference is caused by the local conditions and the objective function settings.
According to the objective function = (
1.0)
∈  , all DERs contribute together (with under-
excited Q or over-excited Q) to maintain all the DER bus voltages at 1.0 p.u.
Figure 11 (b) displays the Q(V)-characteristic curves for DER A and B after modifying the curve
type. In comparison to the Q(P)-characteristic curves on the left, the x-coordinates (voltage) cover
only a portion of the entire [0.9, 1.1] range. As a result, the two Q(V)-characteristic curves appear
relatively similar. It is worth noting that the slopes for Q(V)-characteristic curve must be restricted to
16.5 and may not accurately reflect the distribution well, as seen in A-QV.
Q(P)-control
Q in
p.u.
0.0
-0.1
-0.2
-0.3
0.1
0.2
0.3
under-excited over-excited
operating point optimized charcteristic curves grid code limit
0.0 0.2 0.4 0.6 0.8 1.0
P in p.u.
A-QP B-QP
under-excited over-excited
0.0 0.2 0.4 0.6 0.8 1.0
P in p.u.
Q(V)-control
Q in
p.u.
0.0
-0.1
-0.2
-0.3
0.1
0.2
0.3
under-excited over -excited
A-QV
0.9 0.95 1.0 1.1
V in p.u.
1.05
0.4
B-QV
under-excited over -excited
0.9 0.95 1.0 1.1
V in p.u.
1.05
operating point optimized charcteristic curves
>16.5
<=16.5
fitting curve
(a) (b)
Figure 11. Calculated Q(P)-characteristic (left) and Q(V)-characteristic (right) curves of two
exemplary DERs for supporting voltage stability.
The individually calculated (or optimized) characteristic curves are assigned to all 50
controllable DERs, while the reference characteristic curves are configured collectively. Based on time
series simulation, the results are evaluated in Figure 12. Table 5 defines the simulations with different
characteristic curves.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
Table 5. Description of time series simulation and applied characteristics.
Simulation ID Applied characteristic curves
Q0 (reference) No controller
QPf (reference) Fixed Q(P) (cf. Figure 10)
QP (reference) Q(P) (cf. Figure 10)
QV (reference) Q(V) (cf. Figure 10)
QPopt Individually calculated Q(P)
QVopt Individually calculated Q(V)
OPT Results directly from time series optimization
QVdbd (reference) Q(V) with the dead band (cf. Figure 10)
OVdbdopt Individually calculated Q(V) considering the dead band
Figure 12 (a) compares the bus voltage magnitude distribution caused by different control
modes in violin plots. All bus voltages are located within 90% to 110% of the rated terminal voltage.
The results directly obtained from time series optimization (pink) are the best, i.e., the voltage
distribution is closer to the exemplarily defined setpoint 1.0 p.u. The second-best scenario is caused
by the optimized Q(P)-characteristic curves (green). Correspondingly, more reactive power is
provided, see Figure 12 (b). Compared to the scenario with ID QV, the voltage distribution caused by
the calculated Q(V)-characteristic curves (ID: QVopt, brown) extends downward to 1.0 p.u. with
increased reactive power provision from DERs.
setpoint
(a) (b)
Figure 12. Comparison of bus voltages (left) and reactive power provision (right) for the simulative
quarter with different characteristic curves.
To calculate more proper Q(V)-characteristic curves (maintaining voltage stability with saving
reactive power provision), in the next section, the dead band is considered, and the optimization
process with multi-objective function is applied according to Figure 6, introduced in section 2.3.
4.1.2 Calculation Considering Dead Band Setting
According to Figure 12 (a), the considered bus voltages without reactive power provision (ID:
Q0) were distributed from 0.99 p.u. and 1.075 p.u. Since they are all within the boundaries [0.9, 1.1],
from the point of view of reactive power saving, reactive power doesn’t have to be provided. This
paper does not focus on optimizing the dead band setting but on the characteristic curve calculation
outside the defined dead band. Thus, the dead band of [0.97, 1.03] suggested by the grid code and
[44] is used, cf. Figure 10 (b).
As introduced in section 2.3, only DERs with voltages outside the dead band are taken into
account in the objective function. The setpoints for these buses are set to the upper limit (1.03 p.u.) or
the lower limit (0.97 p.u.), see equations (12) and (13). Furthermore, an additional objective for
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
reactive power saving is added. Its effect can be visualized by running with different coefficient
combinations ( and ).
:  =

0.97
 ∈  .
+

0
 ∈  .
(12)
:  =

1.03
 ∈  .
+

0
 ∈  .
(13)
Figure 13 displays the optimization results with the objective functions (12) and (13) for one
exemplary time step with different coefficient combinations. For this time step, only 24 of 50 DERs
have voltages outside the dead band. It is obvious that with = 1 and = 0 (leftmost), both
capacitive (over-excited) and inductive (under-excited) reactive power are provided from the 24
DERs, and the resulting voltage is the lowest (it is equal to the defined setpoint  = 1.03). With
larger the provided reactive power decreases (especially from = 0 to = 0.1), and the
resulting voltage is close to the value without optimizations.
C
V
=1.0
C
Q
=0
C
V
=0.8
C
Q
=0.2
C
V
=0.6
C
Q
=0.4
C
V
=0.4
C
Q
=0.6
C
V
=0.2
C
Q
=0.8
C
V
=0
C
Q
=1.0
Figure 13. Optimization results with different coefficient settings for an exemplary time step.
Using = 0.1 and = 0.9 as an example, Q(V)-characteristic curves considering dead band
and reactive power saving are calculated individually for the 24 DERs. Figure 14 illustrates the
resulting characteristic curves for some of the DERs, while also comparing them to the previous
results for DER A and B. It is evident that considering the dead band (A-DBD and B-DBD), the DERs
can provide reactive power starting from 1.03 p.u. Moreover, A-DBD and B-DBD exhibit far fewer
time steps with reactive power provision compared to the case without considering the dead band
(A and B). In addition, the trend of the distribution of the operating points in A-DBD and B-DBD is
more prominent, facilitating the identification of the characteristic curves.
Regarding other exemplary DERs (C, D, E, F), the main difference between the newly calculated
(cyan) and the reference (purple) Q(V)-characteristic curves is the slope. In most cases, the newly
calculated characteristic curves have a relatively flat slope compared to the purple dashed line,
suggesting that they allow for lower reactive power provision.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
In the simulation phase, the calculated and the reference characteristic curves are assigned to
DERs for three-month time series simulations. It can be seen in Figure 15 (b), as expected, that the
individually calculated slopes allow a slight reduction of reactive energy by comparing QVdbdopt and
QVdbd. Compared to the result for QVopt calculated in section 4.1.1, the Q reduction caused by
QVdbdopt is very considerable, and the resulting voltage distribution is shifted to 1.03 p.u. (the
probability density distributed close to 1.03 p.u. is more extensive), see Figure 15 (a).
In general, Q(V)-characteristic curves considering dead band and Q saving are individually
calculated for DERs, and the effect of maintaining voltage stability with limited reactive power
provision is achieved. However, it is difficult to compare the results from section 4.1.1 since the
optimization conditions are different. A parameter setting that differs from this can lead to different
characteristic curves and hence different results. An appropriate (or optimal) parameterization for
the optimization model will vary depending on the grid states and the user’s goals.
Q in
p.u.
0.0
-0.1
-0.2
-0.3
0.1
0.2
0.3
under-excited over-excited
optimized operating point calculated characteristic curve
0.9 0.95 1.0 1.05 1.0 1.1
V in p.u.
F-DBD
D-DBD
0.9 0.95 1.0 1.05 1.0 1.1
V in p.u.
grid code limits
grid code limits
under-excited over-excited
characteristic curve suggested by grid code
0.0
-0.1
-0.2
-0.3
0.1
0.2
0.3
E-DBDC-DBD
under-excited over-excited
under-excited over-excited
grid code limitsgrid code limits
grid code limits grid code limits
grid code limits
grid code limits
0.9 0.95 1.0 1.05 1.0 1.1
A
under-excited over-excited
0.97 1.03
under-excited over-excited
B
0.97 1.03
V in p.u.
under-excited over-excited
A-DBD
grid code limits
grid code limits
0.9 0.95 1.0 1.0 1.1
V in p.u.
1.05
B-DBD
under-excited over-excited
grid code limits
grid code limits
0.97 1.03
V in p.u.
Figure 14. Calculated Q(V)-characteristic curves with and the dead band for exemplary DERs.
1.03
(a) (b)
Figure 15. Simulation result comparison for characteristic curve with and without dead band: (a) Bus
voltage distribution; (b) Mean reactive power provision.
4
.2 Characteristic curve calculations for Q-flexibility provision
As mentioned in section 1, a controlled reactive power exchange at the grid interface between
two voltage levels (especially between the distribution and transmission level) is considered
nowadays as an essential ancillary service, which can be provided by the distribution system operator
(DSO) to the transmission system operator (TSO) using existing Q provision capabilities from DERs
in distribution systems. In this case study, central and local provisions of reactive powers from DERs
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
for maintaining the Q flexibility at the TSO-DSO interface are investigated using a generated
SimBench [45] grid, see Figure 16. The observed grid consists of an extra-high-voltage (EHV) grid and
an HV grid out of the SimBench dataset [45]. TSO and DSO are connected via three EHV/HV
transformers. The attached time series are used for calculations and simulations. It is assumed that
DSO offers TSO reactive power flexibility by optimizing the reactive power provision of the involved
7 DERs (Wind or PV-Farms with a total installed power of 79 MW), keeping the Q-exchange at three
interfaces, see Table 6.
Figure 16. Schematic geographic visualization of a cross-voltage level test grid.
Table 6. Defined Q-flexibility for different interfaces.
Interface Q flexibility at the Interface
Güstrow 0 MVAr
Schwerin 8 MVAr
Perleberg 36 MVAr
4.2.1. Central Optimization
For finding the optimized reactive power provision of DERs, central optimization can be realized
using the developed PandaModels. Based on the SimBench time series in 15-minute resolution, the
optimization with reactive power of DERs as optimization variables for each time step is solved for
the objective:
:  = (
,

)
∈[ü,,]
(14)
Figure 17 shows central optimization results for an exemplary day (timestep from 96 to 192). It
is evident that, during the simulative day, all Q-exchanges (green: normal values, orange: optimized
values) at the three interfaces are located within the theoretical Q-range (the grey area), based on the
Q provision capability from DERs, according to the resprectivegrid codes. With central optimizations,
the target providing Q-setpoint at the interface is primarily achieved, e.g., from timestep 92 to 150,
with sufficient available capacities, the optimized values follow the targets, and the corresponding
deviation (see plot on the bottom) is almost zero. Due to limited Q provision capabilities from DERs,
from the time step 150, the expected setpoints are not met, but the optimized values are still better
than that with normal power flow.
When using centralized optimization, communication failures and optimization failures are
inevitable. In such scenarios, it is recommended that the DERs switch back to characteristic-curve-
based local control mode, which should align with the grid condition and the objective. In addition
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
to serving as a backup for failures in central optimization, local control can also function as a bridging
solution for DSOs lacking modern grid monitoring systems to provide TSOs with ancillary services.
In the following section, we will explore the Q-flexibility supported by the characteristic curves.
Figure 17. Q-exchange at the interface with central reactive optimization for an exemplary day.
4.2.2. Characteristic Curves Calculation and Simulations
As DERs in this case study provide reactive power to meet the reactive power balancing at the
TSO-DSO interface as much as possible, the dead band setting is not considered during the
characteristic curve calculations. With maintaining reactive power-setpoints as the objective function,
the proposed method is performed based on a three-month time series optimization considering
forecasting uncertainties to calculate proper characteristic curves. Figure 18 shows the calculated
characteristic curves for two exemplary DERs, where the Q(V)-characteristic curve only shows the
part from 1.0 p.u. to 1.1 p.u. It can be observed that the distribution of QV-coordinates is relatively
more concentrated and has a more pronounced trend (e.g., A-QV in Figure 18). However, due to the
slope’s limitation on grid codes, the calculated Q(V)-characteristic curve (cyan line) can only cover a
part of the distribution of points. By comparison, the Q(P)-characteristic curve follows the
corresponding fitting curve (orange) well, although the QP distribution is relatively scattered. These
calculated characteristic curves are configured for DERs in a three-month time series simulation.
Q in p.u.
DER A
optimized operating point optimized characteristic curve
0.0 0.2 0.4 0.6 0.8
P in p.u.
DER B
0.0
-0.1
-0.2
-0.3
0.1
0.2
0.3
0.4
-0.4
under-excited over-excited
fitting curve (linear decision tree)
B-QP
1.0
grid code limit
1.0
A-QV
under-excited over-excited
A-QV
V in p.u.
B-QV
under-excited over-excited
1.04 1.06 1.11.02 1.08
under-excited over-excited
A-QP
0.0 0.2 0.4 0.6 0.8
P in p.u.
1.01.0
V in p.u.
1.04 1.06 1.11.02 1.08
slope limited
by grid codes
slope limited
by grid codes
Figure 18. Calculated Q(P)- and Q(V)-characteristics of exemplary DERs for maintaining the reactive
power setpoints based on a three-month time series optimization.
To assess the impact of different characteristic curves on Q-exchanges at TSO-DSO interfaces,
the mean errors from the setpoints in Table 6 and the mean total reactive power provisions for each
type of characteristic curve are displayed in Figure 19. As a reference, the characteristic curves with
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
ID QPf, QP, and QV, which have the same parameters as in the last case studies, are applied. The
results directly from the centralized optimization (ID: OPT) yield the smallest deviation to the
objective values, 5 MVAr in total for each 15min; see Figure 19 (a) bottom. The second best is the
simulation with optimized Q(P)-characteristic curves (ID: QPopt; purple: mean total error of 6.35
MVAr), which is better than the reference scenario (ID: QP; green). Compared to OPT, the error is
reduced by about 40% ( .
100% .
100% = 42% ). Similarly, the optimized Q(V)-
characteristic curve (ID: QVopt; brown) supports more effectively than the reference one (ID: QV, red).
The results for QVopt can be better if there was a more relaxed condition on the slope, such as allowing
a larger slope.
10
20
0
mean absoute errors to Q setpoints in MVAr
0
0
0
10
5
5.0
1.25
1.17
2.53
1
2
3
1 2 3
6.35
1.78
1.57
3.0
6.95
1.74
1.60
3.62
8.08
2.23
2.0
3.75
8.55
2.3
1.19
5.0
8.43
1.9
2.0
4.5
32.7
7.4
11.6
13.6
Q
setpoint
= 0
Q
setpoint
= 8
Q
setpoint
= 36
30
0
5
15
25
20
10
11.6
10.6
8.7
5.0
3.2
mean Q provision for each 15 min in MVAr
(a) (b)
Figure 19. Simulation results with different local controllers: (a) mean errors from the targets at the
three interfaces; (b) mean total reactive power provision for each 15min.
Figure 19 (b) shows the mean reactive power provision for each 15min. The most obvious feature
is that with optimization (OPT, QPopt, and QVopt), more capacitive reactive power is provided.
Depending on the local condition and the distance from the interfaces, inductive or capacitive
reactive feed-ins are needed, e.g., the DER A and the DER B in Figure 18 show different properties.
By modifying the objective function or creating proper combinations of
objectives, different characteristics can be calculated for different purposes in terms
of grid operation. For example, the objective function in this study can be extended
to consider voltage support, see (15). For this, it is necessary for the users to find the
most suitable combination of flex and V by means for several simulations.
:  =

(
,

)+


 ∈ ∈
(15)
As previously mentioned, PandaModels includes optimization models for loss and loading
reduction, allowing for the calculation of the corresponding characteristic curves. The related case
studies and simulations are not given in this paper.
5. Conclusions
In this paper, an innovative method to design suitable characteristic curves of DERs for local
reactive power control was introduced, implemented, and validated by different case studies. The Q
control characteristic curves in this paper were calculated based on results from time series
optimizations. To do this, the tool PandaModels was applied and further developed, with which
optimization problems – maintaining voltage setpoints and maintaining reactive power setpoints can be
solved with Q-setpoints of DER as optimization variables. As a result, characteristic curves for the
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
DERs were calculated individually using linear decision tree regression, considering the grid code
limits (e.g., slope and breakpoints). The simulation results clearly demonstrate that the proposed
method in this paper outperforms the reference characteristics in terms of voltage stability and
provision of Q-flexibility at TSO-DSO interfaces (e.g., after calculation, the mean error from the
central optimization was reduced by about 40%.).
The proposed approach is expected to be both simple and efficient in practical implementation.
There are no additional requirements for hardware. Since the length of the applied time series and
the corresponding forecasting errors have a relatively small impact on the results, it is recommended
to choose a longer period, such as six months or one year, for offline calculations based on the
objective and forecasting for the next period. The resulting characteristic curves can then be manually
or remotely set for each DER. In cases where DERs are remotely controllable, a shorter period with a
higher update frequency can be chosen to adjust the objective function in response to changing
demands or recalculate the characteristic curves for significant changes in the grid topology.
Meanwhile, further research is still needed:
1. The application of the proposed method for different power system devices and
types of control curves, e.g., the I(V)-characteristic curve calculation for static var
compensators and the P(V)-characteristic curve calculation for electric vehicle
charging control. Correspondingly, more optimization models in PandaModels are
expected to be further implemented, providing more different ancillary services.
2. In this paper, Q(P)- and Q(V)-characteristic curves are observed separately. It may
be worthwhile to investigate calculating different curve types based on their location
in the grid.
3. After the linear decision tree regression, any segment with an excessive slope is
corrected to meet the grid code requirements. This corrected segment can be further
optimized or appropriately shifted to better represent the distribution of optimized
operating points. Additionally, considering Q(V)-characteristic curves with dead
band, the dead band width and position can also be optimized and integrated with
the proposed method.
Author Contributions: For research articles with several authors, a short paragraph specifying their individual
contributions must be provided. The following statements should be used “Conceptualization, Zheng Liu;
methodology, Zheng Liu; software, Zheng Liu, Maryam Majidi; validation, Zheng Liu; formal analysis, Zheng
Liu; investigation, Zheng Liu; resources, Zheng Liu; data curation, Zheng Liu; writing—original draft
preparation, Zheng Liu; writing—review and editing, Maryam Majidi, Haonan Wang, Denis Mende, Martin
Braun.; visualization, Zheng Liu; All authors have read and agreed to the published version of the manuscript.”
Funding: This work was supported in part by the project RPC2 (grant number 035003A) and the project
Ladeinfrastruktur 2.0 (grant number 0350048D) funded by the Federal Ministry of Economics and Climate
Action according to a decision of the German Federal Parliament.
Data Availability Statement: The data presented in the paper are available on request from the corresponding
author. Some of the data are not publicly available due to confidential agreements with the industrial partner in
this project.
Acknowledgments: This work was supported by the project RPC2 (grant number: 0350003C), the project
Ladeinfrastruktur 2.0 (grant number: 0350048D), and the project SPANNeND (grant number: 5563719) funded
by the Federal Ministry of Economics and Energy according to a decision of the German Federal Parliament. The
used realistic German grid model was provided by LEW Verteilnetz GmbH. The authors are solely responsible
for the content of this publication.
Conflicts of Interest: The authors declare no conflict of interest. The funders had no role in the design of the
study; in the collection, analyses, or interpretation of data; in the writing of the manuscript, or in the decision to
publish the results.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
References
[1] Federal Ministry for Economic Affairs and Energy, Figures, data und information concerning EEG. [Online].
Available: https://www.bundesnetzagentur.de/EN/Areas/Energy/Companies/RenewableEnergy/
FactsFiguresEEG/start.html (accessed: Nov. 29 2022).
[2] Deutsche Energie-Agentur GmbH, “Beobachtbarkeit und Steuerbarkeit im Energiesystem:
Handlungsbedarfsanalyse der dena-Plattform Systemdienstleistungen,” Accessed: Mar. 15 2023.
[Online]. Available: https://www.dena.de/fileadmin/dena/Dokumente/Pdf/9184_Beobachtbarkeit_und_
Steuerbarkeit_.pdf
[3] G. Boyle, Renewable electricity and the grid: The challenge of variability. London: Earthscan, 2009.
[4] P. Du and J. Matevosyan, “Forecast System Inertia Condition and Its Impact to Integrate More
Renewables,” IEEE Trans. Smart Grid, pp. 1531–1533.
[5] H. Li, Y. Li, and Z. Li, “A Multiperiod Energy Acquisition Model for a Distribution Company With
Distributed Generation and Interruptible Load,” IEEE Trans. Power Syst., pp. 588–596.
[6] M. Mao, P. Jin, N. D. Hatziargyriou, and L. Chang, “Multiagent-Based Hybrid Energy Management
System for Microgrids,” IEEE Trans. Sustain. Energy, p. 1.
[7] T.-L. Lee, S.-H. Hu, and Y.-H. Chan, “D-STATCOM With Positive-Sequence Admittance and Negative-
Sequence Conductance to Mitigate Voltage Fluctuations in High-Level Penetration of Distributed-
Generation Systems,” IEEE Trans. Ind. Electron., pp. 1417–1428.
[8] German Energy Agency, “dena Ancillary Service Study 2030: security and reliability of a power supply
with a high percentage of renewable energy,” Accessed: Nov. 29 2022. [Online]. Available: https://
www.dena.de/fileadmin/dena/Dokumente/Themen_und_Projekte/Energiesysteme/dena-Studie_
Systemdienstleistungen_2030/dena_Ancillary_Services_Study_2030.pdf
[9] CEDEC; EDSO; entsoe; eurelectric powering people; GEODE, “TSO-DSO Report: An integrated approach
to active system management,” Accessed: Nov. 29 2022. [Online]. Available: https://
www.edsoforsmartgrids.eu/wp-content/uploads/2019/04/TSO-DSO_ASM_2019_190304.pdf
[10] F. Olivier, P. Aristidou, D. Ernst, and T. van Cutsem, “Active Management of Low-Voltage Networks for
Mitigating Overvoltages Due to Photovoltaic Units,” IEEE Trans. Smart Grid, pp. 926–936.
[11] A. Berizzi et al., “Architecture and functionalities of a smart Distribution Management System,” in 16th
International Conference on Harmonics and Quality of Power (ICHQP), pp. 439–443.
[12] I.-K. Song, S.-Y. Yun, S.-C. Kwon, and N.-H. Kwak, “Design of Smart Distribution Management System
for Obtaining Real-Time Security Analysis and Predictive Operation in Korea,” IEEE Trans. Smart Grid,
pp. 375–382.
[13] VDE-AR-N 4110 - Technische Regeln für den Anschluss von Kundenanlagen an das Mittelspannungsnetz und
deren Betrieb, Verband der Elektrotechnik, Elektronik und Informationstechnik.
[14] M. Meyer, M. Cramer, P. Goergens, and A. Schnettler, “Optimal use of decentralized methods for
volt/var control in distribution networks,” in 2017 IEEE Manchester PowerTech, pp. 1–6.
[15] M. Rylander et al., “Methods to determine recommended feeder-wide advanced inverter settings for
improving distribution system performance,” in 2016 IEEE 43rd Photovoltaic Specialists Conference (PVSC),
pp. 1393–1398.
[16] Y. Takasawa, S. Akagi, S. Yoshizawa, H. Ishii, and Y. Hayashi, “Evaluation of Voltage Regulation
Functions of Smart Inverters Based on Penetration Level and Curtailment in Photovoltaic Systems,” in
2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe), pp. 1–6.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
[17] T. van Dao, H. Ishii, and Y. Hayashi, “Optimal parameters of volt-var functions for photovoltaic smart
inverters in distribution networks,” IEEJ Trans Elec Electron Eng, pp. 75–84.
[18] Y. Takasawa, S. Akagi, S. Yoshizawa, H. Ishii, and Y. Hayashi, “Effectiveness of updating the parameters
of the Volt-VAR control depending on the PV penetration rate and weather conditions,” in 2017 IEEE
Innovative Smart Grid Technologies - Asia (ISGT-Asia), pp. 1–5.
[19] H.-J. Lee, K.-H. Yoon, J.-W. Shin, J.-C. Kim, and S.-M. Cho, “Optimal Parameters of Volt–Var Function in
Smart Inverters for Improving System Performance,” Energies, p. 2294.
[20] D. Montenegro and M. Bello, “Coordinating Control Devices and Smart Inverter Functionalities in the
Presence of Variable Weather Conditions,” in 2018 IEEE/PES Transmission and Distribution Conference and
Exposition (T&D), pp. 1–9.
[21] M. Jafari, T. O. Olowu, and A. I. Sarwat, “Optimal Smart Inverters Volt-VAR Curve Selection with a
Multi-Objective Volt-VAR Optimization using Evolutionary Algorithm Approach,” in 2018 North
American Power Symposium (NAPS), pp. 1–6.
[22] Friederike Thomas, Sebastian Krahmer, and Peter Schegner, Robust and Optimized Voltage Droop Control
considering the Voltage Error. [Online]. Available: https://www.researchgate.net/publication/334491719_
Ro-bust_and_Optimized_Voltage_Droop_Control_con-sidering_the_Voltage_Error
[23] W. Kim, S. Song, and G. Jang, “Droop Control Strategy of Utility-Scale Photovoltaic Systems Using
Adaptive Dead Band,” Applied Sciences, p. 8032.
[24] D. O. Ampofo, A. S. Abdelsamad, J. M. Myrzik, and M. W. Asmah, “Adaptive Q(U) Control using
combined Genetic Algorithm and Artificial Neural Network,” in 2020 IEEE Electric Power and Energy
Conference (EPEC), pp. 1–6.
[25] D. Lee, C. Han, and G. Jang, “Stochastic Analysis-Based Volt–Var Curve of Smart Inverters for Combined
Voltage Regulation in Distribution Networks,” Energies, p. 2785.
[26] Z. Liu et al., “Optimized Characteristic-Curve-Based Local Reactive Power Control in Distribution Grids
with Distributed Generators,” in ETG Congress 2021, pp. 1–6. [Online]. Available: https://
ieeexplore.ieee.org/document/9469673
[27] Z. Wang, J.-H. Menke, F. Schäfer, M. Braun, and A. Scheidler, “Approximating multi-purpose AC
Optimal Power Flow with reinforcement trained Artificial Neural Network,” Energy and AI, p. 100133.
[28] L. Thurner et al., “Pandapower—An Open-Source Python Tool for Convenient Modeling, Analysis, and
Optimization of Electric Power Systems,” IEEE Trans. Power Syst., pp. 6510–6521.
[29] D. M. Fobes, S. Claeys, F. Geth, and C. Coffrin, “PowerModelsDistribution.jl: An open-source framework
for exploring distribution power flow formulations,” Electric Power Systems Research, p. 106664.
[30] B. Chen, A Practical Introduction to 9 Regression Algorithms. [Online]. Available: A Practical Introduction to
9 Regression Algorithms. https://towardsdatascience.com/a-practical-introduction-to-9-regression-
algorithms-389057f86eb9 (accessed: Nov. 30 2022).
[31] M. Cerliani, Linear Tree: the perfect mix of Linear Model and Decision Tree. [Online]. Available: https://
towardsdatascience.com/linear-tree-the-perfect-mix-of-linear-model-and-decision-tree-2eaed21936b7
(accessed: Nov. 30 2020).
[32] Python package Linear-tree. [Online]. Available: https://github.com/cerlymarco/linear-tree (accessed: Nov.
30 2022).
[33] M. Sojer, “Voltage Regulating Distribution Transformers as new Grid Asset,” Procedia Engineering, pp.
109–120.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
[34] F. Wenderoth, E. Drayer, R. Schmoll, M. Niedermeier, and M. Braun, “Architectural and functional
classification of smart grid solutions,” Energy Inform.
[35] W. McKinney, “Data Structures for Statistical Computing in Python,” in Python in Science Conference, pp.
56–61.
[36] PyPower. [Online]. Available: https://pypi.python.org/pypi/PYPOWER (accessed: Nov. 30 2022).
[37] J. Bezanson, A. Edelman, S. Karpinski, and V. B. Shah, “Julia: A Fresh Approach to Numerical
Computing,” SIAM Rev., pp. 65–98.
[38] I. Dunning, J. Huchette, and M. Lubin, “JuMP: A Modeling Language for Mathematical Optimization,”
SIAM Rev., pp. 295–320.
[39] R. Bolgaryn et al., “Recent Developments in Open Source Simulation Software pandapower and
pandapipes,” in 2022 Open Source Modelling and Simulation of Energy Systems, pp. 1–7.
[40] Z. Wang, Z. Liu, M. Kraiczy, N. Bornhorst, S. Wende-von Berg, and M. Braun, “Fast parallel quasi-static
time series simulator for active distribution grid operation with pandapower,” in CIRED 2021 - The 26th
International Conference and Exhibition on Electricity Distribution, pp. 1602–1606.
[41] S. Han, Y. Qiao, J. Yan, Y. Liu, L. Li, and Z. Wang, “Mid-to-long term wind and photovoltaic power
generation prediction based on copula function and long short term memory network,” Applied Energy,
pp. 181–191.
[42] M. J. A. Shohan, M. O. Faruque, and S. Y. Foo, “Forecasting of Electric Load Using a Hybrid LSTM-
Neural Prophet Model,” Energies, p. 2158.
[43] Renewables.ninja. [Online]. Available: https://www.renewables.ninja/ (accessed: Nov. 30 2022).
[44] O. e. a. Marggraf, “U-Control - Analysis of Distributed and Automated Voltage Control in current and
future Distribution Grids,” in ETG-Fb. 155: International ETG Congress 2017: Die Energiewende - Blueprints
for the new energy age Proceedings November 28 - 29, 2017, World Conference Center, Bonn, 2017.
[45] S. Meinecke et al., “SimBench—A Benchmark Dataset of Electric Power Systems to Compare Innovative
Solutions Based on Power Flow Analysis,” Energies, p. 3290.
Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 4 May 2023 doi:10.20944/preprints202305.0250.v1
ResearchGate has not been able to resolve any citations for this publication.
Article
Full-text available
Load forecasting (LF) is an essential factor in power system management. LF helps the utility maximize the utilization of power-generating plants and schedule them both reliably and economically. In this paper, a novel and hybrid forecasting method is proposed, combining a long short-term memory network (LSTM) and neural prophet (NP) through an artificial neural network. The paper aims to predict electric load for different time horizons with improved accuracy as well as consistency. The proposed model uses historical load data, weather data, and statistical features obtained from the historical data. Multiple case studies have been conducted with two different real-time data sets on three different types of load forecasting. The hybrid model is later compared with a few established methods of load forecasting found in the literature with different performance metrics: mean average percentage error (MAPE), root mean square error (RMSE), sum of square error (SSE), and regression coefficient (R). Moreover, a guideline with various attributes is provided for different types of load forecasting considering the applications of the proposed model. The results and comparisons from our test cases showed that the proposed hybrid model improved the forecasting accuracy for three different types of load forecasting over other forecasting techniques.
Article
Full-text available
The proliferation of renewable energy resources (RES), especially solar photovoltaic (PV) generation resources, causes overvoltage and line overloading in distribution networks. This study proposes a two-level volt–var control method based on multiple timescales. The on-load tap changer (OLTC) operates on an hourly timescale, to regulate the voltage on the secondary winding. In the 15-minutes timescale, PV-connected smart inverters and static var compensators (SVCs) are obliged to compensate the reactive power for the voltage control at the point of common coupling. In the multi-timescale voltage control framework, this study proposes a new multi-sectional volt–var curve (MSVVC) of a PV inverter. The objective of the MSVVC is to minimize the energy loss in the network, improve the voltage profile, and obtain the operational margin of other reactive power compensation devices. In the process of determining the optimal parameters of the MSVVC, stochastic modeling-based load flow analysis is utilized to consider the intermittency and uncertainty of RES generation. The effectiveness of the proposed method is verified on the IEEE 33-bus system in comparison with the conventional volt–var curve cases.
Article
Full-text available
This paper proposes a novel droop control strategy for addressing the voltage problem against disturbance in a transmission system connected with a utility-scale photovoltaic. Typically, a voltage control at the renewable energy sources (RESs) connected to the transmission grid uses a reactive power–voltage control scheme with a fixed dead band. However, this may cause some problems; thus, this paper proposes a method for setting a dead band value that varies with time. Here, a method for calculating an appropriate dead band that satisfies the voltage maintenance standard for two disturbances is described using voltage sensitivity analysis and the equation of existing droop control. Simulation studies are conducted using the PSS® E program to analyze the short term voltage stability and display the results for various dead bands. The proposed modeling and operational strategy are validated in simulation using a modified IEEE 39 bus system. The results provide useful information, indicating that the control scheme through an adaptive dead band enables more stable system operation than that through a fixed dead band.
Article
Full-text available
Publicly accessible, elaborated grid datasets, i.e., benchmark grids, are well suited to publish and compare methods or study results. Similarly, developing innovative tools and algorithms in the fields of grid planning and grid operation is based on grid datasets. Therefore, a general methodology to generate benchmark datasets and its voltage level dependent implementation is described in this paper. As a result, SimBench, a comprehensive dataset for the low, medium, high and extra-high voltage level, is presented. Besides grids that can be combined across several voltage levels, the dataset offers an added value by providing time series for a whole year as well as future scenarios. In this way, SimBench is applicable for many use cases and simplifies reproducing study results. As proof, different automated algorithms for grid planning are compared to show how to apply SimBench and make use of it as a simulation benchmark.
Article
Full-text available
This paper proposes a method to improve the performance of a distribution system by optimizing volt–var function of a smart inverter to alleviate the voltage deviation problem due to distributed generation connection. In order to minimize voltage deviation and line losses which represent the performance of a distribution system, this paper proposes an algorithm that optimally sets the parameters of the volt–var function. In the process of optimizing the parameters of the volt–var function, the algorithm proposed in this paper considers minimizing the contribution of the reactive power in order not to affect the output of the distributed generation. In order to apply to the field, the distribution system in South Korea considering the configuration and operation regulation was selected as a test model for algorithm verification. As a result, the system performance was successfully improved by optimally setting the volt–var function of the smart inverter which is an effective way to solve the over-voltage problem caused by distributed generation connection. This paper verified the proposed method through OpenDSS, a quasi-static time-series simulation, for the test model considering the characteristics of the distribution system in South Korea.
Conference Paper
We introduce recent developments in the open source Python libraries pandapower and pandapipes. The purpose of pandapower is to provide an easy to use tool for power system analysis and enable a high degree of workflow automation. We describe the recent developments that extend the functionality of pandapower, such as new elements and controllers, as well as the calculation methods for state estimation, distributed slack, short circuit, asymmetric power flow, as well as advanced optimization functions via a new interface to the PowerModels.jl library. Furthermore, we describe the recent progress in the library pandapipes, which provides functionality to simulate pipe networks, such as district heating or gas networks. We demonstrate the new features of pandapipes in an example for transient temperature calculation and showcase the combined application of pandapower and pandapipes to model sector coupling.
Conference Paper
The increasing penetration from intermittent renewable distributed energy resources in distribution grid brings along challenges in grid operation and planning. To evaluate the impact on the grid voltage profile, grid losses, and discrete actions from assets (e.g. transformer tap changes), quasi-static simulation is an appropriate method. Quasi-static time series and Monte-Carlo simulation requires a tremendous number of power flow calculations (PFCs), which can be significantly accelerated with a parallel High-Performance Computing (HPC)-PFC solver. In this paper, we propose a HPC-PFC-solver-based grid simulation (parallel simulation) approach for a multi-core CPU platform as well as a greedy method, which can prevent the errors caused by simultaneous parallel simulation. The performance of the proposed approach and the comparison is demonstrated with two use cases.
Article
Solving AC-Optimum Power Flow (OPF) problems is an essential task for grid operators to keep the power system safe for the use cases such as minimization of total generation cost or minimization of infeed curtailment from renewable DERs (Distributed Energy Resource). Mathematical solvers are often able to solve the AC-OPF problem but need significant computation time. Artificial neural networks (ANN) have a good application in function approximation with outstanding computational performance. In this paper, we employ ANN to approximate the solution of AC-OPF for multiple purposes. The novelty of our work is a new training method based on the reinforcement learning concept. A high-performance batched power flow solver is used as the physical environment for training, which evaluates an augmented loss function and the numerical action gradient. The augmented loss function consists of the objective term for each use case and the penalty term for constraints violation. This training method enables training without a reference OPF and the integration of discrete decision variable such as discrete transformer tap changer position in the constrained optimization. To improve the optimality of the approximation, we further combine the reinforcement training approach with supervised training labeled by reference OPF. Various benchmark results show the high approximation quality of our proposed approach while achieving high computational efficiency on multiple use cases.
Article
In this work we introduce PowerModelsDistribution, a free, open-source toolkit for distribution power network optimization, whose primary focus is establishing a baseline implementation of steady-state multi-conductor unbalanced distribution network optimization problems, which includes implementations of Power Flow and Optimal Power Flow problem types. Currently implemented power flow formulations for these problem types include AC (polar and rectangular), a second-order conic relaxation of the Branch Flow Model (BFM) and Bus Injection Model (BIM), a semi-definite relaxation of BFM, and several linear approximations, such as the simplified unbalanced BFM. The results of AC power flow have been validated against OpenDSS, an open-source “electric power distribution system simulator”, using IEEE distribution test feeders (13, 34, 123 bus and LVTestCase), all parsed using a built-in OpenDSS parser. This includes support for standard distribution system components as well as novel resource models such as generic energy storage (multi-period) and photovoltaic systems, with the intention to add support for additional components in the future.