Conference PaperPDF Available

Overview of NASA's Moon to Mars Planetary Autonomous Construction Technology (MMPACT)

Authors:
1
Moon to Mars Planetary Autonomous
Construction Technologies (MMPACT)
R. G. Clinton Jr.
1
, Jennifer E. Edmunson
2
, Michael R. Effinger
3
NASA Marshall Space Flight Center, MSFC, AL, 35812, USA
Michael R. Fiske
4
Jacobs Technology Inc., Huntsville, AL, 35806, USA
Jason Ballard
5
, Evan Jensen
6
and Melodie Yashar
7
ICON Technology Inc., Austin, Texas, 78745, USA
Christina Ciardullo,
8
Michael Morris
9
, Rebeccah Pailes-Friedman10
SEArch+ (Space Exploration Architecture LLC) Brooklyn, NY 11221, USA
I. Introduction
NASA’s Artemis Program is a two-phased plan to send American astronauts back to the Moon and to
develop the capabilities for long term presence on the lunar surface. In Artemis Phase 1, NASA plans to
land the first woman and next man on the Moon. In Phase 2, NASA and its international partners plan to
create the infrastructure necessary to enable a sustained long-term presence on the lunar surface. NASA’s
Space Technology Mission Directorate (STMD) is supporting the Agency’s exploration initiative by
developing key technologies and capabilities. Figure 1 provides an overview of the investments that
STMD is making in the four thrust areas, which are color-coded as are the associated technologies.
STMD has also created the Lunar Surface Innovation Initiative (LSII). LSII aims to spur the creation of
novel technologies that will be needed for lunar surface exploration and to accelerate the technology
readiness of key systems and components focused on enabling a sustainable presence on the lunar surface.
NASA’s Marshall Space Flight Center formulated the Moon-to-Mars Planetary Autonomous
Construction Technology (MMPACT) project to address the lunar surface construction thrust area of LSII
in partnership with other Government organizations, multiple academia institutions, industry
organizations, and the Jet Propulsion Laboratory, Kennedy Space Center, and Langley Research Center.
The goal of the MMPACT project is to develop, deliver, and demonstrate on-demand capabilities to
protect astronauts and create infrastructure on the lunar surface via construction of landing pads, habitats,
shelters, roadways, berms, and blast shields using lunar regolith-based materials.
1
MMPACT Principal Investigator, Science and Technology Office, AIAA Fellow
2
MMPACT Project Manager and Geologist, Science and Technology Office, AIAA Senior Member
3
MMPACT Microwave Structure Construction Capability Element Manager, Science and Technology Office
4
MMPACT Olympus Element Manager, Science and Technology Office
5
CEO, ICON Technology Inc.
6
VP of Strategic R&D, MMPACT Project Manager, ICON Technology Inc.
7
Director of Building Design & Performance, ICON Technology Inc., Professional AIAA Member.
8
Partner/Principal Architect, SEArch+, Professional AIAA Member
9
Partner/Principal Architect, SEArch+
10 Partner/Principal Industrial Designer, SEArch+
2
The ability to excavate, convey, and beneficiate large quantities of lunar regolith for construction
materials is key to the successful development of infrastructure at scale. An early projection of lunar
regolith materials needed for a 100 feet diameter landing pad was estimated at several hundred tons.
Transportation of that quantity of materials, or even binders for the regolith, from Earth would be
extremely costly and impractical as Artemis proceeds into Phase 2 with multiple infrastructure elements
required on the surface such as the aforementioned landing pads (multiple), roadways, habitats, shelters,
storage facilities, etc. While there are multiple constituent materials in lunar regolith that could serve as
binder materials for raw regolith such as calcium, sulfur, aluminum, magnesium, and others, the ability to
produce these materials in sufficient quantities from the raw regolith will require time. For these reasons,
MMPACT is also evaluating directed energy methods, such as microwave sintering, laser sintering, and
high temperature methods for melting and sintering regolith.
Figure 1. Space Technology Mission Directorate’s technology thrust areas supporting exploration and the Lunar
Surface Innovation Initiative focal areas.
II. Background
A. IN SITU FABRICATION AND REPAIR (ISFAR)
NASA MSFC has a long history in additive construction technology development. In 2004, NASA’s
Office of Biological and Physical Research (OBPR) restructured its portfolio to increase focus on support
for exploration. Between 2004 and 2007, the Exploration Science and Technology Division at MSFC
executed the In-Situ Fabrication & Repair (ISFAR) Program Element that focused on identification and
development of technologies for infrastructure development on the Moon and Mars, as well as
characterization and development of various planetary simulants. A synopsis of the key elements of
ISFAR is provided in Figure 2. The vision and technology development framework created in 2004 were
foundational, and not only formed the basis of NASA’s In Space Manufacturing initiative today, but also
included the development of additive construction capability for habitat structures using lunar regolith
simulant-based concrete.1 More than 25 different research projects were funded under the
Habitat/Structures effort. These included: (1)Materials - identification and usage of raw materials,
regolith, rock, and lava tubes; (2) Habitat Structures - additive construction, particularly using sulfur
concrete (sulfur binder, regolith aggregate) as a construction material, inflatable domes, use of regolith
3
bags and foldable/deployable structures; (3) Processing Technologies - glass melting for structural
members, fiber, and rebar. Contour Crafting was identified as a prime candidate for an autonomous
construction technology on the lunar surface. MSFC worked with Dr. Behrokh Khoshnevis at the
University of Southern California on his early Contour Crafting technology. The viability of additive
construction for planetary habitats was demonstrated6 (Figure 3) and early construction concepts were
developed7 as shown in Figure 4. Unfortunately, these Program Elements were short-lived, as Agency
priorities changed in 2005 and these efforts were phased down, but not before MSFC gained valuable
experience in “printing” with lunar regolith simulant-based concrete2.
Figure 2. Technology development focal areas of the In Situ Fabrication and Repair (ISFAR) Program Element
for NASA Human Systems Research and Technology Office, 2004.
Figure 3. Early Lunar Habitat Design Concept Built at MSFC in 2005
4
Figure 4. 2006 Lunar Habitat Design Concept Based on Additive Construction of Sulfur Concrete
B. ACES / ACME
In 2014, Professor Khoshnevis contacted MSFC about the possibility of working with the U. S. Army
Corps of Engineers Construction Engineering Research Laboratory Engineer Research and Development
Center (CERL-ERDC), on additive construction technology development. The project, entitled Automated
Construction for Expeditionary Structures (ACES) for CERL-ERDC and Additive Construction with
Mobile Emplacement (ACME) for NASA was a joint venture between NASA’s Space Technology Mission
Directorate Game Changing Development Program and the US Army Corps of Engineers. The projects
shared a common vision. The CERL-ERDC version of the vision was, “capability to print custom designed
expeditionary structures on-demand, in the field, using locally available materials.” With only minor
modification, the NASA version of the vision is “capability to print custom designed exploration structures
on-demand, on extraterrestrial surfaces, using locally available materials (or regolith)”3. The CERL-ERDC
interests in this technology were to reduce the logistics requirements for forward operating bases and reduce
exposure and risk to personnel by reducing the number of construction personnel and the time required to
construct the desired structures. NASA’s interests are in the development of a system that is capable of
constructing multiple structures, such as habitats, landing pads, berms, roadways, etc., autonomously by
using regolith as the basic building material in combination with binders tailored to be created from the
locally available materials on the Moon or Mars to support human deep space exploration1. Team members
and their primary responsibilities were CERL-ERDC, (cementitious materials research, concrete
constituency, properties, and flow process parameters and control relationships, analysis and design of
structures, and full scale additive construction demonstration); Kennedy Space Center (KSC) (excavation
and handling of regolith materials, dry goods storage and delivery system, and integration of the dry good
and liquid delivery systems); Contour Crafting Inc. (print nozzle development and fabrication); and MSFC
(liquids delivery system, concrete mixing and delivery system development and verification, binder
development for Mars regolith simulant-based concrete, mobility system design and construction).
Additional information on project development activities can be found in references 4 and 5. The MSFC
designed and fabricated 54’ x 32’ x 21’ tall gantry-style additive construction printer was delivered by
MSFC to CERL-ERDC in 2018 to enable military infrastructure development.8,9 The gantry can be seen
in the middle of an aerial photograph shown in Figure 5, with the dry materials storage and delivery system
and liquids storage and delivery system developed by KSC in the upper right in front of the large tent
structure.
5
Figure 5. Aerial Photo of ACES-3 system at the CERL-ERDC facility showing (a) gantry print and mobility system;
(b) dry materials storage and delivery system; and (c) liquids storage and delivery system.
III. MMPACT Formulation
After the formation of LSII in mid-2019, MSFC began to formulate plans to support the construction
element of the Excavation and Construction thrust area. An initial step was to enlist Yet2 to perform
surveys of the state of the art and emerging materials for lunar construction and also for state of the art
and emerging construction technologies suitable for use in the lunar environment. These surveys were
instrumental, along with the prior MSFC experience base, in selecting the candidate material systems and
associated processing technologies. In addition, NASA’s 3D- Printed Mars Habitat Centennial Challenge
had recently completed. NASA’s Centennial Challenge for a 3D-Printed Habitat (2015-2019) sought to
identify state-of-the-art capabilities for large-scale additive manufacturing within industry, in addition to
advancing the viability of Building Information Modeling (BIM) workflows for construction operations
in space. The competition was subdivided into multiple Phases of Virtual Design (schematic architectural
design concepts), as well as Construction submission levels (3D-printing demonstrations for a
compression cylinder, foundation, beam member, etc.). Two finalists in the Centennial Challenge, Space
Exploration Architecture (SEArch+), winners of two phases of the design element of the Habitat
Challenge, and ICON, a finalist in the construction element of the Habitat Challenge were in discussions
with MSFC about opportunities to continue the development of additive construction technologies. These
early discussions resulted in a framework for the creation of a proposal that would be subsequently
submitted to the NASA Space Technology Mission Directorate call for proposals addressing the LSII
thrust areas.
A. SEArch+ / MSFC Venn Diagrams
The promise of the Centennial Challenge was to advance technology development for space that
simultaneously (meets some) (intersects with) the global challenges of sustainable development on Earth.
The natural synergies between architecture, engineering, and construction (AEC) and the aerospace
industry: from smart homes to net zero applications, from the design of small efficient spaces (dense urban
housing & development) to sustainable practices employing local material, water, and energy recycling.
6
Typically, the technology transfer from the aerospace sector occurs after it has been researched and
developed. Rather than wait for later exchanges and spin-off applications to facilitate the transfer of
embedded knowledge from the AEC and Aerospace industry, SEArch+ worked with NASA to identify
applications which can be developed and tested simultaneously in order to pool resources previously
divided between these sectors.
Considering habitats as holistic endeavors between technology goals, human habitation needs, and
systems requirements, SEArch+ initiated a series of Venn diagrams” to identify overlapping research
interests between AEC goals and space habitats including: Construction Technology Material Innovation,
Sustainable Operations, and Human Factors. Among many areas of overlap, in the area of construction
means and methods while there were clear differences in terms of the requirements of the operational
environment, while overlaps were identified in terms of needs for autonomous operation, reduced build
time, and mobility systems development. In terms of environmentally induced building performance, while
Earth construction is held to a number of well-established standards (ASTM, IBC, ASCE, etc.) and new
standards would need to be developed for space, there were similar requirements in terms of meeting a
certain level of building envelope tightness, thermal performance, and factors of safety. The Venn diagrams
gave way to a series of comparative requirements to examine the potential opportunities as well as the
limitations to parallel tracking of a building research project between earth and space sectors.
B. ICON / Venn
During this time, ICON was also developing a Dual-Use Strategic Interest Small Business Innovation
Research proposal with the Texas Air National Guard (TANG). MSFC was offered an opportunity by the
TANG to join as a partner in this proposal. Subsequently, the Air Force Civil Engineering Center at Tyndall
Air Force Base and the Defense Innovation Unit also came on board as partners. Large-scale additive
manufacturing introduces shared technology development goals on Earth for the residential construction
market, as well as for the Department of Defense (DoD), and in space for the purposes of autonomous in-
situ resource utilization (ISRU) surface construction on the Moon and Mars. Additive construction is
uniquely suited for both earth & space applications, given that it enables construction of a variety of
structures on-demand in variable settings using local materials. The same Venn diagram process previously
described was utilized by both ICON for commercial structures and the DOD organizations for military
applications. In early 2020, ICON led the definition of functional requirements for construction-scale
additive manufacturing for terrestrial residential construction, for in-space construction on the Moon and
Mars, and for military construction applications desired by the DoD organizations. The requirements
revealed shared technology development goals across the three sectors, such as reliability and repairability
within harsh and/or unpredictable environments.
The requirements definition gave way to suggested areas of mutual collaboration among ICON, NASA,
and the DoD, including: development of long-range communication, monitoring and control systems,
autonomous mobility within variable sites, dust mitigation strategies, projectile shielding strategies (against
micrometeorites, bullets, shrapnel, blasts, etc.), advanced software controls, building information modeling
(BIM) systems, remote teleoperations, off-foundation printing and/or autonomous foundation delivery,
design for field repair, and advanced autonomy capabilities such for site preparation. Areas of collaboration
identified between ICON and NASA alone included: transportation and payload requirements, hardware
system architecture and requirements, Lunar power requirements, materials science for regolith print
medium, regolith excavation, materials handling, and feedstock delivery systems. These common key
functional capabilities formed the framework of ICON’s successful SBIR proposal and the foundation of
the MMPACT project.
C. Architectural Design Concepts by ICON
In 2020, ICON’s proposal was selected for an SBIR award. An initial step taken by ICON was to employ
SEArch+ and the Bjarke Ingels Group (BIG) to develop design schematics for mission-critical surface
construction elements for a permanent lunar base. The design process was informed by discussions with
key ICON engineers and NASA collaborators. The exchange not only ensured the constructability of
7
designs according to known hardware constraints and material processing limitations, but also enabled the
architectural process to influence and shape Project Olympus hardware requirements as they were being
defined. Project Olympus is ICON’s multi-year initiative to develop an autonomous, large-scale
construction system capable of manufacturing horizontal and vertical construction typologies on the
Moon and eventually Mars. ICON’s construction system is planned to first demonstrate capabilities to
manufacture critical horizontal structures such as roads and landing pads, followed by demonstrations of
critical vertical structures including unpressurized shelters and habitats. Within this study, SEArch+
developed landing pad concepts and BIG developed a foundational habitat design, as well as the master
plan for a permanent Lunar base.
1) SEArch+ Landing Pads
The design and construction of lunar landing and launch pads ranks as a high-priority
element of strategic infrastructure to be constructed on the surface of the Moon. To develop civil
infrastructure on the Moon and eventually Mars, repeated visits to the same location will be
necessary. Landing pads on the Moon would prevent regolith dust from sandblasting other
infrastructure at 3 km/s, which would spread over the surface of the Moon and even enter lunar
orbit. A landing pad provides a stable zone for a lander’s touchdown and would deflect exhaust
plumes without excavating a hole under the lander, and the construction of landing pads from in
situ resources will mitigate risks posed by frequent and repeated landings to locations close to a
lunar outpost. Lunar landing pads would benefit from being close to an initial lunar outpost’s
critical infrastructural elements to allow for safe and efficient off-loading of cargo, goods, and
resources. While logistical proximity to infrastructural elements would increase operational
efficiency, standoff distances ensuring habitable and occupiable structures’ safety remain a
critical constraint in site planning. Standoff distances need to be great enough to protect outpost
structures from damage against rocket plumes and also from the acceleration of dust particles
during landing and launch.
Figure 6 (Left) Schematic representation of landing pad designs
Figure 7 (Right) Concept for the Olympus construction system
High-velocity dust impacts are a significant design driver for landing pads. As dust particles
become airborne, they can accelerate to supersonic speeds and travel beyond the lunar surface
and enter into orbit. We have evidence demonstrating that larger particles, traveling at supersonic
speeds, eject at a lower angle of 3 degrees, and slower, smaller particles eject at a higher angle
closer to 17 degrees9. Smaller particles are more subject to intra-particle collisions, slowing
down the travel speed and giving rise to more complex trajectories. Current research indicates
that the majority of ejecta can be contained with a blast wall at the height of 17 degrees.10 The
blast wall in the design study included an angled dust barrier with a height determined by the 17
degree angle requirement, and a dust trench that would collect most of the supersonic ejecta for
later removal.
The landing pad study expands on prior research differentiating the touchdown or center
zone of the landing pad from the immediate area surrounding it, described as a secondary zone.11
8
Four main components for a landing pad are introduced, including multi-material concentric rings
for the central landing surface, a blast wall, a support berm, and a dust trench. Within this study,
multiple construction options were considered, including: a continuous sintering method, paving
options which include a solid paving surface, the creation of interlocking paver elements, and a
layer of 3D-printed gravel aggregate. Further study of how solid paving, 3D-printed gravel, and
interlocking pavers behave is needed before a final recommendation is made.
2) BIG Foundational Habitat
The proposed foundational habitat is a single-story torus-based structure supporting a crew of
four, based on the upcoming Artemis missions.12 Among the various mission drivers typically used
to determine habitat sizing and habitable functions, crew size was a known parameter within the
project. The design team created functional work and living spaces that would not only be adequate
for future long-duration missions of six months or longer, but sought to introduce architectural and
interior design elements that promote crew cohesion, performance, and overall health and well-
being. Among these strategies are circadian lighting solutions to adapt to crew’s activities over the
course of a single Earth-day or 24-hour light/dark cycle. Circulation for the habitat follows the
linear path of the torus structure. Areas for crew living and leisure are separated from science and
research activities by airlocks to ensure the safety of the crew. Windows are located to ensure
constant visibility of Earth.
Figure 8 (Left) Exterior of habitat design
Figure 9 (Right) Circadian lighting within interior of habitat
Throughout the habitat’s lifecycle, the structure will need to prove resilient to cyclic and
fatigue loading, long duration seismic events, asymmetrical thermal loading and internal
pressurization. The habitat’s structure essentializes the use of 3D-printing for the torus’ interior
ribbed lattice and incorporates loose regolith infill for additional radiation shielding. This approach
makes reasonable assumptions that excavation and material handling technologies will support
additive manufacturing capabilities on the Lunar surface and may be less time and energy intensive
as compared with laser, furnace, or microwave-based construction methods. Several technology
development challenges have been considered as constraints driving the final geometry of the
habitat. First, printing tangent overhang angles less than 20° from a previously printed layer
without structural support is a present limitation of the state-of-the-art, and thus was assumed as a
constraint within the design process. Second, it is yet unknown whether regolith construction alone
may create a hermetic seal structurally sound enough to maintain internal pressurization on the
lunar surface. Regolith is materially porous and present research has yet to indicate that it may
support the creation of an airtight seal. The design proposes deploying a fabric or material liner to
the inside of the regolith shell and applying a spray-on polymer-based material to seal the interior
of the structure.
9
Figure 10 (Left) Clustering of foundational habitat & Lunar base infrastructure
Figure 11 (Right) Depiction of phased expansion within master plan
The foundational habitat is envisioned to scale and expands into a master plan over the course
of a phased development timeline. Principles informing requirements for the design and planning
of the lunar base include safety, resiliency, efficiency, redundancy, and expandability.13 Essential
infrastructure elements within the master plan include: power sources such as a solar array, landing
and launch facilities located at a sufficient distance away from habitable structures, storage,
maintenance and repair facilities, as well as ISRU processing facilities. The phased development
timeline projects that roads, unpressurized radiation shelters will be the first elements to be
constructed. Landing pads would be the next elements to be constructed, followed by the
establishment of power and energy resources as well as ISRU production facilities, until finally the
foundational pressurized habitat is constructed with additional clusters following soon after.
IV. Element Summaries
The MMPACT Project is focused on the development, delivery, and demonstration of on-demand
capabilities to protect astronauts and create infrastructure on the lunar surface using lunar regolith-based
materials. To accomplish these goals, MMPACT is divided into three interrelated elements: Construction
Feedstock Materials Development, Olympus Autonomous Construction System, and the Microwave
Structure Construction Capability (MSCC). These elements are described below.
A. Materials
The MMPACT Materials element is a supporting element to the Olympus and MSCC elements. The
Materials element provides a common platform for regolith simulant, Olympus, and MSCC evaluation and
test. Some research in ISRU-based construction falls under the Materials element, including the production
of cementitious and metal alloy materials. This research is necessary to help establish the capability of
producing construction materials in-situ. Activities of the Materials element include establishment of test
parameters, procurement of simulant, and formulation of partnerships with organizations outside of NASA
to assist in NASA’s surface construction materials work.
B. Olympus
The Olympus element of the MMPACT project is focused on development and test of planetary additive
construction hardware. Early efforts are focused on the initial surface construction technology
demonstration mission (DM-1), slated for December 2026, described in the following section. A number
of deposition techniques and materials are being evaluated as part of this element. ISRU-based
cementitious materials (with and without water as a binder), sintering techniques, and others are all being
evaluated. A materials/deposition technology down-select for the DM-1 mission is slated for mid-2022.
NASA is working with MMPACT partner ICON, of Austin, TX, on the development of the hardware
to support these activities. ICON brings a wealth of experience to the table, including real-time
measurement of concrete, development of mixing and pumping protocols and hardware, and has dealt
with issues like hose management, which become problematic at large scale. In addition, they have a
10
strong background in controls system development, remote operations, and design of structures for
seismically active areas as well.
One of ICON’s first MMPACT activities resulted in the construction and subsequent hot fire test of a 20’
diameter 3D-printed landing pad. Shown in Figure X, the LunarPAD was designed and analyzed by a
group of college students that were mentored by MMPACT personnel. The pad was constructed in
October 2020 and tested in March 2021.15
Figure 12. Lunar Pad Subscale 3D Printed Landing Pad (left after completion, right during hot
fire test)
C. MSCC
MSCC traces its origin within MSFC back to the mid-2000s during Shuttle Return to Flight. Internal
development was done on a microwave heater to cure and sinter the Reinforced On-orbit Carbon-Carbon
Crack Repair (ROCR) using Non-Oxide Adhesive Experimental (NOAX) repair material.16 Former ROCR
team members were located and additional industry, academia, and government personnel were added to
develop microwaves systems and protocols for creating horizontal and vertical infrastructure on the Moon.
Microwave energy is being pursued for regolith consolidation by MMPACT since it is the only heating
method to volumetrically heat the regolith. All other methods rely on thermal conduction through the very
low conductivity regolith to sinter, resulting in a less efficient process. However, significant challenges
exist to scale up microwave processing to where densifies infrastructure in a lunar environment.
Since there isn’t enough lunar regolith to develop the processes and protocols, simulants are being
used. The simulants are processed from terrestrial feedstocks which contain non-lunar materials in them.
Therefore, a five-month effort was conducted to establish a heat treat method to remove these non-lunar
materials. Tests were conducted using thermal gravimetric analysis, mass spectrometry, heating in
vacuum and conducting mass spectrometry, dielectric and differential thermal analysis, Raman, Brunauer,
Emmett and Teller (BET), particle size analysis, morphological analysis, carbon and sulfur chemical
content determination and microscopy.17,18 The process has been scaled-up to 6 kg batch size and
undergoing evaluation. A 36 kg batch size is the target for JSC-1A and other limited availability
simulants. These calcining protocols will be standard for NASA and beyond.
Using baked out simulants, microwave sintering is conducted at Jet Propulsion Laboratory (JPL), Alfred
University and MSFC in thermal vacuum. JPL is conducting small scale sintering experiments to develop
protocol that will feed into large scale sintering in a similar manner that would be done on the Moon.19,20
The large-scale microwave sintering is being done at MSFC and Alfred University in Thermal Vacuum
11
Chambers (TVACs) with applicators tested in a manner that would be used in a similar way on the Moon
for the first time. The goal is to use both magnetron and solid state to sinter strips or paving mats and then
join them horizontally. Vertical layers will also be fabricated. Once these specimens are obtained, property
specimens will be extracted and tested mechanically, thermally, and with a torch. The largest TVAC sample
so far is shown in Figure 13. The sintering process using different applicators is being modeled. In order
to avoid having a precise simulant, several minerals are being fabricated and tested to establish models that
bound the possible varied compositions on the Moon.21 These sintering protocols and resulting properties
developed and microwave coupling models will feed into conceptual system designs, conops, and site
preparation, microwave sintering, and verification and validation requirements development.22
Figure 13. Largest TVAC microwave sintered sample to date.23
V. Plans for Construction Demonstration Mission 1 (DM-1) on the Lunar Surface
The current Space Technology Mission Directorate planning indicates an initial mission in late 2026 for
surface construction technology demonstration on the lunar surface. The MMPACT project is focused on
development and selection of construction technologies that would be demonstrated on this mission. The
overall goal of DM-1 is proof of concept for the initial selected construction technology in the lunar
environment. The objectives of the DM-1 mission are as follows:
Demonstrate downselected construction technique utilizing ISRU materials at small scale from the
lander base (produce horizontal and vertical subscale “proof of concept” structural elements)
Demonstrate remote/autonomous operations
Demonstrate early instrumentation for system health monitoring and process monitoring/control
for material deposition
Validate (or refute) that Earth-based development and testing are sufficient analogs for lunar
operations
Generate information to anchor analytical models
The DM-1 mission will be based on a Commercial Lunar Payload Service (CLPS) lander that will target
the South Pole region of the lunar surface. An initial design concept for DM-1 is shown in Figure 14.
The planned outcomes from this demonstration are the achievement of Technology Readiness Level 6 for
autonomous/remotely operated ISRU consolidation into densified, subscale horizontal and vertical
12
structural elements and Technology Readiness Level 9 for limited hardware and instrumentation that will
feed forward and be used on later missions.
Figure 14. Concept of lunar surface construction technology demonstration mission one (DM-1) mission operating from
the deck of a Commercial Lunar Payload Service lander.
VI. Notional Lunar Construction Roadmap
Looking forward for the continued maturation of construction capabilities, a series of construction
technology demonstration and qualification missions are envisioned to mature the capabilities in a phased,
systematic, building block approach. A graphical vision for this sequence of capability development
missions is shown in Figure 15. The second surface construction technology demonstration mission, DM-
2 (target: 2028) will focus on a subscale landing pad construction demonstration. For this mission, the
construction hardware will be mobile and will need to interface with the excavation system for site
preparation and regolith feedstock provision. Instrumentation will be increased to include in-process
monitoring and nondestructive evaluation capabilities. Due to the scale and complexity of the mission,
other infrastructure capabilities will be needed to support the construction, such as power, communication,
and navigation. In addition, there is a goal of performing thermal performance and mechanical loading
tests on the subscale landing pad. These tests will be used to compare performance from Earth-based tests,
anchor analytical models, and provide data to demonstrate that the material performance is acceptable for
scale up to a full-scale functional landing pad. Expected outcomes from this demonstration are the
achievement of Technology Readiness Level 7 for construction of the pad surface (horizontal structure)
and blast shield (vertical structure) pending capabilities to perform mechanical and thermal performance
tests. Specific construction hardware and instrumentation would achieve Technology Readiness Level 9.
The third in the series of surface construction missions represents further scale up of the capability and
would be a Construction Technology Qualification Mission One, (QM-1) for an operational landing pad
construction. A full complement of supporting infrastructure will be needed for a construction project of
this scale and complexity. Although requirements and dimensions have yet to be established, a consolidated
landing pad on the order of 50 meters in diameter is envisioned plus a consolidated apron and full perimeter
blast shield. Included in the vision for this mission is the demonstration of subscale vertical structures, such
13
as an unpressurized shelter. At this point, the construction system for horizontal infrastructure elements
would have achieved Technology Readiness Level 9 and be ready for commercialization.
The fourth in the series of envisioned STMD lunar surface construction missions, Construction
Technology Qualification Mission Two (QM-2), is projected to focus on full-scale habitat structures.
Examples of such structures are the conceptual designs of pressurized habitats as described in Section IV.C,
above, developed by SEArch+ and the Bjarke Ingels Group. Another consideration is the Lunar Safe Haven
being studied by a team led by NASA Langley Research Center.24 Again, dimensions and requirements
are not established, and the expected complementing infrastructure capabilities are expected to have been
in place to support QM-1. At this point, the construction system for vertical infrastructure elements would
have achieved Technology Readiness Level 9 and be ready for commercialization.
Figure 15. Notional phased lunar construction capability development roadmap.
VII. Summary
The Space Technology Mission Directorate is developing technologies to support NASA’s Artemis
Program, which was depicted graphically in Figure 1. The Lunar Surface Innovation Initiative is the
primary thrust area for the development of technologies focused on establishing a sustainable presence on
the lunar surface. The MMPACT project supports this initiative through the development of capabilities
for infrastructure construction that will protect astronauts and equipment from the lunar environment using
lunar regolith as the building material. To accomplish this challenging goal, MMPACT has partnered
extensively with experts in multiple disciplines across other Government agencies, NASA Centers,
industry, and academia. These partnerships include dual use applications having common key functional
requirements for Earth-based commercial (ICON) and military (DoD) applications and for construction of
lunar surface infrastructure. In addition, early architectural design concepts for landing pads and habitats
were developed by SEArch+ and the Bjarke Ingels Group to inform engineering decisions on the
construction hardware design and development. Based on prior experience and surveys of the state of the
art for materials and processes suitable for lunar construction, MMPACT is evaluating multiple materials
and processes. These materials and processes will be thoroughly tested in simulated lunar environmental
conditions to ensure, to the extent possible that lunar environments can be simulated, that the materials and
processes will achieve the goals for lunar surface construction. These capabilities will be developed and
14
demonstrated through a systematic, building block approach utilizing CLPS landers on planned STMD
lunar surface construction technology demonstration missions. These missions will culminate in the early
2030s with the qualification of construction systems which will then be ready for commercialization for the
creation of future lunar surface infrastructure needs.
Acknowledgments
The SEArch+ team for Project Olympus was comprised of the following associates: Michael Morris, Rebeccah
Pailes-Friedman, and Melodie Yashar, as well as the following collaborators: Waleed Elshanshoury, Mahsa
Esfandabadi, David Gomez, Alexander Guzeev, Vittorio Netti, and Albert Rajkumar.
References
[1] Clinton, R. G., Jr., “NASA Additive Manufacturing Initiatives: In Space Manufacturing and Rocket Engines” Presented at the
68th International Astronautical Congress (IAC), Adelaide, Australia, 25-29 September 2017.
[2] Khoshnevis, B., Bodiford, M. P., Burks, K. H., Ethridge, E., Tucker, D., Kim, W., … & Fiske, M. R. (2005, January). Lunar
contour craftinga novel technique for ISRU-based habitat development. In 43rd AIAA Aerospace Sciences Meeting and
ExhibitMeeting Papers (pp. 7397-7409).
[3] Clinton Jr., R. G., “NASA’s In Space Manufacturing Initiative and Additive Manufacturing Development for Rocket Engine
Space Flight Hardware,” 11th International Conference on Additive Manufacturing and 3D Printing, University of Nottingham,
United Kingdom, July 13-14, 2016
[4] Werkheiser, N. J., Fiske, M. R., Edmunson, J. E., and Khoshnevis, B. Development of additive construction technologies for
application to development of lunar/martian surface structures using in-situ materials. Composites and Advanced Materials
Exposition 2015.
[5] Johnston, M. M., “Additive Construction with Mobile Emplacement”, MSFC Research and Technology Report 2016,
NASA/TM-2017-219502, page 54.
[6] “Lunar In Situ Materials-Based Habitat Technology Development Efforts at NASA/MSFC,” M.R. Fiske, et al., Proceedings:
10th ASCE Aerospace Division International Conference on Engineering, Construction and Operation in Challenging
Environments: Earth & Space 2006, League City, TX, March 5-8, 2006.
[7] Khoshnevis, B., Bodiford, M.P., Burks, K.B., Ethridge, E., Tucker, D., Kim, W., Toutanji, H., and Fiske, M.R. (2005). “Lunar
contour crafting A novel technique for ISRU-based habitat development.” Proceedings of the 43rd AIAA Aerospace Sciences
Meeting and Exhibit, Paper AIAA-2005-0538, January.
[8] M.R. Fiske, J.E. Edmunson, J.C. Fikes, “The Disruptive Technology That is Additive Construction: System Development
Lessons Learned for Terrestrial and Planetary Applications” AIAA SPACE and Astronautics Forum and Exposition, September
2018.
[9] M. Fiske, J. Edmunson, J. Fikes, M. Johnston, and M. Case, “3D Printing in Space: A New Paradigm for America’s Military,
The Military Engineer; Vol. 110, No. 715 (2018), pp 74-76.
[10] Lane, John E., Metzger, Philip T., Immer, Christopher D., and Li, Xiaoyi. “Lagrangian Trajectory Modeling of Lunar Dust
Particles,” Earth & Space 2008, Long Beach, CA, Mar. 3, 2008.
[11] Susante, Paul J., and Metzger, Philip T. “Design Test, and Simulation of Lunar and Mars Landing Pad Soil Stabilization Built
with In Situ Rock Utilization.” Earth and Space 2016, Orlando, FL, April 11-15, 2016.
[12] NASA. (2020). NASA’s Lunar Exploration Program Overview (Issue September).
https://www.nasa.gov/sites/default/files/atoms/files/artemis_plan-20200921.pdf
[13] Petrov, Georgi I.; Inocente, Daniel; Haney, Max; Katz, Neil; Koop, Colin; Makaya, Advenit; Arnhof, Marlies; Lakk, Hanna;
Cowley, Aidan; Haignere, Claudie; Messina, Piero; Sumini, Valentina; Hoffman, Jeffrey A. (2019 July). Moon Village
Reference
[14] Masterplan and Habitat Design (ICES-2019-280). 49th International Conference on Environmental Systems (ICES), Boston,
Massachusetts, USA, 7-11 July 2019. Lubbock Texas, USA: Texas Tech University.
[15] Campbell, A., et al, “LunarPAD On the Development of a Unique ISRU-Based Planetary Landing Pad for Cratering and
Dust Mitigation,” 2021 Sci-Tech Conference, Nashville, TN, January 2021.
Pg11
[16] A.W. Fliflet, M.T. Lombardi, S.H. Gold, D. Lewis III (retired), R.W. Bruce, and A.K. Kinkead, “On-Orbit Microwave Curing
of Space Shuttle Repair Materials,” Report (2007), https://apps.dtic.mil/sti/pdfs/ADA518213.pdf
[17] R.P. Wilkerson et al, “Characterizing the effects of thermal profile and gas environment on the heat treatment of JSC-1A
lunar simulant using combined thermogravimetry and mass spectroscopy,” LSSW Fundamental and Applied Lunar Surface
Research in Physical Sciences, August 1819, 2021.
15
[18] G. Voecks et al, “Understanding Pretreatment Processes of Lunar Simulant to Assist in Defining Material Characterization,”
LSSW Fundamental and Applied Lunar Surface Research in Physical Sciences, August 1819, 2021.
[19] D. Rickman et al, “Basis of Creating a Microwave-Based Construction System for the Moon,” 2021 Joint Planetary and
Terrestrial Mining Sciences Symposium and Space Resources Roundtable, Jun 8-11, 2021.
[20] M.R. Effinger et al, “Microwave Sintering: Initial Scale-Up for Lunar Landing and Launch Pad Construction,” 2021 Joint
Planetary and Terrestrial Mining Sciences Symposium and Space Resources Roundtable, Jun 8-11, 2021.
[21] H. Shulman et al, “Exploration of Scalable Methods to Fabricate Synthetic Lunar Minerals for Engineered Regolith
Simulants,” LSSW Fundamental and Applied Lunar Surface Research in Physical Sciences, August 1819, 2021.
[22] R.W. Bruce et al, “Preliminary Considerations for Microwave Consolidation/Sintering of Lunar Regolith Simulant,” 55th
Annual Symposium International Microwave Power Institute (IMPI), Jun 28th-Jul 1st, 2021.
[23] Courtesy of Dr. William Kaukler and Curtis Bahr, Jacobs, September 2021.
[24] Grande, Melanie L., Moses, Robert W., Cosgrove, Patrick A., Mueller, Robert P., Prater, Tracie J., and Blanchard, Alex,
“Protecting Crew and Surface Systems with a Long-Duration Lunar Safe Haven,” ASCEND 2021, Las Vegas NV, November
8-10, 2021.
... are highly valuable for applications such as expeditionary site preparation, disaster response, and extraterrestrial exploration where direct human involvement would be highly risky or even impossible [1][2][3][4][5][6][7][8][9]. In addition to filling major technology gaps in the military, disaster relief, and space exploration domains, these systems also can aid in normal construction activities. ...
Conference Paper
Full-text available
Autonomous construction systems (ACSs) have become a very important area of research in several domains, particularly in expeditionary site preparation, extraterrestrial exploration and base construction, and disaster response. While these systems range from single vehicles to large systems with swarms of autonomous construction equipment, the major need for development is in the extrusion-based autonomous construction systems (EBACSs). These systems use large 3-D printers and supporting equipment to construct buildings and infrastructure in place. This article reviews a major previous study which developed a quasi-general system architecture for EBACSs and uses this as the starting place for further development in system re-alizability (manufacturing, assembly, and integration) and verification and validation efforts using the spiral development approach. Originally developed for software development projects, the spiral method has become more and more widely used in recent years for all kinds of risky and complex systems engineering work. Most importantly, decisions are made based on risk and the development/design process ends once the stake-holders decide the magnitude of system improvements in each cycle is too small to justify further cumulative cost. This work clearly shows the need and value of a general system architecture for EBACS and a path forward for their continued development and refinement. The conclusions and recommendations generated are relevant for the design and realization of a variety of different EBACSs configurations (gantry systems, robotic arms, delta robots, ground robot teams, and others) and will aid in the more effective realizability and fielding of these systems throughout their life cycle.
... Autonomous construction systems [1][2][3][4][5][6][7] have become a important area interest in recent years in a variety of industries [8], including design [9], material mechanics [10,11], building design and modularization [12], sustainability [13], space exploration [14], natural disaster recovery [15], military operations [16], and others [17]. In addition to filling major technology gaps in the military, disaster relief, and space exploration domains, these systems also can aid in normal construction activities. ...
Conference Paper
Full-text available
PREPRINT - ACCEPTED VERSION POSTED PER ASME RULES - PLEASE SEE CONFERENCE PROCEEDINGS FOR FINAL VERSION OF RECORD. Large-scale autonomous construction systems (ACSs) have become an important area of technology development in research years. Several areas remain to be comprehensively studied, including the design of both the construction equipment and final products, the science behind the materials used, system architecture , major applications (such space exploration, local disaster recovery, and expeditionary operations), and the realizability of the system. The realizability (manufacturability, assembly, and integration) of the system components is the most important of these at this point in the technology development, as it drives the feasibility and decision-making of the technology and enables the major applications. This article explores the realizability and system architecture of an ACS based on a large-scale collabora-tive autonomous robot (assumed to be a robotic arm) mounted in a mobile platform (such as a Warthog). The basic system configuration, the interfaces, and the realizability requirements driven by a formal concept-of-operations (CONOPS) diagram and known/designed system architecture. This work will be helpful in the further development, refinement, and application of this and similar systems by showing the major system architecture and formalizing the requirements for developing the system.
... At present, lunar/planetary surface manned vehicle simulation training is still in the conceptual stage [16][17][18][19][20][21][22]. It is difficult for existing astronaut simulation training methods to simulate the behavior of vehicles and human feelings in the lowgravity environment of the moon/planet. ...
Article
Cable-driven robots are characterized by a large workspace, high speed and load-to-weight ratio, providing a new technology approach for large-scale autonomous 3D construction of lunar surface shelters. A novel deployable cable-driven construction 3D printer (CDCP) is developed in this study. Guiding pulleys and cable sagging are considered and modeled to improve the accuracy of the system. A fuzzy adaptive differential evolution PID (FDEPID) control is proposed to reduce end-effector motion errors in Cartesian space and thus improve printing quality and stability. Concentric and zigzag infill strategies are compared to optimize printing efficiency and infill effectiveness in path planning. Finally, experiments are carried out to validate the proposed FDEPID control and path planning strategies which demonstrate the great potential of the developed cable-driven printer in the construction of lunar architecture.
Article
Full-text available
In the lunar activities of the manned lunar landing project, it is necessary to calculate the astronauts’ somatosensory lunar driving operation according to the space mission verification requirements and the astronauts’ extravehicular operation training requirements. Considering the complexity and coupling among astronauts, lunar rovers, and the lunar environment, the measured driving data on the Earth’s surface cannot be applied to astronaut driving tasks on the lunar surface, and the control behaviors caused by different factors have limited adaptability to the lunar surface terrain and special mechanical environment. Under these circumstances, it is difficult to simulate the somatosensory effects of lunar rover driving training in the lunar environment. In response to the above problems, the astronaut–driving somatosensory calculation model is first described through the principle of human motion perception, the lunar environment is created in a virtual environment, the lunar gravity conditions are set, and a dynamic model of the astronaut-lunar rover-lunar surface system is created. Then, a dynamic calculation is used to provide parameters for the astronaut somatosensory calculation model, and the driving somatosensory model is simulated considering the astronauts’ own posture adjustment while driving. Finally, the experiment is designed and analyzed to determine the primary and secondary order of influence on the astronauts’ ability to drive somatosensory activity. The results show that the established driving motion perception model can provide an information model and data basis for astronauts’ lunar surface driving motion perception simulation training and can provide support for the development of manned lunar rovers and astronauts’ lunar surface simulation training.
Article
Full-text available
1. Habitat Structures at MSFC is one element of the In-Situ Fabrication and Repair (ISFR) Program: ISFR develops technologies for fabrication, repair and recycling of tools, parts, and habitats/structures using in-situ resources. ISRU - based habitat structures are considered Class III. 2. Habitat Structure Purpose: Develop Lunar and/or Martian habitat structures for manned missions that maximize the use of in-situ resources to address the following agency topics: bioastronautics critical path roadmap; strategic technical challenges defined in H&RT formulation plan: margins and redundancy; modularity, robotic network, space resource utilization; autonomy, affordable logistics pre-positioning.
NASA Additive Manufacturing Initiatives: In Space Manufacturing and Rocket Engines" Presented at the 68th International Astronautical Congress (IAC)
  • R G Clinton
  • Jr
Clinton, R. G., Jr., "NASA Additive Manufacturing Initiatives: In Space Manufacturing and Rocket Engines" Presented at the 68th International Astronautical Congress (IAC), Adelaide, Australia, 25-29 September 2017.
Development of additive construction technologies for application to development of lunar/martian surface structures using in-situ materials
  • N J Werkheiser
  • M R Fiske
  • J E Edmunson
  • B Khoshnevis
Werkheiser, N. J., Fiske, M. R., Edmunson, J. E., and Khoshnevis, B. Development of additive construction technologies for application to development of lunar/martian surface structures using in-situ materials. Composites and Advanced Materials Exposition 2015.
Additive Construction with Mobile Emplacement
  • M M Johnston
Johnston, M. M., "Additive Construction with Mobile Emplacement", MSFC Research and Technology Report 2016, NASA/TM-2017-219502, page 54.
The Disruptive Technology That is Additive Construction: System Development Lessons Learned for Terrestrial and Planetary Applications
  • M R Fiske
  • J E Edmunson
  • J C Fikes
M.R. Fiske, J.E. Edmunson, J.C. Fikes, "The Disruptive Technology That is Additive Construction: System Development Lessons Learned for Terrestrial and Planetary Applications" AIAA SPACE and Astronautics Forum and Exposition, September 2018.
Lagrangian Trajectory Modeling of Lunar Dust Particles
  • John E Lane
  • Philip T Metzger
  • Christopher D Immer
  • Xiaoyi Li
Lane, John E., Metzger, Philip T., Immer, Christopher D., and Li, Xiaoyi. "Lagrangian Trajectory Modeling of Lunar Dust Particles," Earth & Space 2008, Long Beach, CA, Mar. 3, 2008.
Design Test, and Simulation of Lunar and Mars Landing Pad Soil Stabilization Built with In Situ Rock Utilization
  • Paul J Susante
  • Philip T Metzger
Susante, Paul J., and Metzger, Philip T. "Design Test, and Simulation of Lunar and Mars Landing Pad Soil Stabilization Built with In Situ Rock Utilization." Earth and Space 2016, Orlando, FL, April 11-15, 2016.
LunarPAD -On the Development of a Unique ISRU-Based Planetary Landing Pad for Cratering and Dust Mitigation
  • A Campbell
Campbell, A., et al, "LunarPAD -On the Development of a Unique ISRU-Based Planetary Landing Pad for Cratering and Dust Mitigation," 2021 Sci-Tech Conference, Nashville, TN, January 2021.