Quality control is essential to a successful modular construction project and should be enhanced throughout the project from design to construction and installation. The current methods for analyzing the assembly quality of a removable floodwall heavily rely on manual inspection and contact-type measurements, which are time-consuming and costly. This study presents a systematic and practical approach to improve quality control of the prefabricated modular construction projects by integrating building information modeling (BIM) with three-dimensional (3D) laser scanning technology. The study starts with a thorough literature review of current quality control methods in modular construction. Firstly, the critical quality control procedure for the modular construction structure and components should be identified. Secondly, the dimensions of the structure and components in a BIM model is considered as quality tolerance control benchmarking. Thirdly, the point cloud data is captured with 3D laser scanning, which is used to create the as-built model for the constructed structure. Fourthly, data analysis and field validation are carried out by matching the point cloud data with the as-built model and the BIM model. Finally, the study employs the data of a removable floodwall project to validate the level of technical feasibility and accuracy of the presented methods. This method improved the efficiency and accuracy of modular construction quality control. It established a preliminary foundation for using BIM and laser scanning to conduct quality control in removable floodwall installation. The results indicated that the proposed integration of BIM and 3D laser scanning has great potential to improve the quality control of a modular construction project.
Content may be subject to copyright.
A preview of the PDF is not available
... In other words, it is the mental pictures used by a designer when completing a design task that is improved, reducing the design errors and buildability issues. Predictability is improved because of the usage of the 3D models, enabling the assessment of the building and structural components of the design [23,53,54]. As a result, collaborating improves data distribution and reduces uncertainty. ...
... Working on uneven ground reduces the scanner's field of view, making spatial data collecting more difficult. Because of the overlapping angle of the camera view, generating semantic data is challenging and analyzing structures above the aircraft is tough [48,53,100]. The biggest constraint of RC on construction site monitoring is at the project completion phase, when line-of-sight accessibility is a problem [53]. ...
... Because of the overlapping angle of the camera view, generating semantic data is challenging and analyzing structures above the aircraft is tough [48,53,100]. The biggest constraint of RC on construction site monitoring is at the project completion phase, when line-of-sight accessibility is a problem [53]. The acquisition of data needs to ensure that all scanning targets are gathered with the necessary information within time limitations to generate sufficient point cloud data for various uses. ...
Article
Full-text available
Reality Capture (RC) is a state-of-the-art technology for digital data gathering and visualization of the actual environment through virtual means. In recent years, RC has contributed significantly to the digitalization of the construction industry globally. However, there are no systematic critical analyses of the benefits and challenges of RC technologies in construction project management (CPM) to drive its adoption. This research provides a detailed overview of the potential benefits and constraints of RC to tackle CPM concerns successfully and efficiently. This study uses the PRISMA procedure to conduct a systematic literature review. Based on the inclusion and exclusion criteria set for the study, 96 articles were considered relevant for review. The articles were analyzed using content analysis techniques to synthesize identify emerging themes. A four-step procedure was used to classify the articles into pre-construction planning, —designing and construction. The review show that (a) RC is useful during the planning and designing stage, as the success of a construction project depends on accurate data to reduce the risk of cost and time overruns; (b) the benefits of RC adoption are accurate data, reduced time spent on project monitoring, progress tracking, and quality assessment; (c) RC on a construction site aids in the resolution of the industry’s fragmented nature through collaboration; quick and prompt decision making through remote monitoring and control of projects. RC is used as a visualization tool and for digital documentation of as-built models, construction verification, and flaw discovery, thereby improving work processes to achieve project success; (d) the most challenging aspect of incorporating RC on a construction site is the high investment cost. In the digital revolution era, this study could aid in the knowledge and optimal use of Reality Capture in numerous areas of CPM.
... Финансовые механизмы представляют собой различные программы субсидирования, кредитования и социальных выплат. Снизить стоимость квадратного метра способно применение современных технологий, эффективных строительных конструкций, которые позволяют уменьшить количество издержек на этапе строительства [10][11][12][13][14][15][16][17][18][19]. ...
Preprint
Full-text available
Vatin, N.; Sinelnikov, A.; Cisse, M.; Vasileva, I. Base's structure of Prefabricated Sanitary Module: erection and life stages; 2021; Construction of Unique Buildings and Structures; 98 Article No 9803. Abstract: The use of prefabricated structures and elements improves the quality and speed of construction. The sanitary module is a finished bathroom, combined with a toilet, after this referred to as STM. It is a finished room with a supporting wall frame and base, completely finished. It has mounted utilities and plumbing fixtures. The object of the research is the STM base frame. Analysis of the scientific literature has shown that the study of the bearing capacity of the STM frame was not carried out. The object of research is based on the module structure. By literature review is demonstrated that there are no scientific researches of module structure base work in erection on site. Method of research. Basically, the numerically-analytical method is to be used for the analysis of structural behaviour. Results. Analysis of results of FEM calculations and on-site erection represent that the bearing capacity of module base is ensured.
... He et al. (2021) advised detailed geometrical design and digital fabrication and improved the quality of industrialized construction in modular housing. Li et al. (2020) identified the integration of BIM and 3D laser scanning for quality control in modular construction projects. Zhou et al. (2021) proposed an IoT-enabled smart BIM platform for on-site assembly services to support the decision-making process among stakeholders in sharing data and Lee et al. (2021) studied the BIM data validation process to enhance the translation processes between BIM native data and IFC (Industry Foundation Classes) data and to help different stakeholders ensure the integrity and the accuracy of BIM data. ...
Article
Full-text available
Modular building is an innovative and sustainable construction method and a notable architectural, engineering, and construction trend. Owing to the new constructability and sustainability, significant research efforts have been focused on the engineering aspects of modular building. Since the global outbreak of the COVID-19 pandemic, space utilization has changed radically, and a rethinking of modular building design has become essential. However, current literature lacks a comprehensive understanding of occupants’ newly developed requirements and the relevant changes associated with engineering developments. Therefore, this study aims to review the current status of residential modular building design and construction, define its problems, and identify the key factors necessary for modular design and construction during the post-COVID-19 period from the perspective of architectural design. A total of 220 articles were selected from the Scopus database, out of which 94 papers were selected for a systematic review. The findings indicate that the present academic research primarily focuses on the technical aspects of optimizing architecture and on modularized plans to facilitate cost-effective factory production. Modular residential design has rarely considered people and cultural factors. Therefore, the authors derived 15 problems by adapting four architectural programming frameworks; function, form, economy, and time. The identified problems are mapped for future development with 11 problem-solving proposals. The proposed method contributes to developing new insights into COVID-19’s impacts on dwelling environments and can help introduce modular residential design responses that enhance the quality of life by creating better residentials in the post-pandemic.
... BIM can be described as a process that is supported by various tools and technologies (Li et al. 2020). When BIM is extended from design to include construction, facility management, and maintenance of the building, new levels of interoperability and collaboration can be achieved (Miettinen and Paavola 2014). ...
Conference Paper
Full-text available
Applications of Building Information Modeling (BIM) have widely infiltrated various construction fields. BIM serves as a set of technologies to maximize productivity, increase collaboration, and improve work efficiency throughout the project life cycle. BIM also supports the best practices of other emerging technologies by creating a platform for integration and coordination. The process, approach, and strategy of implementing BIM can impact the entire project's cost and schedule performance. A need exists to evaluate the effectiveness and practicability of the current BIM practices. First, this study reviewed 84 selected BIM projects from 21 countries based on their features, including project information, delivery methods, BIM approaches, level of development, software, and emerging technologies. Second, the challenges and limitations of adopting BIM in the construction project were evaluated. One significant outcome of the research was the identification of key attributes that facilitate the effective use of BIM on construction projects. The result of this study can assist practitioners in making better decisions on project planning and BIM adoption.
Article
Full-text available
The effort towards automation of the building industry processes has increased significantly over the last years worldwide. One of the key tools in this process is the modeling of buildings using Building Information Modeling (BIM). When following fundamental principles, a BIM model serves as an up-to-date pool of information. Combining the results of effective spatial data collection techniques with the information from a BIM model, it is possible to increase the effectiveness of as-built documentation of the structures or in-site clash detection between the built and planned parts. In this paper, we describe an approach for the verification of building structures by comparing the as-built model created from point clouds with the as-planned model of the building. The point clouds can be collected by laser scanning or photogrammetry, while the geometry of the planned (designed) structures is derived from the BIM model in the Industry Foundation Classes (IFC) format. The advantage of the approach is that the as-built model is created by regression models from point clouds preprocessed by detailed segmentation. The deviations from the design and the relative geometry (e.g., flatness) of the elements are expressed by signed color maps. The presented workflow enables semi-automated verification of building structures.
Article
Full-text available
Cisse, M.; Kosterev, D.; Vasileva, I.; Nemova, D. Design of modular structures and use of prefabricated sanitary modules. A review; Abstract: Modular structures can be seen as a game-changing technology, as they provide faster construction, safer production, better quality control, cost-effectiveness, and lower environmental impact compared to traditional on-site construction. These advantages can be maximized in the construction of high-rise buildings or in the construction of large residential areas consisting of houses with typical architectural solutions. With a combined annual growth rate of 5.69%, the modular construction market is projected to expand to a market value of $ 154.8 million by the end of 2023. Traditional design and modular design differ in many aspects, including design, collaboration, logistics, and others. The technical challenges associated with the widespread adoption of modular design offer potential solutions for future research. The article considers an example of using a prefabricated sanitary unit with various components, and also presents a calculation of economic efficiency.
Article
This paper presents a method that exploits the opportunities site imagery offers in construction monitoring practices. While their power and that of derived point cloud data is acknowledged for progress monitoring purposes, (raw) imagery is often overlooked when assessing locational construction quality. This paper’s framework addresses this shortcoming and harnesses the images’ significant potential towards metric quality control of freshly built structural elements. Recorded images are assessed against virtually created BIM counterpart pictures. The discrepancies between both are exploited to determine construction element deviations. The proposed framework is able to output qualitative results with average differences between actual and determined element deviations ranging to approximately 5 mm with a standard deviation of 5 mm. The results unveil the method’s large potential to aid in augmenting construction quality and controlling failure costs, while simultaneously allowing regular updates and conversions of the as-design BIM model into an as-built one.
Article
There have been recent efforts to use reality capture technologies to perform remote quality control in construction. However, there is a lack of research efforts in detecting construction incompatibilities in modular construction using reality capture technologies. The construction incompatibilities in modular construction often cause reworks and delays in the project schedule. To address this issue, this paper presents a general compatibility analysis method that propose scanning the modules in manufacturing plant and construction site, and check module-to-module compatibility remotely, prior to the shipment and installation. This study provides three sample module-to-module compatibility scenarios to validate the proposed compatibility analysis. The case study results show that the compatibility analysis method was able to identify the compatibility issues with high accuracy. Lastly, the compatibility analysis method was validated in terms of accuracy and time performance in six scenarios that was defined on the modules.
Article
Despite the advances of modular construction, the comprehensive understanding of its technical aspects in buildings is still limited, especially during the implementation process. This paper reviews the technical aspects of planning and coordination of modular construction in the building industry. The unclear onsite and practical knowledge need to be clarified for the implementation process. It then leads to the questions on the status of research development and gaps of the technical aspects. One hundred and thirty papers were filtered and analyzed through a systematic review. Four technical aspects of modular construction were found, namely (a) feasibility aspects of modular construction, (b) types of construction or materials, (c) design and structural analyses, and (d) construction planning. The findings render insightful references for the successful delivery of modular construction including its lifecycle analysis and sustainability needs. A research framework is also developed to highlight the gaps and measures for future practice.
Article
Full-text available
Effective progress control is vital for steering infrastructure construction to completion with minimum delay. Walking through the infrastructure project site to record progress in different activities is time-consuming, requiring information extracted from construction drawings, schedules, and budgets, as well as data collected from the construction site. This process can be automated by using advanced remote sensing technologies. This study contributes to progress monitoring in large horizontal infrastructure projects. It presents a practical automated method using laser scanning technology that can track the project’s progress in a real construction environment with limited human input. It is robust and accurate and is currently operational. The system capitalizes on the success of laboratory experiments. This system deals with occlusions effectively, accelerates the registration process of multiple scans, reduces the noise in the data, recognizes the objects of irregular shape, and is economically feasible. It provides evidence that all current challenges encountered in using laser scanners in monitoring construction progress can be overcome. This method has been successfully tested in the Wacker Drive reconstruction project in Chicago, IL.
Article
Full-text available
Small- and medium-sized enterprises (SMEs) are part of the building construction industry. Although many effect analyses of applying building information modeling (BIM) to projects have been conducted, analyses from the perspective of SMEs are lacking. We propose a BIM-based construction of prefabricated steel framework from the perspective of SMEs. We derive the essential functions of the system from the viewpoint of SMEs and verify the qualitative effect through a case analysis of prefabricated steel frame construction that is based on BIM. The following system functions and qualitative effects are analyzed according to project stages that are based on interviews of working groups participating in system development and case projects. (1) Preconstruction stage: extraction of fabrication drawing and review of shop drawing, (2) fabrication stage: prefabrication review, steel member removal, and field loading review, and (3) construction phase: integrated management of cost and schedule and quality management. The expected effects of applying the system are qualitatively and quantitatively analyzed through expert group interviews and surveys. For the quantitative analysis, an evaluation index is used for the end-user computing satisfaction survey. Further analysis of the finishing and installation work is required. Future research should also analyze the effect of system application on human resource management.
Article
Full-text available
Modular prefabricated buildings effectively improve the efficiency and quality of building design and construction and represent an important trend in the development of building industrialization. However, there are still many deficiencies in the design and technology of existing systems, especially in terms of the integration of architectural performance defects that cannot respond to occupants’ comfort, flexibility, and energy-saving requirements throughout the building’s life cycle. This research takes modular prefabricated steel structural systems as its research object and sets the detailed design of an integrated modular envelope system as the core content. First, the researcher chose two types of thermal insulation materials, high insulation panels and aerogel blankets, in order to study the construction details of integrated building envelopes for modular prefabricated buildings. Focusing on the weakest heat point, the thermal bridge at the modular connection point, this work used construction design and research to build an experimental building and full-scale model; the goal was to explore and verify the feasibility of the climate-responsive construction technique called “reverse install.” Second, as a response to climate change, building facades were dynamically adjusted by employing different modular building envelope units such as sunshades, preheaters, ventilation, air filtration, pest control, and other functional requirements in order to improve the building’s climate adaptability. Finally, based on the above structural design and research, this study verified the actual measurements and simulation, as well as the sustainability performance of the structure during the operational phase, and provided feedback on the design. The results highlight the environmental performance of each construction detail and optimized possibilities for an integrated envelope design for modular prefabricated buildings during both the design and renovation phases.
Article
Full-text available
Mobile flood protection systems provide a standardized flood protection method with high reliability. A comprehensive test site for mobile flood wall was established with the support of real applications, which provided opportunities to perform various tests. The anchor plate installation, seepage characteristics, and stress behavior of mobile flood protection systems were investigated through a process test, a water impounding test, and a post loading/unloading test. Test results indicated that installing anchor plates either by direct fixing or by preopened slots and eyes satisfy the construction and normal work requirements. However, the former is preferable over the latter. The mobile flood protection wall leaks when filled with water, and the leakage changes exponentially with the level. The leakage accelerates when the water level exceeds 1.5 m, thus registering 300 L/h at the 1.7 m level. In the post loading test (0–100 kN), concrete plastic deformation was first observed. Then, residual displacement was developed in the posts. The stressing process indicated that the failure process in the post, anchor plate, and base concrete system propagates from the concrete on both sides of the anchor plates toward the water side.
Article
Full-text available
In many cases of monitoring or load testing of hydrotechnical structures, the measurement results obtained from dial gauges may be affected by random or systematic errors resulting from the instability of the reference beam. For example, the measurement of wall displacement or pile settlement may be increased (or decreased) by displacements of the reference beam due to ground movement. The application of surveying methods such as high-precision levelling, motorized tacheometry or even terrestrial laser scanning makes it possible to provide an independent reference measurement free from systematic errors. It is very important in the case of walls and piles embedded in the rivers, where the construction of reference structure is even more difficult than usually. Construction of an independent reference system is also complicated when horizontal testing of sheet piles or diaphragm walls are considered. In this case, any underestimation of the horizontal displacement of an anchored or strutted construction leads to an understated value of the strut’s load. These measurements are even more important during modernization works and repairs of the hydrotechnical structures.
Article
Full-text available
Precast concrete elements are widely adopted and the performance of precast structures is relying on the quality of connections between adjacent elements. For reinforced precast concrete elements, rebar positions are important for the overall structural performance, however, they are usually manually inspected. This study develops a technique for automated position estimation of rebars on reinforced precast concrete elements using colored laser scan data. A novel mixed pixel filter is developed to remove mixed pixels from the raw scan data based on both distance and color difference. A one-class classifier is used for extracting rebars from all the data based on both geometric and color features of points. Furthermore, a novel rebar recognition algorithm is developed to recognize individual rebars based on two newly defined metrics. Experiments on two reinforced precast concrete bridge deck panels were conducted and showed that the proposed technique can accurately and efficiently estimate rebar positions.
Article
The adoption of prefabricated building systems has grown due to the need to reduce duration and cost of construction projects, as well as to improve quality and working conditions. However, the adoption of those systems requires an intense exchange of information to integrate the production of components, logistics operations, and site assembly. This is particularly important in engineer-to-order environments, in which the level of uncertainty tends to be high. This research proposes a model for planning and controlling the delivery and assembly of ETO prefabricated building systems, emphasizing the integration between site installation and logistics operations. This model was devised in an empirical study carried out in a company that delivers and assembles prefabricated concrete structures. The main theoretical contribution is a set of approaches to implement the “pull production” and “reduce variability” principles in this particular context, exploring synergies that exist between Lean Production principles and Building Information Modeling (BIM) functionalities.
Article
Varied sensing technologies have been delved in for positioning workers and equipment in construction sites. Vision-based technology has been received growing attentions by the virtue of its tag-free and inexpensive configuration. One of the core research works in this area was the use of stereo camera system for tracking 3D locations of construction resources. However, the previous work was limited to tracking of a single entity. To overcome the limitation, this paper presents a new framework for tracking multiple workers. The proposed framework supplements the previous work by embedding an additional step, entity matching, which finds corresponding matches of tracked workers across two camera views. Entity matching takes advantage of the epipolar geometry and workers' motion directions for finding correct pairs of a worker's projections on two image planes. This paper also presents an effective approach of camera calibration for positioning entities located a few tens of meters away from the cameras. The proposed framework is evaluated based on completeness, continuity, and localization accuracy of the generated trajectories. The evaluation results have shown its capability of retrieving 96% of actual movements, within localization errors of 0.821 m with 99.7% confidence.