Smart meters in Sweden – Lesson learned and new regulations

Authors:
  • Swedish Energy Markets Inspectorate
  • Swedish Energy Markets Inspectorate
  • Energy Markets Inspectorate

Abstract and Figures

Sweden was one of the first countries in Europe to roll out smart meters. The first regulation regarding smart meters was adopted in 2003, which required monthly metering for small consumers and hourly metering for larger consumers by 2009. This led to the roll-out of the first generation of smart meters in Sweden. The functionality of smart meters has since then evolved from automatic reading of data once a month to more frequent data measuring and remote control. Based on the lessons learned from the first roll-out of smart meters and on the development of functionality of smart meters, the national regulatory authority for energy in Sweden (Ei) has developed new regulations on minimum functional requirements for smart meters. In Sweden smart meters are owned by the distribution system operators (DSOs). Varying functionalities of smart meters between different DSOs endanger the consumers' right to be treated equally. It is important that consumers have equal possibilities to e.g. utilise services from energy suppliers or energy service providers. Therefore, minimum functional requirements for smart meters need to be defined. In 2013, Ei evaluated the impact on market participants of the first roll-out of smart meters in Sweden. The availability of hourly price contracts, the number of consumers who reacted to the electricity price and the competition among different metering service providers were studied. Based on the results of Ei's study and the development of functionality of smart meters, Ei submitted a report to the Swedish Government in 2015 suggesting that minimum functional requirements for smart meters should be regulated and presented a preliminary proposal of requirements based on a long-term cost-benefit analysis (CBA). The CBA was performed in accordance with the EU Commission recommendation on preparations for the roll-out of smart metering system. The reference scenario was defined as the smart metering system in Sweden in 2012. For each proposed functional requirement, the costs and the benefits for both the consumers and DSOs were quantified. Sensitivity analysis was then performed to identify critical variables for the positive roll-out conditions. The proposal was open for public consultation and all responses were reviewed by the government office. In 2016 the government concluded that it is necessary to develop minimum functional requirements for smart meters before the roll-out of the next generation. In 2017, Ei was tasked by the Swedish Government to propose new rules concerning minimum functional requirements for smart meters, based on the previous suggestions in 2015. Ei's study from 2013 showed that lack of hourly price information, lack of knowledge on electricity contract, and lack of standardisation on smart meters were the main reasons that have limited the benefits of using smart meters. After restudying the proposal from 2015 and the outcome of the public consultation, Ei presented a final proposal concerning minimum functional requirements for smart meters to the government in November 2017. The proposed functional requirements focus on both providing more information to consumers to increase their interest in being active and more information to the DSOs to increase their efficiency. Furthermore, the proposal also states that the new functionality should be implemented in a way that protects consumer privacy and data security. The minimum functional requirements, which were then included in the ordinance for metering, calculating and reporting electricity, cover the following areas: 1) Extended measurement, 2) Registration of active energy every hour or fifteen minutes and power outages, 3) Customer interface, 4) Remote collection of 344 345 measured data and power outages, 5) Remote updating of software, settings and control the power of the meter. All the meters in the low voltage network should fulfil these requirements lasted by 2025. Within the next few years, many of the current electricity meters in Sweden will be replaced, as they have reached their economic lifespan. Introducing minimum functional requirements for smart meters will ensure all consumers the same right to the technical solutions and data security, furthermore, it facilitates a fair competition among commercial developers.
Content may be subject to copyright.
SMART METERS IN SWEDEN- LESSONS LEARNED AND NEW
REGULATIONS
Yalin Huang, Elin Grahn, Carl Johan Wallnerström, Lena Jaakonantti,
Tommy Johansson, Swedish Energy Markets Inspectorate, Sweden
Summary
Sweden was one of the first countries in Europe to roll out smart meters. The first regulation
regarding smart meters was adopted in 2003, which required monthly metering for small
consumers and hourly metering for larger consumers by 2009. This led to the roll-out of the
first generation of smart meters in Sweden. The functionality of smart meters has since then
evolved from automatic reading of data once a month to more frequent data measuring and
remote control. Based on the lessons learned from the first roll-out of smart meters and on the
development of functionality of smart meters, the national regulatory authority for energy in
Sweden (Ei) has developed new regulations on minimum functional requirements for smart
meters.
In Sweden smart meters are owned by the distribution system operators (DSOs). Varying
functionalities of smart meters between different DSOs endanger the consumers’ right to be
treated equally. It is important that consumers have equal possibilities to e.g. utilise services
from energy suppliers or energy service providers. Therefore, minimum functional
requirements for smart meters need to be defined.
In 2013, Ei evaluated the impact on market participants of the first roll-out of smart meters in
Sweden. The availability of hourly price contracts, the number of consumers who reacted to
the electricity price and the competition among different metering service providers were
studied. Based on the results of Ei’s study and the development of functionality of smart
meters, Ei submitted a report to the Swedish Government in 2015 suggesting that minimum
functional requirements for smart meters should be regulated and presented a preliminary
proposal of requirements based on a long-term cost-benefit analysis (CBA). The CBA was
performed in accordance with the EU Commission recommendation on preparations for the
roll-out of smart metering system. The reference scenario was defined as the smart metering
system in Sweden in 2012. For each proposed functional requirement, the costs and the
benefits for both the consumers and DSOs were quantified. Sensitivity analysis was then
performed to identify critical variables for the positive roll-out conditions. The proposal was
open for public consultation and all responses were reviewed by the government office. In
2016 the government concluded that it is necessary to develop minimum functional
requirements for smart meters before the roll-out of the next generation. In 2017, Ei was
tasked by the Swedish Government to propose new rules concerning minimum functional
requirements for smart meters, based on the previous suggestions in 2015.
Ei’s study from 2013 showed that lack of hourly price information, lack of knowledge on
electricity contract, and lack of standardisation on smart meters were the main reasons that
have limited the benefits of using smart meters. After restudying the proposal from 2015 and
the outcome of the public consultation, Ei presented a final proposal concerning minimum
functional requirements for smart meters to the government in November 2017. The proposed
functional requirements focus on both providing more information to consumers to increase
their interest in being active and more information to the DSOs to increase their efficiency.
Furthermore, the proposal also states that the new functionality should be implemented in a
way that protects consumer privacy and data security. The minimum functional requirements,
which were then included in the ordinance for metering, calculating and reporting electricity,
cover the following areas: 1) Extended measurement, 2) Registration of active energy every
hour or fifteen minutes and power outages, 3) Customer interface, 4) Remote collection of
344
345
measured data and power outages, 5) Remote updating of software, settings and control the
power of the meter. All the meters in the low voltage network should fulfil these requirements
lasted by 2025.
Within the next few years, many of the current electricity meters in Sweden will be replaced,
as they have reached their economic lifespan. Introducing minimum functional requirements
for smart meters will ensure all consumers the same right to the technical solutions and data
security, furthermore, it facilitates a fair competition among commercial developers.
1. Introduction
1.1 The electricity market in Sweden
The electric power system in Sweden underwent a major reform in 1996. Since then,
generation and trading of electricity are exposed to competition. Network operations, i.e. the
transmission and distribution of electricity, are however considered as natural monopoly since
it would be both economically and environmentally unreasonable to have competing
infrastructures to the same customer. Due to the lack of competition in the transmission and
distribution networks, network operators are subject to regulation to promote efficiency and
quality of supply and to ensure fair prices for customers. The national regulatory authority
(NRA) for energy in Sweden, the Swedish Energy Markets Inspectorate (Ei), monitors whether
the network operators comply with existing rules. Ei is tasked to ensure that customers have
access to a power distribution system with reasonable and non-discriminatory tariffs, to
provide incentives for network operators to operate network cost effectively while maintaining
acceptable reliability [1].
1.2 The electric grid in Sweden
There are currently more than 150 distribution system operators (DSOs) and one transmission
system operator (TSO) in Sweden. The Swedish TSO, Affärsverket Svenska kraftnät, is owned
by the Swedish Government. The TSO owns and operates all parts of the transmission system
(in Sweden defined as 220 kV or higher) with a few exceptions. All other entities that operate
power systems in Sweden are defined as DSOs. The DSOs are of varying size and ownership
structure (state, municipal, private and other), and they each have at least one so-called
concession (permission) for the distribution of electricity, either for a defined geographical
area or for a specific line. The concession means a privilege with rights, but also comes with
several obligations, which are stipulated in the Swedish Electricity Act.
1.3 The electricity regulation revolution in Sweden
From 1996 to 2002, the Swedish DSOs were regulated based on a rate of return (ROR)
approach. The revenues of the DSOs were based on their actual costs ex-post. In 2003, the first
performance-based tariff regulation was introduced, the so-called network performance
assessment model (NPAM). Under the NPAM approach, the revenues of the DSOs were based
on the costs of fictive reference networks (more information can be found in [2] and [3]).
In 2005, a severe storm struck Sweden (referred to as Gudrun or Erwin) and caused outages
for about 450 000 customers; out of which approximately 100 000 customers had an outage
that lasted for longer than four days. This event increased the focus on continuity of supply. In
2006, two legislations entered into force. It implied new mandatory requirements for DSOs,
346
which is to present annual risk and vulnerability analyses with action plans, and to provide
compensation for customers with outages longer than 12 hours. From 2011 outages longer than
24 hours are not tolerated by law. At the same time, additional minimum requirements of the
reliability of supply were defined by Ei; one example is that more than 11 outages per
customer in a year is not tolerated.
In 2012, an ex-ante revenue cap regulation was implemented in Sweden. During the first
regulatory period of 2012-2015, the revenue cap of the DSOs was adjusted according to their
level of continuity of supply (CoS), which was measured by SAIDI1 and SAIFI2 (more
information can be found in [4]). For the second regulatory period of 2016-2019, the CoS
incentive scheme was improved, and at the same time a new incentive scheme for the efficient
utilization of electricity networks was introduced. The incentive scheme for CoS aims to
discourage unreasonable differences in CoS between and within power distribution systems
and to tie the interruption cost to the socio-economic cost of outages [4]. The incentive scheme
for efficient utilization of networks aims to improve efficiency in network investment and
operation [5]. More specifically, it aims to reduce the losses in the network and to even out the
load profile to reduce the risk of over dimensioning the capacity of the networks. The incentive
schemes are under continuous improvement.
The future development of power systems is characterized by major changes on both the
supply and demand side. On the supply side, more power generation from renewable sources,
both small- and large-scale, are integrated in the power system. On the demand side, the load
characteristics are changing with e.g. micro generation, electric vehicles and more flexible
load. The flexibility of loads comes from the combination of demand response program, local
energy storage and distributed generation.
The electricity meter is the bridge that communicates the supply side and the demand side.
Meters provide consumption data to the demand side that in combination with price signals
can be used to activate the flexibility of loads. At the same time meters provide information
from the demand side to DSOs and to the electricity market. The development of smart meters
will enable the integration of more renewable production and empower the demand side. It
also increases the possibilities to evaluate DSOs investments and to evaluate the impact of
flexible load. However, with development of data analysis techniques and different needs in
the meter market, there are different levels of smartness of smart meters available on the
market. For example, some smart meters can offer real-time consumption data and dynamic
tariffs to customers. From a regulatory point of view, it is important to continuously and
carefully adapt the regulation to accommodate these challenges whilst to foster fair
competition for the digital solutions.
1.4 EU rules concerning smart meters
The existing EU Electricity Directive 2009/72/EC [6] includes provisions on smart meters.
According to the directive, the introduction of intelligent metering systems within the EU
should be based on an economic assessment. The economic assessment should consider all the
long-term costs and benefits to the market and the individual consumer and the timeframe to
carry out. The objective was to equip at least 80 % of consumers in EU with intelligent
metering system by 2020 based on positive impact assessments in each country. The directive
1 System average interruption duration index (SAIDI) = total outage time / number of customers
[minutes/customer and year]
2 System average interruption frequency index (SAIFI) = total number of outages / number of costumers
[1/customer and year]
347
does not include a detailed definition of intelligent metering systems; however, it is stated that
the meters shall assist the active participation of consumers in the electricity supply market. In
2012, intelligent metering systems was defined in the EU Energy Efficiency Directive
2012/27/EU as an electronic system that can measure energy consumption, providing more
information than a conventional meter, and can transmit and receive data using a form of
electronic communication [7].
On 30 November 2016, the European Commission presented, “Clean energy for all
Europeans”, which is a package of legislative proposals to facilitate the clean energy transition
[8]. The package covers among other things the topic of electricity market design. The
proposal aims at putting consumers at the heart of the energy markets by ensuring that they are
empowered and better protected. According to the proposal, minimum functional requirements
for smart meters should be set up in line with several principles in the member states. These
principles include for example to measure actual electricity consumption and provide easy-to-
understand information to the customer on actual time of use, and if the customer requests, to
provide metering data via a local standardized communication interface. It also includes to
follow security and privacy legislation, to measure injected energy to the grid, to give the
customer appropriate advice and information at the time of installation, and to enable final
customers to be metered at the same time resolution as the imbalance settlement period in the
national market.
2. First generation of smart meters in Sweden
A major driver for rolling out smart meters in Sweden was to increase consumer awareness
and to reduce energy consumption. Introducing smart meters also improved DSOs’
understanding of the load pattern. Better understanding of the load pattern allows DSOs to
better allocate their costs and reduce the risk of over dimensioning of the network capacity.
The roll-out of the first generation of smart meters in Sweden took place through two major
steps. The first step was the introduction of monthly metering, and the second step was the
gradual introduction of hourly metering.
2.1 Monthly metering
Before 2003, nearly all electricity meters in Sweden measure on a yearly basis. The customers
received their bills based on the previous year’s consumption, and then received a
reconciliation bill for the difference between the previous year’s consumption and the actual
consumption [9]. Hourly metering was only required for consumers who had fuses above 200
A or rated power above 135 kW and for producers. In 2003, the Swedish Parliament decided
that by 2009 all electricity customers should have monthly billing based on actual
consumption. This initiated the roll out of the first generation of smart meters in Sweden.
Therefore, since 2003 smart meters have been rolled out gradually. These meters could be
automatically read at least every month for consumers and hourly for producers; therefore,
they were also referred to as automatic meter reading (AMR) systems. By 2009, nearly all
Swedish consumers had smart meters that could be remotely read at least once a month. The
DSOs are responsible for the meter reading and data reporting. The costs of the smart meters
are included in the DSOs’ asset base in the revenue cap regulation (more information in
section 4).
2.2 Hourly metering
In 2006, the fuse limit for which hourly metering was required was lowered to 80 A from 200
A. In fact, most of the meters that were installed for measuring automatically every month can
348
measure every hour as well and can be read remotely. In May 2010, 91% of the meters could
register hourly values remotely [10]. In 2012, new rules entered into force which meant that
customers who had a fuse below 63 A and subscribe to an hourly-based electricity supply
contract had the right to meters that can measure data hourly without extra cost. Customers
who did not have hourly-based electricity supply contracts or did not have the hourly metering
yet, needed to pay for the hourly metering. When a customer requested an hourly-based
contract, the electricity supplier should inform the DSO to install hourly meters and report the
hourly metering data.
In 2017, a new amendment was made to the legislation. All electricity consumers can now
request hourly metering without extra cost. In Sweden, the DSO is responsible for the
registration and reporting of values. The DSO is obliged to report values in the common
standard electronic data interchange format, upon request from the customer. If the customer
has opted for hourly metering, the DSO must make the metering data available online [10]. A
timeline of the reform and the status of smart meters in Sweden is shown in Figure 1.
Figure 8
- Timeline of the development of smart meters in Sweden
2.3 Functionalities of the first generation of smart meters
The first generation of smart meters in Sweden fulfils the requirements in the EU Directive
2012/27/EU. However, in terms of functionality of meters, the first-generation smart meters
vary significantly. In the early stages of the roll-out, the basic requirement for smart meters
was to read the meter hourly for the customers with hourly-based electricity supply contract.
There was no requirement on communication or visualization of consumption data. However,
most meters are connected to communication systems that can transfer hourly meter values
and are capable of two-way communication [10]. Some of the meters are connected to
visualization tools to enable the customers to monitor and control their consumption. Some
meters are equipped with other platforms to show the real-time price of electricity and their
consumption. According to an investigation in 2013 which included about 90% of the
household consumers in Sweden, around 66% of the meters in Sweden can send alarm signal
to DSOs when there are outages or abnormal voltage levels in the system [13]. Furthermore,
around 76% of consumers have access to hourly measurements and around 40% of the meters
can measure both input and output energy until 2013 [13]. Many new functions of smart
meters are continuously being developed. However, lack of standards for functional
Monthlyelectricity
billingsarerequired
forallelectricity
consumersbythe
Swedishgoverment
by2009.
• 200303
Thelimitoffusefor
hourlymeteringis
decreasedfrom200
Ato80A.
• 200607
Allelectricity
consumershavethe
metersthatcan
measureatleast
onceamonth.
• 200907
Hourlymeteringis
implementedfor
certainelectricity
consumerswithfuse
below63A.
• 201210
Allelectricity
consumershavethe
righttohavehourly
meteringwihtout
extracosts.
• 201707
349
requirements of smart meters has shown as a barrier for facilitating demand response. Within
the coming years many first-generation smart meters need to be replaced since they will reach
their economic lifetime.
2.4 Lessons learned from the roll-out of the first-generation smart meters
In 2013, Ei was tasked by the Swedish Government to evaluate the impact of the legislation
that enabled certain household consumers to request hourly metering without extra cost [12].
The results showed that very few electricity suppliers offer contracts based on hourly prices.
More than 55 suppliers provided hourly price contract according to the investigation in 2013
[12]. Consumers needed to contact the suppliers to find out this information. Therefore, it was
found to be difficult to compare offers from different suppliers. Around 10% of the total
consumers, which is about 600 000 consumers, have switched supplier between 2012 and 2013
[12]. Furthermore, it was difficult for consumers to understand and evaluate the hourly price
contracts. Given the lack of information, it was not surprising that only around 8 600
customers, which is less than 2% of the total customers, had chosen hourly price contracts
until October 2013 [12]. However, most of the DSOs stated that their smart meters could
measure data hourly. About one million customers had hourly metering. A few suppliers that
offered hourly price contracts to consumers also offered equipment or services (e.g. mobile
applications that visualize consumption and price) that could help consumers to react to price
signals [12]. One reason can be that it takes up to 3 months for the DSO to change a monthly
reading meter to hourly read meter, which reduces the interest from consumers to react.
3. Second generation of smart meters in Sweden
In 2014, Ei was tasked by the Swedish Government to analyse and suggest functional
requirements for the future electricity meters in Sweden [13]. The task included a cost-benefit
analysis (CBA) on implementing different functions on smart meters. The CBA was based on
the method recommended by the EU commission [14]. In 2015, Ei published
recommendations for functional requirements of smart meters in the low voltage networks,
which is less than 230 V [15]. In the rest of the paper, we will only discuss the meters in the
low voltage networks. Typical customers in the low voltage networks are household customers
and small industries. One of the conclusions from the study was that minimum functional
requirements should be defined for the second generation of smart meters in Sweden.
Functional requirements will facilitate the development of smart grid and establish a base for
competition on demand response services.
In December 2016, Ei was tasked by the Swedish Government to propose the regulation
concerning minimum functional requirements for the next generation of smart meters. In
November 2017, Ei presented the report to the Government. Ei has during the work with the
report consulted The Swedish Board for Technical Accreditation(Swedac), The Swedish Data
Protection Authority, The Swedish Armed Forces and The Swedish Security Service. Market
participants in the electricity market (DSOs, manufacturers of smart meters, etc.) were also
invited to give their views during the work. The ordinance came into force in September 2018
and Ei was tasked to develop regulations to execute the regulation concerning the minimum
functional requirements for smart meters. These requirements should be implemented by 1
January 2025.
3.1 Why functional requirements?
Well defined functional requirements on smart meters are the basis for the further development
of smart meters. It ensures that all the electricity consumers, electricity suppliers and service
350
providers have equal opportunities. Some requirements can facilitate the development of
energy service markets, for example, information on real-time electricity consumption. With
this information, customers can react to the price signal from the markets and can evaluate
different energy services. Requirements on providing more real-time information can motivate
DSOs to accelerate the journey towards a smarter grid. By providing useful information to
network operation the network can be used in a more efficient way. The development of
functional requirement on smart meters is also a continuation of the EU recommendations
from 2016.
3.2 List of minimum functional requirements
The ordinance defines five functional requirements for smart meters and metering system. The
functionalities and its purposes are shortly summarized in Table 10.
Some of these functionalities are already implemented in a large share of the meters that are
installed in Sweden, for example remote collection of measured data and registration of power
interruptions. However, by regulating the functions it makes sure that all the meters and
metering system fulfil the requirements. That will ensure that all consumers have the same
information and opportunities.
The main difference between the future meters and the meters of today is that the future
metering systems will be able to handle more and more detailed information that will be
accessible to and benefit both the customer and the DSO.
Besides the minimum functional requirements, the functionalities shall be implemented in such
a way that unauthorized persons shall not get access to information or functionalities in the
meters, and consideration must be given to the EU regulations GDPR, General Data Protection
Regulation (2016/679). Since more information will be handled by the metering system and
more actions will be possible to do remotely, it is important to consider the integrity and
security aspects.
Table 10- The minimum functional requirements for smart meters
No
.
Functionality Purpose
1 Extended measurement Promote efficient network operation
Facilitate integration of micro production in the network
2 Registration of active energy every hour
or fifteen minutes and power outages
Increase the customers’ possibility to be active in the market.
Facilitate for the DSOs to pay compensation to the customer due to
outages.
Empower the customer.
3 Customer interface Create conditions for a developed energy services market
Promote demand side flexibility and energy efficiency
Empower the customer.
4 Remote collection of measured data and
power outages
Promote efficient collection of data
5 Remote updating software, settings and
control the power of the meter
Provide the condition that new functionalities can be introduced in
a cost-efficient way.
Avoid expensive field visits.
351
A more detailed description of the functional requirements and the motivation are presented
below, together with a reference to the cost-benefit analysis for each requirement. A
quantitative analysis for all functional requirements is also represented afterwards. A more
comprehensive cost-benefit analysis can be found in [13]
1. Extended measurement
The meter shall for every phase be able to measure voltage, current, active and reactive power
for both directions. The meter shall also be able to measure and register the total withdrawal
and input of energy.
This requirement ensures that the DSOs have sufficient information to operate the network
efficiently. Electricity consumers can also use this information to evaluate different energy
services and to evaluate the possibility to install microgeneration or energy storage. However,
these benefits are difficult to quantify. At the same time, the extended measurement data are
beneficial only if these data are accessible to customers. Therefore, some of the benefits are
analysed in the next functional requirement. Moreover, the benefits depend on the type of
consumers. Customers who live in houses are likely to benefit more than those who live in
apartments. The costs for implementing this requirement is estimated as 0-30 SEK3 per meter
[13]. The benefits from extended measurement are believed to be higher than the costs.
2. Registration of active energy every hour or fifteen minutes and power outages
1) Registration of active energy every hour or fifteen minutes
The meter should be able to save the active energy in both directions every hour and be able to
convert to every fifteen minutes. This will allow for increased customer awareness of their
consumption. The interval of fifteen minutes is adopted from the recommendation from the EU
commission. Hourly data or fifteen minutes data is an important condition to develop demand
response services and electricity contracts which can send out the right market signals.
The benefit of consumers having a better understanding of their consumption and taking
actions to reduce its consumption is estimated to be 35 SEK per household per year. This
estimation assumes that consumers reduce their consumption by 1% per year in average. The
benefit for the DSO is estimated by assuming that the DSO will use the information to provide
better services and to reduce the operational cost. The benefit is estimated to be 15 SEK per
meter and year. This requirement is also expected to reduce the possibility of over
dimensioning the network capacity and to facilitate demand response. However, these
potential benefits are more difficult to quantify.
To fulfil this requirement, the DSOs need to invest in a better data colleting system and
registration system. The cost for investing in such colleting system is estimated to be 23 SEK
per meter, while the cost for such registration system is estimated to be 50 – 150 SEK per
meter. Nevertheless, there will be the additional operational cost to fulfil this requirement,
which is estimated to be 84 SEK per meter per year. To benefit from this requirement,
consumers need to change their behaviour. The cost or the value of a consumer to change its
behaviour is estimated to be 10 SEK per meter per year. There is also cost for the regulator
because contacts from consumers may increase. The estimated cost for the regulator is
between 8 000 and 160 000 SEK per year.
Given these quantified costs and benefits, registration of active energy for every hour or fifteen
minutes has higher costs than benefits. However, it is believed that the costs of the
technologies are going to decrease, and the unquantified benefits will contribute to increasing
the efficiency in the whole society.
3 10 SEK ~= 0,97 Euro, November, 2018
352
2) Registration of power outages
The meter should also be able to register data in the beginning and end of a power outage in
one or more phases if the outage lasts three minutes or longer. This requirement gives more
accurate information on outages. Therefore, it helps the customers to receive the right amount
of compensation for the outage. More accurate information on outages can also help the DSO
to monitor the network and eventually improve the reliability. It also helps the regulator to
have better supervision on the reliability of the system. These benefits are difficult to quantify.
However, this requirement does not imply extra cost for the meters if the function 1 would be
in place.
3. Customer interface
The meter should be equipped with a customer interface, supported by an open standard, for
the customer to be able to take part of the measured values (see function no. 1) in near real
time. The interface should only display these information after the customer’s request. The
DSO must deactivate the interface when the customer moves out. Furthermore, it is not
possible to send information from the customer through the interface.
The requirement ensures the customers have access to the near real-time data. This increase
the awareness of the customers on their electricity consumption. Electricity consumers can
also use this information for decreasing the energy consumption and evaluating different
electricity contracts which may lead to change supplier of electricity. The quantified benefit of
visualizing the near real-time data lies in that the consumers reduce their consumption. If the
reduction is around 5% per household and year, the benefit of having such requirement is
about 173 SEK per household and year.
The cost for a physical interface on the meter to fulfil the requirement is estimated to be
between 20 and 50 SEK per meter. To see all the near real-time data, consumers need to invest
in a display which can obtain the information through the interface. The cost of such a display
is estimated to be between 200 and 1 000 SEK per meter. There is no other extra cost for the
consumers or the regulator if the function 2 is in place.
4. Remote collection of measured data and power outages
The DSO should be able to read the measured values (see function no. 1) and the outage
information remotely (with remote control). This requirement is to promote efficient data
collection. To read the measured values remotely reduces the personal cost. Furthermore, to
automatically send the outage information also increases the accuracy of the outage
information and reduces the workload of DSOs. In addition, the real-time measured values and
the outage information are valuable for the network operation. There is no extra cost for
implementing this requirement in the meters. It may increase the cost for the DSOs depending
on their communication and reporting system.
5. Remote updating software, settings and control the power of the meter
The DSO should be able to update software and change settings of the meter remotely. This
requirement aims to reduce the costs for future updates of smart meters. With the development
of smart meter, more requirements may be defined, and more security measures may need to
be implemented. It also can decrease the operational costs if the field trip can be replaced by
remote control. Each trip costs about 300 - 600 SEK. However, many current meters already
have this function in place.
The DSOs should also be able to turn on and off the power through the meter with remote
control. This requirement only applies for meters that are not connected by current
transformer. This requirement also aims to decrease the operational cost by avoiding the field
trip. This function can be useful for the customers when they move out or in. It can potentially
decrease the energy consumption during the moving out and in period.
353
There is no extra cost for implementing remote updating software and settings since most of
the meters already have this function in place. The meters that are equipped with current
transformer are exempted from this requirement, because it may lead to excessive costs.
The cost for enabling turn on/off the meter remotely is estimated to be between 100 and 200
SEK per meter. But most of the existing meter already have such function in place. It is
assumed that only 5%-20% of the meters need to be reinvested.
4. The cost of smart meters
Ei determines a revenue cap for each DSO for a period of four years at a time. The revenue cap
indicates the total amount that the DSO may charge their customers. The purpose of the
revenue cap is that DSOs shall obtain reasonable coverage for their costs and reasonable return
on the invested capital. The minimum functional requirements may increase the cost for smart
meters. Therefore, it is important to consider how costs related to meters are handled in the
revenue-cap regulation to facilitate the roll-out of the next generation smart meters. The
current Swedish revenue cap regulation is described more in detail in [16].
There are both operating expenses (OPEX) and capital expenses (CAPEX) connected to
meters. The OPEX can for example be affected by changes in the costs associated with reading
and using meter data. Changing to more advanced meters can both increase and decrease
OPEX. On the one hand, more data should be handled. IT security issues, more expensive
software, more competence requirements etcetera will increase OPEX. On the other hand,
better IT systems, more automation and more information from meter data possibly lead to
more efficient operation in the distribution system. The OPEX part in the revenue cap
regulation is based on the DSO’s actual historical OPEX with annual efficiency requirements
of 1.00-1.82 % per year based on a data envelopment analysis (DEA). Hence, new meters do
not change the OPEX part in the revenue cap, which means incentives for the DSOs to reduce
its actual OPEX as much as possible.
When the DSO invest or re-invest in a new component such as a meter, the CAPEX part of the
revenue cap increases. Ei has a norm price list of component categories, so first the DSO must
identify which component category that best fits the actual investment. The norm cost is then
input to the CAPEX calculation. The CAPEX consists of two parts: return and depreciation.
All meters have a regulatory depreciation time of ten years (for most other power system
equipment the depreciation time is much longer). So, if the norm price for example is 10 000
SEK (~1 000 EUR), then the DSO would be compensated with 1 000 SEK/year (10 000/10)
for ten years. The return part is based on the norm value, the age and the rate of return (a
WACC method is used). If the meter in the example is seven years old, it has lost 60 % of its
value (6 000 of 10 000 SEK, 1000 SEK/year depreciation for the first six years), which gives
an age adjusted value of 4 000 SEK (10 000 – 6*1 000 SEK). The annual return is the equal to
WACC*4 000 SEK. To dis-incentivize the DSO to replace well-functioning equipment, the
depreciation time can be increased two years for meters (i.e. totally up to 12-year
depreciation).
The revenue cap regulation also includes incentive schemes based on several indicators for
continue of supply, losses and for having a more even load. Smart meters can have indirect
impact to help the DSO improve such indicators in a longer perspective. Ei has published
papers in English, for example [16], which describe the revenue cap regulation in more
details.
354
5. Smart meters in Sweden-- to be continued
Sweden have around 5.4 million electricity meters in the low voltage network. The installation
of new smart meters is expected to bring benefits both to the DSO and to the customers by for
example supporting the development towards a smart grid by providing information that will
enable new energy services and demand response. New regulations will be drafted by Ei to
ensure the implementation of the minimum functional requirements that are stated in the
ordinance.
Reference
[1] “Benchmarking report on the quality of electricity supply,” 5th CEER , 2011.
[2] C. Wallnerström and L. Bertling, “Laws and regulations of Swedish power distribution systems 1996-
2012: learning from novel approaches such as less good experiences,” CIRED Workshop, 2010.
[3] M.Larsson, “The network performance assessment model,” Royal Institute of Technology, 2005.
[4] E. Grahn, L. Ström, K. Alvehag, C. J. Wallnerström and et.al, “Incentivizing continuity of supply in
Sweden,” 2016 13th International Conference on the European Energy Market (EEM), 2016.
[5] G. Wigenborg, L. Öhling, C. Wallnerström and et.al, “Incentive scheme for efficient utilization of
electricity network in Sweden,” 2016 13th International Conference on the European Energy Market
(EEM), 2016.
[6] Directive 2009/72/EC, 2009.
[7] Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy
efficiency.
[8] “Clean energy for all Europeans,” [Online]. Available: https://ec.europa.eu/energy/en/topics/energy-
strategy-and-energy-union/clean-energy-all-europeans.
[9] [Online]. Available: http://governmentgazette.eu/?p=5540.
[10] NordREG, “Common Nordic Metering Methods,” 2014.
[11] USmart Consumer, “European smart metering landscape report,” 2016.
[12] J. Nillson, J. Leymann and S. Näselius, “Uppföljning av timmätningsreformen (In Swedish),” 2014.
[13] D. Norstede, S. Persson and T. Ny, “Funktionskrav på framtidens elmätare (in Swedish),”
Energimarknadsinspektionen, Eskilstuna, 2015.
[14] EU, “Commission recommendation of 9 March 2012 on preparations for the roll-out of smart
metering systems (2012/148/EU),” Official Journal of the European Union, 2012.
[15] D. Norstedt, S. Persson and T. Ny, “Funktionskrav på framtidens elmätare,” 2015.
[16] C. J. Wallnerström, E. Grahn, T. Johansson and et.al, “The regulation of electricity network tariffs in
Sweden from 2016,” SAEE, 2016.
[17] T. Solver, “Reliablity in performance-based regulation,” Royal Institute of Technology, 2005.
[18] Electricity Act (1997:857) 5 kap. 7a§.
[19] Energimarknadsinspektionen, “Smart metering and smart grids,” 2011.
... Sweden was one of the first countries in Europe to introduce smart meters, which are also playing a key role in the household-level energy change. Smart meters have a number of benefits, such as targeted billing, greater security, more effective energy management, and more accurate behavioural monitoring and intervention [26], although studies have also begun to identify ways in which these systems trigger inequalities among consumers [27][28][29]. ...
Article
The Nordic countries, including Sweden, are often considered to be at the forefront of the drive to introduce sustainable energy technology, including at the household level, as part of the transition to sustainable societies. For a transition to become reality, all groups of society have to be part of it, and the social sciences have a role in investigating the conditions for these groups to be involved. The extent to which diverse (including marginalised) communities and households are part of this transition and have equitable access to the relevant technologies, including smart technologies, and the degree to which the transition is a shared value and aspiration is still unclear. We want to explore what steps are being taken in Sweden to incorporate these groups in planning and technology access, and to what extent this is supported by a range of entities, from the Swedish Energy Agency to grassroots organizations, with a particular focus on social, gender and migrant perspectives. Our preliminary evaluation of Swedish energy policy documents indicates that, while social justice and gender considerations are acknowledged, little funding is actually allocated towards social science covering these areas. Moreover, there is no mention of ethnic equality or the inclusion of migrant communities in the documents that we reviewed. With this Perspective we highlight the need for further research to develop a more nuanced understanding of the different narratives embedded in household sustainable energy usage and decision-making around the adoption of sustainable energy technologies at the household level.
... The largest DSO in Italy, e-distribuzione, with 86% market share in Italy covered almost all its network by smart meters during this period [45]. In Sweden, a regulation change in 2003 required monthly metering for small consumers, and led to the rollout of the first generation of smart meters [46]. Finland is also one of the pioneers of smart metering deployment in Europe [47], in which its DSO regulation has combined different economic models to incentivize DSOs to invest in smart meters since 2005 [48]. ...
Article
Full-text available
This paper investigates how the strategic decisions of innovative firms to collaborate with other firms in research and development projects shape the early evolution of smart grid technologies as an emerging technological system across Europe. The early innovations and developments in an emerging technological system are crucial for understanding further developments of the system. This early stage is highly influenced by the strategic decisions and lobbying power of the firms experimenting with different technological innovations, and the policies trying to maintain competition and steer the direction of innovative activities. Therefore, it is important to analyze how innovative firms behave in terms of collaborating with other firms and doing research on specific energy solutions, which reflect their strategic priorities. By taking a complex network approach, this paper investigates a network of smart grid R&D projects to analyze the convergence of smart grid research activities towards a stream of innovative solutions, and the variety of innovative activities branching out from these solutions. The results verify the convergence of smart grid activities towards one specific stream of innovations, and reveal the existence of four variations centered around different technological applications. The results can guide strategy development in innovative firms to take part in research collaborations or focus on specific smart energy technologies, and have implications for policy makers aiming to influence the direction of smart grid research programs, as well as for researchers in the field of smart grid innovation and technological innovation systems.
Article
Full-text available
In the era of information technology and big data, the extraction, commodification, and control of personal information is redefining how people relate and interact. However, the challenges that big data collection and analytics can introduce in trust-based societies, like those of Scandinavia, are not yet understood. For instance, in the energy sector, data generated through smart appliances, like smart metering devices, can have collateral implications for the end-users. In this paper, we present a systematic review of scientific articles indexed in Scopus to identify possible relationships between the practices of collecting, processing, analysing, and using people's data and people's responses to such practices. We contextualise this by looking at research about Scandinavian societies and link this to the academic literature on big data and trust, big data and smart meters, data ethics and the energy sector, surveillance capitalism, and subsequently performing a reflexive thematic analysis. We broadly situate our understanding of culture in this context on the interactions between cognitive norms, material culture, and energy practices. Our analysis identified a number of articles discussing problems and solutions to do with the practices of surveillance capitalism. We also found that research addresses these challenges in different ways. While some research focuses on technological amendments to address users’ privacy protection, only few examine the fundamental ethical questions that discuss how big data practices may change societies and increase their vulnerability. The literature suggests that even in highly trusting societies, like the ones found in Scandinavian countries, trust can be undermined and weakened.
Conference Paper
Full-text available
A revenue cap regulation for electricity distribution system operators (DSOs) has been in place in Sweden since 2012. The national regulatory authority for energy, the Swedish Energy Markets Inspectorate (Ei), determines a revenue cap for each network operator for a period of four years. This paper describes the new incentive scheme for continuity of supply that is first applied in the period 2016–2019. Depending on the performance of the DSO, the incentive scheme may result in a reward or penalty on the financial return to the DSO. In the new incentive scheme, the performance of all DSOs at local level is benchmarked to set individual baselines for each company based on the customer density. The performance indicators SAIDI and SAIFI are differentiated between different customer groups, and the indicator CEMIn is introduced. This paper aims to act as reference material and inspiration to others as well as a chance for Ei to receive feedback valuable for future development.
Conference Paper
Full-text available
As a result of the 2012 Energy Efficiency Directive, the Swedish regulatory authority for energy, the Swedish Energy Markets Inspectorate (Ei), has introduced new rules regarding an efficient utilization of the electric power system. To incentivize distribution system operators (DSOs) to operate their networks in an efficient way, Ei has developed financial incentives within its revenue cap regulation. This paper describes the newly developed incentive scheme in Sweden that aims to incentivize DSOs to a more efficient utilization of power systems; first implemented during the regulatory period 2016–2019. The indicators that are used for measuring to what extent the grid is utilized efficiently are: network losses, cost of the feeding grid and average load factor. This paper aims to act as reference material and inspiration to others as well as a chance for Ei to receive feedback valuable for future development.
Data
Full-text available
The online-only Data Supplement is available with this article at http://dx.doi.org/10.4070/kcj.2014.44.4.220.
Laws and regulations of Swedish power distribution systems 1996-2012: learning from novel approaches such as less good experiences
  • C Wallnerström
  • L Bertling
C. Wallnerström and L. Bertling, "Laws and regulations of Swedish power distribution systems 1996-2012: learning from novel approaches such as less good experiences," CIRED Workshop, 2010.
Common Nordic Metering Methods
  • Nordreg
NordREG, "Common Nordic Metering Methods," 2014.
Uppföljning av timmätningsreformen (In Swedish)
  • J Nillson
  • J Leymann
  • S Näselius
J. Nillson, J. Leymann and S. Näselius, "Uppföljning av timmätningsreformen (In Swedish)," 2014.
Funktionskrav på framtidens elmätare
  • D Norstedt
  • S Persson
  • T Ny
D. Norstedt, S. Persson and T. Ny, "Funktionskrav på framtidens elmätare," 2015.
Commission recommendation of 9 March 2012 on preparations for the roll-out of smart metering systems
EU, "Commission recommendation of 9 March 2012 on preparations for the roll-out of smart metering systems (2012/148/EU)," Official Journal of the European Union, 2012.
The regulation of electricity network tariffs in Sweden from 2016
  • C J Wallnerström
  • E Grahn
  • T Johansson
C. J. Wallnerström, E. Grahn, T. Johansson and et.al, "The regulation of electricity network tariffs in Sweden from 2016," SAEE, 2016.