Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System

Authors:

Abstract and Figures

Ethiopian government undertakes plans to develop massive hydropower potential with the construction of a large scale Grand Ethiopian Renaissance Dam (GERD) upstream of the Ethiopian-Sudan border in an effort to utilize the water resources potential, improve the water and energy security in order to reduce poverty, create an atmosphere for social change and bring economic growth to the country.The Analytic Hierarchy Process (AHP) is one of the most widely used multi-criteria decision analysis in water resources management and energy planning. AHP was used to study the trade-offs of reservoir capacity design plans in order to promote a sustainable strategy for water resources management in the Eastern Nile countries that includes Egypt, Ethiopia and the Sudan, without dangerous impacts on the environment and riparian countries. Several environmental, economic and social criteria were considered when choosing the best alternative for sustainable water resources management in the Eastern Nile countries to mitigate the adverse impacts resulting from the construction of GERD to downstream countries. The results of this study showed that the “Do nothing” is the most appropriate option with regard to the environmental impact on the Eastern Nile countries compared to the original plan and the new applied one (running now).
Content may be subject to copyright.
IOSR Journal of Computer Engineering (IOSR-JCE)
e-ISSN: 2278-0661,p-ISSN: 2278-8727, Volume 18, Issue 5, Ver. VI (Sep. - Oct. 2016), PP 08-18
www.iosrjournals.org
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 8 | Page
Assessment of Grand Ethiopian Renaissance Dam impacts using
Decision Support System
Ghada Soliman1, Hoda Soussa2& Sherif El-Sayed3
1PhD in Environmental Engineering, Institute of Environmental Studies and Research, Ain Shams University.
Senior Software and Service Architect, Orange Labs Egypt, Cairo, Egypt,+2 012 010 66019
2Professor of Water Resources Engineering, Faculty of Engineering, Ain Shams University
3Associate professor, Head, Numerical Modelling Department, Hydraulics Research Institute, National Water
Research Centre
Abstract: Ethiopian government undertakes plans to develop massive hydropower potential with the
construction of a large scale Grand Ethiopian Renaissance Dam (GERD) upstream of the Ethiopian-Sudan
border in an effort to utilize the water resources potential, improve the water and energy security in order to
reduce poverty, create an atmosphere for social change and bring economic growth to the country.The Analytic
Hierarchy Process (AHP) is one of the most widely used multi-criteria decision analysis in water resources
management and energy planning.AHP was used to study the trade-offs of reservoir capacity design plansin
order to promote a sustainable strategy for water resources management in the Eastern Nile countries that
includes Egypt, Ethiopia and the Sudan, without dangerous impacts on the environment and riparian countries.
Several environmental, economic and social criteria were considered when choosing the best alternative for
sustainable water resources management in the Eastern Nile countries to mitigate the adverse impactsresulting
from the construction of GERD to downstream countries. The results of this study showed that the “Do-
nothing” is the most appropriate option with regard to the environmentalimpact on the Eastern Nile
countriescompared to the original plan and the new applied one (running now).
Keywords: Analytic Hierarchy Process; dam impacts; decision support systems; environmental impacts;
GERD; Nile River; water management
I. Introduction
The Nile Basin is considered one of the most complex and unique river basinsdue to its size and
varying climate, hydrology, topography and demography (Sileetet al. 2013). This variation poses many
challenges to the management of transboundary water resources of the basin, under the growing pressure from
increasing population, poverty, famine, climate change, shrinking water levels of dams and related power
shortages, dams‟ construction and agricultural development plans within the basin(Batisha 2013). These
challenges could trigger social, political and economic conflicts that would threaten the stability of communities
and nations among riparian states. Transboundary water resources offer a great opportunity for developing and
sharing the water resources of the region for personal and household needs, hydropower generation, agriculture,
navigation and several other social needs. The full potential of these shared water resources has not been fully
realized due to the lacking of investment funding requirements. Shared water resources represent a source of
cooperation and negotiation that need to be greatly enhanced at all political levels and the institutional support
for the management and the sustainable use of these water resources (Nile Basin Initiative 2012).
The Nile constitutes of two important water supply sources. The Eastern Nile Basin (Blue Nile) has
about 85% of the flow of the Nile that is originated from Ethiopia whereas Eastern Equatorial Nile (White Nile)
has the remaining of the flow that is about 15% of the flow. The Blue Nile has about 60% of the total flow at
Aswan and is still considered an important river basin to the Eastern Nile countries that includes
Egypt, Ethiopia and the Sudan (Mulat and Moges 2014). The major water uses are irrigation and hydropower.
Both Egypt, and to a less extent Sudan, are dependent significantly on water that come from the Nile for use in
irrigation in both countries (Waterbury 2002). On the other hand, Ethiopia contributes with less than 5% of the
irrigable land in the basin and less than 3% of the hydropower potential (Block et al. 2007). Ethiopia has a
plenty of water resources and abundant hydropower potential that is estimated to be about 30 000 MW with a
total potential of 159 TWh/year (World Energy Council 2007). Currently, 94% of Ethiopia‟s population still
depends on fuel wood for cooking and heating and 83% has no access to electricity (Thomson 2006).
The Nile riparian countries have substantial potential energy resources that include hydropower, natural
gas, oil, coal, peat, biomass, geothermal, solar, and wind energy. Hydropower remains the preferred renewable
energy source in which the power is producedas the result of moving the energy of water from higher to lower
elevations. It takes the dominant and central role among the various energy options for several reasons. One of
the key reasons is the low price-competitive technology that makes electricity affordable to urban and rural
Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 9 | Page
areas. It is reliable power supply and pollution free. It also provides abundant employment opportunities during
construction and operation with additional benefits for flood control and river flow regulation, irrigation,
transport and navigation, aqua farming, recreation, industrial and domestic supply. Moreover, it allows the
construction of infrastructure projects as for roads, electrification, telecommunication, schools, health centers,
government services, commercial and industrial use and thus, delivers additional benefits to rural communities
(Nile Basin Initiative 2012).
1.1. Hydroelectric plans of GERD
The hydroelectric potential in the Nile Basin is massive that is estimated at 150,000 MW of
hydropower potential. Despite the region‟s endowment with enormous hydropower potential, a small fraction
has been utilized by the downstream countries except for Egypt, whose hydropower potential is fully utilized.
There are also restrictions and challenges that impede the full utilization of the region‟s hydropower potential
that demand an implementation of mitigation measures for the negative impacts from hydropower planning
projects in the region. Hydropower potential has also limited ability to meet the energy needs in the region in the
long term. The projections indicated that the total demand and the total hydropower potential will be equated in
the region by 2030. Thus it becomes urgent to explore alternative scenarios to optimize power supply that
requires regional cooperation and power integration, thereby making the region more exposure to investments in
the power sector (Nile Basin Initiative 2012).
Therefore,the Ethiopian government has ambitious plans and programs to develop hydropower in an
effort to utilize the water resources potential, improve the water and energy security and thus reduce poverty,
develop an atmosphere for social change and thus bring economic growth to the country (Whittington et al.
2005).A Large scale hydropower dam known as Grand Ethiopian Renaissance Dam (GERD) is under
construction on the Blue Nile River in the upstream of the Ethiopian-Sudan border in Ethiopia. The GERD will
create a reservoir with storage capacity of 74 billion m3 and is expected to produce 6000 MW of hydropower
energy. By this, Ethiopia will have a massive upgrade over the existing hydroelectric power. At the same time,
this will have a significant impact on the Nile flow for countries downstream of the GERD (Mulat and Moges
2014). The larger the project, the greater the impacts on the natural and social environment is to be expected.
Large-scale development demands integrated planning for an entire river basin before initial implementation of
individual project(s). As the Nile river basin isan international river shared by eleven riparian countries, such
planning fosters further international cooperation.
1.2. Impact of GERD project on Downstream Countries
The international panel of experts submitted its final report in May 31, 2013 submitted a report with the
impact of GERD to Egypt and Sudan and the main gaps on GERD project studies. The report concludes that the
main dangerous impact in Egypt will be a reduction in power generated at Aswan High Dam when the water
levels of Lake Nasser is decreased, salinization of Egypt‟s agricultural lands in the Nile Delta due to the
increased upstream withdrawals resulting from GERD operation and large scale loss of flood recession
agriculture in Sudan during GERD impounding and operation (IPoE 2013).
A Group of professional from Egypt published a recommendation report for their government on the
effects of Ethiopian Grand Renaissance Dam Project (GERDP) on Egypt in June, 2013 of social, economic, and
political impact as consequences of Ethiopian dams. The report concludes that the impact will be a reduction in
the water share of Egypt resulted in securing the future supply of water to Egypt for drinking, agriculture and
industry, production of electricity from the High Dam and the Aswan Dam during the impound and operation of
GERD especially during the drought period, abandoning agricultural lands, and water pollution, navigation,
tourism, fish farms, and catastrophic consequences in both Sudan and Egypt due to GERD rupture where the
water released by GERD‟s saddle dam failure would flow that includes drowning of major towns and villages
exposing millions to the dangers of death and relocation (GNB 2013).
1.3. Environmental impact of GERD project
The environmental impact of the implementation of the Grand Ethiopian Renaissance Dam include
direct and indirect impacts on the biological, physical and chemical features of the river and the environment
where it is located (International Rivers, n.d.-b). Due to the transformation of the riverine ecosystem upstream
of the dam into an artificial lake, the river‟s natural plant and animal species are undermined. Riverine plants
and animals are often not adapted to live in a lake environment (Federal Democratic Republic of Ethiopia
Ministry Of Water Resources, 2002a; International Rivers, n.d.-b; Than, 2011).The changes in water
temperature, dissolved oxygen, chemical composition, salinity and the physical properties of the impoundment
Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 10 | Page
generally happen too fast for the species to adapt themselves (International Rivers, n.d.-b; Than, 2011). In
addition, the survival of natural animals and plants could be further undermined by the presence of non-native
and invasive species. A second undermining factor could be the separation of animalsspawning habitats and
rearing habitats due to the dam (Federal Democratic Republic of Ethiopia Ministry Of Water Resources, 2002a;
International Rivers, n.d.-b). Also, the distribution of wild life and vegetation in the river catchment is affected.
The inundation of the forests and riverbanks will force animals and plants to migrate uphill (Ahram online,
2013; International Rivers, 2012b). Quick habitat changes could threaten animals and plants with extinction,
which endangers the catchment‟s biodiversity (International Rivers, 2012b).
The (involuntary) resettlement of inhabitants living in the project region is one of the most challenging
and controversial outcomes of large dam projects (LererandScudder, 1999; Tilt et al., 2009). The Consulate
General of Ethiopia in Los Angeles (2012), states that the project is located in an area without significant human
settlements or economic activity and will, therefore, involve minimal social and environmental costs. On the
opposite, a field survey conducted by International Rivers (2012b) states that the dam construction will induce
the resettlement of at least 5110 inhabitants that are now living in the reservoir area and downstream of the dam.
Additionally, an approximately 7380 inhabitants living in villages near the future dam impoundment will be
relocated. A survey for resettlement purposes was conducted in the communities threatened with resettlement,
which are almost all areas inhabited by indigenous people (International Rivers, 2012b). It is important to
anticipate on the emergence of conflicts about resource division and utilization between resettled residents
(International Rivers, 2012b). The construction of the Grand Ethiopian Renaissance Dam project on the Blue
Nile can be considered as a perfect example of a top-down process. They state that the involvement and opinion
of local residents was completely neglected during the preparation phase of the project (Bosshard, 2011;
ImhofandLanza, 2010; International Rivers, 2012b). According to Bosshard (2011), the Ethiopian government
currently does not even shy the suppression of everyone who adopts a critical attitude towards the construction
wave of large hydropower projects. However, at least the inhabitants threatened with resettlement should be
involved in the planning of their future (Imhof andLanza, 2010; International Rivers, 2012b).
1.4. Purpose of Study
In this study, the Analytic Hierarchy Process (AHP), a technique in Multicriteria Decision Analysis
(MCDA), was used to assess the trade-offs of reservoir capacity design plans relating to its social,
environmental, and economic indicators in the Eastern Nile Basin in order to secure the regional electricity
market without adverse impacts on the environment and riparian countries, and thus promote a sustainable
strategy for water resources management in the Blue Nile Basin. It also fosters the cooperative management of
shared water resources between riparian countries, thus allowing a sustainable and equitable way to ensure
prosperity and security for all its communities, reducing poverty and promoting economic integration under
conservative environmental prospect.The aim of this study is to assess the potential impact of the GERD Dam
on the downstream riparian countries in the Eastern Nile Basin with the use of the decision support system,
mainly the Analytical Hierarchy Process (AHP), a multi-criteria decision technique based on social,
environmental, and economic indicators.
II. Positive and Negative impacts of Dam
This section summarizes the positive and negative impacts of Dam on the environment:
Employment opportunities: The power project is expected to generate employment opportunities during
both construction and operation associated with the construction of transmission lines, and an additional
people will probably get direct and indirect jobs during operation(ADBG 2010).Improving access to
electricity in the rural areas will encourage the development of rural industries and services and thus open
up many opportunities for young people at minimum cost to national economies (NBI 2012).
Gender Issues: Women will have equal employment opportunities as well as men that will be created
during construction within the project skills requirements; and from convenient and safe access road
facility. Women can obtain further income generating activities for women such as food catering/restaurants
for workers on the construction sites and the selling of local products to construction camp workers and
thus maximizing the purchase of local products and services(ADBG 2010).
Physical displacement and resettlement:Dam construction brings considerable disadvantages to local
communities. Due to the newly created reservoir,some people may lose their land and assets whilst the need
to be resettled. People, who remain in the construction area, may find their livelihoods affected by changes
in river flow (NBI 2012). Local communities do not share the same benefits of the hydropower project,
while they carry most of the burden due to the construction of the dam. The agricultural lands and the
resettlementof millions of families will be also affected due to the reduction in the water share of
downstream countries.
Public Health:Newly created water bodies can produce water related diseases such as malaria and bilharzia
that affect public health. Some infectious diseases can spread around hydroelectric reservoirs, in specific in
Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 11 | Page
warm climates and densely populated areas (NBI 2012).The possible health impacts caused by
theimplementation of large dam projects for inhabitantsclose to the dam site, but also upstream,
downstream and eventually even nationally or internationally are presented in Table 1 (Lerer and Scudder,
1999). Table 1 Potential Health Impacts of Large Dam Projects (Lerer and Scudder, 1999)
Impact Area
Effect of the Dam
Health Impact
Upstreamcatchment and river
Loss of biodiversity, increased
agriculture, sedimentation and flooding,
changes in river flow regime
Changes in flood security, water related
diseases, difficulties with
transport and access to health facilities
Reservoir area
Inundation of land, presence of large
man- made reservoir, pollution, changes
in mineral content, decaying organic
material
Involuntary resettlement, social
disruption, vector- borne diseases,
water- related diseases, reservoir-
induced seismicity
Downstreamriver
Lower water levels, poor water quality,
lack of seasonal variation, loss of
biodiversity
Food security affected on flood plains
and estuaries (farming & fishing),
water-related diseases,
dam failure and flooding
Irrigation areas
Increased water availability and
agriculture, water weeds, changes in
flow and mineral content, pollution
Changes in food security, vector-borne
and water- related diseases
Construction activities
Migration, informal settlement, sex
work, road traffic increase, hazardous
construction
Water- related diseases, sexually
transmitted diseases, HIV/AIDS,
accidents and occupational
Injuries
Resettlement areas
Social disruption, pollution, pressure
onnaturalresources
Communicable diseases, violence and
injury, water- related diseases, loss of
food security
Country/ regional/
Global
Reduced fuel imports, improved
exports, loss of biodiversity,
reallocation of funding, sustainability
Macro- economic impacts on health,
inequitable allocation of revenue, health
impacts of climate change
Water Supply: Dams create reservoirs that supply water for many uses, including domestic, industrial and
agricultural. The seasonal and annual changing in stream flow may cause water rarity problems to people
in the riparian countries. It is expected that the livelihoods of farmers and other rural people in downstream
countries would be substantially impacted.
Safety and Security: Dam safety concerns are related to faulty design or wearing out of materials used for
construction. FEMA (“Why Dams Fail”, 2015) outlined several reasons to why dams can fail, including (a)
overtopping caused by floods that exceed dam capacity; (b) Structural failure of materials used in dam
construction; (c) movement and/or failure of the foundation supporting the dam; (d) settlement and cracking
of concrete or embankment dams; (e) piping and internal erosion of soil in embankment dams; and (f)
improper sufficiency of maintenance and upkeep.
Improve Investments: A country is characterized by reliable power supply is definitely an attractive to
investors leading to supporting expansion, of the industrial and service sectors, creating employment and
improving living standards. An effort is required to speed up the implementation of the transboundary
transmission interconnector to move energy from countries with surplus to countries with deficit, and thus
embracing peak power swapping in an aim to boost the economy with the volume of investments required
(NBI 2012).
Fisheries: Hydroelectric projects often have major effects on fish and other aquatic life. Reservoirs
positively affect certain fish species (and fisheries) by increasing the area of available aquatic habitat.
However, the net impacts are often negative because (a) the dam blocks upriver fish migrations, while
downriver passage through turbines or over spillways is often unsuccessful; (b) many river-adapted fish and
other aquatic species cannot survive in artificial lakes; (c) changes in downriver flow patterns adversely
affect many species, and (d) water quality deterioration in or below reservoirs (usually low oxygen levels;
sometimes gas super-saturation) kills fish and damages aquatic habitats. Freshwater organisms are even
more sensitive to these changes than most fish species, due to their limited mobility (Ledec and Quintero,
2003).
Irrigation:It is expected that the increase in the water surface area will lead to evaporation losses from
water reservoir.As the result, water shortagewill impact the water efficiency reached in the agriculture by
means of irrigation that has substantial economic impact.Also diversion of water through irrigation further
reduces the water supply for downstream.
Cultural assets: Cultural property that includes archaeological, historical, paleontological, and religious
sites and objects, can be inundated by reservoirs or destroyed by associated quarries, borrow pits, roads, or
other works (Ledec and Quintero, 2003).
Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 12 | Page
Downstream Flow regime:Major downriver hydrological changes can damage riparian ecosystems that
depend on periodic natural flooding, water pollution degradation during low flow periods, and increase of
saltwater intrusion near river estuaries.
Agriculture and human water supplies can be damaged due to (a) reducing sediment and nutrient loads in
the downriver of dams leading to an increase in the river-edge and coastal erosion and damage the
biological and economic productivity of rivers and estuaries, and (b) diversion of water to another portion
of the river, or to a different river kills fish and fauna and flora dependent on the river (Ledec and Quintero,
2003).
Water quality:Serious water quality declination will occur due to the reduced oxygenation and dilution of
pollutants by relatively stationary reservoirs, flooding of biomass and resulting underwater decay, and/or
reservoir stratification where deeper lake waters lack oxygen (Ledec and Quintero, 2003).
Greenhouse gas emission:In northern regions, Greenhouse gases (carbon dioxide and methane) emission
from hydroelectricity are significantly smaller than corresponding from thermal power plants alternatives
varying from < 2% to 8% of any kind of conventional thermal generation alternative whereas in tropical
region, these emissions cover a much wider range of values, varying from less than 1% to more than 200%
of the emission factors reported for thermal power plant generation (Tremblay et al. 2002)
Floating aquatic weeds:Floating aquatic vegetation can rapidly increase in eutrophic reservoirs, causing
problems such as (a) degraded habitat for most species of fish and other aquatic life, (b) improved breeding
grounds for mosquitoes and other nuisance species and disease vectors, (c) impeded navigation and
swimming, (d) blocking of electro-mechanical equipment at dams, and (e) increased water loss from some
reservoirs.
Climatic variability and change:Large areas in the basin are vulnerable to drought because of high
variability in rainfall and high evapotranspiration rates. Seasonal shortages in water associated with natural
climate variability make it difficult to maintain peak generation capacity throughout the year, and may
reduce the long term economic feasibility of candidate hydropower projects. The negative impacts of
climate on the power sector are expected to greatly increase with global climate change (NBI 2012).
Tourism: It provides additional income for local populations throughout recreational facilities and water
sports. Accommodation areas offer an income-generation option for the local residents. When the dam site
attracts tourism, it creates an incentive for maintaining environmental sustainability in the area.
Navigation:Dams create barriers for upstream-downstream navigation and movements of fish and other
creatures. Dams can also substantially change the flow of water and transport of sediment, nutrients, and
food materials that supply downstream aquatic ecosystems and estuaries, with impacts commonly extending
for hundreds of kilometres downstream (Krchnaket al. 2009). Lower water levels have an adverse impact
on tourism and boating used for movement and trades downstream the river. With increased sediment
transport, serious changes are occurred to navigation channels and harbours.
Industrial growth:Electricity plays a significant role in poverty alleviation and in promoting the economic
productivity. The production of hydropower would allow the expansion of power-requiring industries and
factories in the surrounding urban areas and thus creating more permanent job opportunities for local
community.
III. Materials and Methods
Multi-Criteria Decision Analysis (MCDA) is an approach that provides a systematic way for decision
makers to reach same consensus by identifying, assessing and scoring options against a set of decision criteria. It
helps solve complex problems by creating structured framework that allows the decision maker to select the
optimal alternative scenario, according to the identified set of criteria.
3.1. Analytical Hierarchy Process (AHP)
Analytical Hierarchy Process (AHP) is one of Multi Criteria decision making methodsoriginally
proposed by Saaty (1980). It is a theory of measurement through pairwise comparisons that relies on the
judgments of experts to derive priority scales.It represents a decision support tool which can be used to solve
complex decision problems. It uses a multi-level hierarchical structure of objectives, criteria, and alternatives.
The priority scales are derived by using a set of pairwise comparisons. These comparisons are used to obtain the
weights of importance of the decision criteria. It provides a mechanism for improving consistency if the
comparisons and judgments are inconsistent. Thus, it helps the decision makers to achieve better judgments
based on hierarchy, pairwise comparisons, judgment scales, allocation of criteria weights, and selection of the
best alternative from a finite set of alternatives.
The methodology of AHP involves four main steps that can be explained in brief as follows:
Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 13 | Page
1. Decompose the complex problem into a hierarchical structure with decision elements descending from an
overall goal to the objectivesfrom a broad perspective, the criteria in the intermediate levels, and then the
alternatives in the lowest level. The multilevel decision hierarchyprovides an overview of the relationships
inherent in the context for practical problem solving. It helps to decompose the complex decision problems
into more comprehensive ones that can be easily evaluated independently. Figure 1 illustrates the hierarchy
structure corresponding to the example.
2. Construct a set of pairwise comparison matrices of various criteria and all decision alternatives under each
criterion, based on Saatyqualitative preference rating scale as per Table 2. Each elementin an upper level is
used to compare the elements in the level immediately below with respect to it.The diagonal elements of the
matrix is 1 indicates the comparison of the criterion to itself.The criterion i is more important than criterion
j if the value of the element (i, j) is greater than 1. The criterion i is less important than criterion j if the
value of the element (i, j) is less than 1.
3. Develop the relative weights for the criteriato produce the priority vector of a pairwise comparison matrix.
The relative weights are computed by using the geometric mean of each row. That is, the elements in each
row are multiplied with each other and then the nth root is taken (where n is the number of elements in the
row). Next the numbers are normalized by dividing them with their sum.
4. Check the consistency of the judgments used to develop the pairwise comparison matrix that can be
measured using the consistency ratio (CR). The pairwise comparisons in a judgment matrix are considered
to be consistent if the corresponding consistency ratio (CR) is 10% or lower (Saaty, 1994). The judgments
are considered random if the consistency ratio (CR) exceeds 10%. The judgments should revise the pairwise
comparison matrix and the pairwise comparison matrix should be recomputed.
5. Aggregate the relative weights of the criteria to perform the overall evaluation of the alternatives. Each
alternative can be evaluated in terms of the relative importance (or weight) of each criterion.
Table 2The pairwise comparison scale
Intensity
of importance
Definition
Explanation
1
Equal Importance
Two activities contribute equally to the objective
3
Moderate importance
Experience and judgment slightly favor one activity over another
5
Strong importance
Experience and judgment strongly favor one activity over another
7
Very strong or
demonstrated importance
An activity is favored very strongly over another; its dominance
demonstrated in practice
9
Extreme importance
The evidence favoring one activity over another is of the highest
possible order of affirmation
2, 4, 6, 8
Intermediate importance
between adjacent scale
values
Compromise is needed between two judgment
Source: Saaty (1977)
3.1.1. Compute the criteria weights
1. Construct the pairwise comparison matrix A. The matrix is n×n where n represents the number of criteria to
be evaluated. Each element aijis derived quantitatively based on Saaty qualitative preference rating scale as
per Table 1. The rating scale is used measure the relative importance of criterion i in comparison to
criterion j for each criteria pair (i, j). The pairwise comparison matrix can be represented in the following
form:
=112  1
21 1 2
 22  
121
2. Calculate the geometric mean of the ith row by estimating the nth root of the product of the pairwise
comparison values in each row.
= 
=1 1
3. Derive the relative weight of each criterion by normalizing the aforementioned nth root of criteria
Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 14 | Page
= 
=1
4. Produce a matrix of priority vector representing the relative weights of the criteria as follows
= 12 
3.1.2. Calculate the consistency ratio (CR)
1. Compute the eigenvalue by the sum of the jth column and then multiplying it to normalized principal
eigenvector or the relative weight of respective criterion.
λ=
=1
2. Calculate the maximum eigenvalue(λmax)of the priority vector by summing them as principal eigenvalue.
It can be used to estimate consistency in a matrix, as reflected in the proportionality of preferences (Saaty
1995, 1980).
λ = λ
=1
The closer λmax is to the number of elements n in the matrix A, the more consistent the matrix will be.
λ
3. Calculating the Consistency Index (CI) to measure the inconsistency and deviations from the consistency is
expressed by the following equation (Albayraket al. 2004; Lee et al. 2002; Saaty1995). The smaller the
value of CI, the smaller is the deviation from the consistency.
= λ  1
4. Derive the Random Index (RI) from Table 3 on the basis of the size of matrix (or n), where n = the number
of the elements in the matrix.
5. Calculating Consistency Ratio (CR) by dividing Consistency Index (CI) by Random Index (RI). If the CI is
less than 0.10, the consistency of the decision-maker is considered satisfactory. But if CI exceeds 0.10,
some revisions of judgment may be required (Lee et al. 2002).
= 
Table 3Random Index (RI) for size of matrix
Size of matrix(n)
1
3
4
5
7
8
Random Consistency Index
0.00
0.58
0.90
1.12
1.32
1.41
3.2. AHP Hierarchy Tree
In this study, a hierarchical decision making approach based on multi-criteria decision making
approach according to the criteria such as social, environmental, and economic, was presented in order to
prioritize the alternatives for reservoir capacity planning for power generation. The hierarchy tree is composed
of 3 main criteria, 18 sub-criteria, and 3 alternatives.
Figure 1The hierarchical structure for the selection of the reservoir capacity planning
Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 15 | Page
3.3. Indicators
The comparative evaluation of proposed alternatives was based on criteria and indicators that are of
fundamental importance for the assessment of GERD construction according to the categories identified,
including Social, Environmental, and Economic. The following table (Table 4) summarizes the indicators that
are used to measure the impacts of alternatives.
Table 4Criteria used for the alternatives evaluation
Criteria (Level 2)
Sub-Criteria (Level 3)
Symbol
Social
Physical displacement and resettlement
SO1
Gender equality and women empowerment
SO2
Water Supply
SO3
Public Health
SO4
Safety and Security
SO5
Environmental
Fisheries
EN1
Downstream Flow regime
EN2
Cultural Assets
EN3
Water quality
EN4
Greenhouse gas emission
EN5
Floating aquatic weeds
EN6
Climatic variability and change
EN7
Economic
Employment opportunities
EC1
Navigation
EC2
Energy production
EC3
Irrigation
EC4
Industrial growth
EC5
Tourism
EC6
3.4. Alternatives
This section identifies the alternatives to the hydropower GERD dam construction in Ethiopia:
1. Alternative 1: “Do-Nothing”: With the “Do-nothing” alternative, the quality of life would remain at a low
level for local community. It indicates that no increase in economic activity would occur. The existing
conditions of the socio-economic and biophysical environment would remain unchanged.
2. Alternative 2: Dam-planned”:The proposed capacity of GERD was 1200 MW with a reservoir of 14
BCM water volume.On the other hand, Ahmed and Elsanabary (2015) proved that the best accepted
scenario for constructing the dam is by charging a reservoir with 10 BCM/year or less in 3.8 years. This
amount of water will be sufficient for power generation and less impacts on the upstream counties.
3. Alternative 3: Dam-reality: The GERD is projected to have 6,000 MW with a reservoir of 74 BCM
water volume when it is completed in 2017 that will constitute a significant threat to downstream countries.
IV. Results and Discussion
The relative weights of main criteria and sub-criteria that were considered in the reservoir capacity
planning for power generation, is shown in Figure 2. According to these weights, the environmental criteria
seemed to be the most important criteria in the selection of the best alternative with regard to the construction of
GERD dam. The criterion with the least significance seems to be the economic criteria.
Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 16 | Page
Figure 2 Relative weights with respect to main and sub-criteria
Following is to determine the importance values for alternatives, this study showed that the “Dam-
reality” alternative was ranked last (0.115) behind the “Dam-planned” (0.297) and “Do-nothing” (0.587) as
shown in Figure 3.
Figure 3 Ranking of alternatives
If the GERD Dam was a multipurpose project for water storage, irrigation, or flood regulation as well
as for hydroelectricity, then the “Dam-planned” would be a considerable reasonable. However, the Ethiopian
government has stated that the dam will be used solely for electricity generation. This means that, in theory, if
the decision makers give marginal attention to the environmental and social aspects, then the decision was not
made to build the dam.
V. Conclusion
This study investigated the impacts of constructing such a dam from social, environmental, and
economic aspects using decision support system. The approach of AHP is relatively new in the field of water
resources, even having its high usefulness in the public sector decision making and resolving controversies and
conflicts. Thus AHP proved to be one of suitable methods in accordance to the problem nature on the scale of
hydropower development in the eastern Nile Basin from application point of view as many criteria are involved
in the decision making.
Poor project design can lead to soil erosion, water quality deterioration, and eutrophication during the
construction and operation of hydropower facilities. The very high sediment loads in the headwater areas
(especially in the eastern Nile region) will affect the economic feasibility of possible hydropower projects by
reducing the storage capacity and water volume available for generating electricity. Trapping the sediment load
in the new reservoir has the effect of altering downstream scour and deposition patterns, ultimately producing
Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 17 | Page
changes in river morphology (NBI 2012).The Ethiopian government has planned to postpone the filling of the
reservoir until after the river‟s sediment peak to reduce the sedimentation in the basin of the Grand Ethiopian
Renaissance Dam (International Rivers, 2012b). According to International Rivers (2012b), the population in
the study area knows about the implementation of a development project on the Blue Nile in their area but they
were not properly informed about the project.Therefore, they did not have the chance to understand the impact
the Grand Ethiopian Renaissance Dam could possibly have on their lives (International Rivers, 2012b).
According to Michaela Schoeters (2013), the benefits of the GERD- project are rather limited. So to
maximize the dam‟s benefits, the project should be implemented as part of an integrated water management
plan, in which the impact of this project is described while bearing all the river-based developments planned and
build in the entire river basin in mind.
Transboundary watercourses traversing different states present a challenge in terms of management as
each country has differing interests as per their national and local needs. It sets a stage to potential
disagreements pointing to the need for cooperation between countries and even lower levels (UNEP
2013).Water resources management affects everybody and should be undertaken with the participation of
relevant stakeholders to promotecooperation and joint action between three co-basin countries of the Blue Nile
through win-win solutions without severe environmental degradation.
Acknowledgement
I‟d like to thank Hoda Soussa for the provided guidance, support, and unbiased opinion while tackling
this topic. I‟m also thankful to Sherif El-Sayed for his contribution from an expert point of view and unbiased
feedback during this research. References
[1]. Ahmed, A. T. and Elsanabary, M. H. (2015), Hydrological and environmental impacts of grand Ethiopian renaissance dam on the
Nile river, Eighteenth International Water Technology Conference, IWTC18, SharmElSheikh, pp. 12-14.
[2]. Ahram online (2013). Egypt presidency issues summary of tripartite report on Ethiopia dam. Ahram online, p. 2. Retrieved
fromhttp://english.ahram.org.eg/NewsContentPrint/1/0/73064/Egypt/0/Egypt-presidency-issuessummary-of-tripartite-repo.aspx
[3]. African Development Bank Group (ADBG) (2010), Environmental and Social Impact Assessment Summary, Electricity
Transmission System Improvement project, P-ET-FAO-008, Ethiopia.
[4]. Albayrak, M. (2004), „Using Analytic Hierarchy Process to Improve Human Performance: An Application of Multiple Criteria
Decision Making Problem‟, Journal of Intelligent Manufacturing, Vol. 15, No. 4, pp. 491-503.
[5]. Batisha, A. F. (2013), “Sustainable Water Cooperation in the Nile River Basin: Problems and Prospects", International Journal of
Sustainability, Vol. 2, No. 1, pp. 39-53.
[6]. Block, P., Strzepek, K. and Rajagopalan, B. (2007), Integrated Management of the Blue Nile Basin in Ethiopia: Hydropower and
Irrigation Modeling. IFPRI Discussion Paper No. 700, International Food Policy Research Institute, Washington DC.
[7]. Bosshard, P. (2011). Sustainable Hydropower Ethiopian Style.
[8]. Consulate General of Ethiopia (CGE), (2013).Grand Ethiopian renaissance dam. Retrieved from:
http://www.ethiopianconsla.org/Documents/BONDINFORMATION.pdf
[9]. Federal Democratic Republic Of Ethiopia Ministry Of Water Resources. (2002a). WATER SECTOR DEVELOPMENT
PROGRAM MAIN REPORT VOLUME II.
[10]. Federal Emergency Management Agency (FEMA) (2015), Why dams fail. Retrieved September 11, 2015, from
http://www.fema.gov/why-dams-fail
[11]. Group of Nile Basin (GNB) (2013), Cairo University‟s report on Ethiopia's Great Renaissance Dam, Cairo University, Egypt.
[12]. Imhof, A., and Lanza, G. R. (2010).Greenwashing hydropower.World watch, 23(1), 814.
[13]. International Rivers (n.d.-b).Environmental Impacts of Dams.
[14]. International Rivers. (2012b). FIELD VISIT REPORT GERD PROJECT (p. 61).
[15]. IPoE (2013), International Panel of Experts on Grand Ethiopian Renaissance Dam Project (GERDP).
[16]. Kiker, G. A., Bridges, T. S., Varghese, A., Seager, T. P. and Linkov, I. (2005), “Application of Multicriteria Decision Analysis in
Environmental Decision Making,” Integrated Environmental Assessment and Management, Vol. 1, No. 2, pp. 95-108.
doi:10.1897/IEAM_2004a-015.1.
[17]. Krchnak, K., Richter, B., and Thomas, G. (2009), “Integrating Environmental Flows into Hydropower Dam Planning, Design, and
Operations”, Water Working Notes, Note No. 22.
[18]. Ledec, G. and Quintero, J. D. (2003), Good Dams and Bad Dams: Environmental Criteria for Site Selection of Hydroelectric
Projects, Sustainable Development Working Paper No. 16.
[19]. Lee, T. N., Fawcett, S. E. and Briscoe, J. (2002), „Benchmarking the Challenge to Quality Program Implementation,
Benchmarking‟, An International Journal, Vol. 9, No. 4, pp. 374-387.
[20]. Lerer, L. B., and Scudder, T. (1999). “Health impacts of large dams.” Environmental Impact Assessment Review, 19 (2), 113123.
doi:10.1016/S0195-9255(98)00041-9.
[21]. Mulat, A. G., Moges, S. A. (2014), Assessment of the Impact of the Grand Ethiopian Renaissance Dam on the Performance of the
High Aswan Dam, Journal of Water Resource and Protection Vol.6 No.6, pp. 583-598.
[22]. NBI (2012), Chapter 6: Hydropower Potential and the Region‟s Rising Energy Demand, State of the River Nile Basin, pp 163-186.
[23]. Nile Basin Initiative (2012), State of the River Nile Basin, Online: http://nileis.nilebasin.org/content/state-river-nile-basin-report
(Retrieved in 2nd of May 2015).
[24]. Saaty, T. L. (1977), A scaling method for priorities in hierarchical structures. Journal of Mathematical Psychology, 15(3), 234281
[25]. Saaty, T.L. (1980), The Analytic Hierarchy Process, New York: McGraw Hill. International, Translated to Russian, Portuguese, and
Chinese, Revised editions, Paperback (1996, 2000), Pittsburgh: RWS Publications.
[26]. Saaty, T.L. (1994), How to make a decision: the analytic hierarchy process‟, Interfaces, Vol. 24, No. 6, pp.19–43.
[27]. Saaty, T. L. (1995) Decision Making for Leaders, RWS Publications, USA.
[28]. Saaty, T.L. (2008), „Decision making with the analytic hierarchy process‟, Int. J. Services Sciences, Vol. 1, No. 1, pp.8398.
[29]. Schoeters, M. (2013), “An analysis of a big dam project: The Grand Ethiopian Renaissance Dam, Ethiopia.” Gent University.
Assessment of Grand Ethiopian Renaissance Dam impacts using Decision Support System
DOI: 10.9790/0661-1805060818 www.iosrjournals.org 18 | Page
[30]. Sileet, T. M., El Shamy, M., Abdel Aty, M, Sharak, A. M. (2013), “The Development of the Baro-Akobo-Sobat sub basin and its
Impact on Downstream Nile Basin Countries”, Nile Water Science & Engineering Journal, Vol. 6, Issue 2.
[31]. Stockholm International Water Institute (SIWI) (2012). Large-Scale water storage in the water, energy and food nexus Perspectives
on benefits, risks and best Practices. Retrieved from
http://www.siwi.org/documents/Resources/Papers/Water_Storage_Paper_21.pdf
[32]. Than, K. (2011). “Ethiopia Moves Forward with Massive Nile Dam Project.”National Geographic News, 811.
[33]. Thomson, G. (2006) Encyclopedia of the Nations-Africa. Thomson Corporation, Farmington Hills.
[34]. Tilt, B., Braun, Y., and He, D. (2009). “Social impacts of large dam projects: a comparison of international case stu dies and
implications for best practice.” Journal of environmental management, 90 (Supplement 3), S24957.
doi:10.1016/j.jenvman.2008.07.030
[35]. Tremblay, A., Varfalvy, L., Roehm, C., and Garneau, M. (2002). “The Issue of Greenhouse Gases from Hydroelectric Re servoirs:
From Boreal to Tropical Regions.” Table 1, p. 3.
[36]. UNEP (2013). “Adaptation to Climate-change Induced Water Stress in the Nile Basin: A Vulnerability Assessment Report”.
Division of Early Warning and Assessment (DEWA). United Nations Environment Programme (UNEP). Nairobi, Kenya.
[37]. Waterbury, J. (2002) The Nile Basin: National Determinants of Collective Action. Yale University Press, New Haven.
[38]. Whittington, D., Wu, X. and Sadoff, C. (2005), Water Resources Management in the Nile Basin: The Economic Value of
Cooperation. Water Policy, 7, 227-252.
[39]. World Energy Council (2007), 2007 Survey of Energy Resources. World Energy Council, London, p. 586.
... Egypt, located over 2500 km downstream of the site, opposes the dam, which it believes will reduce the amount of water available from the Nile (Abdinor 2020). The Government of Egypt, a country which relies heavily on the waters of the Nile River, has demanded that Ethiopia cease construction on the dam as a precondition to negotiations has sought regional support for its position, and some political leaders have discussed methods to sabotage it (Soliman et al. 2016). Egypt has planned a diplomatic initiative to undermine support for the dam in the region as well as in other countries supporting the project particularly donor countries (Bayeh 2016). ...
... Allegedly, it would also "affect Egypt's electricity supply by 25-40%, while the dam is being built". However, hydropower accounts for less than 12% of total electricity production in Egypt in 2010 (14 out of 121 billion kWh), so that a temporary reduction of 25% in hydropower production translates into an overall temporary reduction in Egyptian electricity production of less than 3% (Soliman et al. 2016). ...
Chapter
Abstract Tana sub-basin receives rainfall during summer as a primary source of stream flow. This research aimed to relate the catchment characteristics with hydrology of headwater catchments. Rainfall-runoff and sediment yield modeling in relation to catchment characteristics was conducted. Land use, soil, digital elevation model (DEM), precipitation, water quality and quantity were used in the analysis. ERDAS, GIS and HYDATA software were used to evaluate the physical catchment characteristics and meteorological data. Model parameters were calibrated using observed data of 2009–2011 and validated over the period of 2012. Particle swarm optimization was used to determine optimal model parameters. The model parameters were related to catchment characteristics using linear regression in a statistical software. Normalized difference vegetation index (NDVI) and hypso�metric integral are directly proportional to direct runoff parameter C. Likewise, the baseflow model parameter b is positively affected by elongation ratio and average slope, and NDVI shows negative effect. Finally, regional model for the hydrology of the headwater catchments was developed.
... The above mentioned facts undoubtedly confirm that GERD will cause serious damage to the downstream States (Egypt and Sudan), both when it is completed and filled or in case of a collapse scenario. This, in turn, confirms that GERD does not agree with the principle of "no harm" as one of the governing principles of international rivers (Kandeel, 2019;Hamada, 2017;Abdelhaleem and Helal, 2015;Soliman et al., 2016;Elsayed et al., 2013;Nigatu et al., 2015). p1155 ...
Chapter
Full-text available
Sharing of international water resources has been a crucial challenge that faced international community over the last century. International Water Law provides set of customary and conventional rules governing the aforementioned issue. In this regard, the history of water interactions in the Nile River basin indicates the existence of cooperation relations along with conflict ones since the fifties of the last century. Recently, the negative developments of events in the Nile basin have led to an escalation of disputes regarding the Hydropolitical interactions within its riparian states, namely reaching a critical level especially after the failure of negotiations of the Cooperative Framework Agreement in the Nile basin (Entebbe). The situation has got worse after Ethiopia embarked on the construction of the GERD without prior notification to downstream Egypt and Sudan. Ethiopia has exploited the fragile political situation of the Egyptian state after the January 2011 revolution. And then, Ethiopia unilaterally announced in February 2011 its project “Border Dam”, which later became the Renaissance Dam (GERD) according to technical specifications that threaten the Egyptian water security. It is clear that recent developments in the Grand Ethiopian Renaissance Dam (GERD) file are witnessing an escalation of the conflict in hydropolitical interactions between the Egyptian and Ethiopian sides. These conflictive situations and developments raise questions regarding the legitimacy of dam construction on international watercourses according to international water law rules. Especially after the negotiation between the concerned parties have entered a vicious circle of failure and Mediation by both the United States and the World Bank was unsuccessful. In addition, this study aims also to analyze the hydropolitical interactions in the Nile Basin generally and in the light of the aforementioned current developments. The study is based on both hydropolitical and legal approaches, meaning the analysis and interpretation of international political phenomena; both conflictual and cooperative; in the light of the facts of Water issue.
... --------------------------------------In coming years, Egypt will suffer from serious water shortage and water quality degradation, which results from the population growth and the economic and agricultural expansion. Moreover, disputes about the share of each Nile basin state in water and building Grand Ethiopian Renaissance dam (Millennium dam) increase water crisis (Soliman et al., 2016;MIT's Abdul Latif Jameel World Water and Food Security Lab, 2014;Amer, 2013;Telegraph foreign-staff, 2017). Thus, the officials of water resources management in Egypt need to know the optimal allocation of limited water resources. ...
Conference Paper
This work developed a system dynamics model to simulate and analyze the future potential state of water resources in Egypt. The developed model illustrates the concept of water resources availability and needs through the use of causal loop diagrams, stock and flow diagrams, equations, and simulation output graphs. This model shows the feedback and interactions between different variables of the water system. Multi-temporal data were collected to study the dynamic changes in water resources. The developed model will be the base for a decision support tool that enables policymakers to investigate water resources problem in Egypt and achieve the optimal allocation of limited water resources. Also, this work allows long period predictions, which are not available in other published research. The results showed that population growth and agricultural needs are the main factors causing the water crisis in Egypt. They also illustrated that the water needs exceed water availability. In addition, maximizing the utilization of the agricultural drainage water will contribute to reducing this gap.
... The dam is located in a mountainous area, some 20 kilometers upstream of the Ethiopian-Sudan border. The main purposes of the GERD dam are to reduce poverty; by improving the economy, energy generation and water security, as well as utilize the water resources potential (Soliman et al., 2016). The initial construction cost of the dam was estimated to be US$ 4.8×10 9 (Yihdego et al., 2017). ...
Technical Report
Full-text available
This report provides a technical review of the available literature on different studies and analyses applied to the Grand Ethiopian Renaissance Dam (GERD) up to May 2021.
Thesis
Full-text available
The PhD dissertation titled ”Integrating Multiple Satellite and Climate Model Prod ucts for Hydrologic Modeling in the Upper Blue Nile Basin, Ethiopia” addresses the challenges of water resource management in the region, focusing on the impact of climate change on the basin’s hydrology. The study utilizes advanced remote sens ing technologies, climate and nested hydrological models, and statistical analysis to improve hydrological predictions and provide valuable insights for decision-making processes. The Upper Blue Nile Basin (UBNB) is the main flow contributor to the down stream river and is significantly affected by changes in global climate. However, due to complex topography, limited data availability, highly variable climate, and the use of various modeling tools, previous studies have produced diverse results in future climate projections and runoff modeling. Soil moisture, a crucial hydrological com ponent for understanding climate change impacts and water resources management, has received limited attention in the basin. The dissertation aims to characterize the water balance in the UBNB and demon strate how climate simulations can generate reliable local predictions of runoff and f loods in the Ethiopian highlands. Nested hydrological modeling techniques and multiple climate scenarios are employed to assess the impact of climate change on basin hydrology. The study evaluates long-term global satellite and reanalysis of soil moisture products to identify suitable options for improved hydrological applications. The research framework incorporates the use of the Wflow-sbm nested hydrolog ical model, statistical analysis, and various datasets, including ground observations, remote sensing data, data assimilation models, and climate model outputs. Quan tile Mapping bias correction methods are applied for systematic bias correction, and the Mann-Kendall trend test is employed for trend analysis. The CMIP6 climate models are utilized for climate projections and initializing the nested Wflow-sbm model to analyze long-term runoff trends in flood-prone areas. The calibration of the Wflow-sbm model with in-situ observations is performed using the model-independent multi-algorithm optimization estimation tool (OSTRICH). Additionally, the performance and applicability of operational satellite/reanalysis soil moisture products are evaluated using an existing Citizen Science Initiative (PIRE CSI) in-situ measurements. Preliminary investigations reveal minimal trends in UBNB runoff (1% of variance) and a dominant annual cycle (69%) influenced by the equatorial trough and Hadley circulation. Ensemble model projections indicate upward trends in the runoff, suggesting that it may meet the growing demand for Nile water. The CMIP6-SSPs climate projections provide valuable insights into future temperature and precipitation patterns in the basin, indicating potential benefits from climate change. The application of the Wflow-sbm model demonstrates its effectiveness in simulating saturation excess dominated runoff and flood events in the basin. Promising soil moisture products with the potential to enhance local hydrological applications are identified through validation work. These soil moisture products can be used to calibrate and validate the Wflow-sbm model outputs for the future modeling works in the basin. This dissertation serves as a significant step toward the development and imple mentation of global model-driven nested hydrological assessments in future projec tions. The research findings contribute to emerging development projects such as the Great Ethiopian Renaissance Dam (GERD) and support sustainable water re sources management in the UBNB. Recommendations include improving the quality of real-time reporting of streamflow, soil moisture, and climate variables for better satellite-model calibration and forecasting. Future research will explore uncertainty and investigate its effect on locale impact studies. The findings and methodologies presented in this dissertation have practical implications for water resource manage ment, climate change adaptation, and decision-making processes in the Upper Blue Nile Basin and other similar regions.
Chapter
Because several rivers flow into neighboring countries, Ethiopia is known as Africa's water tower. Aside from the abundance of rivers, the country's terrain, which ranges from 120 m below sea level at Kobar Sink to 4620 m above sea level at Ras Dashen, makes it more appropriate for hydropower generation. Because several rivers flow into neighboring countries, Ethiopia is known as Africa's water tower.
Chapter
According to the Paris climate agreement, signed in 2015 and with 191 members joining the agreement as of March 2021, countries aim to limit the average temperature increase to 2 °C (even 1.5 °C) from the pre-industrial period.
Article
Full-text available
The construction of large-scale water reservoir facilities in transboundary river basins always arouses intense concern and controversy. The Grand Ethiopian Renaissance Dam (GERD) under construction in Ethiopia is perceived to affect water security in Egypt and Sudan. Therefore, this study investigated the water and sediment balance of the Blue Nile River (BNR) basin and identified the spatio-temporal variation in sediment and water yields along with the construction of GERD using Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) sediment and water yield models. The BNR basin experienced increasing water and sediment yields between 1992 and 2020 and has shown a growth trend since 2020. The lion’s share of water and sediment yields come from upstream of the GERD. Taken together, these results imply that the construction of the GERD will serve as a water storage and silt trap for Sudan and Egypt.
Chapter
Egypt, SudanSudanand EthiopiaEthiopia have been negotiating for nearly a decade to reach an agreement on key technical and legal issues related to the impact of the GERD. Some of the major milestones in the negotiationTransboundary water negotiation process are: the formation of the International Panel of ExpertsInternational Panel of Experts (IPOE)), Declaration of PrinciplesDeclaration of Principles, formation of a Joint Research Group, involvement of the USAUnited States and the World BankWorld Bank to observe tripartite talks and the request by EgyptEgypt to the United Nations Security CouncilUnited Nations Security Council to intervene. The outstanding issues to be resolved include: droughtMitigationmitigationDrought mitigation, binding agreementBinding agreement, dam safety and dispute resolution. African UnionAfrican Union (AU) has been approached to intervene in the dispute. The involvement of AU provides an opportunity for the continental peace architectural framework through three ways: the Assembly of Heads of state and government which is the AU’s supreme policy and decision-making organ, the AU Peace and Security Council (APSC)AU Peace and Security Council (APSC) which is the pinnacle of the AU architecture framework of conflict prevention, management and resolution and the involvement of COMESACommon Market for Eastern and Southern Africa (COMESA) which is the largest Regional Economic Community of the African UnionAfrican Union aimed at promoting regional integration through trade and the development of natural and human resources. The main purpose of the chapter is to analyse how the AU peace building frameworks can be used to resolve the GERD dispute. The chapter will explain how the AU frameworks can be used to promote integrated and sustainable management outcomes and the significant steps of dispute resolution mechanisms that can be taken through the AU framework.
Article
Full-text available
The Nile Basin, due to its size and varying climate, hydrology, topography and demography, constitutes one of the most complex and unique river basins. A great number of water resources development projects are being under planning and implementation phase on both national and transboundary levels in order to respond to rapid population growth, climate change impact, urbanization, industrialization, economic and food crises on both global and regional levels. The Baro-Akobo-Sobat sub basin is considered one of the most promising regions in the Eastern Nile Sub-basin and a number of water resources development projects are being planned for this purpose: TAMS Dam, Birbir A and Birbir R Dams, Baro-1 and Baro-2 Dams, Geba-A and Geba-R dams for hydropower production, Itang Irr Scheme, Gilo-2 Dam and Irr Scheme, , Dumbong Dam and Irr Scheme, Genji Scheme (Hydropower). The main objective of this study is to assess the positive and negative impacts of these projects on both national and regional levels. Different assumptions and approaches in proposed dams operation rules and irrigation schemes are used in order to reach an optimal solution for an integrated development of the sub basin while minimizing the negative impact on the basin level downstream. A series of development scenarios and relevant social, environmental and economic indicators on both local and downstream levels are measured and a multi criteria analysis is undertaken to evaluate these scenarios. Based on the quantification of environmental, social and economic indicators and their comparative analysis, this study is presenting an optimized set of development projects within the Baro-Akobo-Sobat basin that can simulate the win-win regional approach, maximizing the regional benefit and minimizing the negative impacts. Therefore, the main output of this study is presented as a proposed master development plan of the BAS basin using the basin water resources as a major potential.
Article
Full-text available
Since 1999 a multilateral effort termed the Nile Basin Initiative has been underway among the Nile riparians to explore opportunities for maximizing the benefits of the river's waters through cooperative development and management of the basin. However, to date there has been virtually no explicit discussion of the economic value of cooperative water resources development. We believe that a serious discourse among Nile riparians about the economics of Nile cooperation is both inevitable and desirable, and that this discourse will not diminish the importance of environmental, social, or cultural issues that new infrastructure on the Nile will entail. To initiate such a discussion, in this paper we present the results of the first economic model designed to optimize the water resources of the entire Nile basin. Total (potential) annual direct gross economic benefits of Nile water utilization in irrigation and hydroelectric power generation are estimated to be on the order of US$7-11 billion. This does not account for the costs of building or operating the infrastructure.
Conference Paper
The Nile River (NR) is an international river shared by eleven riparian countries. It is the primary water resource and the life artery for its downstream countries such as Egypt and Sudan. In Ethiopia which is one of most important water sources of the NR, a study for constructing the Renaissance dam on the Blue Nile close to its border with Sudan was initiated. The dam is designed to create a reservoir that will have a capacity of holding about 74 billion cubic meters of water at the full supply level. This paper aims to study the effects of constructing such dam on the NR streamflow, especially downstream the dam and its impacts on Egypt and Sudan. The study includes simulation works for all possible scenarios from starting the dam construction up to reaching the full capacity of its reservoir to identify impacts of this dam on the Ethiopia and the downstream countries. The possibility of the dam damage also investigated via simulations from HEC-RAC model. Results showed some merits and many drawbacks of this project on the Nile streamflow. Results showed also the weakness of the design and referred to the possibility of impacts due to the dam breach.
Article
Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects.
Article
Decision Making for Leaders is an introduction to Saaty's analytic hierarchy process (AHP) aimed at an audience of leaders in business, industry, and government. As such, the book can be viewed as a popularized version of Saaty's more technical works on AHP (for example, see [1]).