Assessing power performance at sea is an important step in taking wave energy towards commercial projects. Open-sea testing being expensive, it is essential that it be conducted in the most efficient way. One measure of this is how accurately power production can be predicted using data from a given testing period. We report on how using sample durations ranging from three hours to five minutes affects power performance assessment. The analysis focusses on open-sea operating data from EVE’s Mutriku wave power plant, a shoreline breakwater housing oscillating water columns. Results suggest that post-processing with sample duration as short as five minutes, in complement to the standard twenty minutes, can be useful to populate parts of the power matrix where longer-sample data is too sparse. This is because short-term wave statistics cover a wider range of the scatter diagram than standard, longer averaged sea-states. Shorter sampling may also enable faster assessment of various device configurations, by cycling through them in more rapid succession. This would greatly reduce testing duration and costs, but would require changes in the implementation of at-sea testing. With the dataset analysed, it appears that samples as short as five minutes still result in annual energy production estimates within the range of estimates based on standard sample durations. Difficulties that arise when using shorter samples are discussed and some methods that appear to partly resolve them for this particular dataset are presented.
Content may be subject to copyright.
Open Sea Operating Experience to Reduce Wave
Energy Costs
Deliverable D5.3
Uncertainty in Wave Energy Converter
Power Performance Assessment
Lead Beneficiary
TECNALIA
Delivery date
2019-05-30
Dissemination level
Public
Status
Approved
Version
1.0
Keywords
Uncertainty, Yield prediction, Short time scale assessment,
Power matrix dimensionality, LCOE
This project has received funding from the European
Union’s Horizon 2020 research and innovation
programme under grant agreement No 654444
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 2 | 103
Disclaimer
This Deliverable reflects only the author’s views and the Agency is not responsible for any use
that may be made of the information contained therein
Document Information
Grant Agreement Number
Project Acronym
Work Package
Task(s)
Deliverable
Title
Author(s)
File Name
Change Record
Revision
Date
Description
Reviewer
0.1
11/12/2018
Initial outline
WP5 partners
0.2
14/03/2019
Partial draft
WP5 partners
0.5
20/05/2019
First complete draft
UEDIN, UCC
0.9
28/05/2019
Final draft for peer-review
Pablo Ruiz-Minguela
1.0
30/05/2019
Final version for EC
EC
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 3 | 103
EXECUTIVE SUMMARY
The Horizon 2020 OPERA Project greatly increased the set of open-sea operating data publicly
available for wave energy research and development. This document reports on the
application of the Technical Specifications (TS) of the International Electrotechnical
Commission (IEC) to open-sea data collected in the project. Emphasis is on practical
implication for Wave Energy Converter (WEC) developers and experts working with the IEC
technical specifications or other normative processes.
Some of the most relevant findings may be summarised as follows.
The IEC-TS provided a highly valuable coherent framework for the analysis of open-sea
performance data in OPERA
The evaluation of uncertainty as per IEC-TS/62600-100 and IEC-TS/62600-102 is one
aspect where users identify a need for more guidance in the TS
While more data would be needed to confirm, there are indications that an additional
dimension of spectral bandwidth may increase accuracy of yield prediction at a second
site at least in some cases
The use of performance data in samples shorter than the 20 minutes required in the
TS may be highly valuable to make best use of expensive at-sea test time. However,
certain issues such as sample variability must be checked in detail
More data is needed to provide reliable recommendations on yield prediction for
scaled prototypes
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 4 | 103
TABLE OF CONTENTS
EXECUTIVE SUMMARY ............................................................................................................... 3
TABLE OF CONTENTS .................................................................................................................. 4
LIST OF FIGURES ......................................................................................................................... 6
LIST OF TABLES ........................................................................................................................... 8
ABBREVIATIONS, ACRONYMS AND SYMBOLS ............................................................................ 9
1. INTRODUCTION .................................................................................................................... 10
2. UNCERTAINTIES IN YIELD PREDICTION FROM APPLYING TS100 IN OPERA OPEN-SEA
CAMPAIGNS .............................................................................................................................. 12
2.1 Overview of TS100 methodology and application ......................................................... 12
2.2 review of uncertainty components and methodology .................................................. 14
2.3 Challenges and uncertainties in the application of TS100 ............................................. 16
2.4 Issues for consideration by the IEC group of experts .................................................... 17
3. UNCERTAINTIES IN WAVE ENERGY CONVERTER YIELD PREDICTION AT A PROSPECTIVE
DEPLOYMENT SITE .................................................................................................................... 18
3.1 TS102 Procedure ............................................................................................................ 18
3.1.1 TS102 guidance on description of WEC ................................................................... 19
3.1.2 TS102 guidance on description of deployment sites ............................................... 20
3.1.3 TS102 guidance on Presentation of power performance information recorded at
location 1 .......................................................................................................................... 29
3.1.4 TS102 guidance on mapping information from location 1 to location 2 and an
evaluation of spectral bandwidth as an additional matrix dimension ............................ 32
3.1.5 Additional aspects covered in TS102 ....................................................................... 41
3.2 Discussion on the application of TS102 and uncertainty ............................................... 42
3.3 ImplIcations for LCOE modelling and business case development ................................ 44
3.4 Recommendations for TC114 ......................................................................................... 45
4. PERFORMANCE ASSESSMENT USING SHORT SAMPLES ....................................................... 46
4.1 SUMMARY AND MAIN RESULTS ..................................................................................... 46
4.2 INTRODUCTION AND OBJECTIVES .................................................................................. 48
4.2.1 potential interest of power assessment at finer time-scales .................................. 48
4.2.2 Technical issues with power assessment at FINER time-scales ............................... 50
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 5 | 103
4.3 MEASUREMENTS AVAILABLE ......................................................................................... 50
4.3.1 Bimep ....................................................................................................................... 51
4.3.2 Mutriku ..................................................................................................................... 51
4.4 PROPAGATION TIME FROM PRESSURE SENSOR TO OWC CHAMBERS .......................... 54
4.4.1 Propagation time from linear wave theory ............................................................. 54
4.4.2 Propagation time from time-lagged cross correlation ............................................ 55
4.4.3 Manual identification of individual wave signals ..................................................... 56
4.5 WAVE STATISTICS FOR RECORDS OF LESS THAN 20 MINUTES ...................................... 59
4.5.1 Spectral significant wave height .............................................................................. 60
4.5.2 Energy period ........................................................................................................... 63
4.5.3 Scatter diagrams obtained ....................................................................................... 66
4.5.4 Significance of differences in scatter diagrams obtained ........................................ 70
4.6 PLANT OPERATING DATA WITH SHORT SAMPLES ......................................................... 71
4.7 POWER MATRICES .......................................................................................................... 73
4.8 IMPACT ON ENERGY PRODUCTION ESTIMATES ............................................................. 75
4.9 SAMPLE DURATION AND DISPERSION IN PERFORMANCE DATA ................................... 80
4.9.1 Mutriku data ............................................................................................................ 80
4.9.2 Bimep data ............................................................................................................... 83
4.10 SAMPLE DURATION AND TESTING TIME NEEDED........................................................ 83
4.11 CAUSES OF THE HIGH SCATTER IN PERFORMANCE DATA ........................................... 87
4.11.1 Effect of tides ......................................................................................................... 88
4.11.2 Effect of variation of wave height and period across a cell ................................... 89
4.11.3 Capture length matrix and reduction in intra-cell variability ................................ 91
4.11.4 Example of detail of intra-cell variability ............................................................... 93
4.12 SUMMARY AND PRACTICAL IMPLICATIONS ................................................................. 96
4.12.1 issues of potential interest to the IEC group of experts ........................................ 96
4.12.2 Summary for WEC developers ............................................................................... 97
5. YIELD PREDICTION FOR SCALED PROTOTYPES FROM OPEN-SEA TESTING ........................ 100
6. REFERENCES ....................................................................................................................... 102
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 6 | 103
LIST OF FIGURES
Figure 1: IDOM's MARMOK-A5 device deployed at BiMEP ..................................................... 19
Figure 2: WEC mooring arrangement [3] ................................................................................. 20
Figure 3: Chart of the BiMEP site [5] ........................................................................................ 22
Figure 4: Diagram of EMEC's wave test sites [6] ...................................................................... 22
Figure 5: BiMEP directional Rose plot ...................................................................................... 23
Figure 6: EMEC directional rose plot ........................................................................................ 23
Figure 7: BiMEP scatter diagram (corresponding to power measurements) .......................... 24
Figure 8: EMEC scatter diagram ............................................................................................... 25
Figure 9: Comparison of BiMEP and EMEC resource, presentation of available data and
applicable complementation methods .................................................................................... 26
Figure 10: BiMEP and EMEC Probability of exceedance .......................................................... 27
Figure 11: BiMEP Joint probability distribution ....................................................................... 28
Figure 12: EMEC joint probility distribution ............................................................................. 28
Figure 13: WEC (CA 1) mean normalised Electrical power matrix (percentage of overall power
from each sea state) ................................................................................................................. 30
Figure 14: WEC (CA 1) Mean normalised CL matrix - scaled for presentation ........................ 30
Figure 15: WEC (CA 1) Max normalised CL MATRIX - SCALED FOR PRESENTATION ................ 31
Figure 16: WEC (CA 1) Min normalised CL matrix - scaled for presentation ........................... 31
Figure 17: WEC (CA 1) Standard deviation CL matrix - scaled for presefor presentation ....... 31
Figure 18: WEC (CA 1) number of recordings .......................................................................... 32
Figure 19: Normalised capture length plotted against each of the bandwidth parameter tested
for fixed Hm0 (0.5 M to 1.0 M) and TE (7 s to 8 s) ................................................................... 35
Figure 20: Normalised capture length plotted against ε0 for fixed Hm0 (0.5 M to 1.0 M) and TE
(7 s to 8 s) ................................................................................................................................. 36
Figure 21: Diagram of increasing dimensionality of capture length matrix ............................ 37
Figure 22: Percentage of normalised power with the bandwidth ranges for fixed Hm0 (0.5 m
to 1.0 m) and Te (7 s to 8 s) and number of sea states represented in each bandwidth range
.................................................................................................................................................. 37
Figure 23: Percentage of all sea states recorded within presented bandwidths .................... 38
Figure 24: BiMEP - CA1 Annual Energy content of different bandwidth ranges and
comparison of MAEP calculated when considering bandwith with conventional MAEP method
.................................................................................................................................................. 38
Figure 25: BiMEP - CA2 Annual Energy content of different bandwidth ranges and
comparison of MAEP calculated when considering bandwith with conventional MAEP method
.................................................................................................................................................. 39
Figure 26: EMEC - CA1 Annual Energy content of different bandwidth ranges and comparison
of MAEP calculated when considering bandwith with conventional MAEP method .............. 39
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 7 | 103
Figure 27: EMEC - CA2 Annual Energy content of different bandwidth ranges and comparison
of MAEP calculated when considering bandwith with conventional MAEP method .............. 40
Figure 28: Indidcation of bin mismatch and average normalised power for bandwidth ranges
(WEC operating at EMEC under CA1) ....................................................................................... 40
Figure 29: Sensitivity spider plot for LCOE [13] ........................................................................ 45
Figure 30: An example of high peak to average power output at mutriku ............................. 49
Figure 31: position of the wave instrument upwave the plant ............................................... 52
Figure 32: a view of the seabed near the pressure sensor upwave of mutriku (From: CDA) .. 53
Figure 33: Bathymetry upwave the mutriku plant ................................................................... 55
Figure 34: Time-lagged cross correlations between wave signal and plant operating data ... 57
Figure 35: Example of matching wave data to plant data ....................................................... 58
Figure 36: Other example of matching of wave and plant data .............................................. 59
Figure 37: Hm0 vs. H1/3 for 1-hour and 5-minute samples .................................................... 61
Figure 38: Time series of significant heights for various sample durations ............................. 62
Figure 39: Example of resolution problem with 16 DOF spectra in short samples ................. 64
Figure 40: Energy period obtained for the record and zooom on end March ........................ 65
Figure 41: Energy period vs. mean upcrossing period of third of highest waves .................... 66
Figure 42: Time series of turbine 13 power output averaged over various sample durations 72
Figure 43: Time series of power output for the storm and mean regime cells ....................... 86
Figure 44: Convergence in mean with the number of samples ............................................... 87
Figure 45: Convergence to the mean when requiring one-hour spacing ................................ 88
Figure 46: Tidal height and Turbine 13 power for the storm and mean regime cells ............. 89
Figure 47: Effect of change in Hm0 across one cell on turbine 13 output .............................. 90
Figure 48: Correlation of mean power to zero-upcrossing period within the storm cell ........ 91
Figure 49: Wave and plant data for energetic storm cell sample ............................................ 94
Figure 50: Wave and plant data for low energy storm cell sample ......................................... 95
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 8 | 103
LIST OF TABLES
Table 1: Scatter diagram of hourly sea-states at pressure sensor ........................................... 67
Table 2: Scatter diagram of 5-minutes sea-states (8 DOF) ...................................................... 67
Table 3: Scatter diagram from the BiMEP reference buoy ...................................................... 67
Table 4: scatter diagram of 5-minute sea-states at sensor (16DOF) ....................................... 68
Table 5: scatter diagram of 30 minutes sea-states at sensor .................................................. 69
Table 6: Scatter diagram of 15-minutes sea-states at sensor .................................................. 69
Table 7: Scatter diagram of 10-minute sea-states at sensor ................................................... 69
Table 8: relative difference between the 1-hour and 5-minute scatter diagrams .................. 70
Table 9: Relative differences of scatter diagram of 3-hourly and hourly sea-states ............... 71
Table 10: Relative differences of scatter diagrams of half-hourly and hourly sea-states ....... 71
Table 11: 1-hour samples power matrix .................................................................................. 74
Table 12: 5-minute samples power matrix .............................................................................. 74
Table 13: 30-minute samples power matrix ............................................................................ 76
Table 14: 15-minute samples power matrix ............................................................................ 76
Table 15: 10-minute samples power matrix ............................................................................ 76
Table 16: Energy production (MWh) with the 1-hour power matrix and scatter diagram ..... 77
Table 17: Energy production from the 5-minute poweR matrix and scatter diagram ............ 77
Table 18: Energy production in BiMEP using power matrix of 1-hour samples ...................... 78
Table 19: Energy production in BiMEP with power matrix of 5-minute samples .................... 78
Table 20: AEP (MWH) with 1-hour power matrix and 5-minute scatter diagram ................... 79
Table 21: Standard deviation over mean value for cells of the 1-hour power matrix ............ 81
Table 22: Ratio of samples standard deviations, 5-minute to 1-hour matrix ......................... 81
Table 23: rms error om cells of 1-hour power matrix if normally distributed ......................... 82
Table 24: ratio of rms error on mean of 5-min to 1-hour power matrices .............................. 82
Table 25: 1-hour samples Standard deviations over mean value, oceantec marmok ............ 84
Table 26: Marmok, Ratio of 20-minute over 1-hour samples standard deviation .................. 84
Table 27: Marmok, ratio of 3-hour to 1-hour samples standard deviations ........................... 84
Table 28: Turbine 13 output normalised by deepwater eneRgy flux (5-minute samples) ...... 93
Table 29: ratio of standard deviation to that in power matrix cells, 5-minute samples ......... 93
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 9 | 103
ABBREVIATIONS, ACRONYMS AND SYMBOLS
AEP
Annual Energy Production.
BiMEP
Biscay Marine Energy Platform, a test and operating site for floating Wave Energy
Converters and other ocean energy-related studies.
CDA
Commercial Diving Activity, a Bilbao-based marine contractor.
EMEC
European Marine Energy Centre, a test and operating site for marine energy.
EVE
Ente Vasco de Energía.
Significant wave height.
IEC
International Electrotechnical Commission. IEC is active in advancing technical
specifications and standards for wave energy.
OWC
Oscillating Water Column.
Energy period.
WEC
Wave Energy Converter.
WP
Work Package, usually referring to work packages of H2020 OPERA.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 10 | 103
1. INTRODUCTION
Uncertainty on the power performance of WECs greatly limits financing opportunities for
projects and increases cost of capital for existing ones. One of the central objectives of at-sea
testing of a Wave Energy Converter (WEC) is to demonstrably assess power performance,
along with real operating costs, to facilitate the evaluation of further project opportunities
with a particular type of device. This performance assessment is a basic input to evaluate
potential revenues and cost of energy for wave energy.
At-sea testing is expensive. In addition to the cost of engineering and manufacturing a
seaworthy prototype, the testing itself includes berth renting, installation, maintenance and
decommissioning and may well cost developers about the same order as the prototype itself.
For this reason, financing at-sea testing has been and remains a central challenge for many
promising concepts of WEC. Open-sea testing must therefore be used as effectively as possible
to assess power performance.
This deliverable reports on the experience gained in the H2020 OPERA project on power
performance assessment using new open-sea operating data. The report is formatted to
facilitate the sharing of experience with developers planning open-sea testing or post-
processing available data. Also, it reports experience of relevance to technical specifications
of power performance for WECs. In particular: IEC-TS/62600-100, on power performance
assessment, and IEC-TS/62600-102, on yield prediction in a second location.
Section 2 reports considerations on uncertainty in WEC power performance assessment using
the methodology in IEC-TS/62600-100. This includes experience from the OPERA and other
projects.
Section 3 reports on the application of IEC-TS/62600-102 to the particular case of using open-
sea testing results from the BiMEP site in the Bay of Biscay to evaluate power production at
EMEC in the North of Scotland. Site conditions at the two locations are analysed and
differences identified which may most impact the evaluation of power production at EMEC
from BiMEP at-sea testing data. The applicability and gains in yield prediction from adding
dimensions (in addition to Hs and Te) to the power matrix or tensor is analysed in detail in the
case of various metrics of spectral bandwidth. A discussion is also provided on how these
uncertainties may impact the cost of energy and business case for WEC project.
Section 4 reports an assessment of how using shorter samples of open-sea performance data
may yield more accurate estimates of power production. The conditions under which this can
be the case, and some of the technical issues that emerge when using samples shorter than
the 20 minutes recommended by IEC/TS62600-100 are identified. The analysis focusses on
performance data from the Mutriku commercial wave power plant in the Basque Country,
Spain. There appears to be important potential benefits in using shorter samples of power
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 11 | 103
performance, in terms of increasing the number of samples and the area of the (Hs, Te) space
that is explored. Defining meaningful wave statistics shorter than 20 minutes and
decorrelating successive short samples are some of the key issues that must be addressed.
Some methods that appear to work for this particular dataset are proposed. Besides, some
points of potential interest to the IEC Group of Experts working on technical specifications
relating to power performance assessment of WECs are proposed.
Finally, Section 5 discusses the prediction of yield for scaled prototypes. General aspects and
limitations to commonly used scaling laws are discussed.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 12 | 103
2. UNCERTAINTIES IN YIELD PREDICTION FROM APPLYING TS100 IN
OPERA OPEN-SEA CAMPAIGNS
This section analyses uncertainty in the WEC yield prediction from applying TS100
recommendations based on the results from OPERA sea trials and performance analysis
carried out in the project. It includes comments on TS100 methodology on uncertainty analysis
and suggestions to improve power performance assessment.
2.1 Overview of TS100 methodology and application
In TS100, uncertainty analysis is mentions in two locations:
TS100 - Section 7.4. Metocean Data. This section is about wave data only and refers
to a list of wave parameters in TS100 - Section 5.2.1.
TS100 - Annex C, Evaluation of Uncertainty. This annex mainly describes the various
parameters to be taken into account.
A more detailed review of these sections is provided below.
TS100 - Section 7.4. Metocean Data:
Measure and record all parameters believed to have an influence on power
production
Awareness of any correlation between power and a specific parameter should be
sought and reported. It shall be recorded and calculated
List included in 5.2.1
o Spectral shape
o Directionality of waves
o Directional frequency spectrum
o Water depth including tidal effect
o Tidal and marine current, direction and velocity
o Wind speed and direction
o Density of water
o Occurrence and thickness of ice
Minimum requirement: Hm0, Te and wave energy flux (J) shall be calculated using
the measured wave data.
The accuracy of the calculated parameters shall be given, according to the
uncertainty estimation defined by ISO/IEC Guide 98-1 and ISO/IEC Guide 98-3
Directly measured parameters will be expressed with indication of absolute error.
Specifications on the type, location, calibration, and accuracy of the measurement
instrument shall be given.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 13 | 103
TS100 - Annex C, Evaluation of Uncertainty:
Two types of uncertainty categories, all expressed as standard deviations and are donated
standard uncertainty:
- A: the magnitude of which can be deduced from measurements
- B: estimated by other means
Uncertainty analysis:
Power matrix, determined by the measured and normalised values of electrical
power production and sea state parameters, and the estimate annual energy
production.
As a minimum, Hs and Te shall be considered as measurands. Uncertainties in
measurements are converted to uncertainties in these measurands by means of
sensitivity factors
Table C.1. contains a minimum list of uncertainty components than shall be included
in the uncertainty analysis.
Where category A uncertainties are used, the measurement and analysis methods
shall be described.
Where category B uncertainties are used, the means by which the standard deviation
has been determined shall be described
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 14 | 103
2.2 REVIEW OF UNCERTAINTY COMPONENTS AND METHODOLOGY
Energy yield prediction in TS100 is based on the scatter diagram at the WEC location, using Hs
and Te inputs, corresponding wave energy flux and the average electrical power of the device
at the centre of each bins of the scatter diagram. While this method is commonly used, there
are significant uncertainties in its application including measurement of Hs and Te but also
due to variations observed in the WEC electrical power capture length for similar values of Hs
and Te. This is acknowledged in TS100 and was review in the OPERA project, which also
includes the analysis of other parameters influencing the power matrix and energy yield
It is therefore understood that uncertainty in power performance assessment of WEC and
energy yield is difficult to assess fully for all types of device. It is influenced by several
parameters; some are still being investigated in research projects. This section comments
uncertainty components described in TS100 and suggests additional parameters with
discussions and results from work carried out in the OPERA project. Table ?? comments on
the
TS100 uncertainty components:
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 15 | 103
Measured /
model
parameter
Uncertainty component
Comments
Significant
wave height
(Hs)
And
Energy Period
(Te
Wave measuring
instrument/model
calibration
Pre-calibration required and uncertainty
parameters to be used in this analysis
should be described in TS100
Influence of mooring and/or
other local effects on WMI
Difficult to assess, this cannot be done
before deployment and no standard
method is defined in TS100.
Data acquisition system (e.g
Sampling rate, windowing)
A minimum of 1Hz is mentioned in TS100
but there is no information on suggested
uncertainty when this condition is fulfilled.
Directional spectral analysis
This does not affect the Hs or Tp at a given
location but may affect the WEC
performance. It should be in the
“Measured parameter” list when required
Variability of significant
wave height and energy
period
TS100 should include a description of how
this influences the estimation of Hs or Te.
Wave energy
density
Water depth
This can be measured to a high level of
accuracy and is used in the calculation of
energy density but there is no information
on how to estimate its impact on
uncertainty
Water density
This can be measured or estimated to a
high level of accuracy and is used in the
calculation of energy density but there is
no information on how to estimate its
impact on uncertainty
Electrical
power
Current Transformer
When power is measured at the grid
connection point, as recommended in
TS100, this is not relevant
Voltage transformer
When power is measured at the grid
connection point, as recommended in
TS100, this is not relevant
Power transducer or power
measurement device
Pre-calibration required
Data acquisition system
Pre-calibration required to estimate
uncertainty
Variability of electrical
power
Need explanation on how this affects the
power time series
As mentioned in table ??? significant information is missing in order to assess uncertainty of
the measured parameters. This includes details on the uncertainty components, how
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 16 | 103
uncertainty should be assessed for each component and how this affects uncertainty of the
measured parameter. Additional components could be useful:
- Significant wave height and energy period:
o Transferring data from the location of measurement to the location of the
WEC
- Wave energy density:
o Hs and Te should be mentioned in the list of uncertainty components.
- Electrical power:
o No suggestion
These three measured parameters are used to determine the wave scatter diagram, capture
length matrix and the power matrix of a specific WEC at a given location. While this is a
common practice, there is ongoing discussions and research on this method accuracy as this
is neglecting important factors that can affect the WEC performance. TS100 does not discuss
this point and only recommends calculating the standard deviation of the capture length in
each cell. Analysis carried out in the OPERA project show large variability of the intra-cell
capture length.
TS100 does not mention year to year variation in the wave scatter diagram. It recommends
the use of at least 10 years of data which in some cases is not possible and does not define
uncertainty based on this data.
2.3 Challenges and uncertainties in the application of TS100
All information found in the document merely provides a list of parameters and suggest
expressing results in standard deviation. There is no detail or discussion on how to assess
uncertainty which are necessary to ensure all project carries out a similar analysis.
Two references are mentioned, ISO/IEC Guide 98-1 and ISO/IEC Guide 98-3. Relevant
information from those documents should be summarised in TS100.
Based on work carried out in the OPERA project, large uncertainties were highlighted in the
power performance results and energy yield when calculated using the TS100 methodology
and it is unclear how to handle this uncertainty on a standardised method. Several parameters
were highlighted, spectral shape, wave data, sample duration, moorings, etc. and
uncertainties 10-20 % on some results were observed. This shows the importance to improve
power performance characterisation in the future, following future research studies and
publications
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 17 | 103
2.4 Issues for consideration by the IEC group of experts
There is no section dedicated on uncertainty analysis in TS100, therefore a review of the
document structure on uncertainty of power performance results and energy yield is
recommended. In the core part of the document, this is mentioned in section 7.4 for wave
parameters only. More details are provided in Annex C which includes all uncertainty
parameters, up to power performance and energy yield. It is suggested to introduce
uncertainty either in other relevant sections or in one new section for all type of
measurements and calculations carried out following TS100.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 18 | 103
3. UNCERTAINTIES IN WAVE ENERGY CONVERTER YIELD PREDICTION
AT A PROSPECTIVE DEPLOYMENT SITE
This section reports on the inherent uncertainty that remains when applying IEC TS 62600-102
[1] (TS102) to estimate the performance of a WEC at a prospective deployment site. The
observations presented in this section relate to T5.4 of the H2020 project: Improvement of
yield prediction modelling at multiple sites, and scales. T5.4 brings together resource
information provided by IDOM and EMEC.
TS102 is part of the Marine energy - Wave, tidal and other water current converters series and
entitled Part 102: Wave energy converter power performance assessment at a second location
using measured assessment data. It presents a method of estimating the power performance
of a Wave Energy Converter (WEC) at a second location (location 2) based on power
performance measurements recorded at a primary location (location 1). It is expected that
the power performance measurements recorded at the original site should be carried out in
accordance with IEC TS 62600-100:100 (TS100) [2].
This section outlines the steps of the TS102 procedure and an application of that procedure
(Section 3.1), a discussion on its implementation (Section 3.2 ) the implementations of TS102
for LCOE analysis and business case development (Section 3.3) and recommendations for IEC
TS114 (Section 3.4).
3.1 TS102 PROCEDURE
This section outlines an application of TS 102 based on information gathered during the OPERA
project, namely: normalised power performance measurements recorded at the Biscay
Marine Energy Platform S. A. (BiMEP, location 1) along with the corresponding sea state
measurements and sea state measurements recorded at and by European Marine Energy
Centre (EMEC, location 2).
TS102 discretizes its methodology into eleven steps. Steps 1 to 11 are summarised in sections
0 to 3.1.5 (italicised in grey) along with a presentation of the application based on the
information gathered in the OPERA project. Sections 0 to 3.1.5 present: how the WEC(s) under
investigation should be described; how locations 1 and 2 should be assessed; how WEC power
performance at location 1 should be presented; aspects related to mapping data from location
1 to location 2, including an investigation to higher matrix dimensions and; additional aspects
covered by TS102 but not covered in this application.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 19 | 103
3.1.1 TS102 GUIDANCE ON DESCRIPTION OF WEC
1. Describe the WEC under investigation (that which has been deployed at the primary
location and which will be deployed at the second location):
a. Operational principle,
b. Geometry and dimensions,
c. Mass properties,
d. PTO system and
e. Mooring arrangement.
Comment based on present application
The WEC under investigation is IDOM’s MARMOK-A-5 WEC, see Figure 1. It is a point absorber
with an Oscillating Water Column (OWC) Power Take-Off (PTO) [3]. The WEC is a spar buoy
type design and has a diameter of 5 m where it pierces the water’s surface. The buoy is scaled
in diameter relative to the planned commercial device. The WEC has a draft of 35 m, this is
not scaled relative to the planned commercial device. The device tested during the OPERA
project has a generating capacity roughly 1/10th of the planned commercial device.
FIGURE 1: IDOM'S MARMOK-A5 DEVICE DEPLOYED AT BIMEP
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 20 | 103
During the OPERA project, the WEC was deployed at the BiMEP (location 1) on two separate
occasions. The data recorded and used in this study was obtained during the first deployment
of the device. During that deployment, the WEC was fitted with a Wells turbine for a PTO and
the mooring arrangement was in the form of a square around the device, see Figure 2. During
the second deployment, a number of innovations were tested to determine how they
impacted the device’s Levelised Cost of Energy (LCOE), namely: an improved WEC control
program, a bi-radial turbine instead of the Wells turbine and an elastomeric tether, replacing
the conventional mooring lines in the original mooring arrangement. The impact these
innovations have on LCOE will be reported in a further OPERA deliverable - D7.3 Tracking
metrics for wave energy technology performance.
3.1.2 TS102 GUIDANCE ON DESCRIPTION OF DEPLOYMENT SITES
2. Assess the characteristics of the study’s two wave resources (Analysis of the wave
resources should be based on IEC TS 62600-101 [4] (TS101)).
a. Prepare a site description according to section 6 of TS101,
b. Present maps,
c. Geometric coordinates,
d. Water depths,
e. General descriptions of:
i. Shoreline geometry and bathymetry,
ii. Prevailing wave and wind conditions and
iii. Typical tidal range and currents.
f. Directional rose plots,
FIGURE 2: WEC MOORING ARRANGEMENT [3]
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 21 | 103
g. Scatter tables and plots,
h. Exceedance and persistence plots and
i. Joint probability analysis tables.
3. Undertake a quality assurance study on the new capture length matrix for application
at location 2.
a. Label empty bins as ‘undefined.
b. Label bins in which the data is known to be inaccurate as ‘underpopulated,’ or
if there are less than 3 data records.
Comment based on present application
As stated, the two wave resources used for this application of TS102 are BiMEP, the
deployment location of the MARMOK-A-5 WEC, and EMEC at Orkney. Both locations are test
areas for WECs. Figure 3 is a chart showing the WEC test areas at BiMEP and Figure 4 is a
diagram showing the wave test sites at EMEC.
A formal application of TS102 would require a site description to be prepared according to
TS101. Such a description would include details on site: area, bathymetry, wave resource and
wind resource. A site description of this detail is deemed not necessary for this application of
TS102 since the purpose is to evaluate TS102 and not for the actual deployment of the WEC
at a prospective location. However, it should be noted that the parameters that TS101
recommends will impact on the power performance of a WEC.
Further general details that TS102 requests in a formal application but are not required for
this review include descriptions of shoreline geography, bathymetry, prevailing wind
conditions and typical tidal information. As highlighted in the preceding paragraph, these
parameters will have an impact on WEC power performance, however they are not the focus
of this review.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 22 | 103
FIGURE 3: CHART OF THE BIMEP SITE [5]
FIGURE 4: DIAGRAM OF EMEC'S WAVE TEST SITES [6]
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 23 | 103
Figure 5 and Figure 6 are directional rose plots indicating the mean direction of oncoming sea
states to the Wave Measurements Instruments (WMIs) at BiMEP and EMEC respectively.
Figure 5 indicates that the majority of sea states approach the BiMEP WMI from the North
West with fewer sea states approaching from the West and North of the site. Figure 6
indicates that the majority of sea states approach the EMEC WMI from the West with sea
states also approaching the WMI from the North West and North.
FIGURE 5: BIMEP DIRECTIONAL ROSE PLOT
FIGURE 6: EMEC DIRECTIONAL ROSE PLOT
Figure 7 and Figure 8 are the BiMEP and EMEC scatter diagrams and tables respectively. These
are discretised by Hm0 and Te as in other TSs in the 62600 wave series. Hm0 bins have a range
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 24 | 103
of 0.5 m and the numbers presented alongside the vertical axes of the scatter, joint probability
distribution, normalised power and Capture Length (CL) matrices and diagrams are the
midpoints of the ranges. Te bins have a range of 1 s and the numbers presented alongside the
horizontal axis of the aforementioned matrices and diagrams are the midpoints of the ranges.
Note, the scatter diagram presented in Figure 7 reflects the sea states that were recorded
during periods of power measurement. The numbers in each bin indicate the number of sea
states that occurred with Hm0 and Te characteristics that fell within the ranges associated with
that bin. The data presented in Figure 7 was recorded during a period that spanned from the
beginning of March to the end of June 2017. Although there are limitations associated with
using such a limited data set, it is sufficient for this analysis of TS102. The data presented in
Figure 8 represents a recording period spanning from January 2015 to December 2017.
FIGURE 7: BIMEP SCATTER DIAGRAM (CORRESPONDING TO POWER MEASUREMENTS)
Hm0 (m)
11.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
11.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
10.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
10.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
8.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
8.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3.75
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
3.25
0
0
0
0
0
0
0
0
0
0
1
1
1
3
0
0
0
2.75
0
0
0
0
0
0
0
3
0
0
1
3
7
5
0
0
0
2.25
0
0
0
0
0
6
20
20
6
10
20
12
20
1
0
0
0
1.75
0
0
0
0
0
19
27
17
31
56
26
7
4
3
3
0
0
1.25
0
0
0
0
3
62
121
96
115
76
25
10
0
2
0
0
0
0.75
0
0
0
0
0
42
103
174
124
60
44
2
0
0
0
0
0
0.25
0
0
0
0
0
0
1
3
0
0
0
0
0
0
0
0
0
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
15.5
16.5
Te (s)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 25 | 103
Hm0 (m)
11.75
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
11.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
10.75
0
0
0
0
0
0
0
0
0
0
0
0
3
0
0
0
0
10.25
0
0
0
0
0
0
0
0
0
0
0
1
9
1
0
0
0
9.75
0
0
0
0
0
0
0
0
0
0
0
4
15
0
0
0
0
9.25
0
0
0
0
0
0
0
0
0
0
1
9
17
0
0
0
0
8.75
0
0
0
0
0
0
0
0
0
0
8
20
19
3
0
0
0
8.25
0
0
0
0
0
0
0
0
0
0
17
41
19
2
0
0
0
7.75
0
0
0
0
0
0
0
0
0
2
37
76
26
0
0
0
0
7.25
0
0
0
0
0
0
0
0
0
13
76
74
22
3
0
0
0
6.75
0
0
0
0
0
0
0
0
1
23
136
100
18
1
0
0
0
6.25
0
0
0
0
0
0
0
0
0
104
165
129
29
0
0
0
0
5.75
0
0
0
0
0
0
0
0
14
213
212
159
38
3
0
0
0
5.25
0
0
0
0
0
0
0
1
80
401
279
208
51
10
2
0
0
4.75
0
0
0
0
0
0
0
4
231
508
330
209
51
19
3
0
0
4.25
0
0
0
0
0
0
0
61
470
614
381
207
70
21
5
1
1
3.75
0
0
0
0
0
`0
4
270
969
813
520
204
89
38
10
11
4
3.25
0
0
0
0
0
0
61
693
1164
972
584
289
125
48
20
6
2
2.75
0
0
0
0
0
2
320
946
1441
1326
760
341
125
42
19
6
0
2.25
0
0
0
0
0
95
962
1305
1668
1554
875
354
148
68
26
7
1
1.75
0
0
0
0
35
624
1664
1596
1823
1329
764
385
119
23
4
1
0
1.25
0
0
0
18
187
1454
2626
2535
2137
1269
711
213
44
30
12
0
0
0.75
0
0
6
133
579
1692
2478
2649
1341
501
214
42
4
2
0
0
0
0.25
0
0
2
44
93
278
454
324
85
6
0
0
0
0
0
0
0
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
15.5
16.5
Te (s)
FIGURE 8: EMEC SCATTER DIAGRAM
In both Figure 7 and Figure 8, the green border surrounds the area within which sea states
were recorded. The red border surrounds cells in which less than 3 sea states were recorded,
TS 102 indicates that these cells have to be identified and listed as ‘underpopulated.’ Cells
with zero recordings within an area of interest, such as a device’s operating envelope, need
to be identified and listed as ‘undefined.’ Underpopulated and undefined cells need to be
filled with complimentary data from either data fitting or numerical or physical modelling.
Defining the cells as either underpopulated or undefined is part of the quality assurance step
of the TS 102 procedure.
Figure 9 is the EMEC scatter diagram but with different regions highlighted for explanation.
The blue shaded cells indicate the overlap of the BiMEP scatter diagram (associated with the
power measurements) with the EMEC diagram. The orange border indicates a theoretical
MARMOK-A-5 operating envelope. The green and yellow shaded cells indicate the bins, either
underpopulated or undefined, for which complimentary data would need to be generated to
represent how the MARMOK-A-5 device would behave at EMEC. The green shaded cells are
those for which data fitting techniques, either interpolation or extrapolation, could be used.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 26 | 103
Hm0 (m)
11.75
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
11.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
10.75
0
0
0
0
0
0
0
0
0
0
0
0
3
0
0
0
0
10.25
0
0
0
0
0
0
0
0
0
0
0
1
9
1
0
0
0
9.75
0
0
0
0
0
0
0
0
0
0
0
4
15
0
0
0
0
9.25
0
0
0
0
0
0
0
0
0
0
1
9
17
0
0
0
0
8.75
0
0
0
0
0
0
0
0
0
0
8
20
19
3
0
0
0
8.25
0
0
0
0
0
0
0
0
0
0
17
41
19
2
0
0
0
7.75
0
0
0
0
0
0
0
0
0
2
37
76
26
0
0
0
0
7.25
0
0
0
0
0
0
0
0
0
13
76
74
22
3
0
0
0
6.75
0
0
0
0
0
0
0
0
1
23
136
100
18
1
0
0
0
6.25
0
0
0
0
0
0
0
0
0
104
165
129
29
0
0
0
0
5.75
0
0
0
0
0
0
0
0
14
213
212
159
38
3
0
0
0
5.25
0
0
0
0
0
0
0
1
80
401
279
208
51
10
2
0
0
4.75
0
0
0
0
0
0
0
4
231
508
330
209
51
19
3
0
0
4.25
0
0
0
0
0
0
0
61
470
614
381
207
70
21
5
1
1
3.75
0
0
0
0
0
`0
4
270
969
813
520
204
89
38
10
11
4
3.25
0
0
0
0
0
0
61
693
1164
972
584
289
125
48
20
6
2
2.75
0
0
0
0
0
2
320
946
1441
1326
760
341
125
42
19
6
0
2.25
0
0
0
0
0
95
962
1305
1668
1554
875
354
148
68
26
7
1
1.75
0
0
0
0
35
624
1664
1596
1823
1329
764
385
119
23
4
1
0
1.25
0
0
0
18
187
1454
2626
2535
2137
1269
711
213
44
30
12
0
0
0.75
0
0
6
133
579
1692
2478
2649
1341
501
214
42
4
2
0
0
0
0.25
0
0
2
44
93
278
454
324
85
6
0
0
0
0
0
0
0
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
15.5
16.5
Te (s)
FIGURE 9: COMPARISON OF BIMEP AND EMEC RESOURCE, PRESENTATION OF AVAILABLE DATA AND
APPLICABLE COMPLEMENTATION METHODS
The yellow shaded cells are those which would require either physical or numerical data. Since
physical or numerical data isn’t available, a smaller pseudo operating envelope was selected
for the purpose of applying TS102. This smaller operating envelope isn’t a true operating
envelope of the MARMOK-A-5 device. The smaller operating envelope is identified in the
scatter, joint probability distribution (Figure 11 and Figure 12), normalised power (Figure 13)
and CL diagrams/figures (Figure 14 to Figure 18) by a light blue border. The smaller operating
envelope was chosen because sea states were recorded for each of the bins contained within
it at both BiMEP and EMEC. The pseudo smaller operating envelope ranges from a Te of 4 s to
11 s and Hm0 of 0.5 m to 2 m.
With regards to the number of sea states within the smaller operating envelope, 88% of all
the sea states recorded at BiMEP fall within the smaller operating envelope. 50% of the sea
states recorded at EMEC fall within the smaller operating envelope. IDOM envisage the
commercial MARMOK-A-5 operating envelope to range from a Te of 4 s to 16 s and Hm0 of 0.5
m to 4.5 m.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 27 | 103
Figure 10 is a wave energy flux probability of occurrence plot for both BiMEP and EMEC. A
larger data set was used in the generation of the BiMEP curved shown in Figure 10, spanning
from December 2016 to October 2017. This larger data set was used because the exceedance
curve, which is representative of the site, is unrelated to the power performance
measurements and therefore an independent and larger data set could be used to present
the characteristics of the site. The exceedance curves plotted for EMEC represent two periods
spanning from December to October within the three years of data available.
Figure 10 indicates that, in general, EMEC has a greater wave energy flux than BiMEP. In
general, the probability that wave energy flux will be greater than a given level is greater at
EMEC than it is at BiMEP.
Figure 11 and Figure 12 are joint probability distributions; BiMEP and EMEC respectively.
FIGURE 10: BIMEP AND EMEC PROBABILITY OF EXCEEDANCE
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 28 | 103
Hm0 (m)
11.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
11.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
10.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
10.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
9.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
9.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
8.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
8.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
7.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
7.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
6.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
6.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
0%
0%
0%
0%
0%
0%
0%
4.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
1%
0%
0%
0%
0%
0%
0%
4.25
0%
0%
0%
0%
0%
0%
0%
0%
1%
1%
1%
0%
0%
0%
0%
0%
0%
3.75
0%
0%
0%
0%
0%
0%
0%
0%
2%
1%
1%
0%
0%
0%
0%
0%
0%
3.25
0%
0%
0%
0%
0%
0%
0%
1%
2%
2%
1%
1%
0%
0%
0%
0%
0%
2.75
0%
0%
0%
0%
0%
0%
1%
2%
3%
2%
1%
1%
0%
0%
0%
0%
0%
2.25
0%
0%
0%
0%
0%
0%
2%
2%
3%
3%
2%
1%
0%
0%
0%
0%
0%
1.75
0%
0%
0%
0%
0%
1%
3%
3%
3%
2%
1%
1%
0%
0%
0%
0%
0%
1.25
0%
0%
0%
0%
0%
3%
5%
5%
4%
2%
1%
0%
0%
0%
0%
0%
0%
0.75
0%
0%
0%
0%
1%
3%
4%
5%
2%
1%
0%
0%
0%
0%
0%
0%
0%
0.25
0%
0%
0%
0%
0%
0%
1%
1%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
15.5
16.5
Te (s)
FIGURE 12: EMEC JOINT PROBILITY DISTRIBUTION
Hm0 (m)
11.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
11.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
10.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
10.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
9.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
9.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
8.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
8.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
7.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
7.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
6.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
6.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
4.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
4.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
3.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
3.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
0%
0%
0%
0%
2.25
0%
0%
0%
0%
0%
0%
1%
1%
0%
1%
1%
1%
1%
0%
0%
0%
0%
1.75
0%
0%
0%
0%
0%
1%
2%
1%
2%
4%
2%
1%
0%
0%
0%
0%
0%
1.25
0%
0%
0%
0%
0%
4%
9%
7%
8%
5%
2%
1%
0%
0%
0%
0%
0%
0.75
0%
0%
0%
0%
0%
3%
7%
12%
9%
4%
3%
0%
0%
0%
0%
0%
0%
0.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
15.5
16.5
Te (s)
FIGURE 11: BIMEP JOINT PROBABILITY DISTRIBUTION
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 29 | 103
These plots are similar to the scatter diagrams except that they are in terms of the percentage
chance that a specific sea state with a particular Hm0 and Te characteristics would occur.
3.1.3 TS102 GUIDANCE ON PRESENTATION OF POWER PERFORMANCE
INFORMATION RECORDED AT LOCATION 1
4. Calculate the WEC power capture at location 1 and the resulting Capture Length (CL)
matrix based on TS100. Present:
a. An electrical power matrix,
b. a mean CL matrix,
c. a max CL matrix,
d. a min CL matrix,
e. a standard deviation of CL matrix,
f. A number of recordings matrix and
g. If possible (optional) absorbed power and PTO efficiency matrices.
Comment based on present application
Figure 13 to Figure 18 present the information that TS102 requests in terms of the power
performance of the WEC at location 1, except for absorbed power and PTO efficiency matrices;
items 4.a to 4.f.
Figure 13 isn’t strictly an electrical power matrix since a normalised power matrix was
provided for analysis. Figure 13 instead presents the percentages of the overall normalised
power that originates in each of the Hm0 and Te bins. Further to this, power performance
information was provided for the WEC when operating under two different control
algorithms. In this report they will be referred to as CA1 and CA2. It isn’t clear what the
characteristics are of the two different control algorithms, however, it is understood that they
have different impacts on the power performance of the WEC. Unless otherwise stated, the
data presented here is that which was recorded when the WEC was operating with CA1.
Figure 14 presents the mean CL of the WEC for each of the sea states recorded. Both TS100
and TS102 recommend that CL be used in the presentation of normalised power performance
because it is less sensitive to sea-state parameters and therefore less affected to the approach
followed to bin sea states. CL is calculated through equation (1),
(1)
In which is the WEC power measurement and is the wave energy flux which is calculated
through equation (2).
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 30 | 103

(2)
in equation (2) is water density, is acceleration due to gravity, is a particular sea state’s
spectra at the  frequency component,  is the group velocity of the  frequency
component and  is the frequency step of the sea state’s spectra.
The normalised power matrix provided for analysis yielded normalised CL values with an
excessive number of decimal places. The values presented in Figure 14 to Figure 17 were
scaled for ease of presentation.
Figure 14 presents the mean normalised CLs calculated using the normalised power
performance measurements recorded in each of the sea state bins. Figure 15 presents the
maximum normalised CLs calculated using the normalised power performance measurements
recorded in each of the sea state bins.
Hm0 (m)
3.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
3.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2.75
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2.25
0%
0%
0%
0%
0%
5%
0%
8%
0%
8%
8%
5%
0%
1%
0%
1.75
0%
0%
0%
0%
0%
4%
5%
7%
6%
7%
6%
4%
2%
1%
1%
1.25
0%
0%
0%
0%
0%
1%
2%
3%
3%
4%
3%
1%
0%
1%
0%
0.75
0%
0%
0%
0%
0%
0%
1%
1%
1%
1%
1%
1%
0%
0%
0%
0.25
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
Te (s)
FIGURE 13: WEC (CA 1) MEAN NORMALISED ELECTRICAL POWER MATRIX (PERCENTAGE OF OVERALL POWER
FROM EACH SEA STATE)
Hm0 (m)
3.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.25
0.00
0.00
0.00
0.00
0.00
0.04
0.00
0.05
0.00
0.03
0.03
0.02
0.00
0.00
0.00
1.75
0.00
0.00
0.00
0.00
0.00
0.04
0.06
0.07
0.05
0.06
0.04
0.02
0.01
0.00
0.00
1.25
0.00
0.00
0.00
0.00
0.00
0.03
0.04
0.05
0.05
0.05
0.03
0.01
0.00
0.01
0.00
0.75
0.00
0.00
0.00
0.00
0.00
0.02
0.03
0.04
0.05
0.03
0.02
0.01
0.00
0.00
0.00
0.25
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
Te (s)
FIGURE 14: WEC (CA 1) MEAN NORMALISED CL MATRIX - SCALED FOR PRESENTATION
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 31 | 103
Hm0 (m)
3.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.25
0.00
0.00
0.00
0.00
0.00
0.05
0.00
0.05
0.00
0.03
0.04
0.02
0.00
0.00
0.00
1.75
0.00
0.00
0.00
0.00
0.00
0.06
0.08
0.08
0.05
0.08
0.05
0.02
0.01
0.00
0.00
1.25
0.00
0.00
0.00
0.00
0.01
0.08
0.09
0.09
0.11
0.11
0.05
0.02
0.00
0.01
0.00
0.75
0.00
0.00
0.00
0.00
0.00
0.06
0.06
0.08
0.10
0.06
0.03
0.02
0.00
0.00
0.00
0.25
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
Te (s)
FIGURE 15: WEC (CA 1) MAX NORMALISED CL MATRIX - SCALED FOR PRESENTATION
Figure 16 presents the minimum CLs calculated using the normalised power performance
measurements recorded in each of the sea state bins. Figure 17 presents the standard
deviation of the CLs calculated for each of the sea state bins. Figure 18 indicates the number
of power recordings that were obtained for each of the sea state bins.
Hm0 (m)
3.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.25
0.00
0.00
0.00
0.00
0.00
0.04
0.00
0.05
0.00
0.03
0.03
0.02
0.00
0.00
0.00
1.75
0.00
0.00
0.00
0.00
0.00
0.01
0.04
0.06
0.04
0.04
0.02
0.01
0.01
0.00
0.00
1.25
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.01
0.00
0.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.00
0.00
0.00
0.25
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
Te (s)
FIGURE 16: WEC (CA 1) MIN NORMALISED CL MATRIX - SCALED FOR PRESENTATION
Hm0 (m)
3.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.25
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.75
0.00
0.00
0.00
0.00
0.00
0.02
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.00
0.00
1.25
0.00
0.00
0.00
0.00
0.00
0.02
0.02
0.02
0.02
0.02
0.01
0.01
0.00
0.00
0.00
0.75
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.02
0.02
0.01
0.01
0.01
0.00
0.00
0.00
0.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
Te (s)
FIGURE 17: WEC (CA 1) STANDARD DEVIATION CL MATRIX - SCALED FOR PRESEFOR PRESENTATION
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 32 | 103
Hm0 (m)
3.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3.25
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.75
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.25
0
0
0
0
0
5
0
1
0
1
4
2
0
1
0
1.75
0
0
0
0
0
11
10
7
3
19
14
6
3
3
3
1.25
0
0
0
0
3
59
104
81
68
51
18
6
0
2
0
0.75
0
0
0
0
0
42
103
174
114
49
30
2
0
0
0
0.25
0
0
0
0
0
0
1
3
0
0
0
0
0
0
0
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
10.5
11.5
12.5
13.5
14.5
Te (s)
FIGURE 18: WEC (CA 1) NUMBER OF RECORDINGS
3.1.4 TS102 GUIDANCE ON MAPPING INFORMATION FROM LOCATION 1 TO
LOCATION 2 AND AN EVALUATION OF SPECTRAL BANDWIDTH AS AN
ADDITIONAL MATRIX DIMENSION
5. Compare the CL matrix obtained for location 1 with the scatter diagram of location 2.
Complement the CL matrix with validated numerical model or physical data, to fill
undefined or underpopulated cells, so as to cover the range of sea states present at the
second location within the WEC’s operational envelope.
a. Capture length matrix requirements are set out in TS100. Where required, to
reduced variability in capture length in the bins, expand the dimensionality of
the matrix
b. Need to appreciate the sensitivity of the WEC to:
i. Water depth,
ii. Wave direction,
iii. Spectral shape and directional spreading,
iv. Water current and
v. Tidal range.
c. If inclusion of a third dimension modifies MAEP by more than 10% then the third
dimension should be included.
d. Compliment through:
i. Data fitting or
ii. Numerical or physical modelling.
e. Cells containing complemented data should be clearly identified (use the
method with least uncertainty).
f. When using a data fitting approach, you can’t use complementation data.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 33 | 103
g. When using a numerical model, the shape of the spectra used should be
representative of range observed within the bin.
h. Physical modelling should be based on International Towing Tank Conference
(ITTC) Recommended Guidelines 7.5-02-07-03.7.
i. The model used shall be a scale model of the WEC deployed at location 2. The
PTO’s characteristics need to be reported and the means of representing need
to be documented and justified.
6. Validate the [numerical model used to compliment location 1’s capture length matrix]
with data from location 1.
a. TS102 outlines the minimum requirements for validation:
i. Minimum of 10 bins should be used in the validation; 3 model runs each
(bins selected should be justified). Use either observed wave conditions
as input or representative wave conditions,
ii. Need to present the percentage error between the measured and
modelled capture length for each of the 10 validation bins,
iii. Need to present the percentage error between the measured and model
MAEP (based only on the validation bins) and
iv. Need to account for conversion losses within the PTO. For a physical
model, record absorbed power then scale appropriately then apply PTO
efficiencies.
7. Calculate Mean Annual Energy Production (MAEP) at location 2 using the
complimented capture length matrix and location 2’s resource matrix.
a. Use either the standard or alternative methods described in TS100.
8. Clearly present the MAEP that was calculated at location 2 through the different
methods of obtaining capture length values: measured at location 1,
interpolated/extrapolated and numerically estimated or experimentally measured.
Comment based on present application
Section 3.1.2, and in particular Figure 9, compare the coverage of the CL matrix produced for
BiMEP (location 1) with the scatter diagram for EMEC (location 2). Figure 9 also indicates the
bins that would require complementary data, both through data fitting and modelling results,
were this application to consider the MARMOK-A-5’s full theoretical operating envelope.
Section 3.1.2 also notes how, since physical and numerical model data isn’t available, in this
application of TS102, a smaller pseudo operating envelope was used. Since each of the bins
within the smaller pseudo operating envelope had information obtained from more than 3
sea states, no complementary data was required. It is recommended that further studies,
with access to either physical or numerical modelling results, should apply TS102 to test the
procedure more completely.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 34 | 103
With regards to testing increasing the dimensionality of the matrices, in this application of
TS102, four bandwidth parameters were investigated to determine if any correlation existed
between them and the variability in power performance observed in the sea state bins.
Bandwidth was investigated since the other higher dimension parameters suggested by TS102
(5.b.i to 5.b.v) were either considered to be less likely to have a significant effect on the WEC’s
performance or similar information was not available for both BiMEP and EMEC. The
bandwidth parameters are shown in equations (3a) to (3d).


(3a)

(3b)
(3c)
(3d)
in equations (3a) to (3d) is the  mode of the recorded sea states energy spectra.
The bandwidth parameters tested are as follows:
- Broadness parameter () [7],
- Bandwidth parameter () [8],
- Narrowness parameter () [9] and
- Broadness factor () [10]
The references listed alongside the parameters are believed to be the originators of the
parameters. A number of studies and reports have compiled and reviewed these parameters
and their effects on WEC performance, of particular note is [11].
Figure 19 is a plot of normalised CL against bandwidth for each of the recorded sea states that
fell within the most populated bin of the WEC’s power matrix when it was operating under
CA1 at BiMEP; Hm0 ranging from 0.5 m to 1.0 m and Te ranging from 7 s to 8 s. In total, 174
sea states that were recorded for the most populated bin. The coefficient of variation of
normalised CL, which is a relative measure of the standard deviation and calculated as the
standard deviation as a percentage of the mean, is 40%. Each of the bandwidth parameters
considered are presented by different colours and shapes and their respective coefficients of
variation are presented in the legend. Based on Figure 19, little clear relationship exists
between normalised CL and bandwidth for the bandwidth parameters tested.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 35 | 103
FIGURE 19: NORMALISED CAPTURE LENGTH PLOTTED AGAINST EACH OF THE BANDWIDTH PARAMETER
TESTED FOR FIXED HM0 (0.5 M TO 1.0 M) AND TE (7 S TO 8 S)
However, of the bandwidth parameters tested, it is recommended that further investigation
should be carried out determine what relationship exists between CL and the broadness
parameter, . It varied the most out of the parameters tested and has the benefit of being
calculated with lower order moments [12].
Figure 20 plots normalised CL against . The data is discretised by wave steepness, different
marker colours and shapes. Wave steepness (󰇛󰇜) is a nondimensional parameter
which is a function of both Hm0 and Te (). Presenting it on Figure 20 enables a review of
whether the variability of normalised CL within the bin is a result of higher resolution changes
in Hm0 and Te, i.e. greater resolution than the standard 0.5 m discretisation of Hm0 and 1 s
discretisation of Te. Figure 20 indicates that variability in normalised CL is not clearly related
to higher resolution steps in Hm0 and Te, i.e. it is not clear that the variability in normalised CL
is related to changes wave steepness.
As a high level investigation into the relationship between normalised CL and , linear trend
lines are presented on Figure 20 along with their equations and respective coefficients of
determination. Five trend lines are presented, corresponding to the five wave steepnesses.
A linear trend line was produced for the bin’s full dataset which had a coefficient of
determination (R2) of 0.376. The coefficient of determination was only improved by 3% when
increasing the complexity of the trend line to a second order polynomial.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 36 | 103
FIGURE 20: NORMALISED CAPTURE LENGTH PLOTTED AGAINST Ε0 FOR FIXED HM0 (0.5 M TO 1.0 M) AND TE (7
S TO 8 S)
Although each of the trend lines for each of the steepness bins have low coefficients of
determination (less than 0.55), the equations suggest that CL reduces with increasing .
Figure 21 depicts how the dimensionality of any of the matrices presented thus far can be
increased; in this case the dimensionality of a mean normalised CL matrix. Each of the ‘sheets’
in Figure 21, along the axis, present mean normalised CL matrices, discretised by Hm0 and
Te, for a range of bandwidth values. To observe how considering the additional bandwidth
parameters impacts calculated Mean Annual Energy Production (MAEP) required the
generation of similar higher dimension power and occurrence matrices.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 37 | 103
FIGURE 21: DIAGRAM OF INCREASING DIMENSIONALITY OF CAPTURE LENGTH MATRIX
Figure 22 shows the average normalised power performance contained in each bandwidth
range, in the form of the percentage of overall power, for each of the bandwidth parameters
tested. It also presents the number of sea states represented in each bandwidth range. Note,
the results presented in Figure 22 were recorded at BiMEP with the WEC operating under CA1.
Figure 23 indicates the bandwidth ranges within which the all the sea states were recorded,
for each of the bandwidth parameters tested. In general, a marginally greater spread of
bandwidths was observed at EMEC. However, in only four of the bandwidth range bins (cells
outlined in black) were there sea states recorded in bandwidth ranges that were only observed
at EMEC.
FIGURE 22: PERCENTAGE OF NORMALISED POWER WITH THE BANDWIDTH RANGES FOR FIXED HM0 (0.5 M TO
1.0 M) AND TE (7 S TO 8 S) AND NUMBER OF SEA STATES REPRESENTED IN EACH BANDWIDTH RANGE
ε0
ε1
ε2
ε4

D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 38 | 103
BiMEP
EMEC
BiMEP
EMEC
BiMEP
EMEC
BiMEP
EMEC
ε range
0.0 - 0.1
0%
0%
0%
0%
0%
0%
0%
0%
0.1 - 0.2
1%
0%
0%
0%
0%
0%
0%
0%
0.2 - 0.3
25%
23%
2%
1%
0%
0%
0%
0%
0.3 - 0.4
47%
57%
21%
36%
2%
5%
0%
0%
0.4 - 0.5
23%
13%
44%
42%
26%
40%
0%
0%
0.5 - 0.6
4%
4%
23%
12%
33%
34%
0%
1%
0.6 - 0.7
0%
2%
9%
6%
28%
14%
1%
6%
0.7 - 0.8
0%
1%
1%
3%
9%
6%
35%
41%
0.8 - 0.9
0%
0%
0%
1%
3%
2%
58%
49%
0.9 - 1.0
0%
0%
0%
0%
0%
0%
7%
3%
1.0 - 1.1
0%
0%
0%
0%
0%
0%
0%
0%
FIGURE 23: PERCENTAGE OF ALL SEA STATES RECORDED WITHIN PRESENTED BANDWIDTHS
Figure 24 to Figure 27 present the percentage of overall energy content contained in each of
the bandwidth bins, for each of the bandwidth parameters tested, both the control algorithms
and both deployment locations. Each of the figures also indicate how the total MAEPs
calculated when considering bandwidth vary relative to MAEP calculated when disregarding
bandwidth (conventional MAEP), i.e. when using only matrices discretised with Hm0 and Te
bins. It must be stressed that Figure 26 and Figure 27 were created with the data available,
and as such are missing complementary data which would be required for the Hm0/Tex bins
for which there is a mismatch in recorded performance data and EMEC resource data.
TS102 indicates that if the percentage error between the MAEP value calculated when
considering bandwidth and the MAEP value calculated through the conventional method is
greater than 10%, then the result obtained considering the bandwidth should be used.
Figure 24 to Figure 27 indicate that, as the bandwidth parameters progress from to ,
which roughly equates to using increasingly higher order moments to calculate the bandwidth
parameters, the greater the bandwidth range containing the majority of sea states.
ε range
Pct of
conventional
MAEP
0.0 -
0.1
0.1 -
0.2
0.2 -
0.3
0.3 -
0.4
0.4 -
0.5
0.5 -
0.6
0.6 -
0.7
0.7 -
0.8
0.8 -
0.9
0.9 -
1.0
1.0 -
1.1
ε0
100%
0%
1%
27%
55%
15%
2%
0%
0%
0%
0%
0%
ε1
100%
0%
0%
5%
24%
46%
20%
5%
0%
0%
0%
0%
ε2
100%
0%
0%
0%
2%
29%
35%
27%
6%
1%
0%
0%
ε4
100%
0%
0%
0%
0%
0%
0%
0%
32%
66%
1%
0%
FIGURE 24: BIMEP - CA1 ANNUAL ENERGY CONTENT OF DIFFERENT BANDWIDTH RANGES AND COMPARISON
OF MAEP CALCULATED WHEN CONSIDERING BANDWITH WITH CONVENTIONAL MAEP METHOD
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 39 | 103
ε range
0.0 -
0.1
0.1 -
0.2
0.2 -
0.3
0.3 -
0.4
0.4 -
0.5
0.5 -
0.6
0.6 -
0.7
0.7 -
0.8
0.8 -
0.9
0.9 -
1.0
1.0 -
1.1
ε0
100%
0%
0%
50%
42%
8%
0%
0%
0%
0%
0%
0%
ε1
100%
0%
0%
1%
41%
50%
7%
1%
0%
0%
0%
0%
ε2
100%
0%
0%
0%
0%
32%
41%
22%
3%
1%
0%
0%
ε4
100%
0%
0%
0%
0%
0%
0%
0%
18%
79%
4%
0%
FIGURE 25: BIMEP - CA2 ANNUAL ENERGY CONTENT OF DIFFERENT BANDWIDTH RANGES AND COMPARISON
OF MAEP CALCULATED WHEN CONSIDERING BANDWITH WITH CONVENTIONAL MAEP METHOD
In general, the parameter appears to compress the sea states to within a smaller range of
bandwidths than the other parameters. This is also seen in Figure 19 and Figure 22. Figure 24
and Figure 25 present data obtained at BiMEP with the WEC operating under both CA1 and
CA2 respectively.
Figure 26 and Figure 27, showing estimates for EMEC with the WEC operating under both CA1
and CA2, show that the MAEP values calculated when considering bandwidth ranged from
being 82% to 89% of the MAEP values calculated through the conventional method. If these
differences were observed in a formal application of TS102, the TS states that the bandwidth
should considered in the MAEP calculation.
There are a number of reasons why the MAEP values calculated when considering bandwidth
have poorer agreement with the MAEP values calculated through the conventional method at
EMEC, when disregarding bandwidth. To a degree, this is due to the marginally greater spread
of bandwidths observed at EMEC (shown on Figure 23). However, this doesn’t explain the
poor agreement shown for the Narrowness parameter, , (82% for CA1, and 86% for CA2)
since a similar spread of bandwidth ranges were observed at both BiMEP and EMEC. As
alluded to, the lower MAEPs will be due to the mismatches in recorded performance data and
EMEC resource data for certain Hm0/Tex bins. These cells of mismatch would require further
complimentary data. Further to this, the greater the average bin power on a bandwidth range
sheet, the greater the influence that cell mismatch would have.
ε range
Pct. of
conventional
MAEP
0.0 -
0.1
0.1 -
0.2
0.2 -
0.3
0.3 -
0.4
0.4 -
0.5
0.5 -
0.6
0.6 -
0.7
0.7 -
0.8
0.8 -
0.9
0.9 -
1.0
1.0 -
1.1
ε0
84%
0%
0%
28%
62%
8%
1%
0%
0%
0%
0%
0%
ε1
84%
0%
0%
1%
42%
43%
12%
2%
0%
0%
0%
0%
ε2
82%
0%
0%
0%
3%
40%
31%
20%
6%
1%
0%
0%
ε4
89%
0%
0%
0%
0%
0%
0%
1%
39%
58%
2%
0%
FIGURE 26: EMEC - CA1 ANNUAL ENERGY CONTENT OF DIFFERENT BANDWIDTH RANGES AND COMPARISON
OF MAEP CALCULATED WHEN CONSIDERING BANDWITH WITH CONVENTIONAL MAEP METHOD
ε range
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 40 | 103
Pct. of
conventional
MAEP
0.0 -
0.1
0.1 -
0.2
0.2 -
0.3
0.3 -
0.4
0.4 -
0.5
0.5 -
0.6
0.6 -
0.7
0.7 -
0.8
0.8 -
0.9
0.9 -
1.0
1.0 -
1.1
ε0
85%
0%
0%
34%
57%
9%
0%
0%
0%
0%
0%
0%
ε1
82%
0%
0%
0%
43%
47%
9%
0%
0%
0%
0%
0%
ε2
86%
0%
0%
0%
0%
44%
37%
16%
2%
0%
0%
0%
ε4
86%
0%
0%
0%
0%
0%
0%
1%
37%
60%
2%
0%
FIGURE 27: EMEC - CA2 ANNUAL ENERGY CONTENT OF DIFFERENT BANDWIDTH RANGES AND COMPARISON
OF MAEP CALCULATED WHEN CONSIDERING BANDWITH WITH CONVENTIONAL MAEP METHOD
By way of example, Figure 28 indicates, in percentage terms for the WEC deployed at EMEC
operating under CA1: the mismatch that can exist on each bandwidth range sheet, the average
power on each bandwidth range sheet and product values to indicate the significance of the
mismatches observed.
ε range
0.0 - 0.1
0.1 - 0.2
0.2 - 0.3
0.3 - 0.4
0.4 - 0.5
0.5 - 0.6
0.6 - 0.7
0.7 - 0.8
0.8 - 0.9
0.9 - 1.0
1.0 - 1.1
ε0
Mismatch
0%
11%
7%
0%
13%
20%
22%
20%
6%
0%
0%
Average power
0%
8%
38%
39%
12%
2%
1%
0%
0%
0%
0%
Product
0%
16%
47%
0%
27%
8%
2%
0%
0%
0%
0%
ε1
Mismatch
0%
0%
22%
2%
3%
3%
14%
22%
22%
10%
0%
Average power
0%
0%
11%
34%
28%
21%
5%
1%
0%
0%
0%
Product
0%
0%
45%
10%
17%
13%
12%
3%
0%
0%
0%
ε2
Mismatch
0%
0%
13%
29%
10%
6%
10%
6%
16%
10%
0%
Average power
0%
0%
0%
9%
28%
29%
21%
10%
2%
0%
0%
Product
0%
0%
0%
26%
26%
18%
19%
6%
4%
0%
0%
ε4
Mismatch
0%
0%
0%
0%
8%
12%
28%
28%
12%
12%
0%
Average power
0%
0%
0%
0%
0%
0%
1%
32%
54%
14%
0%
Product
0%
0%
0%
0%
0%
0%
1%
52%
38%
10%
0%
FIGURE 28: INDIDCATION OF BIN MISMATCH AND AVERAGE NORMALISED POWER FOR BANDWIDTH RANGES
(WEC OPERATING AT EMEC UNDER CA1)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 41 | 103
3.1.5 ADDITIONAL ASPECTS COVERED IN TS102
9. Estimate the uncertainty in the MAEP calculated at location 2.
a. Some of this is indicated by the percentage of the MAEP calculated using
measured cells from location 1; the more measured cells there are the more the
estimate of MAEP is based on real data and it indicates that the device is
operating in conditions similar to those observed at location 1.
b. Uncertainty is due to:
i. The quality of the performance and wave data at location 1,
ii. The quality of the wave resource data at location 2 and
iii. The accuracy and quality of the complementary data.
10. Outline proposed WEC changes that would be actioned to optimise its performance at
location 2.
c. Need to document:
i. Description of the change,
ii. Purpose of the change and
iii. Impact of the change.
11. Evaluate how the proposed changes affect the capture length using physical and/or
validated numerical models. If the difference between measured (at location 1) and
numerically estimated or physically measured capture length is greater than 10% then
use the numerical or experimental value.
d. Can only use capture length matrix obtained using WEC1 at location 1 to
characterise WEC2 if the difference in power performance is observed to be less
than 10% per bin - if the difference is greater than 10% then use a numerical
model result,
e. If the WEC is modified, the numerical model validation steps outlined in step 6
need to be followed for every capture length bin recorded at location 1 and
f. The difference between mean capture lengths shall be calculated for each bin
and use numerical value if difference is greater than 10%.
Comment based on present application
As highlighted, it is recommended that a similar test application of TS102 be conducted with
physical and/or validated numerical model data to more fully test the methodology. Due to
the approach taken in this study, calculating MAEP using a smaller pseudo operating envelope,
no physical and/or validated numerical model data was used (recall it wasn’t available), so it
is not possible to indicate what percentage of the MAEP figure was estimated by these
complimentary methods.
With regards to the quality of the data used, there is no evidence to suggest that the data
recorded is of poor quality in terms of how it was recorded. The bins within the smaller pseudo
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 42 | 103
operating window contained information from at least 3 sea states or more. It isn’t clear how
the power performance information has been normalised and whether this has affected the
quality of the analysis.
It has been clear throughout this application, that it is more than likely that a WEC’s design
will change when moved from location 1 to location 2. Particularly if the approach followed
to select location 2 does not consider the characteristics of the WEC. TS102 describes how to
account for changes to the WEC this involves using physical and/or validated numerical
model data (with the model adjusted to the WEC design for location 2) to replace measured
cells if the difference in values is greater than 10%.
Finally, it should be noted that TS102 stresses the importance of transparency in the
procedure.
3.2 DISCUSSION ON THE APPLICATION OF TS102 AND UNCERTAINTY
WECs will be required to operate at different deployment locations, however the approach
taken to choosing deployment locations can be approached in two ways. In one approach,
arbitrary locations with a high energy resources could be chosen. In the other approach, the
location could be based on what is appropriate for the WEC being deployed. The former
approach might require significant changes to the WEC, incurring corresponding costs,
although it would be in a higher resource and therefore generate a higher income. In the
latter approach, minimal changes would be required to the WEC however the income might
not be as great. In the ideal scenario, both approaches could be satisfied, in which the WEC is
suited to a high level of resource site. However, it is up to a project developer to determine
which approach to take for the most economic deployment.
The steps outlined in TS102 guide on what to do in both approaches. TS102 acknowledges
that location 2 will have different metocean conditions and that WECs might have design
changes
1
for the purposes of location 2. TS102 specifies the physical tests, validated
numerical model tests and/or data fitting techniques that should be conducted to compliment
the performance observations from location 1 and reflect the changes that device design will
have on performance. Further to this, it states that there should be an assessment of the
uncertainties involved in the procedure followed.
It would be useful if TS102 provided guidance on selection of an appropriate location for
WEC’s deployment. For example, it could indicate a range of parameters that should be
checked, and if they are within certain limits, then location 2 could be deemed to be similar
1
Changes in dimension, geometry, PTO system, control logic and moorings system. Need to explain the change,
its purpose and its impact on power performance.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 43 | 103
to location 1, within the accuracy that can be expected from WEC power performance
assessments.
In an ideal scenario, power performance measurements would be recorded at location 1 that
cover all the sea states that arise at location 2. The longer the deployment period of the WEC
at location 1, the greater the chance that power performance measurements would be
recorded for all the sea states that occur at location 2. However, until power performance
measurements are recorded, at location 1, for all the sea states that occur at location 2,
complimentary data will be required. The complimentary data obtained either through data
fitting or physical or validated numerical model data. In addition to this, and as discussed at
the start of this section, physical or validated numerical model results should be used when
accounting for changes that arise due to modifications in WEC design if the results obtained
differ from measured results by more than 10%. Deferring to these approaches of generating
power performance data suggests a high level of trust in values that they provide, i.e. in the
case of differences being greater than 10%, the approach of generating synthetic data is
preferred over the measure data. This being the case, it suggests that the data measured at
location 1 might be best used to validate the physical and/or numerical models. Then the user
could prefer to use those models to estimate the performance of the WEC at location 2. TS102
provides some guidance on model validation, however, perhaps this section could be further
developed to provide more guidance on acceptable limits on accuracy.
With regards to the uncertainty in estimating the performance of a WEC at a prospective
deployment location, TS102 highlights that the uncertainty in the estimate will be greater the
more complimentary data that is used and vice versa. This has hard to assess without either
physical or numerical data and actual power performance data recorded at location 2.
In addition to this, the application of TS102 presented in this deliverable attempted to
determine how higher dimensions (different bandwidth parameters) could explain the
variability of power performance measurements in the different sea state bins. No clear
relationships were observed, except that normalised power appeared to reduce as bandwidth
increased which makes sense for a point absorber type WEC. There is still uncertainty in this
area and WEC developers need to identify which sea state parameters, other than Hm0 and Te,
impact the performance of their device. Understanding these additional parameters and how
they impact their devices will reduce uncertainty further.
Further to this, TS102 emphasises that additional sources of uncertainty in predictions of
power performance will arise because of differences in site characteristics (bathymetry, tidal
and weather conditions etc.), marine currents, wave direction and WEC modifications. The
more that is understood about these factors the less uncertainty there will be.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 44 | 103
3.3 IMPLICATIONS FOR LCOE MODELLING AND BUSINESS CASE
DEVELOPMENT
Figure 29 is a sensitivity spider plot indicating how LCOE, equation (4) varies with percentage
changes in different inputs.

󰇛󰇜
 
󰇛󰇜

(4)
LCOE is a well-established metric used to evaluate the economic performance of an energy
generation device over its lifetime. It is comparable to the market selling price/break-even
price of electricity. As shown in equation (4), LCOE is the total Capital Expenditure (CAPEX),
Operational Expenditure (OPEX) and Decommissioning (DECOM) costs associated with the
generation of electricity, discounted to present day values, divided by the sum of the
discounted , also discounted. in equation (4) is the nominal discount rate, is time
measured in years and is the number of years a WEC, or WEC array, would be in operation.
Figure 29 indicates that MAEP (identified as AEP (MWh) in the Figure 29) has the greatest
impact on LCOE out of all the components that go into the calculation of LCOE, highlighting
the importance of being able to accurately estimate LCOE at prospective deployment
locations.
In addition to the MAEP at a prospective deployment location calculated by following the
method set out in TS102, the other information gathered on site characteristics is also useful
for economic modelling. For example, the site resource information collated through the
application of TS102 could feed into an OPEX model and the deployment site information
could also feed into logistic modelling, such as activities to estimate electrical architecture
costs etc.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 45 | 103
FIGURE 29: SENSITIVITY SPIDER PLOT FOR LCOE [13]
It should be noted that, due to the significant impact that MAEP has on LCOE, uncertainty in
MAEP also has a significant impact on LCOE. It is clearly important that uncertainties in AEP
need to be understood and reduced as much as possible.
3.4 RECOMMENDATIONS FOR TC114
Through this application of TS102, based on an early stage WEC with a limited deployment
time, the following recommendations are made:
- Guidance should be provided on how to determine if a site is suited to a WEC’s
characteristics, i.e. advice on differences acceptable for location 2 to be considered
similar to location 1.
- Consideration should be made on the applicability of this TS to early stage devices. As
discussed, if performance data is limited or changes are made to the WEC, TS102 tends
to suggest that users defer to the use of physical or validated numerical model data.
Perhaps the TS should to focus on how to ensure that models are properly validated
by data recorded at location 1 so as to increase the confidence in the models that are
used to estimate the performance of the WEC at a location 2.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 46 | 103
4. PERFORMANCE ASSESSMENT USING SHORT SAMPLES
Abstract
Assessing power performance at sea is an important step in taking wave energy towards
commercial projects. Open-sea testing being expensive, it is essential that it be conducted in
the most efficient way. One measure of this is how accurately power production can be
predicted using data from a given testing period. We report on how using sample durations
ranging from three hours to five minutes affects power performance assessment. The analysis
focusses on open-sea operating data from EVE’s Mutriku wave power plant, a shoreline
breakwater housing oscillating water columns. Results suggest that post-processing with
sample duration as short as five minutes, in complement to the standard twenty minutes, can
be useful to populate parts of the power matrix where longer-sample data is too sparse. This
is because short-term wave statistics cover a wider range of the scatter diagram than
standard, longer averaged sea-states. Shorter sampling may also enable faster assessment of
various device configurations, by cycling through them in more rapid succession. This would
greatly reduce testing duration and costs, but would require changes in the implementation
of at-sea testing. With the dataset analysed, it appears that samples as short as five minutes
still result in annual energy production estimates within the range of estimates based on
standard sample durations. Difficulties that arise when using shorter samples are discussed
and some methods that appear to partly resolve them for this particular dataset are
presented.
4.1 SUMMARY AND MAIN RESULTS
This section reports on the use of various sample durations for power performance
assessment of Wave Energy Converters (WECs). Currently IEC-TS/62600-100 specifies a
minimum of 20 minutes for sample duration. Practice in metocean data analysis is to use
samples no shorter than 17 minutes (1024 seconds, or 2048 samples at 2 Hz, a convenient
number for spectral analysis). This would correspond typically to a record of some hundred
waves. It is difficult to derive reliable statistics on waves with much less.
However, for the particular application to WEC power performance assessment, both the
wave energy flux and the power output of WECs often show high peak to average ratio at time
scales as short as that of one individual wave. It thus appears worthwhile to investigate how
the shorter time scale response of the WEC could be related to statistics of the incoming
wavefield at shorter time scales.
Power data and wave data from EVE’s Mutriku wave power plant were analysed for power
performance with sample duration ranging from 24 hours to 5 minutes and then down to
individual waves. The Mutriku plant is a shoreline breakwater housing 18 chambers of
Oscillating Water Columns (OWC), most of which are equipped with Wells Turbines of nominal
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 47 | 103
capacity of 18.5 kW. Certain results with data from IDOM/Oceantec’s floating OWC operating
at the Biscay Marine Energy Platform (BiMEP) are also presented.
Results indicate that for the dataset considered, sample variability actually increases
significantly at shorter sample duration of power performance. There doesn’t appear to be
any simple way to relate power output to wave characteristics at finer time-scales that can be
used to reduce scatter in power performance data.
On the other hand, it was found that this increase in sample variability may be compensated
by the increase in the number of samples, so that the rms error expected in the final estimate
of the mean may be significantly less when using short samples. Conditions such as
independence and separation of samples may be necessary and certain methods are reported
on that seem to work for this particular dataset.
No significant loss of accuracy in energy yield prediction is found from using samples as short
as five minutes, in that differences are of the same order than between samples of 30 minutes,
one hour and three hours about 5%. The wider applicability of this result is difficult to assess
with this dataset only. The main limitation is duration of the observing campaign, which spans
less than a year, with imperfect coverage. Should robustness of yield prediction to changes in
sample duration be confirmed with larger datasets and other devices, it would be valuable in
reducing necessary testing duration and better assess various device configurations such as
control algorithms.
Finally, another potential advantage of using short samples is that a significantly larger part of
the 󰇛󰇜 space can be covered. The main reason is that the scatter diagram of “sea-states”
of five minutes duration covers significantly more 󰇛󰇜 space than twenty-minute samples.
Performance data can thus be obtained for cells of the power matrix where modelling or
interpolation would normally be used. This may be particularly useful when the developer is
interested in performance of their WEC in conditions that occur rarely at the test site. For
example, when evaluating performance at a second location with a different wave climate. A
nice feature is that this populating of more parts of the power matrix with shorter samples
can be added at no cost to any post-processing analysis, in complement to, and without any
modification to, the analysis of standard, twenty minutes or longer samples.
More data from Mutriku would be useful to confirm these results, and applicability to other
shoreline or floating devices remains to be investigated. Considering the cost to developers
of open-sea test time, and the many device configurations such as control strategies that must
be evaluated during this limited period, the possibility to assess performance with shorter
samples would be highly valuable to wave device developers and plant managers. This report
is formatted so as to facilitate the use of this experience by developers planning or post-
processing open-sea data. Some considerations of relevance to IEC technical specifications for
wave energy performance assessment are also proposed.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 48 | 103
4.2 INTRODUCTION AND OBJECTIVES
This section reports on experience using various sampling strategies to assess wave energy
converter (WEC) power performance. The focus is on the impact of using various durations of
samples of power performance.
The analysis reported herein was part of H2020 OPERA/T5.3: Wave-by-wave assessment of
power production to reduce uncertainty in IEC/TS 62600-100. Task 5.3 (T5.3) is within WP5,
which has overall goal to accelerate the establishment of appropriate practices and standards
at all the levels of the supply chain for wave energy, in order to reduce uncertainty and their
impact on cost of capital for projects. T5.3 investigates how uncertainty in WEC power
performance assessment may be reduced by increasing the resolution at which WEC power
output is related to statistics of the incoming wavefield.
4.2.1 POTENTIAL INTEREST OF POWER ASSESSMENT AT FINER TIME-SCALES
Perhaps many a visitor to the Mutriku wave power plant has noted the high peak to average
ratio of the power output from turbines there. On some days, the plant may be silent for a
few minutes, then, suddenly, with the arrival of a group of large waves, the water columns
will oscillate loudly for a few cycles, perhaps a bit less than one minute, during which one may
feel like their head is in a jet engine at take-off, before going silent again for a few minutes.
Until the next wave group. Many a casual beachgoer also would have observed similar
behaviour of the nearshore waves on some days, where wave agitation appears to be
dominated by the contribution of groups of a few waves with relatively quiescent lulls in
between.
This phenomenom, and the initial motivation for this study, may be best illustrated by the
plant operating data shown in Figure 30. This is a 20-minute record of wave elevations at the
pressure sensor (upper panel) and Turbine 13 power output (lower panel), on February 19th,
2018, from half past midnight to 0:50 (data sources and other specifics will be presented in
the following sections). While groupiness may not be so conspicuous in the wave elevation
record shown, the elevation squared (middle panel), which is more relevant for the wave
energy flux, shows more pronounced grouping. Turbine 13 power output shows very marked
patterns of high output sequences, which may last from 15 seconds to slightly over one
minute, where power is over the turbine nominal power of 18.5 kW, followed by lulls of a few
minutes where output is a few kW or less.
This behaviour is not resolved in 20-minute samples. One may be tempted, therefore, to
investigate whether the turbine output on shorter time scales (during the peaks or lulls) may
be usefully related to some characteristic of the incoming wavefield at the corresponding time
scales (for example, a group of large waves or a peak in the elevation squared, or energy flux).
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 49 | 103
This is, essentially, the initial motivation to investigate plant production at short time-scales,
with an objective to relate turbine output to individual waves characteristics.
Successfully relating turbine output and wave characteristics at these time scales may have
valuable applications, such as:
- Better understanding and specifying how the WEC power output behaviour can be
related, and predicted, by certain measurable conditions in the wavefield
- Reducing dispersion in power performance samples: could shorter individual samples
of power performance better resolve the peaks/lull in power output and thereby
better predict them by peaks/lull in wave power?
- Possibility to have more samples in the same testing period, which would allow for
reduced error on the mean
- Possibility to populate more parts of the power matrix, since shorter sea-states are
expected to show more variability (this will be shown in the following sections).
These possibilities become particularly attractive considering the high cost of testing time to
developers. Another important aspect is that power output may depend on device
configuration, such as control strategy. For example, in OPERA, seven control strategies were
tested and compared at Mutriku, with impacts on power output of the order of 50%. In this
context, the possibility to have meaningful information on power performance of a particular
FIGURE 30: AN EXAMPLE OF HIGH PEAK TO AVERAGE POWER OUTPUT AT MUTRIKU
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 50 | 103
device configuration with shorter samples becomes increasingly crucial for effective use of at-
sea test time.
4.2.2 TECHNICAL ISSUES WITH POWER ASSESSMENT AT FINER TIME-SCALES
There is at least one obvious technical difficulty in reducing the sampling time for WEC power
performance assessment. It relates to the necessary sampling time to obtain meaningful wave
statistics.
Long experience with the analysis of wave records has shown that to obtain meaningful
statistics on the heights and periods of waves, a minimum record length of some twenty
minutes is necessary. More precisely, common practice is to use 1024 seconds (17 min and 4
seconds), which corresponds to 2048 data points sampling at 2 Hz (a power of two is best for
efficiency of the fast Fourier transform (FFT) algorithm). This corresponds to some hundred
waves of period 10 seconds and is a good trade-off between acceptable sampling variability
and the need for a stationary sea-state (e.g., Goda 2010 [14]). For more slowly varying
wavefield, such as remotely-generated swell after its initial arrival, records longer than 30
minutes are preferred. IEC-TS/62600-100, Edition 1, Clause 6.2, specifies a minimum sample
duration of 20 minutes. It is noted therein that a short sampling duration can result in poor
characterisation of the sea-state.
Another issue with using shorter records is the lack of frequency resolution with the spectral
analysis. Wave statistics such as peak period or energy-mean period are obtained with spectral
analysis. To obtain reasonable confidence intervals in spectral component estimates, common
practice in oceanography is to combine FFTs on 8 sub-records, which gives 16 degrees of
freedom. A 1024 seconds record divides in eight 128 sub-records, the Nyquist interval in this
case results in a resolution a little worse than 2 seconds for variance at periods over 15
seconds. Coarser resolution in variables such as peak period may become a problem for many
marine applications. IEC-TS/62600-100, Edition 1, Clause 7.5-a) specifies that the minimum
frequency resolution for the spectral analysis of wave data is 0.015 Hz, which means sub-
records of at least 66 seconds.
Section 4.4 reports on the examination of characterising the sea-state with short samples. In
brief, it appears that while the aforementioned issues may be problematic for studies focussed
on assessing the wave climate, their impact on the analysis of WEC power performance may
be more manageable. The effectiveness of various method used to deal with the issues
outlined above is reported.
4.3 MEASUREMENTS AVAILABLE
The analysis presented in this section is focused on operating data from EVE’s Mutriku
shoreline wave power plant. The main reason for this focus is the availability of high-quality
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 51 | 103
datasets with little or no confidentiality requirement. However, the analysis of sample
variance also includes data from Marmok, Oceantec’s (now IDOM) floating WEC operating in
BiMEP.
4.3.1 BIMEP
Wave measurements at BiMEP were presented in various reports from WP1. Briefly, spectral
wave data is available every 20 minutes from a Triaxys particle-following buoy situated
some 200 m upwave of the WEC. If needed these can be complemented by data from the
bimep reference buoy, a FUGRO heave-pitch and roll buoy deployed about 1 km to the south
the WEC, and several Zunibal particle-following buoys within the same distance.
Regarding power performance data, Borja de Miguel of IDOM kindly provided data of standard
deviation in power outputs, normalized to mean power, for many cells of the power matrix.
4.3.2 MUTRIKU
There are many data streams from the Mutriku shoreline plant. This analysis focusses
essentially on wave and plant data from two deployments in 2018: Phase II, from February to
mid-April 2017, and Phase III, of which the useful data is from July to mid-August 2018.
It should be noted that the First Edition of IEC62600-100 explicitly excludes shoreline devices
from its scope. Also, the data available does not comply with minimum requirements therein
to evaluate annual energy production, such as at least a full-year of operating data to correctly
sample seasonality. However, useful conclusions can be obtained with the data available at
Mutriku on the impact of sample duration on power performance assessments.
4.3.2.1 WAVE DATA
The main source of wave data in this study is an RBR pressure sensor and data-logger installed
on the seabed some 200 m upwave of the plant.
Wave instrument deployed
An RBR virtuoso pressure transducer was deployed some 200 m upwave of the wave power
plant in Mutriku (Figure 31). This distance is a trade-off between representativity of the
wavefield at the wave power plant, which requires proximity, and reducing the impact on
measurements of the waves reflected off the breakwater at Mutriku, which can be important
up to about this distance (Pedro Liria, personal communication 2018). Approximate
coordinates are as follows:
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 52 | 103
Mean depth: 9.5 m
Latitude: 43°18'51.59"N
Longitude: 2°22'33.99"W
Data used in this analysis are from two deployments in 2018, Phase II (January 31 to April 18th)
and Phase III (June to Mid-August).
Processing of data
The pressure is sampled at 2 Hz. To remove tidal and non-wave signal, a 10-minute moving
mean average is used. Pressure is converted to depth assuming hydrostatic balance and linear
wave theory (see below considerations on the validity of this approximation) and seawater
density values typical of this region and season. More details are available in the OPERA
Technical Note: Processing of Bottom-Pressure Sensor Data (2018). The calculation of wave
statistics from wave heights is described in Section 4.4.
Possible limitations with wave statistics from nearshore pressure sensor data
Compared to deeper water sea waves, the nearshore wavefield includes a number of
phenomena which impact the analysis and interpretation of wave data. One issue is wave
breaking, which occurs as far as 300 m offshore during winter in Mutriku. In general, the
wavefield in the nearshore may be more non-linear, which will influence wave statistics such
as significant wave height. In addition the seabed in Mutriku is highly irregular, with large rocks
and other topographic features of one meter or so in scale (see Figure 32 for an example of
such topographic features). Thus depth changes by some 10% over distances of a few meters,
FIGURE 31: POSITION OF THE WAVE INSTRUMENT UPWAVE THE PLANT
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 53 | 103
and this could modify the wavefield in various ways such as scattering, refraction, and bottom
friction.
It is expected, thus, that the wavefield upwave of Mutriku have significant variability at small
spatial scales. This is confirmed by plant data, which shows that the wave climate for OWC
chambers just a few meters apart can be significantly different. Clearly the wavefield at the
pressure sensor 200 m upwave cannot be expected to the same as the wavefield at the
shoreline and for any particular chamber of the plant. These data are not adequate for
purposes such as assessing the wave resource at the WEC location. In general, measurement
of the incoming wavefield for shoreline devices is expected to include some additional
complications relative to the deeper water WECs, though they may be less severe on gently
sloping beaches than on an irregular coastline with rocky bottom such as that faced by the
Mutriku plant.
Regarding the instrument itself, bottom-pressure measurements have long been used as a
convenient and cost-effective way to analyse waves and is generally reported to be accurate
to within 5% for important wave statistics [15], [16]. In the conditions of deployment at
Mutriku, that include humbling plunging breakers in winter and large rocks sloshed around
the seabed by these, measuring from the bottom was the only option that entered within
project budget. And even then, surviving one winter was not obvious. However, it should be
noted that there are issues specific to the measurement of waves with bottom-fixed pressure
sensors. In OPERA deliverable D4.2 [17], Annex 8.2, João Henriques et al. discuss how, when
applied to predictive control of WECs, bottom-pressure sensor data analysed with linear wave
theory may result in underestimation of short-period waves. The data from the sensor appears
FIGURE 32: A VIEW OF THE SEABED NEAR THE PRESSURE SENSOR UPWAVE OF MUTRIKU (FROM: CDA)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 54 | 103
rather consistent with this possibility, with a low occurrence of sea-states with short energy
period (more details in Section 4.5.3 when discussing the scatter diagrams obtained).
After reviewing these potential limitations, it should be clarified that the wave pressure record
available is quite well correlated with the plant operating data. No obvious ways have been
found by which imperfection in the wave measurements should greatly impact broad
conclusions on the influence of sample duration on power performance assessment of WECs.
4.3.2.2 PLANT DATA
The Mutriku plant operating data used in this analysis was provided by François-Xavier Faÿ of
Tecnalia, after processing as part of investigation conducted in H2020-OPERA/WP4 (see e.g.
[17]). Pressure differential, turbine rotation velocity, butterfly valve angle and power output
for turbines 7, 13 and 15 are used in this analysis, with a focus on turbine 13 as it has the best
coverage and may be the most directly impacted by waves measured at the pressure sensor
location. WP4 and WP1 deliverables should be consulted for details of the Mutriku wave
power plant instrumentation.
4.4 PROPAGATION TIME FROM PRESSURE SENSOR TO OWC CHAMBERS
To match power output time series with the incoming wavefield statistics at shorter time
scales, the wave propagation time from the pressure sensor to the plant chambers must be
accounted for. An initial study [18] showed promising results in relating phase lag between
signal at the pressure sensor and in the OWC chamber pressure with the tidal height. This
work was subsequently extended to a larger dataset but at time of writing, an unambiguous
prediction method for the propagation time has not been obtained. This section reports on
the methods used and technical difficulties encountered.
Attempts to predict propagation time at Mutriku in this project can be classified into three
groups. The first is based on shallow water linear wave theory, relating wave group velocity to
observed tidal height. The second is analysis of time-lag in the cross-correlation functions
between the pressure signal at the sensor and the pressure signal in the OWC chambers. The
third one is the manual identification and matching of individual wave features in the pressure
signal and in plant operating data. Experience applying these three methods is reported in the
following subsections.
4.4.1 PROPAGATION TIME FROM LINEAR WAVE THEORY
In water depths significantly lesser than the wavelength of ocean gravity waves, these become
non-dispersive and the frequency-independent propagation velocity, in this case equal to the
phase velocity, can be approximated as:
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 55 | 103

where  is the wave propagation velocity (or group velocity),  is the phase velocity, is the
gravity acceleration and is the water depth. In this approximation thus the wave velocity at
some point nearshore is entirely determined by the water depth only.
Nearshore multibeam data collected in earlier projects in this area was kindly provided by
Azti-Tecnalia. Figure 33 shows a colour rendition. The meter scale features discussed earlier
are quite visible in this high-resolution data. A representative mean depth along the wave rays
is necessarily a rather coarse approximation.
Tidal elevation are obtained from 10-minutes averages of the pressure sensor as discussed in
the previous section. Inclusive of tides, mean depth at the sensor during the observed period
ranges from 7.5 to 12 m. The resulting propagation time from linear wave theory range from
19.5 to 27 seconds. While it is expected that this approximation will have limited accuracy due
to non-linearity in the wavefield, complex topography, changes in wave direction, etc.; it does
provide a useful indicator of the expected range in propagation time.
4.4.2 PROPAGATION TIME FROM TIME-LAGGED CROSS CORRELATION
For certain pairs of signals, identifying a maximum in the time-lagged cross correlation
function is a useful approach to determine a representative delay between them. This section
FIGURE 33: BATHYMETRY UPWAVE THE MUTRIKU PLANT
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 56 | 103
reports on the complications encountered in applying this method with the pressure sensor
and plant data.
The main problem is the difficulty to distinguish between the peaks in cross-correlation that
correspond to (1) the time-lag between an individual wave signal in the pressure sensor and
this same wave’s signal in the plant operating data, which is the peak that is required here to
evaluate propagation time; or (2) those peaks that correspond instead to the correlation
between successive waves. No method was found to unambiguously discriminate between
those two. That the average propagation time from linear theory, at some 20 or so seconds,
approximately corresponds to two wave periods is adding to the complication.
As illustration of this problem, the calculated cross-correlations between pressure sensor
derived wave elevation and Turbine 13 pressure and power output for a 20-minutes sample
on April 4th, 2018 are shown in Figure 34. It is apparent that while there is periodicity in the
extrema in correlation, it is difficult to assign a particular peak or minimum to either the
propagation time or to the periodicity in the incoming wave signal itself.
Another issue illustrated in Figure 34 is the different phase lag for the chamber pressure and
power output. The turbine rotation velocity has yet other lags for its extrema (not shown).
Determining which of these should be considered the relevant phase lag would necessitate a
consideration of the details of excitation forces and response of the oscillating water column,
generator characteristics, etc.
In summary, basic cross-correlation analysis does not appear to easily provide useful
estimates of propagation time for these data. However, it is possible that more advanced
analysis inclusive of the details of the chamber and generator physics would be more
successful.
4.4.3 MANUAL IDENTIFICATION OF INDIVIDUAL WAVE SIGNALS
As described above, periodicity in the wave signal complicates the matching of peaks and
troughs in the pressure sensor data upwave to peaks and troughs in the plant operating data
and power output. However, it should be possible to identify and match individual events that
are not periodic. These could be, for example, an isolated large wave or wave group, or the
end/beginning of a lull or of a high-activity run in incoming waves. [18] obtained promising
results with a short stretch of data from late 2016 with this approach. Apparent propagation
times were well correlated to tidal heights in ways that could be well predicted by linear wave
theory. Unfortunately at time of writing it was difficult to reliably obtain similar results with
this dataset. This section reports on the methods applied and technical difficulties
encountered.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 57 | 103
Figure 35 shows an example of matching incoming wave data to plant power output. As is
often the case, it is difficult to identify clearly non-periodic features in the original wave
elevation record. However, the wave elevation squared or the square of the heave velocity
derived from the original time series of wave elevation, which are better indicators of the
incoming wave energy flux than surface elevation, reveal pronouncedly non-periodic events.
The lower two panels show an example of matching lulls before a burst in incoming wave
energy and plant output; and matching peaks in the square of the heave velocity to peaks in
plant outputs. In this particular case, both methods yield propagation times of about 30
seconds.
Figure 36 shows another matching, where more of the available plant data is used. In this case,
turbine pressure differential or rpm exhibit strong periodicity and are thus difficult to use.
Turbine power output and, again, wave heave velocity squared reveal pronounced non-
periodic events. (The thin blue and green in the power graph are the outputs of Turbine 7 and
Turbine 15 showing, incidentally, how the long-crested approximation is not valid for the
incoming wavefront). In this particular case the peak can be better matched than the ends of
lulls, but for many cases analysed the situation was reversed.
FIGURE 34: TIME-LAGGED CROSS CORRELATIONS BETWEEN WAVE SIGNAL AND PLANT OPERATING DATA
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 58 | 103
This method appears to work rather well when zooming-in on short stretches of a few
minutes. Specific individual wave features can be matched seemingly unambiguously to
individual features in the plant response, and the lags obtained do not exhibit clear
inconsistencies in other parts of the few minutes stretch. However, when considering many
such cases with longer spacing in time, no coherence was found across cases in the
propagation times obtained. Differences do not appear to be easily explained by tidal
elevation or other measurements available.
Nonetheless, despite the scatter in the time lags, it is found that propagation time is almost
always roughly within the range that is expected from linear shallow water wave theory.
FIGURE 35: EXAMPLE OF MATCHING WAVE DATA TO PLANT DATA
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 59 | 103
Should a rough approximation be needed for a particular application, a mean propagation
time of 20 to 30 seconds is suggested.
4.5 WAVE STATISTICS FOR RECORDS OF LESS THAN 20 MINUTES
As discussed in Section 4.2.1, standing in the way of exploring the potentially valuable benefits
of using shorter samples of WEC power performance, one important issue is whether
meaningful wave statistics can be obtained using records shorter than 20 minutes (or 17 min
4 s, to be more precise). In applying the method used to try to address this, it is found that:
FIGURE 36: OTHER EXAMPLE OF MATCHING OF WAVE AND PLANT DATA
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 60 | 103
The meaningful definition of the energy period for short records is far more complicated
than the definition of a significant wave height for short records
The lack of established practice and studies on the use of records shorter than 20 minutes
to characterise the wavefield means that further, more rigorous work on this aspect would
be useful
However, reducing the sampling record length from three hours to as short as five minutes
had little impact on two important statistics for WEC power performance assessment, the
scatter diagram and the power matrix (or a proxy of it, as will be discussed later), and
consequently little impact on energy yield prediction.
These findings are reported on in detail below.
4.5.1 SPECTRAL SIGNIFICANT WAVE HEIGHT
It is common practice to characterise a wavefield by its spectral significant wave height Hm0,
which is defined e.g. in IEC-TS/62600-100 as
 
Where is the zeroth moment of the distribution of the spectrum of a surface elevation
time series. The nth moment is defined as


Where is the i-th spectral component, that is, the spectral density of variance in the surface
elevation record associated to frequency , and  is the width of the frequency band
associated with frequency . is the total number of spectral components of the spectrum.
In this particular case,


so that is simply the total variance in the spectrum, which, from Parseval’s identity, must
equal the time-domain variance of the samples of wave heights in the wave records.
Hence the spectral significant wave height  must equal four times the square root of the
signal variance, or four times the standard deviation of the surface elevation. This relationship
gives a straightforward way to assign a value to for short records based on the variance
observed in the time-domain, as
 
Where is the standard deviation of the samples of surface height in the wave record.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 61 | 103
Whether this is a meaningful statistic for records shorter than 20 minutes depends on the
intended use. As will be shown later, for the purpose of WEC power performance assessment
this definition of  does not appear to give rise to particular complications or at least,
much less so than the energy period, as will be discussed in the next section.
As a basic consistency check for the short samples significant wave height, the relationship
with time-domain statistics were examined. [19] showed that the wave heights reported by
human observers was closely related to the average heights of the highest one third of the
waves. Thereafter this was referred to as the significant wave height of a wavefield. It is
usually noted H1/3. It was found that for most wave records, the spectral significant wave
height  and time-domain significant H1/3 are equal in very good approximation. However,
for nearshore waves significant differences are reported and must be considered for the
design of coastal structures [20].
Figure 37 shows the scatter plot of spectral significant wave height obtained from the time-
domain variance (or equivalently, ) against the average height of the highest one-third of
the waves (H1/3) for one-hour and five-minute samples. The correspondence is good for both,
though a slight tendency for larger Hm0 may be seen for the short samples at larger wave
heights. For extreme events (H1/3 over 4 meters) it does appear the five-minute samples lead
FIGURE 37: HM0 VS. H1/3 FOR 1-HOUR AND 5-MINUTE SAMPLES
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 62 | 103
to significantly higher Hm0, but these occur so rarely that this is not expected to impact power
performance analysis for this plant, where contribution to annual yield of such extreme events
is negligible.
The time series of significant wave heights obtained with this method and for sample
durations ranging from 24 hours to 5 minutes is shown in Figure 38. The whole record is shown
(upper panel) as well as a zoom around a storm event end March 2019. As expected, the short
sample variability is higher, oscillating around the longer samples average with amplitudes of
the order of half a meter. Apart from this, no striking inconsistency is found between the time
series.
In summary, no particular difficulties were found in assigning a significant wave height to short
duration samples, using the equivalence of variance in the spectral and time domain. The
utility of the wave statistics, and in particular, the scatter diagrams obtained with this method
will be discussed in the section on annual energy production.
FIGURE 38: TIME SERIES OF SIGNIFICANT HEIGHTS FOR VARIOUS SAMPLE DURATIONS
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 63 | 103
4.5.2 ENERGY PERIOD
Together with significant wave height, energy period is the other commonly used wave
statistic to which WEC power output dependence is analysed. Unlike the evaluation of
significant wave height for which time domain variance, or mean of the highest third of waves
could be used, for energy period, a spectral analysis is needed, which complicates the
definition of meaningful values for short samples. These issues and some methods that appear
to partially remediate them for this particular dataset are presented in this section.
It is worth recalling here that as discussed in Section 4.3.2.1, data from the pressure sensor on
the seabed, independently of the sample duration, leads to a low occurrence of short-period
sea-states. This could be related to measurement limitations or to nearshore phenomena such
as refraction of longer-period waves off from the undersea canyon to the east of the plant.
This does not appear to affect shorter samples more than longer samples so it is not expected
to significantly change the results presented hereafter.
Energy period is defined (e.g. in IEC-TS/62600-100-Ed.1/7.5-e) as the variance weighted mean
of the period of the spectral components, as:

Where the moments of the spectral distribution and are defined as per the previous
section. As a ratio of integrals of the spectrum, it is less sensitive to details of the spectral
analysis than the peak period commonly used in marine structure design, but it still normally
requires adequate record length to reduce confidence intervals on spectral component
estimates.
In looking at the coherence of estimates of as the time resolution is increased (and record
length for the spectral analysis shortened), it was found that for this dataset it is useful to
ensure only variance at wave frequencies should be used. Including spectral components
outside wave frequencies resulted in shorter-sample sea-states with consistently higher . It
was found that using cut-off periods of between 4 and 40 cycles per second removed low-
frequency variance that is more present in the longer-sample spectra than in the shorter-
sample spectra. With this first fix the energy periods of samples of duration ranging from three
hours down to ten minutes were found to be in acceptable agreement, inasmuch as their
mean values were similar.
It was then found that the five-minute samples energy period was still consistently higher than
that of longer samples. The main contributor appears to be the lack of resolution of the
spectral analysis, where the Nyquist frequency interval results in too coarsely spaced periods
in the range of interest.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 64 | 103
Figure 39 is an example of this problem for a record on the morning of 18 March 2018. The
spectrum obtained with 16 degrees of freedom (DOF) on a 1-hour record (upper panel) has
good resolution even for long period wave. (The vertical dashed lines indicate the periods
corresponding to the frequencies on the abscissa for convenience). The spectra obtained for
the 12 five-minute records within this 1-hour record are on the mid and lower panels,
obtained with respectively 8 DOFs and 16 DOFs spectra.
The important difference between the middle and lower panel on Figure 39 is that the 15
second component that was still in the 8 DOF spectrum has disappeared in the 16 DOF spectra,
as expected from coarser Nyquist frequency interval. Consequently the variance that could
project on the 15 seconds component now must project on the adjacent components near 12
seconds and 20 seconds. As a consequence, the integration of the variance to obtain  will
result in spuriously high variance assigned to periods longer than 20 seconds. This will result
in a bias towards longer energy periods if the five-minute samples are analysed with 16 DOF
spectra. While reducing the degrees of freedom from 16 to 8 will result in larger errors bounds
for the spectral components, it is found that this is a preferable limitation than the significant
bias towards long energy periods.
FIGURE 39: EXAMPLE OF RESOLUTION PROBLEM WITH 16 DOF SPECTRA IN SHORT SAMPLES
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 65 | 103
Figure 40 shows the time series of energy periods obtained with the various sample durations,
with the aforementioned corrections for short samples applied. The long time series shown in
the upper panel illustrate the good overall coherence of the energy periods with various
samples. The zoom on end March in the lower panel shows the larger scatter for the short
samples. The five-minute oscillate around the hourly values with an amplitude of about 1
second.
As a basic consistency check, the relationships between the energy periods from these
spectral analysis and zero-upcrossing periods from time-domain analysis were compared. The
scatter plot of the energy period for one-hour and five-minute samples (with the corrections
applied) vs. the mean of the zero-upcrossing period for the highest third of the waves in the
samples is shown in Figure 41. While scatter is higher for the short samples (as expected from
the much larger population), the means and their trends with the zero-upcrossing period are
quite consistent.
In summary, certain complications were found when attempting to assign meaningful values
of energy period to short samples. Simple methods were presented that appear to
FIGURE 40: ENERGY PERIOD OBTAINED FOR THE RECORD AND ZOOOM ON END MARCH
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 66 | 103
significantly reduce the problems for this dataset. As will be discussed later, a convenient
metric to evaluate the utility of the resulting sea-states, for the purpose of power performance
assessment, is the impact on annual energy production estimates of changing the scatter
diagrams obtained with the longer samples with those obtained with shorter samples. It will
be seen that for the data available for this analysis, resulting differences are within an
acceptable range.
4.5.3 SCATTER DIAGRAMS OBTAINED
The scatter diagrams obtained with the wave statistics at time scales from 3 hours to 5
minutes are reported in this section. Due to the limited coverage of the data used, these
diagrams are not representative of conditions near Mutriku for the whole year. However,
conditions for winter, spring and summer are reasonably well sampled, so the range of wave
conditions at Mutriku should be covered. Also, the earlier discussion of how the wavefield at
the entrance of the OWC chambers may be significantly different from that at the pressure
sensor should be borne in mind.
Table 1 and Table 2 show the scatter diagram obtained with 1-hour wave records and 5-
minute wave records, respectively. Compared to scatter diagrams obtained from wave buoys
at BiMEP nearby (Table 3, see OPERA/WP1 deliverables for more details) , both have low
occurrence of sea-states with short energy period. This absence is consistent with the bias
towards longer periods, especially for shorter-period sea-states, that would be expected from
the dynamic effects detailed by Henriques et al. in OPERA/D4.2 [17]. However, it could be
FIGURE 41: ENERGY PERIOD VS. MEAN UPCROSSING PERIOD OF THIRD OF HIGHEST WAVES
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 67 | 103
explained by other nearshore phenomena, such as refraction, diffraction or attenuation of
waves. One candidate would be the general topographic configuration, with an underwater
canyon to the east of the plant from which long period waves would be refracted off towards
the plant. At any rate, again, while a possible bias in the Te estimates would be a problem for
TABLE 1: SCATTER DIAGRAM OF HOURLY SEA-STATES AT PRESSURE SENSOR
Hs (top of bin)
>5.5
5.5
5
0.1
0.1
0.2
4.5
0.1
0.1
0.2
0.4
4
0.1
0.2
0.2
0.0
0.5
3.5
0.1
0.5
0.3
0.1
0.1
0.0
1.1
3
0.8
1.5
0.5
0.2
0.1
0.0
3.2
2.5
0.0
1.4
2.6
0.6
0.1
0.1
4.7
2
0.1
0.1
0.1
0.9
1.8
3.3
0.7
0.3
0.1
0.1
7.5
1.5
0.2
0.6
0.8
3.0
3.3
2.7
1.5
0.8
0.4
0.2
0.1
13.5
1
0.1
1.6
1.6
7.5
7.0
4.7
3.3
1.7
0.3
0.1
27.9
0.5
0.1
2.2
8.8
10.0
9.7
4.2
3.3
1.5
0.8
0.5
0.0
41.0
0.1
2.2
10.5
12.3
18.1
14.4
12.1
11.6
12.0
4.1
1.6
0.8
0.3
100
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
TABLE 2: SCATTER DIAGRAM OF 5-MINUTES SEA-STATES (8 DOF)
Hs (top of bin)
>5.5
0.0
0.0
0.0
0.0
5.5
0.0
0.0
0.0
0.1
5
0.0
0.0
0.1
0.1
0.0
0.2
4.5
0.0
0.1
0.1
0.1
0.0
0.3
4
0.0
0.1
0.2
0.2
0.1
0.0
0.0
0.6
3.5
0.0
0.2
0.5
0.3
0.2
0.1
0.0
1.3
3
0.0
0.6
1.4
0.5
0.2
0.1
0.1
0.0
2.8
2.5
0.0
0.0
0.2
1.3
2.2
0.6
0.2
0.1
0.1
0.0
4.7
2
0.0
0.2
0.1
0.2
0.8
1.9
2.5
0.8
0.3
0.1
0.1
0.0
7.0
1.5
0.2
0.6
0.9
2.6
3.0
2.7
1.9
0.9
0.4
0.2
0.1
0.0
0.0
13.4
1
0.1
1.5
1.9
6.8
7.0
4.9
3.2
1.8
0.5
0.1
0.1
0.0
27.9
0.5
0.1
2.7
8.5
9.8
9.6
4.8
3.2
1.6
0.9
0.4
0.1
0.0
0.0
41.7
0.1
2.8
10.2
12.5
17.4
14.6
12.1
11.5
11.4
4.3
1.9
0.9
0.4
0.1
0.0
100
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
TABLE 3: SCATTER DIAGRAM FROM THE BIMEP REFERENCE BUOY
Hs (top of bin)
>5.5
0.0
0.1
0.1
0.1
0.1
0.0
0.0
0.3
5.5
0.0
0.0
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.3
5
0.0
0.0
0.1
0.1
0.1
0.1
0.1
0.0
0.0
0.0
0.5
4.5
0.0
0.2
0.2
0.1
0.1
0.2
0.1
0.1
0.0
0.0
0.9
4
0.0
0.2
0.3
0.3
0.3
0.3
0.3
0.2
0.1
0.0
0.0
2.0
3.5
0.0
0.5
0.6
0.7
0.6
0.6
0.4
0.2
0.1
0.0
0.0
3.8
3
0.0
0.4
0.7
0.8
1.1
1.0
0.7
0.5
0.3
0.1
0.0
0.0
5.6
2.5
0.2
1.0
1.3
1.7
2.2
1.8
1.5
0.9
0.3
0.1
0.0
0.0
10.9
2
0.0
1.0
2.5
2.4
3.2
3.2
2.8
1.8
0.5
0.2
0.0
0.0
0.0
17.7
1.5
0.0
0.6
3.4
4.7
6.0
5.4
4.1
2.4
0.9
0.3
0.1
0.0
0.0
27.8
1
0.3
2.3
6.0
6.7
5.0
3.3
1.7
0.6
0.2
0.1
0.0
0.0
26.4
0.5
0.1
0.8
1.1
0.9
0.6
0.2
0.0
0.0
0.0
3.8
0.4
3.7
11.7
16.2
16.7
15.6
13.7
9.8
6.3
3.2
1.4
0.6
0.1
0.1
0.0
100
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 68 | 103
many applications, for evaluating the impact of using short samples for power performance
assessment, there are no obvious reasons why this should affect the main conclusions.
Another aspect that is apparent is that the shorter sample statistics cover more cells of the
scatter diagram. (This is clear at Mutriku, comparison with the hourly sea-states at the BiMEP
buoy may give a different impression, but that’s another sensor in another, deeper location).
For about half of the energy period bins, the five-minute scatter diagram has one more bin of
significant wave height populated. Further, these matrices only show frequency of occurrence
over 0.05% (rounded up to 0.1% in the display). In the matrices of the number of occurrence
(not shown), the larger coverage of 󰇛󰇜 for the short sample is far more striking. This will
also be more visible in the power matrices presented in the following section.
This feature could have been expected from the time series of wave statistics from samples
of different durations that were shown in the previous section. As it turns out, this may be
one of the chief advantages in complementing post-processing of open-sea performance data
with a shorter sample analysis. This will be discussed in more details later.
To complete the earlier discussion on obtaining meaningful estimates of the energy period for
short samples, the scatter diagram obtained using 16 degrees of freedom for the spectra on
the 5-minute records is shown in Table 4. It exhibit what appears to be a bias towards longer
energy periods for all cells above 15 seconds (compare the occurrence of sea-states with
energy period over 16 seconds with those in Table 1 Table 2). This is quite consistent with the
problems expected from insufficient spectral resolution discussed in the previous section.
The scatter diagrams obtained for other sample durations are also shown for completeness.
The significance of the differences between these scatter diagrams is discussed in the next
section.
TABLE 4: SCATTER DIAGRAM OF 5-MINUTE SEA-STATES AT SENSOR (16DOF)
Hs (top of bin)
>5.5
0.0
0.0
0.0
5.5
0.0
0.0
0.0
0.0
0.1
5
0.0
0.0
0.0
0.1
0.1
0.0
0.2
4.5
0.0
0.0
0.1
0.1
0.1
0.0
0.0
0.3
4
0.0
0.1
0.1
0.2
0.1
0.1
0.0
0.6
3.5
0.0
0.4
0.4
0.2
0.1
0.1
0.0
0.0
1.3
3
0.0
0.2
1.1
1.0
0.3
0.2
0.1
0.0
0.0
2.8
2.5
0.0
0.0
0.0
0.6
1.9
1.5
0.4
0.1
0.1
0.1
0.0
4.7
2
0.0
0.1
0.1
0.1
0.6
1.2
2.5
1.5
0.4
0.2
0.1
0.1
0.0
0.0
7.0
1.5
0.1
0.6
0.7
2.0
3.0
2.5
2.2
1.2
0.6
0.3
0.1
0.1
0.0
0.0
13.5
1
0.1
1.3
1.6
5.6
7.2
5.0
3.5
2.2
1.0
0.3
0.1
0.1
0.0
0.0
27.9
0.5
0.0
2.3
7.8
9.2
9.7
5.0
3.5
2.0
1.1
0.6
0.2
0.1
0.0
41.6
0.0
2.3
9.3
11.5
16.1
14.4
12.2
10.0
11.4
7.3
2.7
1.4
0.8
0.4
0.1
0.0
100
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 69 | 103
TABLE 5: SCATTER DIAGRAM OF 30 MINUTES SEA-STATES AT SENSOR
Hs (top of bin)
>5.5
5.5
0.0
0.0
0.0
5
0.0
0.1
0.0
0.2
4.5
0.0
0.1
0.2
0.1
0.4
4
0.0
0.1
0.2
0.2
0.1
0.5
3.5
0.2
0.4
0.3
0.1
0.1
1.1
3
0.0
0.8
1.4
0.5
0.3
0.1
0.1
3.2
2.5
0.1
1.3
2.7
0.4
0.1
0.1
0.0
4.8
2
0.0
0.1
0.1
0.1
0.8
2.2
2.9
0.7
0.3
0.2
0.1
7.3
1.5
0.2
0.6
0.8
3.2
3.0
2.8
1.7
0.6
0.4
0.1
0.1
13.6
1
0.1
1.6
1.5
7.6
7.2
4.9
3.3
1.6
0.3
0.1
0.0
28.1
0.5
0.1
2.4
8.6
10.1
9.5
4.3
3.1
1.4
1.0
0.4
0.1
40.8
0.1
2.5
10.4
12.3
18.0
14.8
11.8
12.0
11.8
3.6
1.8
0.7
0.3
100
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
TABLE 6: SCATTER DIAGRAM OF 15-MINUTES SEA-STATES AT SENSOR
Hs (top of bin)
>5.5
0.0
0.0
5.5
0.0
0.0
0.0
5
0.0
0.1
0.0
0.2
4.5
0.0
0.1
0.1
0.1
0.3
4
0.0
0.1
0.2
0.2
0.0
0.6
3.5
0.2
0.4
0.3
0.1
0.0
0.1
1.1
3
0.0
0.8
1.4
0.6
0.2
0.0
0.0
3.1
2.5
0.1
1.5
2.6
0.5
0.1
0.1
0.0
4.9
2
0.0
0.1
0.1
0.2
0.8
2.0
2.8
0.5
0.3
0.1
0.1
7.1
1.5
0.2
0.6
0.9
2.9
3.1
2.7
1.8
0.8
0.4
0.1
0.1
13.5
1
0.1
1.5
1.7
7.4
7.1
4.8
3.3
1.6
0.4
0.1
0.0
28.0
0.5
0.0
2.5
8.8
10.1
9.2
4.5
3.0
1.4
1.0
0.4
0.1
0.0
41.1
0.0
2.6
10.5
12.6
17.5
14.7
11.9
11.8
11.7
3.7
1.8
0.7
0.3
100
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
TABLE 7: SCATTER DIAGRAM OF 10-MINUTE SEA-STATES AT SENSOR
Hs (top of bin)
>5.5
0.0
0.0
0.0
5.5
0.0
0.0
0.0
5
0.0
0.1
0.1
0.0
0.2
4.5
0.0
0.1
0.1
0.1
0.0
0.3
4
0.0
0.1
0.2
0.2
0.1
0.0
0.5
3.5
0.1
0.5
0.2
0.2
0.1
0.0
0.0
1.2
3
0.0
0.5
1.5
0.6
0.2
0.1
0.1
3.0
2.5
0.1
1.3
2.5
0.6
0.2
0.1
0.1
0.0
4.9
2
0.0
0.1
0.1
0.2
0.8
1.8
2.8
0.8
0.3
0.1
0.1
0.0
6.9
1.5
0.2
0.6
0.9
2.7
3.1
2.7
2.0
0.9
0.3
0.2
0.1
0.0
13.6
1
0.1
1.5
1.8
7.0
7.1
5.0
3.3
1.7
0.5
0.2
0.0
28.0
0.5
0.0
2.5
8.5
9.8
9.8
4.4
3.2
1.6
1.0
0.5
0.1
0.0
41.3
0.0
2.5
10.2
12.3
17.7
14.3
12.1
11.3
12.0
4.3
1.8
0.9
0.4
0.0
100
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 70 | 103
4.5.4 SIGNIFICANCE OF DIFFERENCES IN SCATTER DIAGRAMS OBTAINED
The one-hour sea-states and five-minutes sea-states (resp. Table 1 and Table 2) appear rather
similar in structure but differences will be better appreciated in Table 8, which shows the cell-
to-cell relative differences (positive indicate higher occurrence in the 5-minute matrix). The
relative difference is only shown for cells with an occurrence higher than 0.8% in the 1-hour
matrix, which together account for over 91% of the record. Cells that occur less frequently
may be under-sampled in the hourly record and differences between methods may be large
but may not be statistically relevant. Differences are less than 10% for the most frequent sea-
states, but there are differences of over 15% or even 20% in some of these cells. A tendency
towards lesser occurrence of sea-states with large Hmo for longer period sea-states, more of
low Hm0 at these long periods and generally higher occurrence of short-period sea-states is
visible in the record of five-minute samples statistics.
The significance of these differences may be appreciated by first comparing to the differences
between scatter diagrams obtained with standard sampling duration, and second, evaluating
the impact of these differences on key aspects of power performance assessment, such as
Annual Energy Production (AEP). The latter is perhaps the most relevant to this analysis.
Table 9 Table 10 show these relative differences for the 3-hourly and half-hourly sea-states
respectively. For this dataset, the statistics of Hs and Te obtained from five-minutes samples
at energy periods less than 13 seconds do not differ more from those obtained with standard
sample durations of 3-hour, 1-hour and 30 minutes than those standard method differ
between themselves. For longer energy periods, however, the relative differences become
more significant for the five-minute samples.
Results on the impact of these differences on power performance assessment and in particular
on AEP will be presented in the following sections. These suggest impacts of only a few percent
TABLE 8: RELATIVE DIFFERENCE BETWEEN THE 1-HOUR AND 5-MINUTE SCATTER DIAGRAMS
Hs (top of bin)
>5.5
5.5
5
4.5
4
3.5
3
-8%
2.5
-7%
-14%
2
-10%
+5%
-23%
1.5
+14%
-16%
-8%
+1%
+24%
1
-4%
+18%
-10%
-1%
+5%
-5%
+6%
0.5
+24%
-3%
-2%
-2%
+14%
-3%
+12%
+12%
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 71 | 103
on power production estimates, which for many applications will be well within the range of
other sources of uncertainty such as interannual variability and intra-site variability in the
wavefield.
In conclusion, for this dataset, it appears that samples significantly shorter than twenty
minutes can provides wave statistics that are sufficiently stable to be useful for the purpose
of power performance assessment. It was necessary to filter out non-wave frequency variance
as for longer samples, low-frequency noise impacted the Te estimates. For sample of duration
shorter than five minutes, it is found that reducing the number of degrees of freedom in the
spectral analysis is necessary to avoid a significant bias in Te.
4.6 PLANT OPERATING DATA WITH SHORT SAMPLES
Certain characteristics of the time series of plant operating data with samples of various
durations are presented in this section. As for wave statistics, it is presumed that a trade-off
must be made between having sufficient resolution in time (short samples) to resolve key
TABLE 9: RELATIVE DIFFERENCES OF SCATTER DIAGRAM OF 3-HOURLY AND HOURLY SEA-STATES
Hs (top of bin)
>5.5
5.5
5
4.5
4
3.5
3
+5%
2.5
+13%
+14%
2
+15%
+1%
-13%
1.5
-6%
+8%
-4%
+1%
+9%
1
+20%
-27%
-1%
+3%
+5%
-1%
-2%
0.5
-4%
+4%
-1%
-12%
+1%
+18%
-6%
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Te (top of bin)
TABLE 10: RELATIVE DIFFERENCES OF SCATTER DIAGRAMS OF HALF-HOURLY AND HOURLY SEA-STATES
Hs (top of bin)
>5.5
5.5
5
4.5
4
3.5
3
-3%
2.5
-3%
+5%
2
-10%
+17%
-13%
1.5
-5%
+3%
-8%
+3%
+16%
1
+2%
-8%
+1%
+2%
+4%
-6%
0.5
+10%
-2%
+1%
-2%
+3%
-6%
-3%
+14%
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 72 | 103
plant behaviour, vs. the increase in sample variability and lack of reliability of e.g. estimates
of mean power for a short sample. However, much less guidance is available for these data
than for wave data. On the other hand, the processing used here is much easier for plant data,
where only mean value over the sample duration is needed. It is recalled that in contrast, for
wave statistics spectral analysis must be done even for short samples. For this reason
particular difficulties from using shorter samples are not expected as was the case for wave
data.
Figure 42 shows the time series of power output averaged in samples with duration ranging
from 24 hours to five minutes, for the whole dataset (upper panel) and zooming in on a few
days late March 2018. Gaps in coverage are visible end February 2018, and then mid-April to
June 2018. Also, a problematic period in the power record is apparent in June, were turbines
output is registers are exactly zero. It was assumed this was due to some problem in the data
collection and the June data was not used in the analysis that follows. Another period that is
excluded are the last few days of July and first few days of August, where Turbine 13 output
climbs at 23 kW before shutting down and rising again.
Such events would have to be accounted for in an assessment of the plant power performance
as they impact turbine availability, but for the purpose of assessing a method for power
FIGURE 42: TIME SERIES OF TURBINE 13 POWER OUTPUT AVERAGED OVER VARIOUS SAMPLE DURATIONS
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 73 | 103
performance assessment, it is less of a problem. It also considerably simplifies the analysis by
reducing scatter and accelerating convergence in mean. It is noted, however, that the
methods examined herein may be less effective when data includes many problematic records
that, for example, augment the number of samples necessary for means to converge.
4.7 POWER MATRICES
This section reports on the joint statistics of turbine power output, conditioned on the
significant wave height and energy mean period obtained from the record at the pressure
sensor. As discussed earlier, the wavefield at the entrance of a chamber of the plant may be
significantly different from that above the pressure sensor 200 m upwave. In fact it appears
to be significantly different between chambers spaced only a few meters. These matrices are
thus not properly speaking power matrices, as defined e.g. in IEC-TS/62600-100. A power
matrix relates a WEC mean power output to the statistics of the wavefield at the WEC itself.
The matrices presented here relate the power output to the closest available wave
measurement. A spatial transfer model would be necessary to evaluate statistics at the WEC
from the measurements, but at least 3 months of data at the entrance of the breakwater
chamber would be necessary, following IEC specifications (which, also, explicitly exclude
application to shoreline devices).
Another important difference with power matrices as per IEC-TS/62600-100 is that as per
Clause 9.2 (in Edition 1), the power matrix is to be obtained via a capture length matrix. This
process was not followed here due to the additional uncertainty introduced by the calculation
of the energy flux for this shoreline device. The deepwater approximation for the energy flux
is not applicable. The shallow water energy flux may be calculated assuming linearity, but the
group velocity will be much lower at the entrance of the plant than at the wave measuring
instrument (as it goes with the square root of depth). The possibility to reduce intra-cell
variance with a capture length matrix instead of a power matrix is discussed further in Section
4.11.
It should also be mentioned that in this analysis all periods where data was not available from
the plant sensors, or when they appear to malfunction, were discarded. This reduces the
influence of spurious data on the results and is acceptable when the objective is to assess
methods for power performance assessment. However, should the objective be instead
performance assessment, these periods where data from the Mutriku plant appear
problematic should be considered more carefully as they could be correlated to times where
some of the turbines are not available for power production, the occurrence of which
obviously should be considered when assessing power production in normal conditions. The
matrices presented herein should thus be considered indicative of the upper bound of power
matrices that would result from a comprehensive performance assessment. At any rate, data
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 74 | 103
coverage from the pressure sensor is nearly 100% during the period considered, and plant
data for Turbine 13 is consistently available except for the month of June.
These distinctions with normal terminology and the reasons for this method of estimation
should be borne in mind. Nonetheless, the term “power matrix” will be used hereafter for
convenience.
Table 11 and Table 12 show the power matrices obtained for Turbine 13 from the hourly
records and from the five-minutes samples respectively. An immediately visible difference is
that the five-minute matrix has many more cells populated. This is due to the fact that, as was
seen in the scatter diagrams presented in the previous section, the five-minutes wave
statistics oscillate around the longer samples’ values, and have higher extremes. (This effect
of wider coverage of the (Hs, Te) space appears more pronouncedly than in the scatter
diagrams because only cells with occurrence higher than 0.1% were shown there). The total
number of power vs. (Hs, Te) records is also about 12 times higher (although the issue of
independence of samples should be considered, as discussed in following sections. This
TABLE 11: 1-HOUR SAMPLES POWER MATRIX
Hs (top of bin)
>5.5
5.5
5
4.4
2.3
4.5
7.3
2.8
4.9
4
12.3
4.2
8.0
8.1
3.5
12.2
9.8
4.3
11.7
8.6
6.7
3
9.6
11.1
10.0
9.7
8.5
4.6
2.5
10.7
9.2
10.2
10.9
4.3
7.7
2
12.3
11.6
11.4
9.4
9.2
8.2
6.2
8.2
6.2
4.8
1.5
10.0
8.4
5.9
7.2
6.6
6.5
6.0
5.6
6.4
4.0
3.1
1
3.4
3.2
3.5
3.3
2.9
2.4
1.8
2.3
2.1
0.5
0.1
0.3
0.5
0.6
0.8
0.9
0.7
0.5
0.4
0.1
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
TABLE 12: 5-MINUTE SAMPLES POWER MATRIX
Hs (top of bin)
>5.5
6.1
1.4
0.1
5.5
-0
4.9
4.3
5
7.7
6.8
4.2
4.1
7.9
4.5
8.1
6.4
6.1
5.1
6.4
4
10.4
10.3
5.8
5.5
7.8
6.7
10.4
3.5
11.8
10.5
10.0
7.8
9.4
8.3
6.4
3
10.6
10.3
10.3
9.6
9.9
8.9
7.4
5.6
2.5
11.1
12.4
10.0
9.6
9.8
9.7
9.1
7.4
6.4
5.2
2
11.4
11.3
8.2
9.3
9.5
8.7
8.6
7.8
8.0
7.2
5.4
4.5
1.5
10.2
8.2
6.1
6.9
6.8
6.8
6.3
5.9
5.9
4.8
3.7
4.0
5.0
1
0.8
3.0
3.3
3.7
3.5
3.3
2.6
2.2
2.4
2.6
2.5
2.3
0.5
0.0
0.2
0.3
0.5
0.6
0.8
0.9
0.7
0.7
0.5
0.3
0.1
0.1
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 75 | 103
possibility to populate more cells of the power matrix with performance data, though from
short samples, may at least in some case be a useful complement, if not preferable, to the
interpolation or numerical modelling results that must be used otherwise to populate cells
that occur too infrequently in the longer samples wave statistics.
Matrices obtained with half-hourly, quarter-hourly and ten-minute samples are also shown
for completeness. Other than the cell coverage being higher for matrices using shorter
samples, there are no striking differences in the mean power estimates for each cell. But the
main criterion for whether differences are significant is arguably their impact on the
evaluation of annual energy production. This will be looked at in the next section.
4.8 IMPACT ON ENERGY PRODUCTION ESTIMATES
One of the main outputs of power performance assessment is prediction of energy yield, a
basic parameter for valuation of wave energy projects. Therefore an important criterion on
whether the use of shorter samples can provide useful information is whether yield prediction
agrees with that obtained with samples of longer duration. This provides a useful metric to
evaluate the relevance of the differences in power matrices or scatter diagrams obtained with
various sample durations.
The data available for this study does not adequately sample the annual cycle of wave climate
so it cannot be expected to provide accurate energy yield prediction. Data do cover winter,
spring and summer conditions so the range of conditions expected at Mutriku should be
reasonably well represented. In particular, the power matrix should be populated with data
on a reasonable range of the (Hs, Te) space. The method to calculate Annual Energy Production
(AEP) in a real performance assessment would be the same as that used in this analysis, except
a longer dataset would be used to better assess the scatter diagram and the average year’s
wave climate.
Thus, it is reasonable to expect that results concerning the impact of using shorter sample
durations would be of relevance to a more comprehensive AEP calculation. For simplicity the
power productions calculated will be referred to as AEP, though again the autumn season is
not sampled and other limitations such small spatial scale variability of the wavefield must be
considered for a device operating in complex nearshore topography, as discussed in previous
sections.
Table 16 Table 17 show AEP estimates obtained for Turbine 13 with 1-hour samples and the
5-minute samples respectively. AEP estimates are within 0.3% of each other. Unfortunately
this is not a validation of the short-sample analysis, but simply a reflection of the fact that we
have summed the same time series of power output from Turbine 13, just in smaller groupings
for the short-samples. This is due to the fact that the time series of sea-states that were used
to make the power matrix is exactly the same as that used to make the scatter diagram used
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 76 | 103
to obtain AEP (by multiplying element by element by the power matrix). Differences can only
emerge when the time series of sea-states is different from that used to populate the power
matrix. This is normally the case when power performance is evaluated in one location, e.g.
as described IEC-TS/62600-100. A longer interannual time series of sea-state statistics is
TABLE 13: 30-MINUTE SAMPLES POWER MATRIX
Hs (top of bin)
>5.5
5.5
4.5
-0
5
12.4
5.3
3.2
4.5
12.3
7.0
3.8
4.5
4
12.5
11.9
4.7
8.1
4.7
3.5
11.1
8.7
6.3
8.6
8.2
3
12.1
10.2
10.8
9.8
11.0
8.6
5.2
2.5
11.4
9.2
10.1
10.3
7.1
8.6
5.7
2
11.9
12.2
9.9
9.7
9.8
8.7
8.5
6.5
8.3
6.8
4.6
1.5
9.8
8.4
5.9
7.2
6.8
6.5
5.8
5.9
6.0
3.5
3.4
1
2.2
3.2
3.6
3.3
3.0
2.3
1.8
2.1
2.0
3.8
0.5
0.2
0.1
0.3
0.5
0.6
0.8
0.9
0.7
0.5
0.4
0.1
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
TABLE 14: 15-MINUTE SAMPLES POWER MATRIX
Hs (top of bin)
>5.5
0.1
5.5
6.8
-0
5
6.1
4.8
5.1
4.5
12.8
7.3
5.0
4.2
4
12.6
9.0
4.5
6.4
6.1
3.5
12.2
8.9
7.1
9.9
10.2
6.5
3
11.8
10.2
10.5
9.9
10.2
9.1
6.5
2.5
10.8
9.3
10.2
9.8
8.5
7.3
6.2
2
12.3
11.8
9.3
11.5
9.6
8.6
8.3
7.1
8.2
6.1
4.7
1.5
10.2
8.0
6.2
7.0
6.8
6.8
6.0
6.0
5.6
3.9
3.5
1
1.0
2.9
3.2
3.6
3.4
3.1
2.4
1.9
1.9
3.3
2.3
0.5
0.0
0.1
0.3
0.5
0.6
0.8
0.9
0.7
0.5
0.5
0.1
0.1
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
TABLE 15: 10-MINUTE SAMPLES POWER MATRIX
Hs (top of bin)
>5.5
0.1
0.1
5.5
4.7
5.8
5
6.9
4.2
4.7
7.3
4.5
12.5
7.3
5.6
4.3
-0
4
12.7
9.8
5.5
6.0
6.7
5.8
3.5
11.8
10.1
6.4
9.9
9.8
6.5
10.1
3
10.1
10.4
10.2
9.9
9.5
9.0
7.2
2.5
10.4
9.8
9.9
9.8
8.5
7.6
6.2
5.3
2
12.4
11.6
7.6
11.2
9.6
8.5
8.5
7.6
7.5
7.7
4.9
4.0
1.5
10.0
8.6
6.0
7.0
6.8
6.7
6.2
5.9
6.0
4.7
3.4
4.2
1
1.1
2.8
3.3
3.7
3.3
3.2
2.5
1.9
2.1
2.6
3.0
0.5
0.2
0.3
0.5
0.6
0.8
0.8
0.7
0.6
0.4
0.3
0.2
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 77 | 103
available for the location than that available for the testing period. For evaluation of yield in
another location, e.g. with IEC-TS/62600-102 the scatter diagram will also be different.
In this case there is no long time series of wave climate available at Mutriku. To get a
meaningful evaluation of the impact of differences in the power matrices in power production,
the scatter diagram for the BiMEP reference buoy is used. There are obvious limitations to
using the wave climate at this buoy deployed at some 70 m depth to calculate energy
production for this shoreline WEC. However, it does provide a realistic scatter diagram to
evaluate how important the differences in power matrices obtained with various sample
durations are, in terms of mean annual energy production. However, because the power
matrix of the five-minute samples is much more populated than that of the one-hour sample,
and that for all cells of the one-hour matrix that are not populated the production must be
assumed to be zero, simply calculating energy production element by elements leads to
significantly higher production with the five-minute matrix, of some 20% (not shown). This is
TABLE 16: ENERGY PRODUCTION (MWH) WITH THE 1-HOUR POWER MATRIX AND SCATTER DIAGRAM
Hs (top of bin)
>5.5
5.5
5
0.1
0.0
0.1
4.5
0.1
0.0
0.1
0.2
4
0.1
0.1
0.1
0.0
0.3
3.5
0.1
0.4
0.1
0.1
0.1
0.0
0.8
3
0.7
1.4
0.5
0.2
0.1
0.0
2.8
2.5
0.0
1.1
2.3
0.6
0.0
0.1
4.1
2
0.1
0.1
0.1
0.7
1.5
2.4
0.4
0.2
0.0
0.1
5.6
1.5
0.2
0.4
0.4
1.9
1.9
1.5
0.8
0.4
0.2
0.1
0.0
7.9
1
0.5
0.5
2.3
2.1
1.2
0.7
0.3
0.1
0.0
7.5
0.5
0.0
0.2
0.4
0.5
0.3
0.3
0.1
0.0
0.0
0.0
1.8
Capacity
0.0
0.9
1.4
3.3
4.4
4.1
5.7
7.7
2.2
0.9
0.4
0.1
31.1
factor
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
19.19 %
Te (top of bin)
TABLE 17: ENERGY PRODUCTION FROM THE 5-MINUTE POWER MATRIX AND SCATTER DIAGRAM
Hs (top of bin)
>5.5
0.0
0.0
0.0
0.0
5.5
-0
0.0
0.0
0.0
5
0.0
0.0
0.0
0.0
0.0
0.1
4.5
0.0
0.0
0.1
0.0
0.0
0.2
4
0.0
0.1
0.1
0.1
0.1
0.0
0.0
0.4
3.5
0.0
0.2
0.4
0.2
0.2
0.1
0.0
1.0
3
0.0
0.5
1.2
0.4
0.2
0.1
0.0
0.0
2.5
2.5
0.0
0.0
0.1
1.1
1.9
0.6
0.1
0.1
0.0
0.0
3.9
2
0.0
0.2
0.0
0.2
0.7
1.5
1.9
0.5
0.2
0.1
0.0
0.0
5.3
1.5
0.2
0.5
0.5
1.6
1.8
1.6
1.0
0.4
0.2
0.1
0.0
0.0
0.0
7.9
1
0.0
0.4
0.6
2.2
2.2
1.4
0.7
0.3
0.1
0.0
0.0
0.0
8.0
0.5
0.0
0.0
0.2
0.4
0.5
0.3
0.2
0.1
0.1
0.0
0.0
0.0
0.0
1.9
Capacity
0.0
0.0
0.8
1.6
3.3
4.3
4.3
5.7
7.1
2.4
1.1
0.5
0.2
0.0
0.0
31.2
factor
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
19.24 %
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 78 | 103
mainly a reflection of the fact that the five-minute matrix is far more populated arguably a
good thing. To obtain meaningful comparisons, the elements of the five-minute power matrix
that are zero in the one-hour matrix must also be set to zero.
Table 18 and Table 19 show the energy productions obtained for the one-hour samples and
the five-minute samples with this method. The difference of two MWh amounts to a slightly
less than 6% relative difference. Using 30-minute, 15-minute and 10-minute samples results
in slightly lesser differences in AEP, just below 5%. This is consistent with previous results that
suggest the five-minutes samples do differ slightly more than longer samples. However, it
should be mentioned that the 30 minutes samples fare worse by this metric, at -4.4%
compared to the 1-hour samples, than the 15 minutes samples, at -2.97. The 3-hours sample
fare the worst, at -7.3%, but that is dominated by the effect of unpopulated cells in the 3-
hours power matrix compared the one-hour power matrix, where production must be
assumed to be zero. Considering the limitation of the dataset, it appears to be a valid
TABLE 18: ENERGY PRODUCTION IN BIMEP USING POWER MATRIX OF 1-HOUR SAMPLES
Hs (top of bin)
>5.5
5.5
5
0.0
0.0
0.0
4.5
0.0
0.0
0.0
0.0
4
0.2
0.0
0.0
0.0
0.2
3.5
0.4
0.2
0.0
0.0
0.0
0.7
3
0.4
0.3
0.1
0.0
0.0
0.8
2.5
1.4
0.7
0.2
0.1
0.0
0.0
2.5
2
3.4
3.3
2.9
1.5
0.4
0.1
0.0
0.0
0.0
11.5
1.5
5.3
3.9
2.1
1.5
0.5
0.2
0.0
0.0
0.0
13.6
1
1.5
0.9
0.5
0.2
0.1
0.0
0.0
0.0
3.2
0.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Capacity
0.0
6.8
8.3
5.9
4.5
3.4
2.2
1.1
0.3
0.1
0.0
32.6
factor
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
20.09 %
Te (top of bin)
TABLE 19: ENERGY PRODUCTION IN BIMEP WITH POWER MATRIX OF 5-MINUTE SAMPLES
Hs (top of bin)
>5.5
5.5
5
0.0
0.0
0.0
4.5
0.0
0.0
0.0
0.0
4
0.1
0.1
0.0
0.0
0.2
3.5
0.4
0.2
0.1
0.0
0.0
0.7
3
0.4
0.3
0.1
0.0
0.0
0.8
2.5
1.3
0.7
0.2
0.1
0.0
0.0
2.4
2
3.1
2.3
2.3
1.5
0.4
0.1
0.0
0.0
0.0
9.8
1.5
5.3
3.9
2.2
1.4
0.5
0.2
0.1
0.0
0.0
13.6
1
1.3
1.0
0.6
0.2
0.1
0.0
0.0
0.0
3.1
0.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Capacity
0.0
6.7
8.0
5.1
3.9
3.4
2.1
1.0
0.3
0.1
0.0
30.6
factor
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
18.89 %
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 79 | 103
conclusion that no statistically significant increase in the AEP difference is found for the five-
minutes samples compared to the more standard 30 minutes samples.
AEP also provides a convenient metric to evaluate the significance of the differences in the
scatter diagrams obtained with the various sample durations. AEP can be calculated with the
one-hour power matrix combined with the scatter diagrams of the other sample durations. In
this way the differences in AEP resulting from the differences in scatter diagrams only can be
calculated, with a realistic power matrix.
Table 20 shows the AEP calculated with the one-hour power matrix and the 5-minute samples
scatter diagrams at Mutriku. Compared to AEP obtained with the one-hour power matrix and
one-hour scatter diagram, AEP decreases by -2.7%. And for this calculation a monotonic
increase in the AEP change with reduction in sample duration is seen with AEP with the 30-
minute, 15-minute, and 10-minute scatter diagrams at -0.15%, -0.6% and -1.7% respectively.
This suggest a consistently increase bias in the scatter diagram as sample duration is reduced
beyond usual durations for sea-state statistics. However, it also suggests that these changes,
if consistent, have little impact on the calculation of power production. It is reasonable to
expect that resulting from interannual variability and intra-site variability, for example, will be
far more significant.
It is worth noting that using the 5-minute power matrix with the 1-hour scatter diagram results
in slightly lesser agreement, with AEP 3.2% higher. Likewise, using the 1-hour power matrix
with the 5-minute scatter diagram reduces AEP by 2.8%. These differences are still very
acceptable and indicate that at least for this dataset, the scatter diagrams obtained with 5-
minute samples still provide an acceptable estimate of the scatter diagram. It may be worth
noting at any rate that they are not inconsistent with what would be the effect of a bias
towards longer energy periods, of which some possible signs and potential causes were
TABLE 20: AEP (MWH) WITH 1-HOUR POWER MATRIX AND 5-MINUTE SCATTER DIAGRAM
Hs (top of bin)
>5.5
5.5
5
0.0
0.0
0.0
4.5
0.0
0.0
0.0
0.1
4
0.1
0.1
0.1
0.1
0.4
3.5
0.2
0.4
0.1
0.2
0.1
0.0
1.0
3
0.5
1.3
0.5
0.2
0.1
0.0
2.5
2.5
0.1
1.0
2.0
0.6
0.1
0.1
3.9
2
0.2
0.1
0.2
0.7
1.6
1.8
0.4
0.2
0.1
0.0
5.2
1.5
0.2
0.5
0.5
1.6
1.7
1.6
1.0
0.4
0.2
0.1
0.0
7.7
1
0.4
0.5
2.1
2.0
1.3
0.7
0.3
0.1
0.0
7.5
0.5
0.0
0.2
0.4
0.5
0.3
0.2
0.1
0.0
0.0
0.0
1.9
Capacity
0.0
0.9
1.6
3.1
4.2
4.0
5.6
7.0
2.2
1.1
0.4
0.1
30.3
factor
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
18.66 %
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 80 | 103
discussed in the previous sections, if this bias were also to be more pronounced for shorter
samples.
As conclusion, the results of annual energy production presented in this section show that for
this dataset, power performance assessment, and in particular, annual energy production
estimates, are impacted by the order of 5% when changing the sample duration from one-
hour to five-minutes. This may not be statistically significant, and changes of the same order
are obtained when using standard sampling durations of 30 minutes. Changes to the scatter
diagram are lesser, below 3%, and suggest scatter diagrams for short samples are quite
accurate for power performance calculation.
4.9 SAMPLE DURATION AND DISPERSION IN PERFORMANCE DATA
As discussed earlier, an initial motivation for this study was to investigate if the scatter in
power performance data could be reduced by relating WEC power output to wave
characteristics at time scales finer than the standard 20 minutes of sea-state statistics.
Summarising our results, we were not successful in using the finer time-scale wave
characteristics to better predict the WEC behaviour at short time-scales. However, the error
on the mean, that is, on the value to be reported in a cell of the power matrix, can be expected
to be lesser using short samples, due to the larger number of measurements it makes
available. This is subject to conditions of independence that will be examined in the next
section. Results in this section are mostly on the dataset available at Mutriku. Certain results
are also reported for the IDOM Oceantec WEC operating at BiMEP.
4.9.1 MUTRIKU DATA
4.9.1.1 SAMPLE VARIABILITY
The sample standard deviation obtained for the one-hour samples of power performance for
Turbine 13 at Mutriku is shown on Table 21. (Only cells with more than 5 samples are shown).
The ratio of the standard deviation obtained with the five-minute over that obtained with the
one-hour samples is shown on Table 22. For almost all the cells, sample variability is
significantly higher for the five-minute sample, with an average of 51% higher for the cells
shown.
Sampling variability is expected to increase for shorter samples. And at least with the methods
that are presented here, this effect could not be compensated by relating power output to
shorter-term wave statistics in some improved way. This doesn’t rule out that future analysis,
that would for example identify better predictability patterns at shorter time scale, may not
be successful in doing so.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 81 | 103
4.9.1.2 RMS ERROR ON THE MEAN
For unbiased, normally distributed measurements, the Root Mean Square (rms) error on the
mean is the standard deviation of the samples divided by the inverse of the square root of the
number of measurements:  

The rms error on the mean of cells of the power matrix for the one-hour samples that would
be obtained if these measurements were normally distributed is shown in Table 23 (rms error
normalised by the mean value for each cell). Scatter is rather high for all cells, with a mean
value of 53% of the mean for the cells shown. There are 2396 hourly samples, but the
dispersion in performance measurements within one cell still results in significant rms error
to be expected on the mean.
TABLE 21: STANDARD DEVIATION OVER MEAN VALUE FOR CELLS OF THE 1-HOUR POWER MATRIX
Hs (top of bin)
>5.5
5.5
5
1.20
1.77
1.48
4.5
.71
1.73
1.00
1.15
4
.03
1.18
.62
.46
3.5
.07
.44
1.33
.10
.26
.37
3
.43
.20
.36
.45
.25
.28
2.5
.47
.24
.16
1.41
.18
.41
2
.03
.02
.01
.33
.27
.37
.67
.34
.48
.19
.27
1.5
.08
.43
.26
.24
.30
.33
.50
.30
.19
.21
.06
.26
1
1.08
.78
.55
.60
.61
.64
.82
.62
.35
.67
0.5
2.32
1.30
1.26
1.15
.84
.50
.55
.59
.93
.94
2.32
.82
.63
.49
.42
.35
.39
.40
.70
.64
.52
.06
.53
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
TABLE 22: RATIO OF SAMPLES STANDARD DEVIATIONS, 5-MINUTE TO 1-HOUR MATRIX
Hs (top of bin)
>5.5
5.5
5
1.09
1.09
4.5
1.17
1.16
1.13
1.15
4
1.20
1.15
1.17
3.5
1.01
0.99
4.17
2.05
3
0.92
1.68
1.27
0.95
1.89
1.34
2.5
0.94
1.33
1.99
1.42
2
7.79
1.08
1.49
1.05
0.88
1.13
2.40
2.26
1.5
1.95
0.94
1.54
1.31
1.25
1.38
1.08
1.65
2.43
2.75
1.63
1
0.90
1.00
1.14
1.16
1.26
1.32
1.25
1.15
0.5
1.08
1.05
1.08
1.08
1.06
1.33
1.31
1.79
1.35
1.24
1.08
1.30
2.70
1.25
1.18
1.23
1.23
1.31
1.31
1.73
1.92
2.40
1.51
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 82 | 103
Table 24 shows the ratio of the expected rms error of the five-minute samples to the one-hour
samples, were they conditions of independent, normally distributed measurements be
satisfied. The much larger number of measurements for the five-minute samples (28 740
samples) results in significantly lower expected error on the mean value of the power matrix.
On average, the rms error would be less than half of that in the hourly power matrix cell.
It will be seen in the following section that at least for the five-minute samples, conditions of
independence of successive samples are not fulfilled. More advanced analysis would be
necessary to determine what are the expected errors in the means of the one-hour and five-
minute samples. Table 24 however serves to illustrate that despite the significantly higher
sample variability for short samples, the error on the mean value in the power matrix cells
may be lesser, due to the corresponding increase in the number of samples.
TABLE 23: RMS ERROR OM CELLS OF 1-HOUR POWER MATRIX IF NORMALLY DISTRIBUTED
Hs (top of bin)
>5.5
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
5.5
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
5
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
54%
Nan
Nan
Nan
Nan
Nan
54%
4.5
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
32%
77%
41%
Nan
Nan
Nan
Nan
50%
4
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
42%
23%
Nan
Nan
Nan
Nan
Nan
33%
3.5
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
10%
40%
4%
Nan
Nan
Nan
Nan
Nan
18%
3
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
8%
3%
8%
17%
11%
Nan
Nan
Nan
Nan
9%
2.5
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
Nan
6%
2%
3%
Nan
Nan
Nan
Nan
Nan
Nan
4%
2
Nan
Nan
Nan
Nan
Nan
1%
Nan
Nan
8%
3%
3%
15%
10%
Nan
9%
Nan
Nan
Nan
7%
1.5
Nan
Nan
Nan
Nan
3%
10%
5%
3%
3%
3%
7%
6%
7%
9%
Nan
Nan
Nan
Nan
6%
1
Nan
Nan
Nan
Nan
38%
12%
5%
5%
5%
7%
14%
Nan
Nan
Nan
Nan
Nan
Nan
Nan
12%
0.5
Nan
Nan
Nan
31%
9%
10%
10%
8%
5%
10%
14%
38%
Nan
Nan
Nan
Nan
Nan
Nan
15%
Nan
Nan
Nan
31%
17%
9%
6%
6%
5%
6%
8%
23%
28%
20%
9%
Nan
Nan
Nan
14%
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
TABLE 24: RATIO OF RMS ERROR ON MEAN OF 5-MIN TO 1-HOUR POWER MATRICES
Hs (top of bin)
>5.5
5.5
5
0.45
0.45
4.5
0.47
0.36
0.47
0.43
4
0.37
0.36
0.37
3.5
0.29
0.29
0.97
0.51
3
0.31
0.51
0.37
0.25
0.76
0.44
2.5
0.29
0.42
0.56
0.42
2
2.11
0.34
0.41
0.35
0.23
0.35
0.93
0.68
1.5
0.63
0.25
0.44
0.41
0.38
0.40
0.27
0.47
0.58
0.88
0.47
1
0.21
0.27
0.34
0.32
0.36
0.39
0.33
0.32
0.5
0.29
0.31
0.30
0.32
0.29
0.40
0.36
0.53
0.37
0.35
0.29
0.39
0.73
0.37
0.34
0.37
0.36
0.39
0.39
0.47
0.70
0.93
0.45
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 83 | 103
4.9.2 BIMEP DATA
This discussion of scatter in performance data is now completed with data from the Marmok
floating WEC, operated by Oceantec (now IDOM) at the Biscay Marine Energy Platform
(BiMEP). More information on this WEC can be found in relevant deliverables of the OPERA
Project or from the IDOM Oceantec website. Borja de Miguel of IDOM kindly provided the
standard deviations of measurements for the power matrix of twenty-minute, one hour, and
three hour samples.
Table 25 shows the standard deviations, normalised to the mean power for each cell, for the
one-hour samples. Table 26 shows the ratio of standard deviation for the twenty-minute
samples to the that of the one-hour samples (>1 means the twenty-minute samples have more
scatter). Table 27 shows the same ratio for the three-hour to the one-hour samples. Only sea-
states that occurred at least five times during the testing period reported are shown. Due to
various issues such as incomplete coverage from the wave measuring buoy, upper ranges of
the power matrix were not sufficiently populated during the particular stretch reported upon
therein.
For those sea-states that occurred at least five times, the twenty-minute samples usually have
higher standard deviation than the one-hour samples, with an average increase of 12%. The
three-hour samples have slightly lesser standard deviation, though the difference, at 4% on
average, may be well within uncertainty. Thus, for this testing period, samples of power
performance for this floating WEC also exhibit higher variability with shorter samples, in
agreement with the conclusions at Mutriku. These differences, while less than those shown in
the previous section for Mutriku, are likely to be significantly higher for even shorter samples.
Again, for normally distributed measurements, the increase in number of samples for the
twenty-minute samples relative to the one-hour samples (or one-hour samples relative to
three-hour samples), should be more than compensate for the slight increases in standard
deviation, in terms of expected rms error on the mean. So that as far as reducing the
confidence intervals in the power matrix cells, using shorter samples may still be a good
strategy. However, this is subject to conditions of independence that will be discussed for
Mutriku in the next section.
4.10 SAMPLE DURATION AND TESTING TIME NEEDED
This section reports methods, their assessment and potential caveats in using short sample
duration to reduce the open-sea testing time necessary to obtain reliable estimates of power
performance. Some of the conditions that were found to be necessary to best use short
samples for this particular dataset are reported. As discussed earlier, the reduction in
necessary testing time is one of the three main potential benefits of using short samples that
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 84 | 103
are reported upon. (The other two are reduction of error on the mean with obtaining
performance data over a wider range of 󰇛󰇜).
The rate of convergence in mean (or mean square) of the measurements of power output,
and how it may vary with sample duration and sample size is examined. It was seen in the
previous section that, (1) the standard deviation of the individual samples of power output
during a particular combination of Hs and Te increases when the sample duration is reduced,
but that (2) the standard deviation of the mean (i.e., the expected rms error on the estimate
of the mean) for shorter samples may still be lower due to the increase in number of samples.
For this to be true several properties are required for the sample distribution. One of them is
the independence of samples. Short samples may be less independent than longer samples
TABLE 25: 1-HOUR SAMPLES STANDARD DEVIATIONS OVER MEAN VALUE, OCEANTEC MARMOK
Hs (top of bin)
3
0.42
0.33
0.38
2.5
0.24
0.27
0.09
0.14
0.35
0.41
0.17
0.24
2
0.41
0.33
0.26
0.22
0.20
0.19
0.18
0.22
0.25
1.5
0.28
0.53
0.43
0.31
0.27
0.30
0.44
0.50
0.38
1
0.21
0.60
0.50
0.44
0.41
0.51
0.31
0.18
0.40
0.5
0.29
0.38
0.30
0.37
0.34
0.26
0.48
0.36
0.33
0.25
0.29
0.32
0.32
0.27
0.33
0.32
5
6
7
8
9
10
11
12
13
14
15
16
Te (top of bin)
TABLE 26: MARMOK, RATIO OF 20-MINUTE OVER 1-HOUR SAMPLES STANDARD DEVIATION
Hs (top of bin)
3
0.74
0.98
0.86
2.5
0.97
1.11
2.15
1.31
0.75
1.06
1.68
1.29
2
1.02
1.25
1.14
1.04
1.26
1.17
1.28
1.11
1.16
1.5
0.97
1.02
1.04
1.12
1.16
1.07
1.15
0.88
1.05
1
1.16
1.08
1.06
1.05
1.07
0.99
1.12
1.26
1.10
0.5
0.93
0.99
1.39
0.99
1.08
1.02
1.03
1.14
1.08
1.36
1.16
1.05
1.12
1.17
0.98
1.12
5
6
7
8
9
10
11
12
13
14
15
16
Te (top of bin)
TABLE 27: MARMOK, RATIO OF 3-HOUR TO 1-HOUR SAMPLES STANDARD DEVIATIONS
Hs (top of bin)
3
2.5
0.29
0.29
2
1.25
1.05
1.20
0.80
0.98
0.87
1.04
1.03
1.5
0.89
1.09
0.87
0.91
0.97
1.10
0.97
1
0.92
1.02
1.11
0.77
1.02
0.94
0.82
0.94
0.5
0.64
1.12
1.30
1.05
1.03
0.78
1.07
1.14
0.97
0.91
0.96
0.93
1.04
0.29
0.96
5
6
7
8
9
10
11
12
13
14
15
16
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 85 | 103
because, say, more of them are taken during a time where the wave spectrum has a particular
shape, or the tide is at a certain level, or wave direction is more correlated, etc. This would
decrease the real degrees of freedom of the sample mean and could reduce or reverse the
expected reduction in the scatter of the mean values in the power matrix. The analysis
reported in this section shows that this is the case to some extent, but that this effect can be
reduced significantly and, in selected applications, possibly removed altogether by ensuring
sufficient separation in time between the short samples.
It is useful to first focus the analysis on a few selected cells of the power matrix. Two cells are
particularly appropriate as they represent very different sea and plant operating conditions
but both contribute importantly to the annual energy production (see Table 16):
Storm cell

Mean regime cell

The first one is a local maximum in energy production due to a good trade-off between large
incoming wave energy flux and plant production vs relatively frequent occurrence. It will be
referred to as “storm cell”. The second one is a local maximum in energy production
essentially because the high frequency of occurrence compensates, in terms of annual energy
production, for a small plant production. It will be referred to as the mean regime” cell
hereafter.
Times series of Turbine 13 mean power during storm cell and mean regime cell sea-states are
shown in Figure 43. Dash-dotted lines correspond to the final estimate of the mean for the
samples of the same colour. These final estimates are quite similar for the various sample
durations for these cells. Scatter in mean power measurements is significantly higher for the
shorter samples, as expected from the previous section’s discussion. The general impression
is one of surprisingly high scatter in mean power output considering that these are data for
the same cell of the scatter diagram in the upwave pressure sensor data. The next section will
report on some of the reasons identified for this high intra-cell dispersion.
The convergence in mean with number of samples is shown for the same cells in Figure 44.
The number of samples for the estimate of the mean to converge near its final value is clearly
many times larger for the short samples. This increase is far more than that expected from the
larger sample variance alone. Successive short sample measurements appear to be much
more correlated than successive hourly measurements. The results is that in terms of testing
time needed to converge near the final estimate of the mean, there are no gains from using
the shorter samples (not shown). Other cells yield similar results. Hence, it appears that simply
reducing the sampling duration does not bring any benefits in terms of reducing necessary
testing period.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 86 | 103
If correlation between successive samples is the problem, it is worth examining if requiring a
minimum time spacing between short samples may alleviate this problem. This would not
have any application in terms of reducing necessary testing time to obtain a power matrix. It
may, however, have applications in terms of reducing the necessary sampling duration for
each device configuration. For example, control algorithms such as those evaluated in OPERA
could be cycled through much faster if shorter sampling were to yield acceptable performance
assessments.
Figure 45 shows the convergence in mean for five-minute samples without requirement of
spacing (red), five-minute samples with requirements of at least one-hour spacing (green),
and the one-hour samples (blue). The gains in terms of rapidity of convergence are quite
substantial. The five-minute samples converge about as fast as the one-hour samples when
required to be spaced apart at least one hour. The spacing requirement thus appears to work
in reducing correlation between successive measurements. Unfortunately, the final estimate
of the mean for the 1-hour spaced five-minute samples is now some 10% off from the
FIGURE 43: TIME SERIES OF POWER OUTPUT FOR THE STORM AND MEAN REGIME CELLS
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 87 | 103
estimates of the mean from the one-hour or the non-spaced five-minute samples. Similar
problems are found for other cells. The exact reasons for this were not investigated. It may be
due to the combination of large sampling variability and large reduction in the number of five-
minute samples when requiring that they be at least one hour apart.
In summary, the results reported in this section suggest that the gains in terms of rms error
on the mean from using shorter samples is minimal. Possibly because of higher correlation
for successive short samples. The number of samples necessary to converge to the mean may
be significantly reduced by requiring that short samples be spaced at least one hour from each
other. However, this results in what appears to be larger rms error on the mean, presumably
due to the significant reduction in the number of short samples. The potential benefits from
applying this method to more rapidly testing various device control or configuration, and best
trade-off between reduced accuracy and reduced testing time, will depend on the details of
each application.
4.11 CAUSES OF THE HIGH SCATTER IN PERFORMANCE DATA
The time series of power in Figure 43 shows that even for the same cell of the scatter diagram,
power output for the WEC may vary by as much as 100% for the five-minute samples. The
FIGURE 44: CONVERGENCE IN MEAN WITH THE NUMBER OF SAMPLES
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 88 | 103
hour-long samples have slightly less but still surprisingly high scatter. It is worth assessing
likely reasons for this as they may impact conclusions regarding the possible use of shorter
samples. Main findings are reported in this section.
As summary, some (perhaps about half) of the intra-cell variance in sample power output can
be explained by small variations in the statistics of the incoming wave field across a same
󰇛󰇜 cell. So it may be reduced by normalising power measurements such as in the capture
length matrix or by adding dimensionality to the power matrix. However, it appears some of
the intra-cell scatter is due to other causes, which may relate to details of the plant control
algorithms or physics or misrepresentation of the incoming wavefield by the statistics of the
pressure sensor. The latter could be due, for example, to long-shore variability in the wavefield
or slight changes in wave direction.
4.11.1 EFFECT OF TIDES
On very low tides, the seabed at the foot of the Mutriku plant uncovers. This suggest that the
effect of tides on a shoreline plant like Mutriku be significant. Tidal height is thus a good
candidate explanation for some of the scatter in plant operating data for a same 󰇛󰇜 sea-
state.
FIGURE 45: CONVERGENCE TO THE MEAN WHEN REQUIRING ONE-HOUR SPACING
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 89 | 103
Figure 46 shows the power output vs. mean tidal height during each sample for the storm
(upper panel) and mean regime (lower panel) cells of the power matrix. As discussed earlier,
these two cells are representative of two different types of high contributors to the annual
energy output and are a convenient way to examine dependencies to variables others than
󰇛󰇜 in the power matrix. A very slight positive correlation between tidal height and power
output may be seen for both cells, possibly more pronounced for the mean regime cell.
However, it is clear from Figure 46 that very little of the scatter in performance data appears
correlated with mean tidal height. This is the case for other cells and for any of the sample
durations.
Clearly this investigation is far from sufficient to accurately assess the effects of tides on power
production at Mutriku. Nonetheless, it appears unlikely that tidal height could explain much
of the scatter in performance data within a same cell of the power matrix.
4.11.2 EFFECT OF VARIATION OF WAVE HEIGHT AND PERIOD ACROSS A CELL
The scatter plots of each sample’s mean power output vs.  for the storm cell and mean
regime cell are shown in Figure 47. Correlation is high for the mean regime cell, where output
FIGURE 46: TIDAL HEIGHT AND TURBINE 13 POWER FOR THE STORM AND MEAN REGIME CELLS
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 90 | 103
rises from a near-zero to slightly above 5 kW. The effect is not significant for the storm cell. A
stronger effect may have been expected for the low wave heights of the mean regime cell,
since the relative change in , and hence in the energy flux, across the cell is much higher
there.
The strong impact of  for small wave height suggests that the standard half a meter
resolution in the power matrix is insufficient for low wave heights for the Mutriku data.
Possibly this is the case for many shoreline devices, and possibly also for floating WECs.
Edition 1 of IEC-TS/62600-100 does not require that low wave height cells have higher
resolution in  than other cells. It may be worth consideration, though, again, TS100
excludes shoreline devices from its scope.
Correlation of power output for the storm and mean regime cell with other readily available
parameters for each sample was also investigated. It is found that output at low wave heights
correlates positively and significantly with H1/10, the mean of the highest 10% of the waves
(not shown). No strong influence of the energy period of samples is found. However, and
somewhat surprisingly since energy period has little influence, the mean zero-upcrossing
period may also predict some of the variability within cells at large Hm0 (Figure 48), though
the correlation is less within cells of small wave heights.
FIGURE 47: EFFECT OF CHANGE IN HM0 ACROSS ONE CELL ON TURBINE 13 OUTPUT
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 91 | 103
4.11.3 CAPTURE LENGTH MATRIX AND REDUCTION IN INTRA-CELL VARIABILITY
It was shown above that some of the large scatter in output within cells of the power matrix
appears related to slight changes in wave statistics across cells. In the capture width matrix,
the variation of the energy flux across a cell is accounted for by dividing mean power by the
energy flux calculated for the significant wave height and energy period for each sample. (Note
that to obtain this reduction in dispersion the energy flux must be calculated with the wave
statistics of each sample rather than using a single average value of the energy flux for all the
sample that fall in a cell).
As briefly discussed earlier, one difficulty in calculating capture width at Mutriku is assigning
the correct value of the energy flux. The deepwater approximation is not applicable. Assuming
linear shallow water waves, another simple formula for the energy flux can be obtained for
the water column above the wave measuring instrument. However, even assuming rays
straight from the sensor to the chamber, the energy flux at the chamber entrance must be
calculated with a lower depth, slower group velocity, and possibly different wave height. Also,
the linear approximation is problematic in front of the plant due to the wave height becoming
of the same order as the water depth.
There are thus a few complications that must be addressed in calculating the capture width
for a shoreline device. A rigorous analysis of the potential benefits of using a capture width
matrix instead of a power matrix in power assessment would involve deriving an acceptably
accurate form for the energy flux.
It may be however that normalising sample mean power by approximate formula of the
energy flux may also be useful to reduce scatter in measurements. More generally, other
operations using other wavefield variables unrelated to the energy flux may also be useful to
reduce intra-cell dispersion. The energy flux has the desirable property that it also makes
FIGURE 48: CORRELATION OF MEAN POWER TO ZERO-UPCROSSING PERIOD WITHIN THE STORM CELL
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 92 | 103
physical sense to divide power output by it. But if any operation on the measured power
reduces sampling variability, thus providing better estimates of mean power for each cell and
of annual energy production from a given testing period, it would still be interesting even if
does not make physical sense. The benefits in terms of accuracy of the yield prediction is the
same. What is important for this to be used is that the variables which operate on the mean
power can be accurately for each sample, and that they be available in long time series to be
used for annual energy production calculation. The method used would be the same as for
the real capture length matrix, both to calculate mean values for each cell and to predict yield.
To see if such benefits in reduced intra-cell scatter and more accurate mean estimation could
be obtained with other normalisations than that of the capture length matrix, mean power
for each sample was normalised by various formula including:

for each sample, which mimics the formula for energy flux in the deepwater
limit

, which mimics the formula for energy flux of shallow water waves, where is
a representative water depth obtained from the mean water level during the sample
various combinations of dividing sample mean power by , 
or 
 as well
as time-domain variables such as H1/10, Tzup and mean period of highest one third of
waves.
It was found that none of them significantly changed the mean of the sample variability across
the entire power matrix, but that one certain ranges of cells the difference could be important.
One of them, the shallow water energy flux approximation, was found to significantly increase
variability.
As illustration Table 28 shows the mean values found when dividing sample mean power by

, and the ratio of sample standard deviation to that in the corresponding cell of the
power matrix, normalised to the mean value in each cell is shown in Table 29. Table 28 is thus
a form of the capture length matrix. Obviously the deepwater energy flux is not applicable at
Mutriku but it doesn’t matter when the objective is reduction in sample variability. Both tables
are for the five-minute samples are shown for illustration. The dispersion is quite similar
between the power matrix data and that of the capture length data approximated in this way,
with many cells having ratios close to one in Table 29. However, for lower wave heights except
for very short energy periods, there is reduction of about 15% and up to 30% in sample
variability. The average of change for all cells (not accounting for frequency of occurrence or
contribution to annual energy production) is negligible (+2%). It may be that this is still a useful
method to reduce variance for those cells that matter most to power production, depending
on the details of the site and WEC characteristics. Similar behaviour is observed for the various
matrices obtained with the various proxies listed above, except for the shallow water energy
flux, where variability increases significantly.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 93 | 103
In summary, the definition of the capture length matrix for Mutriku would require more
advanced analysis. Normalising sample mean power by various sea-state variables associated
with each sample indicate that intra-cell sampling variability may be somewhat reduced at
low wave height, relative to the power matrix. The reduction, if any, would not be sufficient
to explain the very high intra-cell variability observed, but may have some advantages in terms
of more accurate mean yield prediction, depending on the details of a site wave climate and
WEC response.
4.11.4 EXAMPLE OF DETAIL OF INTRA-CELL VARIABILITY
As illustration of a high intra-cell difference in power output, two time series of 5-minute
samples of WEC operating data and incoming wave field at the pressure sensor is shown for
the “storm cell”, one of the largest contributors to mean annual energy production. These
two samples are characterised by very different mean power despite being in the same
󰇛󰇜 cell. Relevant sample data are summarised in the table below, where J is the
deepwater energy flux that would correspond to the significant wave height and energy
period, and T13 is the mean power output for Turbine 13 during the sample.
TABLE 28: TURBINE 13 OUTPUT NORMALISED BY DEEPWATER ENERGY FLUX (5-MINUTE SAMPLES)
Hs (top of bin)
>5.5
0.0
0.0
0.0
5.5
-0
0.0
0.0
5
0.1
0.0
0.0
0.0
0.0
4.5
0.1
0.0
0.0
0.0
0.0
4
0.1
0.1
0.1
0.1
0.1
0.1
0.1
3.5
0.2
0.2
0.1
0.1
0.1
0.1
0.1
3
0.3
0.2
0.2
0.2
0.2
0.1
0.1
0.1
2.5
0.7
0.6
0.4
0.3
0.3
0.3
0.2
0.2
0.1
0.1
2
1.2
1.0
0.7
0.7
0.6
0.5
0.4
0.4
0.4
0.3
0.2
0.2
1.5
1.9
1.3
1.0
1.0
0.9
0.7
0.6
0.5
0.5
0.4
0.3
0.3
0.2
1
0.8
1.3
1.5
1.4
1.2
1.0
0.7
0.6
0.5
0.6
0.4
0.4
0.5
0.1
0.4
0.7
1.0
0.9
1.0
1.0
0.7
0.6
0.4
0.2
0.1
0.1
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
TABLE 29: RATIO OF STANDARD DEVIATION TO THAT IN POWER MATRIX CELLS, 5-MINUTE SAMPLES
Hs (top of bin)
>5.5
1.00
1.00
1.00
5.5
1.00
1.00
1.00
5
1.00
1.00
1.01
1.00
.99
1.00
4.5
1.00
1.00
1.00
1.00
.92
.99
4
1.05
1.00
1.01
1.01
1.01
.99
1.01
3.5
1.19
1.02
1.02
1.02
1.02
1.00
1.10
1.05
3
1.02
1.03
1.04
1.03
1.02
1.03
1.11
1.19
1.06
2.5
.83
1.07
1.04
1.04
1.03
1.03
1.05
1.01
.98
1.01
2
1.37
1.16
1.07
1.03
1.07
1.04
1.06
1.02
1.07
1.01
1.07
1.88
1.15
1.5
1.38
1.04
1.15
1.02
.98
1.02
1.02
1.04
.96
.97
1.28
1.60
1.12
1
1.03
.62
.80
.93
.84
.83
.80
.78
.72
.72
.67
1.18
.83
0.5
1.38
1.34
1.19
.88
.88
.92
.86
.89
.96
.92
.76
.80
.98
1.38
1.18
1.14
.94
1.01
.95
1.00
.99
.99
.98
.97
.96
1.07
1.41
1.02
<4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
>20
Te (top of bin)
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 94 | 103
Date
Begin
End
Hm0
Te
J
T13
Energetic sample
2018
2
8
5:20
5:25
2.44
13.95
40.70
14.08
Low energy sample
2018
2
8
16:00
16:05
2.11
13.27
29.04
7.45
While both samples fall in the same cell of the scatter diagram or power matrix, the energy
flux in deepwater would be some 30% less in the lower sample. Assuming the energy flux at
Mutriku is proportional to 
, as in the shallow water approximation, it would also be 25%
lower. Energy production is slightly over half of that of the other sample.
Time series of wave and plant data are shown for the energetic sample are shown in Figure
49 and that for the low energy sample in Figure 50. The turbine power response amplifies the
difference in the incoming wavefield (second panel from the bottom, red is Turbine 13 and
thin blue and cyan lines are Turbines 7 and 15). In the energetic sea-state it must be cropped
FIGURE 49: WAVE AND PLANT DATA FOR ENERGETIC STORM CELL SAMPLE
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 95 | 103
at 23 kW (for a nominal capacity of 18.5 kW) for nearly half of the time. For the low energy
sample, Turbine 13 output also reaches this maximum value some of time, but for a much
lesser part of the sample duration.
These two examples show that some of the intra-cell variance is readily explained by the
variation in wave statistics across cell. This type of scatter may be reduced by using a capture
length matrix, or with one of the methods outlined in the previous section. Over half of
difference in output between the two samples may be simply proportional to the difference
in the energy flux. The remaining difference may be related to details of the plant response,
control, or possibly to limitations in the measurement of the incoming wavefield. For example,
longshore variability, or small changes in direction, may contribute to some of the intra-cell
standard deviation.
FIGURE 50: WAVE AND PLANT DATA FOR LOW ENERGY STORM CELL SAMPLE
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 96 | 103
4.12 SUMMARY AND PRACTICAL IMPLICATIONS
The results of analysing the data for winter, spring and summer 2018 from EVE’s wave power
plant at Mutriku compel further investigating the potential value of conducting certain power
assessments with sample duration shorter than the minimum of twenty minutes currently
required in IEC-TS/62600-100. There are several potential advantages that may be expected
from this approach:
1. Reduced test-time thanks to faster convergence to final values of power matrix cells,
since number of samples per hour of testing is up to four times higher. However, this
is subject to certain conditions such as independence of short samples, which appear
to be important for this dataset.
2. Reduced standard deviation on the estimate of the mean (or reduced rms error in the
values of the power matrix), again subject to conditions of independence of samples.
3. Better coverage of the (Hs, Te) space in the power matrix, because the short-term
statistics change faster, and have more pronounced extremes, as is expected for
samples that average a lesser number of waves.
Of these three potential benefits, it is found that that third one, on larger coverage of the (Hs,
Te) space, appears to be the most robust. In addition, it can easily be implemented in post-
processing existing datasets of testing at sea.
4.12.1 ISSUES OF POTENTIAL INTEREST TO THE IEC GROUP OF EXPERTS
IEC-TS/62600-100 and IEC-TS/62600-102 are some of the IEC technical specifications where
the results presented are of potential interest. An important caveat on the relevance of these
results is that neither of these technical specifications cover the case of shoreline device,
which is what most of this analysis as focused on. Bearing in mind this limitation, some of the
following issues are worth mentioning.
It may be of interest to the sector that future editions of TS100 and TS-102 provide a unified
framework for using short samples to populate a larger range of the power matrix. It was
shown that short sampling may be particularly useful to better predict yield at a second
location where the scatter diagram is significantly different from that of the test-site.
However, it was found that particular care is necessary to obtain meaningful wave statistics
beyond 15 minutes resolution. These include sufficiently small frequency interval to reduce
bias on the energy period, which may necessitate reducing the number of degrees of freedom
of the spectral analysis. Another important caveat is the higher correlation between
successive short samples than for longer samples.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 97 | 103
For this shoreline device, it was found that the 0.5 m resolution in significant wave height (Hs)
is insufficient at low wave height. This is because incoming wave energy increase manifold
between the low Hs side and high Hs side of the same cell. Despite the low hourly energy
production, due to their high frequency of occurrence these cells contribute significantly to
annual energy production. Reducing bias there by increasing the resolution in wave height
may thus be beneficial for more accurate yield prediction.
Results suggest intra-cell standard deviation may be reduced appreciably in certain cells by
using, rather than a power matrix, a capture width matrix or similar matrices where each
sample mean power is normalised or operated upon by various wave statistics pertaining to
this sample. A representative energy flux is more difficult to define for this shoreline device
than in the deepwater. But simple operations such as normalising by the deepwater energy
flux appear to reduce intra-cell variance by some 10-30% at low wave heights.
4.12.2 SUMMARY FOR WEC DEVELOPERS
As far as practical applications of these results for WEC developers, two particular situations
can be thought of where the results presented may be used. The first is the case where open-
sea testing is over, or largely underway; the second is for a case where open-sea testing is still
at the planning stage.
4.12.2.1 APPLICATION TO EXISTING DATASETS OF POWER PERFORMANCE
In this first case, no change is required to the experimental setup and data collection protocol.
It is essentially adding short-sample analysis to the post-processing of the open-sea testing
data, in complement to standard 20-minute or longer sample analysis.
It is required, however, that wave and plant data are available that contain the original data
allowing for shorter sampling. This is expected to be almost always the case for plant operating
data. For wave instrument data also, it is usually the case nowadays that raw measurements
of pressure, acceleration, or GPS data is registered at 2 Hz someplace onboard, though it
usually isn’t transmitted in real time. The short-sample analysis may then be used as a
complement to the standard analysis in the post-processing.
A particular interest could be the possibility to obtain performance data on 󰇛󰇜
combinations that occur too infrequently in the hourly or 20-minute statistics, but that, as was
seen in previous sections, may occur more frequently in the 10- or 5-minutes statistics. This
could be interesting, for example, when evaluating power production at a second location
based on testing at a first location. Some 󰇛󰇜 that occur infrequently at the test site may
be important contributors to the annual energy flux at the second location. In this case the
short-sample statistics may provide some performance data for these cells, to complement or
replace interpolation or modelling results.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 98 | 103
A second area of interest would be when adding dimensions to the power matrix in the post-
processing. For example, considering the effect of spectral shape, tides, etc. The more
dimensions are added to the power matrix, the more the number of samples per cell will
decrease. To have meaningful averages in each cell, short-sample analysis may prove
particularly useful when exploring WEC performance across added dimensions to the power
matrix.
A third potential use in post-processing would be when comparing the performance of control
strategies. Again, short samples will cover a wider range of the 󰇛󰇜 plane, and this can be
done in a shorter testing period than with longer samples. A comparison over a larger variety
of sea conditions may thus be possible. In this and other applications it is important to consider
the issue of independence of measurements, which may require a minimum time-spacing
between short samples (see Section 4.8).
4.12.2.2 APPLICATION AT THE PLANNING STAGE OF OPEN-SEA TESTING
It was shown that to obtain faster convergence of means when using samples shorter than
twenty minutes, it is important to decorrelate successive samples by requiring that they be
spaced in time. One hour appeared to be sufficient with the data analysed here, shorter
separations may be possible. However, results suggest that other problems may arise such as
larger errors in final estimates. A likely reason this is the reduction in number of samples,
which makes the problem of higher sampling variability for short samples more severe, in
terms of rms error on the mean. In this case, this may be resolved in a testing period longer
than the few months of data available to this analysis. Despite these issues that need further
investigation, and, above all, more open-sea operating data, it is worth reporting the
possibility that further benefits may be available to developers who will consider short-
sampling at the planning stage for open-sea testing of various WEC configurations.
Sufficient separation of successive short samples will be easily achieved when, for example,
testing various control strategies. In OPERA, seven control strategies were tested at EVE’s
wave power plant in Mutriku. A method was successfully implemented so they can be
remotely or automatically switched via the Internet, as detailed in e.g., [17]. It should thus
have little additional cost or complication to cycle through these seven strategies in short
implementations of five minutes each, instead of twenty minutes or one hour each. This would
provide for the necessary separation of short samples. Another potential advantage is that
different control strategies would be compared on sea conditions that are more similar,
including in ways that are not apparent when looking at only 󰇛󰇜, such as spectral shape,
tides, currents, etc. (This may result, however, in higher correlation between successive
samples).
The chief advantage, however, would be an up to 75% reduction in the testing time necessary
to compare the performance of the various control strategies, using five minutes samples
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 99 | 103
instead of twenty minutes samples. This could have important implications both for reducing
the cost of testing and for accelerating the improvements to WEC controls and power
performance in general.
However, the analysis identifies a number of potential caveats in using short samples of power
performance, including: obtention of meaningful estimates of the energy period, increase in
sampling variability, and independence of samples. The previous sections present some
methods to account for these issues, that appear to work for this particular dataset, in that
differences in annual yield prediction using five-minute or one-hour samples are of the same
order as those obtained with various standard sample durations (hourly, half-hourly, three-
hourly).
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 100 | 103
5. YIELD PREDICTION FOR SCALED PROTOTYPES FROM OPEN-SEA
TESTING
In this section, general comments are provided on scaling power performance from an open-
sea testing of a prototype device to a commercial device at a different location which may
involve device scaling to adapt to the commercial site scatter diagram. The OPERA project did
not produce open-sea test data or numerical modelling which can be used to generate
comments on this topic. Therefore, all information provided in this section is based on
experience in the OPERA team from OPERA project or previous WEC development activities.
This may be used in the development of TS102 where device scaling is not described.
In the development path of a WEC design, scaled physical testing using the Froude scaling
methods is generally used on the device main design parameters. This method was proven
accurate, especially using relatively small scaling factors, which is the case between a
prototype and a commercial device. There are however several aspects of scaling to be
considered as they can affect the device power performance and energy yield:
Froude scaling limitations
There are device specific parameters which cannot be scaled using Froude scaling, such as air
compressibility and viscous forces. In OWC devices such as the MARMOK-A-5 and the Mutriku
wave power plant, turbine design and air compressibility cannot be scaled with this method.
Air compressibility influences the air flow through the air turbine and can influence the power
performance and/or the optimal turbine control strategy.
When a parameter cannot be scaled using the Froude scaling method, additional numerical
modelling is required.
Structural design
The detail design at the commercial scale cannot be directly derived from the prototype design
using Froude scaling, which only provides the device general dimensions and weights required
at each scale considered. It is important to ensure the structural integrity of the device, its
stiffness and fulfil all Froude scaling requirements. Deviations may introduce variations in the
device performance.
Control system
The detail design at the commercial scale cannot be directly derived from the prototype design
using Froude scaling, which only provides the device general dimensions and weights required
at each scale considered. The control and automation system may not need any modifications.
This does not affect the device operation and performance but does not follow the Froude
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 101 | 103
scaling requirements. While it can be an issue for large scaling factors, it may not have any
impact on small scaling factors as dealt with in this section.
Electrical PTO
The electrical PTO needs to be fully designed for the new scale in order to guarantee similar
power performances. In some cases, with small scaling factors, the same electrical PTO can be
used but its efficiency is most likely to be reduced when the most common sea states occur.
In summary, small changes in device dimensions may be beneficial to ensure the optimised
prototype design remains optimised at a commercial location. This would allow accurate
prediction in energy yield from an open sea scaled prototype. However, scaling requirement
are difficult to fulfil, and a substantial amount of work is needed. Guideline to carry out this
work would be beneficial in TS100.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 102 | 103
6. REFERENCES
[1]
International Electrotechnical Commission (IEC), IEC-TS62600-102: Marine Energy -
Wave, tidal and other water current converters - Part 102: Wave Energy converter power
performance assessment at a second location using measured assessment data. Edition
1.0, 2016-08, 2016.
[2]
International Electrotechnical Commission (IEC) , IEC-TS62600-100: Marine Energy -
Wave, tidal and other water current converters - Part 100: Electricity producing wave
energy converters - Power performance Assessment. Edition 1.0, 2012-08, Geneva: IEC,
2012.
[3]
M. Ojanguren and J. L. Aguiriano, “MARMOK-A-5 Brief Description,” Oceantec, 2016.
[4]
International Electrotechnical Commission (IEC), IEC-TS62600-101: Marine Energy -
Wave, tidal and other water current converters - Part 101: Wave energy resource
assessment and characterization. Edition 1.0, 2012-08, 2015.
[5]
Esgemar, S. A., Campaña de Sísmica de Reflexión en El Área de BiMEP, Armintza (Vizcaya)
- Informe de resultados, 2017.
[6]
EMEC, Wave Test Site, Orkney, 2014.
[7]
D. Mollison, “Wave climate and the wave power resource,” in Hydrodynamics of Ocean-
Wave Energy Utilization, Proceedings of the IUTAM Symposium, Lisbon, Portugal, 1985.
[8]
D. Woolf, “Sensitivity of power output to wave spectral distribution,” Seapower Ltd.,
2002.
[9]
M. S. Longuet-Higgins, “The statistical analysis of a random moving surface.,” Phil. Trans.
R. Soc. Lond. A 249, pp. 321-387, 1957.
[10]
D. E. Cartwright and M. S. Longuet-Higgins, “The statistical distribution of the maxima of
a random function,” Phil. Trans. R. Soc. Lond. A 237, pp. 212-232, 1956.
D5.3
Uncertainty in Wave Energy Converter Power Performance
Assessment
OPERA Deliverable, Grant Agreement No 654444 Page 103 | 103
[11]
J.-B. Saulnier, A. Clement, A. F. O. Falcao, T. Pontes, M. Prevosto and P. Ricci, “Wave
groupiness and spectral bandwidth as relevant parameters for the performance
assessment of wave energy converters,” Ocean Engineering, pp. 130-147, 2011.
[12]
K. Doherty, “Temporal and Spectral Ocean Wave Characteristics and their Influence on
WEC Performance (in Draft),” Kenneth Doherty Consultancy, 2015, 2015.
[13]
OPERA, “Tracking metrics for wave energy technology performance,” Grant Agreement
No 654444, 2019.
[14]
Y. Goda, Random seas and design of maritime structures, World Scientific Publishing
Company, 2010.
[15]
C. T. Bishop and M. A. Donelan, “Measuring waves with pressure transducers,” Coastal
Engineering, vol. 11, no. 4, pp. 309-328, 1987.
[16]
C. H. Tsai, M. C. Huang, F. J. Young, Y. C. Lin and H. W. Li, “On the recovery of surface
wave by pressure transfer function,” Ocean Engineering, vol. 32, no. 10, pp. 1247-1259,
2005.
[17]
F.-X. Faÿ, A. Pujana, P. Ruiz-Minguela, J. Kelly, M. Mueller, J. Henriques, L. Gato, A.
Carrelhas, B. Lopes and E. Aldaiturriaga, “OPERA D4.2: Shoreline OWC wave power plant
control algorithms,” H2020 OPERA Project Deliverable. , 2018.
[18]
I. Txarterina, “Wave by wave assessment of power production to reduce uncertainty in
IEC-TS/62600-100,” Dissertation for MSc., Heriot-Watt University , Orkney, 2017.
[19]
H. U. Sverdrup and W. H. Munk, “Wind, sea and swell: theory of relations for
forecasting,” US Hydrographic Office, HO Pub. 601 (1947): 1-44, 1947.
[20]
F. Thompson and C. Vincent, “Significant wave height for shallow water design,” Journal
fo Waterway, Port, Coastal and Ocean Engineering, pp. 828-842, 1985.
[21]
J. Berque, “OPERA Technical Note: Processing of Winter-Spring 2018 pressure sensor
data at Mutriku,” H2020 OPERA Project. , 2018.
ResearchGate has not been able to resolve any citations for this publication.
Article
Full-text available
Except the commonly selected pressure transfer function derived from the linear wave theory, a previous study on the pressure transfer function for recovering surface wave from underwater pressure transducer suggested that the pressure transfer function is a function of frequency parameter only. With careful analysis, this study showed that the pressure transfer function should include a transducer submergence parameter as that given by the linear theory. It was found that the previously suggested empirical formula should be restricted to measurements with the pressure transducer close to the surface; otherwise overestimation of wave height would result. Field measurements were carried out with an acoustic wave gauge and a synchronized pressure transducer located at various depths with submergence parameter close to 1 (near the sea floor). It was shown that the previous one-parameter empirical formula might overestimate the significant wave height by more than 30%. This study found that with deep-water wave bursts excluded, the transfer function based on the linear wave theory provided a fairly good estimation on the significant wave heights, with an average deviation of 3.6%.
Article
Full-text available
To date the estimation of long-term wave energy production at a given deployment site has commonly been limited to a consideration of the significant wave height Hs and mean energy period Te. This paper addresses the sensitivity of power production from wave energy converters to the wave groupiness and spectral bandwidth of sea states. Linear and non-linear systems are implemented to simulate the response of converters equipped with realistic power take-off devices in real sea states. It is shown in particular that, when the converters are not much sensitive to wave directionality, the bandwidth characteristic is appropriate to complete the set of overall wave parameters describing the sea state for the purpose of estimating wave energy production.
Article
Several models of random sea waves for use in the design of maritime structures are described. Transformations and deformations of random sea waves in intermediate to shallow water are also discussed. Models of frequency spectra are described in terms of sea state parameters such as significant wave height and wave spectra. The concept of directional wave spectra is briefly described, including an empirical formulation of the directional spreading function. (D.W.T.)
Article
Wave height parameters used in coastal and ocean engineering are grouped into three classes according to their definition bases: Height statistics, energy, and monochromatic. Parameters within each class are easily interrelated lor most engineering purposes. However, parameters from different classes are difficult to interrelate, particularly for shallow water applications where waves are near breaking. The often-used parameter “significant wave height” has traditionally been based on height statistics but many modern estimates are based on wave energy. A simple empirical method is developed to relate statistical and energy based significant height estimates. The method is developed with CERC laboratory flume data from a 1:30 plane slope, two samples of field data, and stream function wave theory. Since the two significant height estimates differ by over 40% in some laboratory cases, engineers should clearly recognize the distinction between them.
Article
This paper studies the statistical distribution of the maximum values of a random function which is the sum of an infinite number of sine waves in random phase. The results are applied to sea waves and to the pitching and rolling motion of a ship.
Article
Although the measurement of waves with pressure transducers has been practised since around 1947, there still remains a considerable difference in findings on the adequacy of linear wave theory to compensate the pressure records. Measurements of surface elevation in gravity waves are compared with corresponding estimates from simultaneous subsurface pressure measurements. A review of previous work precedes a description of laboratory tests in a 103-m-long wave flume at Canada's National Water Research Institute. Pressure transducers and surface-piercing capacitance wave probes are used to collect data in water depths of 0.9 and 1.2 m with monochromatic and irregular waves. Results indicate that linear theory is adequate to compensate pressure records to give surface wave heights to within five percent. Reasons for greater discrepancies in previous studies are discussed.
MARMOK-A-5 Brief Description
  • M Ojanguren
  • J L Aguiriano
M. Ojanguren and J. L. Aguiriano, "MARMOK-A-5 Brief Description," Oceantec, 2016.
Campaña de Sísmica de Reflexión en El Área de BiMEP, Armintza (Vizcaya) -Informe de resultados
  • S A Esgemar
Esgemar, S. A., Campaña de Sísmica de Reflexión en El Área de BiMEP, Armintza (Vizcaya) -Informe de resultados, 2017.
Wave climate and the wave power resource
  • D Mollison
D. Mollison, "Wave climate and the wave power resource," in Hydrodynamics of Ocean-Wave Energy Utilization, Proceedings of the IUTAM Symposium, Lisbon, Portugal, 1985.