A closer look at the SECA compliance the situation reveals that the currently preferred compliance strategies depend on low oil price where ship owners shun investments in abatement technologies which may lead into an economic trap in the event of the oil price increase. The research considers incentive provisions for maritime investors who make investment decisions related to clean shipping and maritime fuel management. Traditionally, the financial assessments of these decisions are based on capital budgeting methods comprising cash flow analyses and net present value calculations. The findings reveal that the Real-Option approach represents a more realistic, reliable and promising method for the evaluation of abatement projects, especially under uncertainty and high volatility in material resource markets. The results can be applied to the evaluation of all projects in the maritime industry that depends on the price variation of the underlying asset during a specific period.
Content may be subject to copyright.
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
Publisher
http://jssidoi.org/esc/home
1062
REAL OPTIONS ANALYSIS OF ABATEMENT INVESTMENTS FOR SULPHUR EMISSION
CONTROL AREAS COMPLIANCE
Sina Atari 1, Yassine Bakkar *2, Eunice Omolola Olaniyi 3, Gunnar Prause 4
1,2.3,4 Tallinn University of Technology, Akadeemia tee 3, 12618 Tallinn, Estonia
* Corresponding author. Tel.: +372 6203973.
E-mails: 1 sina.atari@taltech.ee ; 2 yassine.bakkar@taltech.ee ; 3 eunice.olaniyi@taltech ; 4 gunnar.prause@taltech.ee
Received 20 October 2018; accepted 25 February 2019; published 30 March 2019
Abstract. Since the introduction of the Sulphur Emission Control Areas (SECA) regulations in the Baltic Sea Region (BSR) in 2015, the
BSR has witnessed high compliance rate. However, a closer look to the situation reveals that the currently preferred compliance strategies
depend on low oil price where ship owners shun investments in abatement technologies which may lead into an economic trap in the event
of the oil price increase. The research considers incentive provisions for maritime investors who make investment decisions related to clean
shipping and maritime fuel management. Traditionally, the financial assessments of these decisions are based on capital budgeting methods
comprising cash flow analyses and net present value calculations. The findings reveal that the Real-Option approach represents a more
realistic, reliable and promising method for the evaluation of abatement projects, especially under uncertainty and high volatility in material
resource markets. The results can be applied to the evaluation of all projects in the maritime industry that depends on the price variation of
the underlying asset during a specific period.
Keywords: SECA regulations; maritime investments; Real-Options; Monte Carlo simulation; clean shipping
Reference to this paper should be made as follows: Atari, S.; Bakkar, Y.; Olaniyi, E. O.; Prause, G. 2019. Real options analysis of abatement
investments for sulphur emission control compliance, Entrepreneurship and Sustainability Issues 6(3): 1062-1087.
http://doi.org/10.9770/jesi.2019.6.3(1)
JEL Classifications: G31, G32, L26, L98, M1
This work is in principle linked to the EnviSuM Environmental Impact of Low Emission Shipping: Measurements and
Modelling Strategies project sponsored by the European Regional Development Fund.
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1063
1. Introduction
Green and environmentally friendly shipping have received much attention based on concerns for its local and
global contribution to air pollution and environmental problems. Therefore, the Sulphur Emission Control Areas
(SECA) was implemented targeting reduction of sulphur emissions from shipping (Olaniyi, 2017). International
Maritime Organization (IMO) decided that all ships in SECA have to use marine fuels with a lower amount than
0.1% of Sulphur content from January 2015 (IMO, 2015, 2016) to ensure a greener and more sustainable maritime
transportation system.
There are three primary SECA regulations compliance options for the ship owners. First, as Turesson and
Weddmark (2015) stated, is to switch the use of the marine heavy fuel oil (HFO) to the cleaner low-sulphur fuel
such as the Marine Gas Oil (MGO) and Marine Diesel Oil (MDO). The second alternative is to continue with the
high-sulphur fuel (i.e. HFO) and installing an exhaust gas treatment system, an abatement technology called the
scrubber which gives room for the continuous use of the HFO (Farrell et al., 2002). The third option is to switch to
other alternative sources of fuel such as Liquefied Natural Gas (LNG), methanol or hydrogen cells. These alternative
fuels are being considered for future solutions to meet the SECA requirements (Turesson & Weddmark, 2015).
Olaniyi, Atari and Prause (2018) result also revealed that most of the ships are switching to the use of the low
sulphur fuel because it removes the hassles of capital compliance investments. Moreover, Hämäläinen (2016) found
out that, in Finland, 45 % of shipping operating costs are fuel costs. This finding makes fuel one of the most critical
factor in shipping industry so that the optimisation of fuel consummation as well as the choice of the best alternative
for abatement are not only important for environmental reasons but are also crucial for the maritime industry due
to economic conditional.
The Global Marine Fuel Trends 2030 study (DNV GL, 2018), affirms that combining the use HFO with an
abatement technology is likely the most cost-effective option for the ships for SECA compliance because the MGO
is more expensive than the HFO. Furthermore, the limitations associated with the use of the LNG such as insufficient
bunkering facilities and the expensive conversion costs for old vessels is also a hindrance (Bergqvist et al., 2015).
With this background, the scrubber technology, in the light of different uncertain factors of other low sulphur fuels
received much attention over the last years and the number of scrubbers installed on board ships increased slightly
(Eelco & Maarten, 2015).
The scrubber technology was initially developed to prevent the pollution problem from the power plants with the
first marine scrubber developed in Finland and started operation since 2012 (Matczak, 2013). Through installations
on new ships and retrofitting meanwhile, 87 scrubbers were installed by the end of the year 2016 in the BSR (HIS,
2017). Scrubbers are classified as open loop and closed loop, and some of those are built based on hybrid technology
(i.e. a combination of the both the open and the close scrubber technology installed on one ship). The open loops
are cheaper with lesser operating costs than closed loops. Scrubber installations have sparked a discussion on the
ecological implications and specific problems the abatement technology so that Germany and Belgium are not
allowing ships to enter their ports, which are operating with an open loop scrubber (Lindstad et al., 2015).
It is no gainsaying that clean shipping initiative demands best business solutions for the maritime industry since the
economic impact of the SECA regulations is as significant as the environmental impacts for clean shipping
infrastructure investments and development of sustainable business models for public and private maritime
enterprises. Making investment decisions require advanced analytical methods because the known traditional
methods have many shortages and are not particularly precise when they measure static conditions without
forecasting and estimating or taking many parameters in future into consideration (Dixit and Pindyck, 1994). Right
decision-making process regarding investments or financing project is essential to creating positive projects
economic conditions and this applies to projects with high risks in front lines of technology (Cox et al., 1979).
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1064
Accordingly, the SECA regulation and compliance can promote the enhancement of high technology and in
response to new needs; the analysis of the actual disposal of the new rationale concerning investment and valuation
decisions is needed. Thus, the objective of this work is to provide empirical validation of methods that can solve
investors’ challenge of SECA compliance investment decisions to avoid loss and maximise profit. Through a case
study, the work focuses on the analysis of the historical time series data of fuel prices, scrubber inward investment,
operating cost of scrubber-retrofitted ships, as well as on the analysis of the NPV and Real-Option investments
calculations. All activities took place in the frame of “EnviSuM−Environmental Impact of Low Emission Shipping:
Measurements and Modelling Strategies” project sponsored by the EU regional development fund.
This paper intends to assess the economic performance of this innovation project of the shipping companies.
Methods for economic analysis are currently the most diffused methods for evaluation of innovation projects (Ryan
and Ryan, 2002). Although the existing methods largely differ in their implementation, they all share a common
principle, that is, the capital budgeting approach for calculating the economic return of a project as a sequence of
discounted cash flows (Chiesa and Frattini, 2009). Besides the standalone practices for analysis of investments and
assessment of innovative projects, these traditional techniques are extended in this work through the use of the real-
options approaches and dynamic analyses into project evaluation, which considers the value of embedded options
and the flexibility of the dynamic process of decision-making (Brealey et al., 2012). The authors also suggest the
use of analytical and numerical methods like the Black-Scholes model, binomial model and Monte Carlo
simulations to quantify risks and uncertainties associated with the feasibility of investments in scrubber
technologies.
The remainder of the paper is arranged in the following manner: In the next section, the authors describe the
theoretical framework that forms the bases for this study. The third section presents the empirical methodology
described briefly above, with an emphasis on the identification of exogenous parameters related to the study case,
the capital budgeting approaches and the real option valuation methods. The fourth section illustrates the case study,
layout our estimations and discusses the main results and findings. The last section concludes the article.
2. Theoretical background
2.1. Investment and capital budgeting in scrubber technology
Evaluating corporate investments’ value or assessing innovative projects’ performance allows managers to
effectively improve their business decisions and investment planning, in order to guide the project management,
optimize the project efficiency and maximize the project economic return. Finance theory states that expected
(future) cash flows (CF), either the positive or negative income streams an investor would receive from an
investment should be discounted at the opportunity cost of capital and adjusted for the time value of money, so as
to estimate the net present value of the investment. Thus, the project valuation and the investment decision are made
thoroughly.
It is widely recognized that the process facilitating the decision-making is called the Discounted Cash Flow (DCF)
method. This method (DCF) is viewed as a plausible and robust approach to quantify the complex and large-scale
investment in single parameters (e.g. the net present value−NPV generated by investments to summarise
performance indexes that illustrate the attractiveness of the investment (e.g. the internal rate of return−IRR and the
profitability index) (Ye and Tiong, 2000; Downes and Goodman, 1998). The reliability of this method is motivated
by the fact that its parameters are easily observed and calculated, takes into account the time-dependent value of
money and involves predicting cash inflows and outflows related to the investment over its lifespan (Savvides,
1994; among others). In addition, although the existing methods largely differ in their implementation, they all share
a common principle, that is, the capital budgeting approach for calculating the economic return of a project as a
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1065
sequence of discounted cash flows (Di Lorenzo et al., 2012, Copeland et al., 2010; Chiesa and Frattini, 2009; among
others).
One another hand, the Net Present Value (NPV) is the most commonly used economic approach to evaluate different
types of investments (Ross, 1995). It consists of discounting all future cash flows (both in- and out-flow) resulting
from the innovation project with a given discount rate and then summing them together as reported in equation 1.
The most straightforward rule of the NPV decision is to discard all projects with negative NPVs and undertake all
projects with positive NPVs. This type of decision rule ensures that companies maximise value for their
investments. Therefore, the merit of innovation is measured considering its contribution to the creation of economic
value out of the investment initial cost, i.e. when the NPV is greater than zero. Thus, when applying the NPV
approach to the scrubber investments in the shipping industry, the NPV of a scrubber is expressed with the flowing
specification:

 
(1)
In this given formula, CFt is the expected cash flow generated in year t, representing the savings from operating
income at the end of year t, which assumed to be constant over the whole investment period. T is the investment
period (i.e. the economic life of a scrubber); r is the risk-free interest rate - usually in financial evaluation, cash
flows are discounted at the weighted-average cost of capital (WACC). The term (1+ r) is in the finance literature
called the discount factor and CapEx0 is the capital expenditure, which corresponds to the initial capital investment
in a SOx scrubber. The sum of the discounted values of the cash flows corresponds to the present value (PV) of the
inflows sequence.
This approach is risk-adjusted, while other metrics of capital budgeting and performance criteria such as ROI, IRR
(Internal Rate of Return) or MIRR (Modified Internal Rate of Return) are not (e.g. Maquieira et al., 2012; Jackson
and Sawyers, 2008; Kierulff, 2008). In its basic application the discount rate is calculated looking at the “real” cost
of capital employed in the project, that is, by calculating the weighted average cost of equity and debt used to
finance the project. This was discussed from theoretical and empirical standpoints in Lifland (2015), Chiesa and
Frattini (2009), Myers, et al. (1976), Myers (1972).
However, when flexibility is the core project objective, the standard DCF based method and the NPV indicator
underestimate the current value of the investment i.e. the present-worth asset-value, as well as some management
options such as sensitivity and scenario approaches and real-option analysis (e.g. Di Lorenzo et al., 2012; Farragher
et al. 2001; Copeland, 2001; Ho and Pike, 1998). For instance, Milne and Whalley (1999) discussed that in the
event of delayed investment, the future income and option values have to be added to the current year NPV, so to
take into consideration compensation of the time-value of money, the asset value should be higher than the
commencing investment in the options. This description mainly makes the NPV and standard-DCF method
inappropriate and insufficient for evaluating shipping industry investments.
The recognized inappropriateness of the DCF method has necessitated the undertaking of different approaches such
as the real-option pricing approach and scenario techniques, which introduced sensitivity analysis, uncertainty
associated to the option value and dynamic analysis to the project valuation (Di Lorenzo et al., 2012). Similarly,
McLeish (2005), Copeland (2001) and Dixit and Pindyck (1994) have in the past proposed better models based on
the NPV indicator, the uncertainties associated with future discounted cash-flows and the probability of the different
possible scenarios in different market conditions to evaluate investment appraisal.
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1066
Di Lorenzo et al. (2012) and Dixit and Pindyck (1995) propose that the DCF could be used together with Real-
Option integration to assess investments plan in a common project or in a high-tech industry where the company
want to commercialise new products.
2.2. Real-Option investment evaluation of the scrubber technology
Options trading is a major part of investments in the capital market and its use in the evaluation of investment
appraisals is popular. It is important to emphasize that the real option valuation method of investment projects is
the extension of financial options theory on real property. Black and Schools (1973) introduced options trading
approach into investment appraisal by using the option pricing to evaluate an investment from the zero points of the
project. By incorporating a constant price variation of the asset, the money value of the time, the option's exercise
price and the option's expiration value, the Black and Schools model calculates the price of a call option and put
option in general. Boyle (1977) introduced a new option valuation approach called Monte Carlo Simulation (MCS)
where the options traders generate random variables to get the pricing value. With this approach, a simplified
simulation is to generate an optional quantity of random variables. However, it has been less acceptable than other
approaches for the evaluation of an option price (Glasserman, 2013).
Maritime investors, especially in the shipping industry, appreciate investment decisions, which allow reaction and
adaption on price movements for energy commodities since there is no reliable method to predict future prices
trend. Thus, the authors propose that it might be of a higher value to obtain a scrubber or install engines that allow
them to switch between energy sources to be able to use the most economical fuel. Acciaro (2014a) suggested such
an abatement technology installation model for maritime industry and used the model to determine the optimal time
for deferrals of investments and to evaluate investments at the present or in the future. Acciaro investment model
was empirically tested and validated with an abatement project on a handy size vessel which was LNG retrofitted.
Cox et al. (1979) offered the first simplified future pricing and option valuation model popular among options
traders. According to Brach, (2003), the application of Cox’s model delivers an expected asset value, the best and
worst-case fuel prices scenario as well as the risk-free rate where the investment cost is the same as the exercise
price. In the case of a new abatement technology such as the scrubber, investment as an option forces managers to
make a decision based on their profit in the first two or three years. However, if the company want to know what
could happen within the market in a longer period, then the binomial option-pricing approach would be helpful to
illustrate or make investments strategic map where it shows the upper and the lower bands values in the best and
worst investment scenarios. Because of this, it has been a more favourable approach among investors. The different
fuel scenarios with the highest (VMax) and lowest (VMin) value of saved capital will be calculated to draw the
strategic investment binomial lattice (tree) of scrubber technology investment. To acquire the expected asset value
of the periodic cash flow C so savings from a constant HFO fuel price over time will be calculated as:
   

(2)
where, K is scrubber costs; r is risk-free rate or WACC (weighted average cost of capital), proxied by the LIBOR
rate; T is time at which the option can be exercised; VMax is lattice’s up-factor that reflects the maximum value of
the saved capital and VMin is lattice’s down-factor that reflects the minimum value of the saved capital. In the
binomial tree approach (Cox-Ross-Rubinstein) these two factors generate the project’s random (present value) of
cash flows (CF) so that the original cash flow volatility is preserved. Hence, the next period project cash flow values
will move in two directions to conform to the lattice’s up and down multiplicative factors and expressed as follows:
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1067
(3)
where, σ is the volatility of the underlying assets’ value, i.e. the present value of cash flows and ∆t is one time
period.
With this approach, it should be noted that the option value is calculated by applying the risk¬ neutral probability
P of the investment result. The risk-neutral probabilities allow discounting the cash flow and asset over the period
at the internal rate of company risk-free added to the cost of the capital. In other words, instead of using the simple
decision tree to calculate the option values, a risk-neutral probability decision tree has to be used discounting asset
values at the risk-free rate r. The weighted probability P using the actual outcome of the sum of probabilities on
upward and downward option values will be:

 
(4)
Where P is the risk-neutral probability.
Acciaro (2014b) option evaluation model was based on a discrete binomial tree approach and he argued that using
Black and Scholes’s method as an option-pricing approach is not appropriate for real asset option-pricing in
maritime sector due to several reasons, one of which is the difficulty of proving the historical normal distribution
of the underlying data.
2.3. Real-Options and deferral investments
A real project is a tangible asset with the same value as a corporate investment opportunity. It means that the
integration between DCF and the Real-Option is similar to a call option where the investor has the right but not the
obligation to invest in an underlying asset at a specified fixed price during an agreed period of time or at a given
date (Cherry, 2007; Hull, 2006; Luehrman, 1998; Natenberg, 1994. As a common managerial option, its use in
practice is through an option to defer, i.e. to wait until further information reduces market uncertainty, and an option
to abandon, i.e. to dispose of any unprofitable project or investment (Fusaro, 1998; Trigeorgis, 1996).
Fundamentally, the price of an option in both financial and real project reflects the expected future payoff of the
underlying asset at the time of exercise where the expected future payoff is discounted back to the present at the
risk-free rate revealing the present option value (Fusaro, 1998; Luehrman, 1998). There is an essential acquisition
time for the call options, exercising (strike) options time, twin security arbitrage options of selling and buying or
lending and borrowing the capital for the investment (Fusaro, 1998; Trigeorgis, 1996). Arbitrage occurs when a
security is purchased in a single market concurrently and using the twin security strategy and investment decision
at the time of investment is like a mixture of lending and borrowing. Capital investors can thus build a continued
duplicating portfolio to hedge the options this way (Poon and Granger, 2003). However, in diverse financial market
options, the strike prices (i.e. the price at which the holder of options can buy) are fixed, while in Real-Options
acquisition are not constant. The value of the Real-Option also depends on how uncertain costs and future cash
flows correlate to each other (Trigeorgis, 1996).
Furthermore, in Real-Options pricing, it is assumed that the twin investment security option exists which would
allow the investors to choose between the real projects or invest in two or more securities at the same time. This
situation allows the risks and payoff of the projects to better conform to the market, the options and stock risks or
gives room to construct a risk-free hedge in a very optimal situation. In financial market options, the strike prices
are fixed, while in Real-Option acquisition, the strike time is set for the future (Poon and Granger, 2003). The value
of the Real-Option will depend on how uncertain the costs and future cash flows correlate with each other.
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1068
Therefore, investors in an uncertain situation can predict the costs of the options accusation that will eventually take
place (Bareley et al., 2012). In fact, the situation for Real-Options is different in financials market where the value
of the asset is observable at any time of exercise, expiration and sales are well defined (Ho and Liao, 2011).
Notably, the options are essential for the sizeable capital-intensive project because of the proven efficiency in
diverse industries to evaluate nuclear plants, airlines, and railroads (Fernandes et al., 2011). They are also crucial
for projects involving new products where the acceptance in the market is uncertain and is equivalent to a firm
having a portfolio of call and put options (a call option is like restarting an operation when a project is currently
shut down while a put option is like shutting down a current project operation) (Bengtsson, 2001). The option to
choose when to start a project is an initiation or deferment option. Initiation options are particularly valuable in
natural resource dependent companies where a firm can delay purchasing a commodity like a scrubber or change
the fuel type it uses until the market conditions are favourable. This is what it means to wait before taking any action
until more is known or when the timing is expected to be more favourable (Dixit, 1992). In a typical market, this
approach entails understanding when to introduce a new product or replace an existing piece of equipment to
increase or decrease the scale of operation in response to demand, which is comparable with the option to expand
or abandon which are crucial for after-investment progress (Trigeorgis, 1993).
The key action for the uncertain situation is to be able to delay investment without losing the available opportunity
done by creating a call option on the future investment (Myers and Majluf, 1984). The riskiness of cash flow
generated by the project can change significantly during the project lifespan and in the case of projects with
production facilities. It may not be optimal to operate a plant for a given period if revenues do not cover the variable
costs (Grimsey & Lewis, 2002). In this view, if the price of fuel or any other correlated alternative fuel type falls
below the cost of initially calculated, it may be optimal to temporarily shut down the engine type and switch to
another type of fuel source until the oil price recovers. An electric utility may also have the option to switch between
various fuel sources to produce electricity on the ship.
Against this backdrop, this work will be considering a pricing model of options that depend on the approach of
Black¬ Scholes model and the Binomial option-pricing model (i.e. Hull, 2006; Black and Scholes, 1973; Cox and
Rubinstein, 2001). The option prices are determined by the simple discounting method with the expectation that the
values of each option at the expiration date will be traded using unreasonable risks premiums as discount factors
that were to reflect the volatility of the option according to Jensen (1972). However, the Black-Scholes pricing
methods of financial asset assume a lognormal distribution of future returns in a continued period of work from
Black and Scholes (1973) where they called the practice a diffusion process or a continued and unhindered arrival
of information that causes price change with either a constant or changing variance. These price changes are
normally distributed or logged to resolve market uncertainties so that investors can make better and informed
decision regarding whether to invest or defer (Arriojas & Mohammed, 2007).
In shipping, operators may have a different approach to the investment on prices and project available to provide
better insights into market conditions. Aforementioned, they may decide for example to exchange input resources,
that is, switch from one energy form to another or from one type of engine and fuel to another. The commodities
between the two include the following generic basics: investment ambiguity, irreversibility, the ability to choose
between two or more alternatives (Black and Scholes, 1973).
Following the general option-pricing model of Black and Scholes (1973) and upward and downward probability
(this will replace later by a real value to the main formula), investment opportunity in a scrubber technology can be
modelled as a call option on the net present value of the expected future revenues from the operating scrubber gas
treatment system. This offers the option to invest or postpone regarding the circumstances that affect the formation
of the net present value of this project. Therefore, the price of the call option is estimated by solving the following
nonlinear equation:
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1069
 
(5)
Where N(d1) and N(d2) denominate the standard normal cumulative distribution function and e is Euler’s constant.
The formulas for d1 and d2 are given as follows:



(6)
Where C is the value of a call option. S0 is the present value of future cash flows from the investing in the scrubber
(i.e. the expected revenues from the operational risky investment in scrubber). T is option’s time to maturity or
expiration (i.e. the length of time option is viable). N(x) is the cumulative distribution for the standard normal
distribution. σ the riskiness of the scrubber, the volatility of the worst- and best-case scenario of the investment (i.e.
the standard deviation of the expected rate of return on S). K is the option's exercise price at the end of the period
(i.e. the cost of converting the investment opportunity into the option's underlying operational project) and d1, d2
are deviations from the expected value of the normal distribution.
Thus, the proposed pricing in the maritime industry for obtaining new technologies specifically scrubber technology
will be calculated as:
  
(7)
In reality, the daily fuel consumption of any ships is a critical factor in calculating the daily and annual cost of fuel
consumption, so the time spent within or outside SECA and the time of sail are considered for computation. With
these numbers, it would be easy to calculate the value of the cost of fuel consumption easily. If the ship owners
decide to operate their ships with fuel change, then, the price spread can be considered for calculations to determine
the additional costs of operation and how much savings can be achieved by not changing fuel. The savings are the
future cash flow parameters in option value and the cash flows for each period in the traditional methods.
2.4. Real-Options and dynamic analysis: Monte Carlo simulation
The paper empirically examines the joint stance of the DCF and Monte Carlo Simulation (MCS) analyses so to
approximate the true NPV of the scrubber investment by incorporating a set of dynamic variables that directly affect
the anticipated cash inflow-outflow valuations. The MCS introduces dynamic (probabilistic) analysis into project
evaluation by using random inputs in order to model uncertainty and as such, it makes the DCF method more precise
for investment appraisal and reliable decision tool in the project risk management (e.g. Di Lorenzo et al., 2012;
McLeish, 2005; Ryan and Ryan, 2002). Based on multiple statistical simulations (modelling various scenarios), the
MCS technique is likely to be realistic and reflects the dynamic nature of the investment lifespan (e.g. see Ara and
Lee (2017)).
More formally, the MCS primarily allows producing an estimate of the project's NPV conditional on the set of
random variables drawn from their underlying distribution and to assess the risk associated with the project (i.e. the
Value-at-Risk related to the investment). Specifically, in this study, the MCS technique consists on generating
stochastic variables by using a random uniformly distributed variable (in the [0,1] interval) to create a scenario
analysis utilizing hundreds of possible iterations that continually change the NPV of the asset valuation (e.g.
McLeish, 2005; Ryan and Ryan, 2002). The Black and Scholes (1973) model flowed back and the expectation
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1070
function of the underlying asset defined (project's value) as a function of a geometric Brownian motion with a drift.
Hence, the project’s value was pre-specified and assumed to follows a stochastic process as follow:

(8)
where St is the value of the financial in each time period t, σ its estimated volatility, μ is the drift (yield) measuring
the average growth per unit of time, Wt is normally distributed random variable with mean 0 and standard deviation
√dt and W is a Brownian motion. Assumming that σ, μ and Wt are constants.
3. Methodology
The study was empirically validated through data from expert interviews, focus group meetings and other case
studies done in the frame of EnviSuMEnvironmental Impact of Low Emission Shipping project. The case project
began in early 2017 until the end of the same year using investments in a scrubber with an installed capacity of 15
KW for the engine power of 48K KW sailing in BSR, mainly between the ports of Helsinki and Tallinn. The daily
fuel consumption of the considered ship is assumed to be about 60 mt/day for 350 operating days/year.
The study reviews the compliance investment of a scrubber retrofit with a continuance use of IFO380 or an engine
upgrade that involves the boiler and other necessary equipment for LSMGO or ULSFO with 0.1% Sulphur content.
A case study was constructed to project real-life scenario to evaluate the scrubber project investment feasibility.
The empirical data was used to determine the costs build-ups of the scrubber technology using the conventional
investment evaluation tools, i.e. NPV, IRR, MIRR and the payback period comparable to using the proposed real
options model. Afterwards, the result of the comparative analysis was used to determine which of the investment
evaluation tool is most promising for SECA compliance investment decisions to avoid loss and maximise profit.
3.1. Case Study: application of Real-Option methodology to a maritime investment project
Investment evaluation with the Real-Option approach is not widespread in the maritime industry, and existing
literature mostly used the real-option investment evaluation in mining, power plants and new sustainable energy
resources with only a couple of research in the maritime industry working on LNG evaluation. With this investment
evaluation approach, the authors made a qualitative analysis of the case in the shipping industry. The presented case
study addresses an investment project of scrubber abatement and its evaluation. For this study, two evaluation
methodologies were compared: the traditional NPV and the ROA (using Black and Scholes model, Monte Carlo
method and Binomial option-pricing).
3.2. Project characteristics and descriptive
The cost of a new standard open loop 15 MW scrubber system for the mentioned ferry RoPax type sailing within
SECA in the BSR with two main engines is roughly 5.5 million €. The price of a scrubber installation is calculated
based on the ship engine power and the number of main engines. Results from the experts' interview indicated that
an upfront investment for a ship with two powerful engines required a scrubber cost of €5.8 million. Usually, the
flat rate of the scrubber initial cost start from over €2 million depends on the ship design and the choice between
the dry or wet (open/close/hybrid loop) scrubber system. The design of the scrubber is usually tailor-made and is
unique for every ship.
Half of the total costs are estimated as the actual cost while the other half is designated for installation. At the time
of scrubber installation, the ship will be out of service for more than thirty days, involving fundamental construction
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1071
changes, commissioning, testing and training. The estimated cost of maintenance is approximately 20 000€/yr. The
scrubber system was created using Caustic Soda (NaOH) solution, which is easily within reach globally.
The quickest approach to procure the scrubber chemicals is to order the needed amount of tank cars to the port that
the vessel will visit. The cost of materials depends on where the chemical is purchased, and the delivery time,
however, the usual price for NaOH was around 300 €/t in 2017. If the ship scrubber system running is a closed loop
mode, the costs of operation include a bleed-off treatment unit (BOTU) for the water treatment. This unit usually
consumes additional chemicals to complete the cleaning circle adding an operating cost that includes flocculent or
coagulant additives. Sometimes to calculate the extra expenses and operating cost, a 2% maintenance and extra
operation cost is added to the annual operating costs.
The scrubber has a lifespan of 15 years and the economic lifetime of the ship is 25 years (Atari and Prause, 2017).
Some parts of the scrubber may have a shorter lifetime, which would require replacing with spare parts before the
machine span life is over. For investment appraisal, it is crucial to predicting the risk-free rate as well as the cost of
capital. Mkouar and Prigent (2014) explained that the primarily driven factor in erratic investment is the interest
rate, which influences both the cost of capital and discount rate. Some part of the investments funding is from the
company’s equity while the remaining funding through bank loans, manufacturer companies or export credit
financers. The subject case is using a bank credit of over 15 years set to be repayable through annual payments from
the beginning of the scrubber operations and whose annual payments are subject to an interest rate and an
opportunity cost on the capital.
4. Results and analyses
Among the advanced low-gas emission regulations in the shipping industry in the BSR, switching to low-sulphur
fuel by installing scrubbers and/or using LNG is gaining widespread acceptance as promising options. Thus, its
economic performance should be compared with that of identical without using the scrubber and low-sulphur fuel
(i.e. ship using HGO 3.5%S).
The subsequent subsections will present and discuss different calculations methods and the main results for the
appraisal of low-sulphur scrubber investment proposals. Importantly, such economic analyses are based only on the
baseline results of the first-year cost-benefit evaluation of the project.
4.1. Investments evaluation using conventional methods for evaluation
Undertaking the switch to low-sulphur emission and investment in scrubber technology requires that the shipowner
conducts cost-effectiveness and evaluation analyses, and as such evaluate the worthwhileness of installing an
exhaust gas cleaning technology.
The conventional methods to evaluate the project viability in this case of study are a set of criteria: the NPV, the
IRR, the MIRR, the payback period and the profitability index. These methods are optimistic assumptions because
it is improbable that bunker fuel prices would remain constant over a span of 15 years. Hence, in the real world,
fuel prices might be characterized by a significant variance over the time, and so the realized future cash flows are
not constant over the operational period. Thus, the basic assumptions were slightly modified, to provide NPV and
real options valuations with a realistic quantitative outcome. Thus the authors applied a dynamic approach by
introducing a random variable to predict future fuel prices.
In this case, the pricing is based on the assumption that the movement of fuel prices follows some sort of random
walk and all effective costs and benefits due to the scrubber technology solution adjustment for the annual inflation
rate. The success and accuracy of DCF analysis are determined by the choice of concomitant discount rate. A
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1072
discount rate of 11% is assumed, which is defined by disregarding the composition of funding sources. This
assumption could strongly influence the project results. Therefore, bearing in mind these assumptions, the results
of the project evaluation are reported in Table 1.
Table 1. Key input-variables, DCF primary results and criteria for evaluation
Data
Value
Definition/Sources
Measure
Panel A: Inputs and cost-benefit analysis
CapEx
€5 684 000.00
Annual capital expenditures equal approximatively to the initial
price of a scrubber.
OpEx
€4 238 945.31
Annual operating expenditures of the first operational year.
Spread-saving
€4 768 908.00
Annual spread savings equal to the daily spread prices between
HFO and MGO prices of the first operational year.
Saving-OpEx
€3 251 344.67
Estimated annual cash flows of the first operational year.
NPV1y.
€−2 432 655.33
The net present value (NPV) of the first operating year, a
forward-looking measure of the project profitability, equals the
difference between saving-OpEx and CapEx. By default,
keeping the NPV without 1y-index.
Equation (1)
Discount rate
11.00%
The Weighted Average Cost of Capital (WACC) is the
company’s weighted cost of capital that, that includes all capital
sources: equity and debts. It proxies the discount rate of the
estimated cash flows (i.e. Block, 2011; Bennouna et al., 2010).
Proxy by Treasury bonds
with a maturity of 10 years
in the EU zone.
Panel B: Conventional investment evaluation indicators
NPV15y.
€22 767 025.57
The net present value (NPV) is the difference between the
present value of the cash flows (the benefit) over the project
lifespan (15 years) and the cost of the investment (i.e. Maquieira
et al., 2012; Viviers and Cohen, 2011; Bennouna et al., 2010).
Equation (1)
Payback Period
1.69
The payback period (PP) is the expected number of years
required to recover the original investment (i.e. Hermes et al.,
2007; Ross et al., 2004).


IRR
56.92%
The internal rate of return (IRR) is the discount rate that equates
the present value of cash flows over the whole 15 years and the
initial cost of the investment (i.e. Maquieira et al., 2012; Jackson
and Sawyers, 2008).



MIRR
20.92%
The Modified Internal Rate of Returns (MIRR) is the average
annual rate of return that will be earned on investment if the cash
flows are reinvested at the WACC (i.e. Kierulff, 2008; Jackson
and Sawyers, 2008).

 

Profitability Index
5.01
Profitability Index (PI) metrics the relative profitability of the
project to the initial investment cost. It is the ratio of the present
value of expected net cash flows over the project’s lifespan to
the investment cost (i.e. Viviers and Cohen, 2011).
 

Source: Computed by authors
Due to the investment-oriented approach of this project evaluation, the economic performance of installing a
scrubber is assessed according to several criteria and indicators as shown in Table 1. Panels A and B of Table 1
display the statistics and definitions of all the input-data, indicators and indexes used for investment evaluation and
economic performance assessment of the study case. Panel A reports the inputs of the investment evaluation and
the baseline results of based on the estimations cost-benefit of the first operating year; whereas, Panel B displays
the conventional investment evaluation criteria based on the overall project lifespan.
Speaking about the capital costs of a sulphur scrubber investment for our particular ship case, Table 1 (Panel A)
shows that the initial cost of the equipment (i.e. scrubber price) equals approximatively to €5.68 million. It is
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1073
noteworthy to say that the price of a scrubber tends to largely vary depending on the scrubber engine installed power
and size, as well as the specific of ship operating fuel consumption.
The results of the costs analysis for the scrubber technology gives interesting findings of the project investment
feasibility. First, the estimated annual scrubber capital expenditures (CapEx) are in the order of €5.68 million the
first operating year. In addition to the price of a scrubber, the CapEx includes the costs of installing an exhaust gas
cleaning technology on board the vessel (e.g. internal combustion engine, piping, etc.), start-up costs (10% of total
capital costs) and other additional costs related to the engine power (weighted by 58 coefficient) and the unit-fuel
cost (weighted by 0.5%). The additional capital expenditures are relatively insignificant compared to the initial
price scrubber. For conveniently, we retain that the scrubber price proxies CapEx. The estimated annual scrubber
operating expenditures (OpEx) are in the order of €4.24 million the first operating year. These costs incorporate
consumable costs: additional scrubber fuel consumption (10% of HFO consumption), scrubber services (2% of
investment cost) and other additional operating expenditures related to the vessel engine power and scrubber
technology (e.g. sludge disposition in port, cost of chemicals supplies, periodic inspections and repairs, minor tests
and adjustments to performance monitoring, water management system, etc.) (IMO, 2015); and financial operating
costs: financial-interests costs of scrubber (6% interest rate) and depreciation. All annual operational scrubber
expenditures are adjusted to 2% inflation-rate through the investment period. More interestingly, according to DNV
GL (2018), the operational costs for methanol are expected to be compared with those for oil-fuelled vessels without
scrubber technology. This simply implies that the OpEx costs associated with installing a scrubber technology to
comply with the SECA requirements on the BSR could not be considered as a business constraint.
Before proceeding further, it is primarily important to clarify that installing a scrubber might take about 2 weeks to
six months, which will be a lost revenue period also called off hiring period (Ruiz-Cabrero et al., 2017). However,
this consideration will not be taken independently into account in the costs analyses approach, because it is
implicitly considered in the annual scrubber operating costs.
Furthermore, Panel A of Table 1 shows that money-saving capability of the scrubber (OpEx) using low-sulphur
fuel and a SOx scrubber relies on the daily spread prices between HFO and MGO prices. The authors followed a
dynamic-based approach and construct the average fuel prices on the observed daily fuel prices over four years
(2013−2017), i.e. using the average annual prices and the annual volatility of prices. On average, the daily spread
prices are close to €214 with €52 standard deviation over the period spanning from 2013 to 2017. The spread prices
were relatively constant, high and less volatile for this period of study; though, the HFO prices drop to €81/bbl at
the beginning of 2016.
Against this backdrop and statistics, the authors assess how OpEx and CapEx contribute to the total investment in
a scrubber and the feasibility of switching to low-sulphur fuel as well as the scrubber adoption. Similarly, the results
show that the relative operating expenditures (OpEx) and the relative capital expenditures (CapEx) to the investment
cost of installing scrubber (i.e. the price) are around 15% and 13%, respectively; which cannot be economically
seen as a burden for the feasibly of the business.
From this, the result in Panel A suggests that the annual spread savings, due to this shift to low-sulfur fuel, is €4.77
million; and thus the balance of the cost-benefit analysis, i.e. the saving-OpEx indicator, accounts for
approximatively €3.25 million and the net present value (NPV) of the first is €−2.43 million.
Alternatively, the discount rate is fixed as an imputed data; while the conventional criteria of the investment
evaluation: the NPV15y., discounted payback period, the IRR, the MIRR and the profitability index are calculated
based on the expected future cash flows, occurring at the end of each year over the investment lifespan (i.e. 15
years). In this case, the expected cash flows are estimated based on fuel prices predictions, annual predicted spread
savings (HFO versus MGO costs), annual OpEx and annual CapEx expenditures.
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1074
Results in Panel B of Table 1 show that the project of a ship scrubber has a positive present value, which reveals
that the wealth generates by this investment is attractive and economically viable. The project will, therefore, raise
the value of the shipping company (by €22.22 million euros), which is the financial objective of the shipowners.
Hence, the conclusion is that installing a scrubber is relevant and should be undertaken and can be implemented
successfully. Interestingly, the initial investment in the scrubber is recovered during the second year and the
investment payback occurred after 1.69 years (i.e. break-even point). By implication, this means that the operating
costs and the capital expenditures are recovered by the income inflows generated by the project to break even within
approximatively two years. Furthermore, the results show that the IRR equals to 57% and MIRR equals to 21%,
supporting the acceptance of the scrubber investment since these rates exceed the cost of capital, i.e. indicating that
the benefits exceed the WACC. MIRR is substantially lower than IRR since the MIRR assumes that project cash
flows are reinvested at the cost of capital (instead of the project’s own IRR). Lastly, the profitability index shows
that the relative profitability of the project is greater than the threshold value of 1-one. Thus, the scrubber investment
is expected to produce €5.01 cash inflows for each €1 of investment.
However, production uncertainties were not considered in this evaluation of performance, though it has to be
considered carefully, although the NPV calculation only contains the endogenous value of the scrubber investment.
As previously stated, this evaluation can be regarded as the first step leading toward real options valuation (ROA),
as the ROA is used to overcome those uncertainties. Thus, the application of ROA in evaluating this project will be
presented in the next section.
4.1. Investment evaluation using the ROA (Real Options Analysis)
In the application of the ROV (Real-Options Valuation) to evaluate the project using the binomial approach and the
Black & Scholes model, two assumptions are taken into account. First, all data provided by traditional evaluation
methods are considered, all estimations are conducted based on the cash flow of the first operating year. Other
necessary data are unavailable such as future oil price and future scrubber price; however, since the primary
objective of this study is to compare traditional investment evaluation method with the ROA methods, these
drawbacks may be disregarded.
In contrast to the ships’ operational costs, the cost of the scrubber itself is not usually affected by high levels of
uncertainty. As a simplified assumption, other uncertainties such as technological changes or environmental policies
were not considered. Moreover, since in the case of fuel switching, fuel costs will not have a significant impact on
operating costs their values were not introduced. Thus, the primary uncertainty factor is the volatility of fuel prices.
The prices considered were the fuel prices of long-term contracts and the average price of the EU main ports for the
three years 2015, 2016 and 2017. For the research, spot prices were not included because they may have been
strongly influenced by short-term factors such as demand and supply, new regulations, etc. Mean and standard
deviation of 963 days IFO380 prices were calculated using yearly-basis rolling windows, reaching 399 €/mt and
178 €/mt, respectively. Then, a simulation with 1000 interactions was conducted to calculate the fuel volatility. The
results show an annualized standard deviation of 31.44% approximately, corresponding to the project projected
volatility.
It should be noted that investment in a scrubber is not implemented in phases, i.e., the probability of stopping
scrubber running after its start-up is low. Given the current economic situation, policymakers may not willingly
support its development or make it a priority. More so, legislation could change in the coming years, limiting the
feasibility of the scrubber project making the cost of a new scrubber installation or retrofit unstable. In a worst-case
scenario, the cost could still subject to ship-freight rate uncertainty as well as fuel prices in the open market.
Therefore, the option of deferring the project within one year can be considered and is justified by the high
uncertainty of regulatory change.
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1075
Therefore, for the scrubber investment, a deferral option corresponds to a call option, where the decision for a
present investment will be taken if the NPV of the scrubber project exceeds the value of the option. These options
are typically evaluated through the binomial tree, developed by Cox, et al. (1979). The parameters used to build the
tree are displayed in Table 2.
Table 2. Inputs for the Real-Option Analysis
Input data
Value
Description
Present value of future cash flows
€3.25
Million
Saving-OpEx of the 1st operating year
Volatility
31.44%
Annual
Variance of fuel prices
The risk-free rate of return
11%
Annual
WACC
Time to expiration
15
Years
Duration
Time step 
1
Year
Analysis period
Investment cost
€5.68
million
Strike price
Source: Computed by authors
The investment horizon in a scrubber is 15 years, the initial outlay is €5.68 million, the estimated cash flows in the
first year is $1.5 million and its uncertainty (volatility) is computed as 31.44%, as shown in Table 1 above. The
risk-free rate of returns would represent the return rate of treasury bonds with a maturity of 10 years in EU added
to the opportunity cost of capital. The binomial tree results show a possible evaluation of the underlying asset price
and the deferral option from left to right. Regarding the underlying asset, the value presented by the first node of
the tree is the current price of the underlying asset (i.e. and the end of time t-1). As shown in the table in Table 3,
the underlying asset value can increase or decrease depending on coefficients VMax and VMin respectively (see
Equation 2).
Table 3. Key parameters of Real Option-Value
Input data
Calculated parameters
Source
Up factor (VMax)
2,12
Equation 3
Down factor (VMin)
0.47
Equation 3
Risk-neutral probability ()
0.60
Equation 4
Source: Computed by authors
After identifying inputs factors required for setting up binomial model, the lattice’s up-factor and down-factor, the
authors thus construct the binomial lattice (tree) for the project's value, that approximates a lognormal distribution,
and calculate the asset values on each node of the binomial lattice, using one-year time period. Currently, the present
value of net cash flows (estimation of the first-year inflows) is S0=100m, and the annual volatility of S0 is σ=31.44%.
The time of options maturity was divieded into several one-year phases. The results of a recombining lattice are
displayed below in Figure 1. For analytic purposes, the truncated values of the lattice is reproduced below.
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1076
Fig.1. Tree for option to wait
Source: Computed by authors
Figure 1 forms the diagram of sequential decisions and possible ROA results. Upon completion of each phase,
project management has the option whether to invest in a scrubber at that point or delay its implementation and wait
until next period. Thus, the binomial lattice (tree) presents the diagram of the next periods' project's random values
conform to the value of expected cash flows arising from investing in the scrubber, , multiplied with the up-factor
and down-factor to obtain  and . These two factors generate random project’s values (i.e. present
value of cash flows) so that the original volatility is preserved. For instance, it was verified that at the end of the
first year, the project cash flow values conform to (up) = = €4.45 million and (down) = = €2.37
million. The investment option’s values in the end of the second year show three scenarios: 
= €6.10 million,  == €3.25
million and = = €1.73 million. Additionally, this binomial option-pricing
model assigns two associated probabilities to the various nodes that constitute the diagram. Hence, Results shows
that the asset value has to be corrected by two coefficients: p=0.60 and 1−p=0.40 (see Equation 4). Finally, as seen
in the diagram, the options gave only the right but not the obligation for the manager to make the investment,
implying that the payoff scheme to the option holder/ship owner is asymmetric.
Similarly, with the same procedure, the calculation is repeated to show the expected values of option values for
every node of the binomial tree until the last year. In Figure 1, the upper numbers on the binominal lattice present
expected future asset values over the options life period and bottom numbers indicate option values.
The last column of the binomial tree represents the possible values of the underlying asset at the option maturity
date. Since the deferral option is similar to a call option, the last values of the tree are determined by subtracting the
values of the underlying asset to the exercise price. The result can fluctuate between (S K) and 0 with the option
value S and the underlying asset price K. The other values are determined by the application of a neutral probability
All numbers are in million €.
Top numbers are asset values.
Bottom numbers are option values.
2.37

1.46
6.10

4.86
3.25

2.15
1.73

0.84
4.45

3.39
3.25
2.35
8.35

6.92
4.45

3.14t
2.37

1.27
1.27

0.43
...
...
...
...
...
363.24

357.56
193.69

188.01
193.69

188.01
...
0.10

0
0.10

0
0.03

0
...
Year 1 Year 2 Year 3 Year 4 Year 15
p
pp
p
p
p
p
p
p
p
p
p
1p
1p
1p
1p
1p
1p
1p
1p
1p
1p
1p
1p
Years 514
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1077
to each pair of vertically adjacent values. The result shows that a scrubber project value in the first year with the
option of delay in the binomial tree is €2.35 million, higher than the NPV of the first year which equals €−2.43
million (this value represents the difference between Saving-OpEx and CapEx of the first-year estimations (see
Panel A of Table1)); hence, with high volatility of the market conditions the ROV value exceeds the NPV from
investing in scrubber ‘’today‘’. Thus, it is better to postpone the investment decision.
Furthermore, an option value of delay is offered by calculating the difference between the expanded NPV (predict
future cash flows, i.e. ROV) and the computed NPV of the 1st operating year which yields a value of €4.79 million
and suggests that the deferral option value is higher than the value of investing immediately. Creating a shortened
outcome or a shortcut investment in the NPV analysis will be negative in the first year, a situation not so surprising
for such a significant investment. Thus, the project can be postponed until more favourable investment conditions
appear.
Since investment decisions are subject to opportunity costs in regards to deferring, the investment should be made
only when its NPV is higher than the value of the option. This result is so because an immediate investment implies
a loss of opportunity to invest later and corresponds to the value of delaying the option. Even though the value
generated by the scrubber project cannot make up for the total cost of investment, it would be sufficient to cover
the deferral option. If these assumptions are applied to a binomial tree, the decision tree of current investment will
signal to “invest” or “delay”, at each node, which simplifies the decision-making processes for managers. The
advantage of using the binomial tree for a case like this is that the result will show if the option of investing now is
better when the underlying asset reaches a higher value. If the underlying asset has a lower value, then the option
of postponing the project for the next period would be a better choice.
Thus, the investor will only invest if the evaluation of bunker fuel remuneration exceeds the investment initial cost
together with the opportunity costs of not postponing the project for one year ahead. Since the project presents a
low static NPV in the first year (despite its positive outcome over the years), it will be necessary to invest €5.68
million in implementing the scrubber project immediately or facing an increase of value in the daily ship fuel
consumption. This action will risk a decrease in the cash flow as well as a decrease in the cost of the underlying
asset. For example, after 4 years and 15 years, the investor will obtain future cash flows of €8.35 million and €363.42
million respectively, according to the lattice values. Having this amount of underlying asset value is a motivation
for the investor to invest because the value compares to the option value is positive. Whereas at a pessimistic
scenario of making future cash flows of €1.27 million and €29 102, the underlying asset value confirms that a risk
avoidance will be a better option. On the other hand, a negative option price will be a signal not to take the risk of
investment. This way, even with a positive NPV static the tree shows that the project should be postponed because
the value of the deferral option is superior.
Next, using the approach outlined in the Equations 5, 6 and 7, the Black-Scholes option valuation model was used
to calculate the real call-option value by specifying the required parameters to set-up the Black & Scholes model
(1973), which are the same as in binomial option-pricing model: i.e. the initial cash flows, the volatility of the
project, etc. (see Table 2). Herewith, once the inputs parameters required for setting up the model are identified,
then the call-option value is calculated using Equations 5, 6 and 7. Results are as follows (Table 4):
Table 4. Values obtained with the Black & Scholes model
Input parameters
Value
d1
1.51
d2
0.29
Value of the call option: C
2 366 992.83 €
Source: Computed and constructed by authors
The results display the value of the real option (C) and the deviations from the expected value of the normal
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1078
distribution (d1 and d2) by applying the Black-Scholes model. As described above, the estimated value of the real-
option (ROV) in = 1 by Black & Scholes option is positive and approximately amounts to €2.37 million, which
does not imply that this project may be accepted and undertaken immediately. Realistically, this suggests that the
investor should hold the option of this project investment and retard the investment, but not abandon the project. It
also indicates the implicit value of taking the flexibility and the option into account. The large size of this value can
be explained by the high volatility of the project’s cash flows (31.44%) and the significant long lifetime of the
option (15 years). Note, that this situation is not surprising for such a significant investment. Similarly, to the
binomial model, the option value of delay is measured by adding the ROV amount to the project’s NPV of the first-
year leaves us with the extended strategic NPV equalling: −2.43+2.37=€4.80 million, which suggests that the
deferral option value is substantially higher than the investment. Thus, in this case, also, the implication is that the
investor would postpone the full project program and decide to operate it in next coming periods until better
investment conditions appear. In all, the authors found the results provided by Black & Scholes formula converge
to those provided by the binomial option-pricing approach, under certain assumptions.
4.3. Monte Carlo Simulation and further investigations
In this subsection, the stochastic Monte Carlo simulation is developed for the analysis of the NPV, for the investment
analysis. Hence, in Table 5 below, the project scope and the inputs parameters that lead to implementing the
stochastic simulation of the project valuation is defined and identified.
Table 5. Parameter used in calibration of Monte Carlo Simulation
Inputs parameters
Value
Initial NPV15y. ()
€25.24
Million
Volatility ()
31.44
Percent
Drift ()
[0−1]
Random number
Trials
1000
Iterations
Source: Computed by authors
Using the approach outlined in the Equation 5 with a normal distribution, thousand unique iterations of
the Monte Carlo simulation is conducted to obtain randomly the possible project values and generate a
sample of the NPVs of the asset valuation paths. The most important assumption underlying this Monte
Carlo model is that the generated variables (i.e. NPVs) are independent. The primary outputs of the Monte
Carlo simulation, the parameters and the main descriptive statistics of the NPV of the project over the
whole investment period, are presented as follows in Table 6.
Table 6. Summary statistics and Risk analysis for the simulated NPV of the Monte Carlo Simulation
Inputs parameters
Value
Average
€14.97
Million
Median
€14.78
Million
Standard Deviation
€5.02
Volatility, Million
Min
€0.90
Million
Max
€29.67
Million
Asymmetry
0.12
Skewness
Flattening
0.28
Kurtosis
VaR1%
€4.58
Parametric Value-at-Risk at 1% quantile,
Million.
VaR10%
€8.47
Parametric Value-at-Risk at 10% quantile,
Million.
Source: Computed by authors
Table 6 displays the primary outputs of the Monte Carlo simulation and presents descriptive statistics and
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1079
characteristics for the distribution of the one thousand estimated NPV iterations. Overall, within these data, the
average (median) NPV is €14.97 million (€14.78 million), which is slightly lower than the estimated NPV in the
project analysis that equals to €22.76 million over the whole 15-years lifespan. Dispersion in this NPV is relatively
low with a standard deviation of €5.02 million, which is strongly reliant on fuel prices volatility. Across these data,
an interesting result is that the NPV is simulated plausibly positive in all the experiments. Therefore, looking at the
minimum and maximum values, results of the Monte Carlo iterations reveal a positive minimum value (€0.90
million), thus ranging the NPVs from €0.90 million to €29.67 million (maximum value). Moreover, aforementioned,
the asymmetry (skewness) is 0.12, which shows a slightly expanded distribution to the right; and the flattening
(kurtosis) stands at −0.28, indicating a slight flattening compared to a normal distribution.
Therefore, these empirical results and the absolute positive value of the simulated NPVs give support to the previous
findings, implying that the project will deliver an acceptable NPV and so the relevance of undertaking scrubber
technology.
Based on data obtained, the graph of the distribution of frequencies and cumulative frequencies cumulative diagram
(probabilities) for the one thousand NPV iterations of the project are drawn in the following chart.
Fig.2. Probabilistic distribution of the simulated NPV15y
Source: Computed by authors
Figure 2 presents the histogram of the Monte Carlo simulation results (frequencies and cumulative distribution
function−CDF for the one thousand NPV experiments). As can be seen, there is strong evidence that the frequencies
of the project value are normally distributed. Implications of Monte Carlo simulation drawn in Figure 2 show that
60% of the analyzed cases of the NPV are higher than €13 million. Also, it results in a probability of approximatively
22% that the project value will be higher than the initially estimated project value (€22.76).
In the same stream, according to these results and the CDF, risk analysis of the Value-at-Risk indicators at 1-percent
and 10-percent quantiles give interesting insights. Hence, the investors would have 99% (90%) confidence that the
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1080
project expected NPV over 15 years will generate at least an amount of €4.58 million (€8.47 million).
To address the nexus between NPV and ROV for the results obtained from the MCS, the authors process primarily
by evaluation the option value (discounted by the risk-free rate) for each iteration and then calculate the average
ROV of these one hundred iterations. Simulation results show that the average value of the real-option in the 1st
operating year is positive and approximately equals to 1.79 million. Additionally, the option value of delay is
computed as the difference between the ROV and NPV (i.e. the value-added) which amounts to a value of €4.22
million. This also supports previous findings; hence, the investor will face the decision to accept the option of the
project investment, but with postponing the full project program until better investment conditions appear.
Not surprisingly, the parallel Monte Carlo simulation results, with the same input data of an option traded at 31.44%
and 1000 random trials, present very similar findings to those obtained with the binomial approach and the Black
& Scholes model. These results are by and large in line and consistent with the main findings of the other approaches
on real options analysis.
4.4. Discussion
Under the same procedure and assumptions, results had given comparative option values at the first operating year.
This gives a perception that the value of the introduction of a new scrubber investment is approximately the value
provided by the binomial option-pricing model, the Black & Scholes option valuation model or the Monte Carlo
method. Overall, throughout the analyses, the results are reliable and robust to various methodologies and they are
not driven by any specific specification.
In contrast, when comparing the binomial results in the first year with the results of Black and Scholes, a small
difference appears as shown below in Tables 7, where the three different approaches are compared with the
conventional NPV calculation for the first operating year. These first-year results give useful insights to the
investors when they gauge the project investment. They also allow them to decide about the best investment timing,
i.e. either to launch it today or to postpone it for the next following year; to acquire enough guarantee about the
uncertainty of the fuel market conditions and the inherently unstable nature and risks of the industry than today.
Therefore, certainty and visibility are the essences for an investor. Subsequently, with less volatility of the market
condition and a clear vision of the industry, the investor/stakeholders can generally decide easier to whether the
investment is profitable in term of value creation and in line with the new regulation, or not; and the whether the
payback period is satisfying or not. Thus, in presence of good economic conditions such as fewer volatility pressures
or low-interest rates, there is no point to decline or postpone the investment.
Table 7. ROA Comparison between, Binomial, Black-Scholes and Monte Carlo approaches
Method of
option-pricing
NPV of the 1st-
year investment
ROV for the 1st-year
of investment
Value added (Difference
between ROV and NPV)
Binominal
− 2 432 655.33
2353753.78
4 786 409.12
Black-Scholes
− 2 432 655.33
2366992.83
4 799 648.17
Monte-Carlo
− 2 432 655.33
1789960.35
4 222 615.68
Source: Computed by authors
Although these option-pricing methods provide similar insights, prior studies have provided some criticisms. Hence,
to benchmark our findings, previous studies in the literature (Acciaro, 2014; Glasserman, 2013) have argued that
using Black & Scholes method and Monte Carlo simulation are not favourable for investment analysis, especially
for the call and put option in ROA. For example, they documented that the Black & Scholes results might not
provide a historical normal distribution and the Monte Carlo results are generated from simulations and random
numbers, which do not follow a particular trend nor a probability distribution. To that extent, compromises can
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1081
always be made between the three different ROA pricing approaches.
Considering the setbacks mentioned, the binomial option-pricing method could be said to have an advantage over
the Black & Scholes and Monte Carlo methods, as it gives flexibility of decision-making over an extended period
of investment. In contrast, the other methods focus only on a specific time slot, e.g. in the last year of binomial
option-pricing, the investor thereby could decide only if there are favourable conditions to invest, as far as the option
to defer the project is no longer possible. In such case, the investor can only invest if the spread value of the two
main fuel prices is sufficiently (or expected to) high.
Furthermore, the project value grows as the decision is postponed, due to the implied uncertainty reductions.
Nevertheless, the option to defer in the binomial case might involve losses in cash flows and competition. Thus, the
decision whether the project will be implemented or not can only be made if these losses are taken into account in
the final decision. This suggests that although the conventional investment method does not consider this flexibility,
which underestimates the project value, the incorporation of ROA alongside NPV evaluation increases the project
estimation accuracy because it gives room for a project deferral. Indeed, over the full investment period, our insights
of the conventional investment evaluation indicators (Panel B of Table 1) and the MCS simulated outputs (Table 6)
suggest that the project presents a good investment opportunity over a long-term run.
Finally, the ROA approach allows the investor to define the best investment opportunity and decisions with the
highest return for regulation compliance. The results indicate that the best short or long-term investment and capital
budgeting strategies for the future of maritime companies with significant value can be considered at the early stages
of a new ship investment or scrubbers retrofit device for older ships. By assessing different scenarios of the scrubber
investment, the ship owners can maximise the benefit of their asset.
Conclusion
The objective of this work was to validate methods that can solve investors’ challenges of SECA compliance
investment decisions to avoid loss and maximise profit using the scrubber abatement technology. The results
validate a stochastic approach for assessing real options with a case study for compliance with sulphur regulations.
From the analysis made, the application of ROA, in particular, the Binomial approach looks promising. Given this
result, a potential investor has the flexibility to re-evaluate the scrubber project and redefine a new strategy if need
be.
Getting similar results although slightly different by few points between ROA between the Binomial, Black &
Scholes and Monte Carlo models demonstrates that the real options approaches are practical for simulating various
investment scenarios with the different situation of future oil prices. This paper contribution is new to the maritime
industry that is highly characterised by burdensome uncertainties because it integrated the valuation of the payback
period and discounted cash flow of the low sulphur fuel like the MGO versus the scrubber technology option as a
popular solution. The findings prove that the Real-Option approach as an investment evaluation method could be a
reliable and worthy approach. Investors in the maritime industry can thus rely on and take advantages of this method.
The obtained results bear critical policy implications for the industry operators, the regulators of the SBR, and the
IMO.
Further work will be directed towards benching marking these results with LNG driven ships. This will create a
more precise picture regarding compliance investments and reduce investment decision risks.
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1082
References
Acciaro, M. (2014), "A real options application to investment in low-sulphur maritime transport." International Journal of Shipping and
Transport Logistics 6(2): 189-212. https://doi.org/10.1504/IJSTL.2014.059570
Ara, B., Lee C. (2017). "IMO 0.5% S GLOBAL: SCRUBBERS YES OR SCRUBBERS NO?. " https://www.cconnection.org/wp-
content/uploads/2017/09/iScrubbers-y-or-n-8-28.pdf
Arriojas, M., Hu, Y., Mohammed, S-E., Pap, G. (2007). "A delayed Black and Scholes formula." Stochastic Analysis and Applications 25(2):
471-492. https://doi.org/10.1080/07362990601139669
Atari, S., Prause, G. (2017). "Risk assessment of emission abatement technologies for clean shipping." In International Conference on
Reliability and Statistics in Transportation and Communication, pp. 93-101. Springer, Cham.
https://link.springer.com/chapter/10.1007/978-3-319-74454-4_9
Bengtsson, J. (2001). "Manufacturing flexibility and real options: A review." International Journal of Production Economics 74(1-3): 213-
224. https://doi.org/10.1016/S0925-5273(01)00128-1
Bennouna, K., Meredith, G. G., Marchant, T. (2010). "Improved capital budgeting decision making: evidence from Canada. Management
Decision, 48, 225247. https://doi.org/10.1108/00251741011022590
Bergqvist, R., Turesson, M., Weddmark, A. (2015) "Sulphur emission control areas and transport strategies-the case of Sweden and the forest
industry." European Transport Research Review 7(2): 10-25. https://doi.org/10.1007/s12544-015-0161-9
Berk, B., and DeMarzo, M. (2007) "Corporate finance." Pearson Education. https://s3-ap-southeast-
1.amazonaws.com/erbuc/files/5210_0b965bc9-d9e0-40ab-a8a7-43bd1e79a55e.pdf
Black, F., Scholes, M. (1973). "The pricing of options and corporate liabilities." Journal of political economy 81(3): 637-654.
https://doi.org/10.1086/260062
Block, S. (2011). "Does the weighted average cost of capital describe the real-world approach to the discount rate?" The Engineering
Economist: Journal Devoted to the Problems of Capital Investment, 56(2), 170180. https://doi.org/10.1080/0013791X.2011.573618
Brach, Marion A. (2003). "Real options in practice." John Wiley & Sons, 198.
https://books.google.ee/books?id=ttrWdu3uEgkC&printsec=frontcover&dq=inauthor:%22Marion+A.+Brach%22&hl=et&sa=X&ved=
0ahUKEwifubn7h-bfAhUSalAKHfczCtIQ6AEIJjAA#v=onepage&q&f=false
Bräutigam, J., Esche, C., Mehler-Bircher, A. (2003). "Uncertainty as a key value driver of real options." In 7th Annual Real Options
Conference, pp. 1-20. http://realoptions.org/papers2003/BraeutigamUncertainty.pdf
Brealey, R.A., Myers, S.C., Allen, F. Pitabas, M. (2012). "Principles of corporate finance." Tata McGraw-Hill Education.
https://www.academia.edu/30032518/Principles_of_Corporate_Finance_10th_Edition_Richard_A._Brealey_Stewart_C._Myers_Frankl
in_Allen
Boyle, P.P. (1977). "Options: A Monte Carlo approach." Journal of financial economics. 4(3): 323-338.
https://doi.org/10.1016/0304-405X(77)90005-8
Copeland, T. (2001). "Real Options Analysis." Texere Publishing, New York.
Cherry, H. (2007). "Financial Economics." 1st edition. Actuarial Study Materials, 3217 Wynsum Ave., Merrick, NY 11566.
Chiesa, V., & Fratini, F. (2009). "Evaluation and performance measurement of research and development: techniques and perspectives for
multi-level analysis." Cheltenham: Edward Elgar. https://doi.org/10.4337/9781849801942
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1083
Copeland T. (2001). "Real options analysis." New York: Texere Publishing.
Copeland, T., Koller, T., & Murrin, J. (2010). "Valuation: measuring and managing the value of companies." Hoboken, NJ: John Wiley.
http://elibrary.bsu.az/books_200/N_1.pdf
Cox, J., Rubinstein, M. (2001). "Options Market." Beijing: Qsinghua University Press. 1:351-362.
https://cdn.ymaws.com/www.afajof.org/resource/resmgr/files/Historical_Texts/cox-rubinstein-ocr-1985.pdf
Cox, John C., Ross, Stephen A., Rubinstein, M. (1979). "Option pricing: A simplified approach." Journal of Financial Economics 7(3): 229-
263. https://doi.org/10.1016/0304-405X(79)90015-1
Cullinane, K., Bergqvist, R. (2014). "Emission control areas and their impact on maritime transport." 1: 1-5.
https://gup.ub.gu.se/v1/asset_data/155916
Di Lorenzo, G., Pilidis, P., Witton, J., Probert, D. (2012). "Monte-Carlo simulation of investment integrity and value for power-plants with
carbon-capture." Applied Energy 98: 467478. https://doi.org/10.1016/j.apenergy.2012.04.010
Dixit, A. (1992). "Investment and hysteresis." Journal of economic perspectives 6(1): 107-132. https://doi.org/10.1257/jep.6.1.107
Dixit, A.K., Dixit, R.K., Pindyck, R.S. (1994). "Investment under uncertainty." Princeton university press.
https://press.princeton.edu/titles/5474.html
Dixit, A.K., Pindyck, R.S. (1995). "The options approach to capital investment." Real Options and Investment under Uncertainty-classical
Readings and Recent Contributions. MIT Press, Cambridge 6.
DNV GL (2018). Assessment of selected alternative fuels and technologies (No. ID 1765300). DNV GL Maritime.
https://hydrogeneurope.eu/sites/default/files/2018-04/DNV_GL_Complete-Alt-Fuels_guidance_paper_2018-04_web.pdf
Downes, J., Goodman, J.E. (1998). "Dictionary of Finance and Investment Terms", 5th Edition, Barron's Financial Guides, p.153.
Farragher, E.J., Kleiman, R.T., Sahu, A.P. (2001). "The association between the use of sophisticated capital budgeting practices and corporate
performance." Eng. Econ. 46(4): 300311. https://doi.org/10.1080/00137910108967579
Fernandes, B., Cunha, J., Ferreira, P. (2011). "The use of real options approach in energy sector investments." Renewable and Sustainable
Energy Reviews 15(9): 4491-4497. https://doi.org/10.1016/j.rser.2011.07.102
Fusaro, P.C. (1998). "Energy Risk Management: Hedging Strategies and Instruments for the International Energy Markets." 1st edition. New
York: McGraw-Hill. pp. 9-37.
Gailly, B. (2011). "Developing innovative organizations: a roadmap to boost your innovation potential." Houndmills, Basingstoke,
Hampshire: Palgrave Macmillan https://doi.org/10.1057/9780230295285
Glasserman, P. (2013). "Monte Carlo methods in financial engineering." Vol. 53. Springer Science & Business Media.
https://books.google.ee/books?hl=en&lr=&id=aeAlBQAAQBAJ&oi=fnd&pg=PA1&dq=Glasserman,+P.+(2013).+%22Monte+Carlo+met
hods+in+financial+engineering.%22+Vol.+53.+Springer+Science+%26+Business+Media.&ots=kMJfBhRM9r&sig=SLpiGNz_rER6J3
W_HQ9Xl_5oyJE&redir_esc=y#v=onepage&q=Glasserman%2C%20P.%20(2013).%20%22Monte%20Carlo%20methods%20in%20fi
nancial%20engineering.%22%20Vol.%2053.%20Springer%20Science%20%26%20Business%20Media.&f=false
Grimsey, D., Lewis, M.K. (2002). "Evaluating the risks of public-private partnerships for infrastructure projects." International journal of
project management 20(2): 107-118.
https://doi.org/10.1016/S0263-7863(00)00040-5
Hämäläinen, E., Hilmola, O. P., Prause, G., and Tolli, A. 2016) "Forecasting maritime logistics costsWill the low oil price remain." In Le
transport maritime à courte distance (Short-Sea Shipping), Devport 2016 Conference, pp. 19-34.
https://research.utu.fi/converis/getfile?id=19164931&portal=true
Herbst, A.F. (2003). "Capital asset investment: strategy, tactics and tools. John Wiley & Sons.
http://160592857366.free.fr/joe/ebooks/tech/Wiley%20Capital%20Asset%20Investment%20Strategy,%20Tactics%20&%20Tools.pdf
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1084
Hermes, N., Smid, P., Yao, L. (2007). "Capital budgeting practices: a comparative study of the Netherlands and China." International Business
Review, 16: 630654. https://doi.org/10.1016/j.ibusrev.2007.05.002
Ho, S-H., Liao, S-H. (2011). "A fuzzy real options approach for investment project valuation." Expert Systems with Applications 38(12):
15296-15302. https://doi.org/10.1016/j.eswa.2011.06.010
Ho, S.S.M., Pike, R.H. (1998). "Organizational Characteristics Influencing the Use of Risk Analysis in Strategic Capital Investments." Eng.
Econ. 43 (3): 247268. https://doi.org/10.1080/00137919808903198
Hull, C. J., (2006). "Options, futures and Other Derivatives." 6th edition. Pearson Prentice Hall. pp.99-37.
https://fac.ksu.edu.sa/sites/default/files/options_futures_and_other_derivatives_5th_ed.pdf
IMO (2015). "Guidance on the application of regulation 13 of MARPOL annexe VI tier III requirements to dual fuel and gas-fuelled engines."
MEPC.1/Circ.854. London
IMO (2016). "IMO sets 2020 date for ships to comply with low sulphur fuel oil requirement." Press briefing release 28/10/2016.
http://www.imo.org/en/MediaCentre/PressBriefings/Pages/MEPC-70-2020sulphur.aspx Accessed 30/11/2016
Jackson, S., Sawyers, R. (2008). "Managerial accounting: A focus on (5th Ed.)." Mason: South-Western Cengage Learning.
Jensen, M.C., Black, F., S. Scholes, M. (1972). "The capital asset pricing model: Some empirical tests.".
https://pdfs.semanticscholar.org/ca5c/1407b5cf8257a7efbe425e72e9d8e17897c1.pdf
Kierulff, H. (2008). "MIRR: A better measure." Business Horizons, 51, 321329.
https://doi.org/10.1016/j.bushor.2008.02.005
Kodukula, P., Papudesu, C. (2006). "Project valuation using real options: a practitioner's guide." J. Ross Publishing, 2006.
http://www.academia.edu/27822201/Project_Valuation_Using_Real_Options_A_Practitioners_Guide
Lifland, S., 2015. "Creating a Dynamic DCF Analysis: A Detailed Excel Approach Utilizing Monte Carlo Methodology." Journal of Higher
Education Theory & Practice. 15(2): 5666. http://www.na-businesspress.com/JHETP/LiflandS_Web15_2_.pdf
Luehrman, Timothy A. (1998) "Investment opportunities as real options: Getting started on the numbers." Harvard Business Review.
https://hbr.org/1998/07/investment-opportunities-as-real-options-getting-started-on-the-numbers
Maquieira, C. P., Preve, L. A., Sarria-Allende, V. (2012). "Theory and practice of corporate finance: Evidence and distinctive features in
Latin America." Emerging Markets Review, 13: 118148. https://doi.org/10.1016/j.ememar.2011.11.001
McLeish D.L. (2005) "Monte Carlo simulation and finance." Hoboken: John Wiley & Sons Inc. https://download.e-
bookshelf.de/download/0000/5848/35/L-G-0000584835-0002384532.pdf
Milne, A., Whalley, A. E. (2000). "Time to build, option value and investment decisions': a comment." Journal of Financial Economics 56(2):
325-332. https://doi.org/10.1016/S0304-405X(00)00043-X
Mkouar, F., Prigent, J-L. (2014). "Long-Term Investment with Stochastic Interest and Inflation Rates Incompleteness and Compensating
Variation." No. 2014-301. http://www.ipagcn.com/wp-content/uploads/recherche/WP/IPAG_WP_2014_301.pdf
Nielsen, C. K., Schack, C. (2012). "Vessel emission study: comparison of various abatement technologies to meet emission levels for ECA's."
In 9th Annual Green Ship Technology Conference, p. 13.
https://www.finaval.com/site/images/documenti/news/2014/articoloNOV14paper.pdf
Mun, Johnathan. (2002). "Real options analysis: Tools and techniques for valuing strategic investments and decisions. Vol. 137. John Wiley
& Sons. https://books.mec.biz/tmp/books/URSF4SYM38H1V3TRSUZ3.pdf
Myers S.C. (1972). "A Note on Linear Programming and Capital Budgeting, J. Finance, vol. 27(1):89. https://doi.org/10.1111/j.1540-
6261.1972.tb00622.x
Myers, S., Dill, A., Bautista, A. (1976). "Valuation of financial lease contracts." Journal of Finance 31, 799819.
https://doi.org/10.1111/j.1540-6261.1976.tb01924.x
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1085
Myers, S., Majluf, N., (1984). "Corporate financing and investment decisions when firms have information that investors do not have."
Journal of Financial Economics (13): 187221. https://doi.org/10.3386/w1396
Myers, Stewart C., Majluf, Nicholas S. (1984). "Corporate financing and investment decisions when firms have information that investors
do not have." Journal of financial economics 13, no. 2: 187-221. https://doi.org/10.1016/0304-405X(84)90023-0
Natenberg, S., (1994). "Option Volatility & Pricing: Advanced Trading Strategies and Techniques." Chicago: Probus Publishing Company.
pp. 257-330. http://terredegaia.free.fr/ppics/Trading/Mcgraw-Hill%20-%20Option%20Pricing%20And%20Volatility%20-
%20Advanced%20Strategies%20And%20Trading%20Techniques%20-%20Sheldon%20Natenberg%20-%20(1994).pdf
Olaniyi, E.O. (2017). "Towards EU 2020: An Outlook of SECA Regulations Implementation in the BSR." Baltic Journal of European Studies
7(2): 182-207. https://doi.org/10.1515/bjes-2017-0016
Olaniyi, E.O., Viirmäe, M. (2017). "The economic impact of environmental regulations on a maritime fuel production company." Research
in Economics and Business: Central and Eastern Europe 8(2).
Olaniyi, E.O., Atari, S., Prause, G. (2018). "Maritime Energy Contracting for Clean Shipping." Transport and Telecommunication Journal
19(1): 3144. https://doi.org/10.2478/ttj-2018-0004
Olaniyi, E.O., Gerber, P., Prause, G. (2017). "Strategic Energy Partnership in Shipping." In International Conference on Reliability and
Statistics in Transportation and Communication, pp. 102-111. Springer, Cham. https://link.springer.com/chapter/10.1007/978-3-319-
74454-4_10
Patricksson, Ø., Erikstad, S.O., (2017). "A two-stage optimization approach for sulphur emission regulation compliance." Maritime Policy
& Management 44(1): 94-111. https://doi.org/10.1080/03088839.2016.1237781
Poon, S-H., Granger, Clive W.J. (2003). "Forecasting volatility in financial markets: A review." Journal of economic literature 41(2): 478-
539. https://doi.org/10.1257/.41.2.478
Rehn, C. F., Haugsdal, A., Erikstad, S.O. (2016). "Flexible strategies for maritime sulphur emission regulation compliance." Proceedings of
PRADS2016 4: 8th.
Ross, S.A. (1995) "Uses, abuses, and alternatives to the net-present-value rule." Financial management 24(3): 96-102.
https://doi.org/10.2307/3665561
Ross, S. A., Westerfield, R. W., Jaffe, J. F. (2004). "Corporate finance." 7th E). New York: Mc-Graw- Hill.
http://www.academia.edu/8652113/Ross_Westerfield_and_Jaffe_Corporate_Finance_Mc_Graw-Hill_6th_ed_
Ruiz-Cabrero, J., Govindahari, H., Moreno, R. (2017). "Preparing for a sea change in global refining." Boston Consulting Group.
https://www.bcg.com/publications/2017/downstream-oil-gas-petrochemicals-energy-environment-preparing-for-sea-change-in-global-
refining.aspx
Ryan, P.A., Ryan, G.P. (2002). "Capital budgeting practice of the fortune 1000: How Have Things Changed." Journal of Business and
Management, 8, 389-419.
Savvides, S., (1994). "Risk Analysis in Investment Appraisal', Project Appraisal 9(l).
https://papers.ssrn.com/sol3/papers.cfm?abstract_id=265905
Squire, L. H.G., Van der T., (1975). "Economic Analysis of Projects." Baltimore, MD: Johns Hopkins University Press.
Trigeorgis, L. (1993). "Real options and interactions with financial flexibility." Financial management: 202-224.
https://doi.org/10.2307/3665939
Trigeorgis, L. (1996). "Real options: Managerial flexibility and strategy in resource allocation." MIT Press.
https://econpapers.repec.org/article/eeejrpoli/v_3a22_3ay_3a1996_3ai_3a3_3ap_3a218-220.htm
Viviers, S., Cohen, H. (2011). "Perspectives on capital budgeting in the South African motor manufacturing industry. Meditari Accountancy
Research, 19(1-2), 7593. https://doi.org/10.1108/10222521111178646
ENTREPRENEURSHIP AND SUSTAINABILITY ISSUES
ISSN 2345-0282 (online) http://jssidoi.org/jesi/
2019 Volume 6 Number 3 (March)
http://doi.org/10.9770/jesi.2019.6.3(1)
1086
Weintrit, A., Neumann, T. (2013). "Marine Navigation and Safety of Sea Transportation: STCW." Maritime Education and Training (MET),
Human Resources and Crew Manning, Maritime Policy, Logistics and Economic Matters. CRC Press. https://www.crcpress.com/Marine-
Navigation-and-Safety-of-Sea-Transportation-STCW-Maritime-Education/Weintrit-Neumann/p/book/9781138001046
Ye, S. D., and Tiong, R. L. K. (2000). "NPV-at-risk method in infrastructure project investment evaluation." J. Constr. Eng. Manage., 1263,
227233. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:3(227)
Aknowledgement
This work is in principle linked to the EnviSuM Environmental Impact of Low Emission Shipping: Measurements
and Modelling Strategies project sponsored by the European Regional Development Fund
Sina ATARI is a researcher and a PhD candidate in Tallinn University of Technology. His research interests are in investment appraisal,
entrepreneurship and financial management.
ORCID ID: 0000-0001-6737-3651
Yassine BAKKAR is a PostDoctoral researcher at Tallinn University of Technology. His research interests are financial management,
maritime operations/logistics, risk management, internationalization and quantitative economics.
ORCID ID: 0000-0002-3392-7174
Gunnar PRAUSE is the Professor of Business Development at Tallinn University of Technology. His research interests are entrepreneurship
& business development, sustainable supply chain management and innovation.
ORCID ID: 0000-0002-3293-1331
Omolola OLANIYI, PhD is a researcher and an EU Project Manager at the Tallinn University of Technology. Research interests are in
sustainable transport, maritime operations/logistics, SME management & internationalization, regional development and innovation.
ORCID ID: 0000-0002-2181-9328
Copyright © 2019 by author(s) and VsI Entrepreneurship and Sustainability Center
This work is licensed under the Creative Commons Attribution International License (CC BY).
http://creativecommons.org/licenses/by/4.0/
... However, these methods are not adequate in the case of investments of a magnitude typical of oil and gas production investment such as the ammonia plant, because changes in discount rates or changes in market conditions may jeopardize the estimations of the underlying investment value [12]. Flexible evaluation approaches such as the options given provide fitting choices, especially when the economic life of such a plant ranges up to 15 years [13]. Moreover, managerial flexibilities must be included in the assessment of an investment with high value in an uncertain or volatile market [14,15] such as the oil and maritime markets. ...
... For example, shipowners who decided to install the scrubber to comply with the SECA regulations experienced additional fuel consumption resulting in further CO2 emissions that partly cancelled out the original intention of emissions reductions [15]. For those ships, the scrubber cannot reduce the CO2 emissions and necessitate the need for another supplementary abatement device for energy efficiency [13]. ...
... For instance, Schinas and Stefanakos [30] proposed stochastic programming; Jiang et al. [31] used cost-benefit analysis. Ren and Lützen [32] suggested the multi-criteria approach; Lindstad et al. [33] calculated the cost function of emission abatement alternatives and Atari et al. [13] used value-at-risk assessment for the scrubber installation investment. However, besides the apparent high costs of these compliance investments recorded by these studies, Psaraftis [29] argued that most of the available compliance approaches are only interim and cannot drive the industry forward. ...
Article
Full-text available
One of the consequences of the conflict in Ukraine relates to the growing shortfall in global ammonia production. There are additional negative global impacts on the availability of fertilizers and prices of ammonia (NH3). The shortage in ammonia production does not only influence the agroindustry but also the global shipping industry, as ammonia is positioned as a promising zerocarbon fuel and as a storage and transport medium for hydrogen. There are plans underway to start ammonia production in Estonia to minimize the consequences of the import stop of Russian ammonia in the context of the Ukrainian crisis. This study investigated the Baltic Sea Region (BSR) ammonia market and analyzed the economic implications of building an ammonia plant within the BSR. Using fuzzy real options models as the conceptual framework, together with secondary data analysis, case studies and expert interviews, the authors chart possible courses for the construction of ammonia production facilities within the region. Based on the case of the NH3 production plant, as well as the underlying distribution system, the study provides new economic perspectives for lower carbonization for the shipping industry, an attempt at creating a model for other European regions toward climate change mitigation.
... Consequently, the selection of real options analytical strategies involves not only a quantitative perspective but also a qualitative understanding of the real options to classify options. Various methods for valuing real options in projects vary based on the project's nature and the surrounding circumstances (Atari et al., 2019;Lambrecht, 2017). ...
... Ajak et al. (2019) emphasized that the real options approach is qualitative and analytical, with the strategy selection relying not only on a quantitative perspective but also on the qualitative system International Journal of Project Management ISSN 2520-4519 (Online) Vol.6, Issue 2, pp 26 -50, 2024 www.ajpojournals.org that classifies real options. Various methods for real options to valuation projects differ based on the project's nature and surrounding circumstances (Atari et al., 2019;Lambrecht, 2017). ...
Article
Full-text available
Purpose: In the contemporary landscape of mining projects, the imperative to navigate through periods of uncertainty has driven the exploration of alternative strategic tools rooted in project flexibility. Real options have emerged as a pivotal strategic approach, offering the means to adapt and refine mining projects under unpredictable conditions Materials and Methods: This paper provides a comprehensive review and discussion on the strategic application of real options for optimizing mining project planning in the face of uncertainty. Organized into four sections, the paper begins with a general introduction to real options in Section one, delving into their strategic and technical classifications. Section two critically examines and reviews the indispensable role of real options in the realms of mining investment and project planning. The third section is dedicated to an in-depth discussion of the strategic tools inherent in real options, specifically focusing on their valuation and optimization aspects within mining project planning. The final section provides a discussion and conclusion on the strategic application of real options for optimizing mining project planning under uncertainty. Findings: The review identifies that real options offer valuable strategic flexibility in addressing uncertainties inherent in mining project planning. Through a detailed examination of their application, it becomes evident that real options can enhance decision-making processes and improve project outcomes by allowing for adaptive responses to changing conditions. Implications to Theory, Practice, and Policy: The strategic integration of real options into mining project planning presents significant implications for theory, practice, and policy. Theoretical implications include advancing understanding of decision-making under uncertainty and the role of flexibility in strategic planning. In practice, the adoption of real options can lead to improved project outcomes, increased resilience to market fluctuations, and enhanced risk management strategies. From a policy perspective, recognizing the value of real options may inform regulatory frameworks and promote the adoption of flexible planning approaches within the mining industry, ultimately contributing to sustainable development and resource management.
... Other strategies involve the use of exhaust gas cleaning systems (scrubbers) in conjunction with HFO or the adoption of alternative fuels like liquefied natural gas (LNG). However, these compliance strategies often come with significant financial implications, leading shipowners to carefully balance capital and operational expenditures in their decision-making processes [37]. ...
Book
Full-text available
This paper explores Africa’s emerging maritime opportunities, focusing on the increasing flow of maritime goods and the demand for vessel transport. This analysis takes into consid-eration the flourishing economy of the Northern Hemisphere and its implications for Africa. We explore the continent’s economic and maritime hubs, their historical development, and their future outlook. Additionally, the paper examines fleet requirements and growth fore-casts, drawing on current trade patterns and anticipated trends. We also assess the needs for fleet construction and maintenance, the prospects of adopting alternative fuels, and the ex-ploration of bunkering opportunities. This document proposes a strategic framework for understanding Africa’s evolving position in global sea trade, acknowledging the fluid nature of global dynamics which could prompt swift changes. Despite this, it offers a foundational perspective on Africa's potential to capitalize on sea trade for economic advancement.
... This includes the purchase or construction of the vessel itself, containers, and other equipment necessary for maritime operations. Additionally, it encompasses financing expenses, depreciation costs, insurance, and any other costs directly related to the ownership and financing of the vessel (Atari et al., 2019). Periodic Maintenance Costs on the other hand include all expenses made to keep the vessels and other equipment in working order. ...
Article
Full-text available
The multi-objective optimization for voyage planning, which aims to balance time, fuel utilization, and all other relevant service costs, is noticeably absent in the scientific literature. The reason behind this gap is closely linked to the involvement of a large number of participants with conflicting interests in the process. This complexity explains why modelling an optimization tool for maritime logistics services appears challenging. Although new technologies such as blockchains and smart contracts have helped reduce the number of participants and address some complexities, they cannot fully resolve the fragmentation observed in maritime transport. To address the need for optimized voyage management for vessels, this study takes a holistic approach to voyage costs within the maritime supply chain, similar to how a single company would approach it. The study combines a case study from the container shipping industry, expert interviews, project results, and secondary empirical data research to develop a financial model for optimizing voyage costs. The research opens up opportunities for improving logistics services and developing new business models in the field of supply chain finance.
... For governance to be effective, researchers have identified that choices must be made at the proper levels, roles should be clearly defined, enough resources must be provided, and consistent policies should be developed (Keovilignavong, 2019;Atari et al., 2019;Wheeler et al., 2020). A common approach to resource management is known as subsidiarity which involves delegating decision-making authority to the most localized tier of government that is nonetheless competent to act in that position and is seen as a positive development since it increases the likelihood that governance choices will be appropriate for and reflective of local conditions (Glynn et al., 2017). ...
Article
Full-text available
Rapid increases in natural resources globally during the 1970s have had far-reaching environmental consequences. The rising exploitation of environmental assets has progressively detrimental societal effects. Therefore, the current study aims to identify the nexus between natural resources and governance conflicts while assessing the role of governance in natural resource management. The results identify three significant categories of governance challenges (associated with capacity, connectivity, and knowledge) and three domains of good governance (effectiveness, involvement, and efficiency). The results highlighted that developing countries would likely need more decision-making power, financial and human resources, leadership on crucial resource challenges, and conflict resolution mechanisms. On the contrary, research into natural resource management governance structures in industrialized countries has often shown problems with policy clarity and the alignment of stakeholder institutions' goals and aims. The study adds to the existing literature by summarizing new organizational capacities and governance frameworks essential for better natural resource management.
Article
Investment is one of the most crucial factors for a company. The decisions that a company makes in an investment uncertainty environment with high global competition, such as in the shipping industry, affects the life of the company either positively or negatively. Therefore, correct decision-making is extremely important particularly in an environment of investment uncertainty. Fuzzy set theory can be used to represent uncertainty and vagueness to generate decisions in decision-making problems. In this study, the aim is to evaluate ship investment by means of Net Present Value (NPV), Profitability Index (PI), and Payback Period (PP) under the Trapezoidal Interval Type-2 Fuzzy environment. In addition, two methods, Interval Type-2 Fuzzy Payback Period (IT2FPP) and Interval Type-2 Fuzzy Profitability Index (IT2FPI), were developed for the first time in the literature by integrating Interval Type-2 Fuzzy with traditional methods. These methods were then successfully applied to a real case study of ship investment for evaluation in the shipping industry in an uncertain environment.
Article
Full-text available
The indications from BSR after 2015 showed that the low fuel price has eased the economic effects of the SECA regulation and as a result, most ship owners have delayed their investment decisions. Even though the postponement of emission abatement techniques seems to have reduced the compliance expenses for SECA, they, however, did not improve the position of shipowners relative to their competitors. Consequently, new policy instruments to stimulate innovation, to raise competitiveness and to comply with the new environmental regulations are needed. It would have been easier to hedge fuel price volatility and offer maritime logistics services for a lower price, but to be able to ensure sustainable results in long-term, maritime stakeholders must be ready to device astute strategies that can propel them to unparalleled advantage. This research first appraised the investment risks and payback period associated with the scrubber using different capital budgeting methods. It further illustrated the Maritime Energy Contracting (MEC) model as a market mechanism for the delivery of a cost-effective emission reduction using the scrubber technology as well as an instrument to realise a competitive advantage for ship operators. The results are empirically validated by case studies from BSR.
Conference Paper
Full-text available
Reliable forecasting of elements that have an impact on business processes generally supports success in industries. The aim of this paper is to estimate impacts that oil price has on maritime fuel costs and how this influences the economy of an export industry. Historically, forecasting the relevant supply chain factors has been a challenge for freight owners and logistics service providers. Bunker prices represent important cost factors, and a variety of parameters influence them, which the logistics actors should take into account. Researchers have scantily examined this topic in journals. Our simulations highlighted that all markets are rather unique because of different logistics routes, sold products and invoice prices. Nevertheless, the gross margins of export would seem to improve clearly, if bunker prices dropped 80 percent. Transport researchers should be alert to sudden changes in oil prices, and try to reveal their future developments and the impacts they cause.
Article
Full-text available
The clean shipping concept emerged in a bid to make maritime transportation green and environmentally friendly. This mandate is being accomplished through improved conducts, actions and technology in the maritime industry. One of such measures was the creation of the Sulphur Emission Control Areas (SECA) in 2005 and 2012 to reduce the rate of sulphur emissions from shipping. Sustainable growth—an EU 2020 priority—is strategically linked to the SECA regulation in that it promotes resource efficiency, greener environment and a competitive economy. Thus, the International Maritime Organisation (IMO) and, as adopted by the European Parliament (EP), SECA regulation stipulated that from 2015 all ships in SECA are under the obligation to use low sulphur marine fuel that must not exceed 0.1% (IMO, 2011). This regulation has incited rigorous arguments on the economic disadvantage it would subject affected maritime stakeholders who are made to comply with stringent regulation their counterparts in non-SECA are not subjected to. Two years of 0.1% sulphur regulations have witnessed many changes in the maritime industry and most of the first responses were realised with vessels that ply along the Baltic Sea. This work presents an account of European maritime industry’s approaches towards SECA regulations and the stakeholders’ thoughts on the economic impact of SECA. This contribution brings a clearer picture to the status quo as well as highlighting a needed future focus.
Article
Full-text available
e International Maritime Organization (IMO) and the European Parliament (EP) in 2005 and 2012 established Sulphur Emission Control Areas (SECA) in Northern Europe where from 2015 ships must use fuel with a sulphur content not exceeding 0.1% and 3.5% in non-SECAs. is has spurred active discussion that the regulation has created economic disadvantages for maritime stakeholders who must comply with strict regulations that competitors in other parts of the world are not subjected to. rough a case study, this work investigates the impact of environmental regulations on the business model of the maritime supply company Viru Keemia Grupp (VKG), which is of national importance to the Estonian economy, especially in the eastern region. It explores the strategic entrepreneurial compliance options for VKG based on their return on investments and associated risk. e ndings show that VKG is currently struggling to keep aoat under the weight of the consequences of changes in maritime consumer demand due to sulphur emission regulations and that the most viable compliance options are expensive and risky. JEL classification codes: L26, M11
Chapter
The International Maritime Organisation (IMO) is employing a global clean shipping approach to reduce shipping emissions and to improve the Maritime’s carbon footprint. One of the measures was the establishment of Sulphur Emission Control Area (SECA) in special parts of the world including Baltic Sea Region (BSR). Since 2015, ships are allowed only to use fuel with a maximal Sulphur content of 0.1% forcing ship owners to use special bunker fuel like LNG or to invest in expensive abatement technologies like the scrubbers. These are more expensive than the usual heavy fuel oil (HFO). Predictions are that oil prices may increase in which case ship-owners who have started using the LNG or the scrubber’s technologies will enjoy a competitive advantage over others due to the higher margins that can further increase with additional investments into energy efficiency.
Conference Paper
The purpose of this study is recognizing and assessing the existing risks of SECA related investments of ship owners and the consideration of their risk attributes. Complying with the SECA regulations, maritime stakeholders have to choose among different abatement strategies, which are generally linked to high and risky investments. The paper focusses on the evaluation of scrubber technologies and their relationship to other abatement techniques. Literature review reveals shortcomings in investment risk evaluation among the ship owners operating in emission control areas (ECA). The research fills this gap by presenting a comprehensive compilation of identified risks attributes in an analytical framework together with a risk assessment in the context of HFO and MGO fuel and scrubber related performance indicators comprising CAPEX and OPEX. The results in a classification framework categorize the investment risks and different elements of value at risk (VaR) as well as historical and parametric evaluation of risks. Besides that, this study contributes to new knowledge in the disciplines of green transport and shipping. For future research, the identified risk and investment must be tested in a real business case study and in different scenarios to measure and analyze its performance and efficiency. The results of the paper are based on empiric activities, which were realized during 2017 in the frame of the EU project “EnviSuM”. The empiric measures comprise primary and secondary data analysis, focus group meetings and expert interviews with specialists from shipping sector in BSR.
Article
In this paper, we present a two-stage optimization model for the machinery system selection problem. The objective is to minimize total cost, while aggregated power requirement and emission regulations are constraining the problem. Future fuel prices are considered to be uncertain. From a set of alternatives, the machinery configuration providing the lowest total cost is found. Also design flexibility in terms of future reconfiguration possibilities is taken into account. The machinery selection for a 2000 TEU container vessel is used as an illustrative case. Five initial machinery concepts are considered: diesel machinery, diesel machinery with a scrubber system, dual fuel (DF) machinery, pure gas engines, and a DF ready machinery. There is also a set of reconfiguration possibilities available for each alternative. From solving the case study, DF machinery is found optimal, while pure gas machinery is close to equally good. By solving the problem with deterministic fuel prices, the value of flexibility is not properly accounted for, resulting in an unreasonably high total cost for the flexible machinery alternatives. This demonstrates the need for a decision support approach that explicitly handles future uncertainty, as the two-stage stochastic model presented in this paper does.