An evaluation of project management tools and techniques in Vietnam
Quynh Le Hua Xuana, Massoud Moslehpourb* and Dat Tran Tienc
aDepartment of Business Administration, Saigon Institute of Technology, Vietnam
bDepartment of Business Administration, Asia University, Taiwan
cGeneral Manager Assistant, Khai Thanh Trade and Production Joint Stock Company, Vietnam
C H R O N I C L E A B S T R A C T
Article history:
Received: October 2, 2018
Received in revised format: No-
vember 15, 2018
Accepted: November 22, 2018
Available online:
November 22, 2018
Project management tools and techniques provide the efficiency and effectiveness in managing
and handling the projects. Many tools and techniques have been discovered and applied widely for
a long period of time among project managers around the world with great contributions to the
success of projects. Vietnam is a developing country and has become an attractive hub for national
and international business opportunities. Consequently, there has been an increasing development
and expansion of business projects in Vietnam. The purpose of this study is to analyze the use of
project management tools and techniques in Vietnam. More specifically, this study aims at inves-
tigating: 1) the awareness of business people related to projects, 2) the application of project man-
agement tools and techniques within the organization and 3) the challenging obstacles that have
prevented organizations in using the tools and techniques. The mixed-method methodology is em-
ployed to collect and analyze the data. This study uses interview and questionnaire techniques to
collect the data for the study. Several companies in different industries in Vietnam participated in
collection of the data. The findings of the study indicate lack of in-depth understanding and recog-
nition of project and project management tools and techniques in Vietnamese businesses. The term
“project” has not yet become popular in Vietnam. Hence, companies in Vietnam have been facing
many obstacles with the application of project management tools and techniques affected on the
performance of the projects. The study suggests that the definition and recognition of Project Man-
agement should go beyond the current assumption of the Vietnamese business people. Better ex-
ercises and practices of the concept of Project Management can benefit the local and international
companies. Achieving higher awareness of projects and project management tools can signifi-
cantly improve economic success of Vietnam.
© 2019 by the authors; licensee Growing Science, Canada
Keywords:
Project management tools and
techniques
Challenges
Vietnam
Developing country
1. Introduction
1.1 Background
There has been a movement within the organizational environment: moving from “managing projects”
to “management by projects” (Melton, 2011). Therefore, the term “Project Management” (PM) has
been popularized among several different industries (Fortune et al., 2011) especially in developed coun-
tries. Project Management has performed as a distinct management concept, especially in developing
countries (Ofori, 2013; Dey, 2001; Hydari, 2012; Larson & Gray, 2011).
284
The term of Project Management hence is an important term in business process and together with that,
it also comes along with specific supporting tools and techniques. Vietnam has some misconception in
term of Project Management (PM) and Project Management tools and techniques (PTTs). Generally,
the term “Project Management” in Vietnam has created the awareness specifically in engineering or
construction sector. However, “Project Management” should be understood and applied widely within
various business sectors as a temporary organization in the firms (Konstantinou & Müller, 2016; Ling,
& Bui, 2009).
The purpose of this study is to understand better about the usage of Project Management tools and
techniques in operational Vietnamese organizations. In addition, the authors also focus on analyzing
why companies do and do not operate their temporary organization as a project. Moreover, once the
tools and techniques have been implemented, the analysis about the obstacles or challenges should be
conducted in this research when firms execute their project management. Through this research, the
authors hope that it can contribute to the general acknowledgement of Project Management in the busi-
ness environment of Vietnam.
1.2 Problem discussion
In developing countries, managing projects often face extreme and complex problems; however, those
concerning issues are still happening and not yet sorted (Duy Nguyen et al., 2004; Yanwen, 2012). In
Vietnam, one of the developing countries, projects appear in many industries and especially, in con-
struction and infrastructure. Moreover, there are projects and mega projects that suffer losses or cost
and time overruns that impact negatively on the general economic circumstances as well as the societal
goodwill. However, there are still a big gap and missing theories document about the use of Project
management practices such as tools and techniques that are closely related to the reduction of project
failure, leaving no evidence on the use of PTTs in Vietnam.
1.3 Research aims and questions
The circumstance and practices of PM and PTTs in Vietnam are not well documented by empirical
studies or research papers. The authors therefore desire to accomplish this research that could slowly
build up the theory aspect in Vietnam. For that reason, the following research questions have been
established to achieve the project’s aims:
- What are the PM tools and techniques used in Vietnamese organizations?
- What are the challenges in adopting and/or using PM tools and techniques in Vietnamese organiza-
tions?
More specifically this study aims at achieving the following objectives:
- To critically analyse the level of usage about Project Management term in Vietnamese business envi-
ronment.
- To learn about the application of Project management tools and techniques in Vietnam
- To identify if there is any obstacles or challenges when applying or adopting those tools and tech-
niques
In order to discover the answer for the research questions, the researchers decided to collect the primary
data through with both quantitative and qualitative data collection methods.
2. Preliminary Review of the Literature
A project is a temporary organisation that is organised within the limited project constraints as time,
cost and resources (PMBOK, 2017). More importantly, a project must be unique and not a routine
operation. Project management is defined as “the application of knowledge, skills, tools, and techniques
to project activities to meet the project requirements” (PMBOK, 2017).
Q. Le Hua Xuan et al. / Management Science Letters 9 (2019) 285
2.1 Project Management Tools and Techniques
Frame (2014) and Carstens et al. (2013) discussed specifically about Project Management tools and
techniques. There are many tools and techniques or in other words, they are processes or mechanics
they serve the project team needs. Different project management tools/ techniques or practices have
different approach to support the project performance (Carstens et al., 2013). The development and
efficiency provided from Project Management tools and techniques have participated in the organiza-
tional project management and Project Team excellence (Melton, 2011).
2.2 Definition of terms
Work Breakdown Structure (WBS) and Product Breakdown Structure (PBS)
A Work Breakdown Structure is a diagram or a list that describes deliverable-oriented breakdown of
the project’s work into smaller activities or group of activities (Norman et al., 2011). Similarly, Product
Breakdown Structure details the products or deliverables that the project has to produce accordingly to
its requirements (Shaltry, 2008; Indelicato, 2010). Depending on the nature of projects, WBS or PBS
will be selected appropriately.
Feasibility Study (FS)
Feasibility study is basically an analysis of how successful or feasible a project plan when it turns into
real life (Gardiner, 2005). Specifically, it studies about many influencing factors that are in accordance
with the success rate of the projects. FS does not require professional PM background to build up, staff
or individual with business background can exercise and practice FS accordingly to their knowledge
and research (Mukherjee & Roy, 2017).
Stakeholder Power Interest Matrix (SPIM)
Stakeholder Power/ Interest Grid/Matrix is a tool that allows project team to categorize stakeholders
with a certain level of power and interest (APM, 2017).
Risk Register (RR)
Risk Register is also referred as Risk Log. It is a detailed and advanced document that is created at the
beginning of the project to identify, analyse the project’s risks and prepare a proper risk response plan
and so on. Risk register will perform specifically the risk of the projects and it is a helpful reference for
the project team to address problems and react precisely when they rise. Risk register involves largely
on the success of risk management (Ling & Tran, 2012; Teller et al., 2014). Meanwhile, in developing
countries, the awareness and consideration with the nature of risk is relatively low; hence, it prevents
project to achieve success.
PI Matrix
Probability-Impact (PI) Matrix is a tool that allows project team to prioritize and evaluate their risks
(Raydugin, 2013). From PI Matrix, the project team can identify the importance level of the risks and
also the level as high, low or medium impact of risk on their project. Using PI matrix, it supports the
project team in planning and creating their risk response plan in order to manage their project’s risks
properly and allow a smooth sailing for the project.
Gantt Chart (GC)
Gantt Chart is a collection of horizontal lines that demonstrate the amount of work or activities should
be done or done within a certain period of time; moreover, Gantt chart also performs the millstones of
the project’s process which is the important stage that has to be done crucially to review the previous
steps and plan continuously for the next activities. It also describes the achievement at some points of
the project (Kirk, 2012).
286
The role and importance of Project Management tools and techniques
Every project strives to be successful. However, there should be a distinction between project success
criteria and factor (Murphy & Ledwith, 2007). A success criterion is defined as the measures by which
success or failure of a project will be judged. Success factor is defined as the “inputs” to the manage-
ment system that leads directly or indirectly to the success of the project (Cooke-Davies, 2002).
Table 1
Review of success criteria and success factor adapted from (Murphy & Ledwith, 2007)
Author Success criteria Success factors
Fortune and White (2006) Not addressed Top management support
Clear and realistic objectives
Efficient plan
Performance monitoring
Communications
Resources
Crawford et al. (2006) Not addressed Relationship management
Resource management
Time management
Cost management
Risk management
Westerveld (2003) Budget, schedule quality appreciation by:
client, project personnel, users, contract-
ing partners and stakeholders
Leadership and team
Policy and strategy
Resources
Stakeholder management
Schedule
Risks
White and Fortune (2002) Complete within schedule Clear goals/objectives
Complete within budget Realistic schedule
Meet Clients requirements Top management support
Adequate resources
Effective risk management
Clear communication channels
Cooke-Davies (2002) Not addressed Risk management
Responsibilities plan
Scope change control process
Line of sight feedback
Learning from experience
Belassi and Tukel (1996) Cost Clear goals/ objectives
Time Top management support
Quality Scheduling
Client satisfaction Sufficient resources
Planning and control
Monitoring and feedback
Client consultation
To determine the project success, criteria and factors become more complex when the traditional ele-
ments of the project constraint: time, cost and quality are no longer sufficient (Belassi & Tukel, 1996).
From Table 1, there was a common point in the success factor table between that “Risk Management”
impact greatly on the success of project (White & Fortune, 2002; Westerveld, 2003; Chua et al., 2003;
Crawford et al., 2006). There is no research that could prove the most effective or perfect tools in
leveraging risks, however, Chapman (1998), Thamhain (2013) and Patil et al. (2012) agreed that the
use of risk management tool with proper application based on organizational structure, project size and
relevant impacting factors may reduce the uncertainty or negative impact of risks on project perfor-
mance. Therefore, without the support of project tools in analysing the risks, project is challenged to
obtain its desired objectives.
In fact, planning does not provide 100 percentages in project success, however, poor planning may lead
project to failure (Andersen et al., 2009). Without effective PM practices, comprising the project’s
target and benchmarking the desired values could not be easily obtained (Long et al., 2004; Dang et al.,
Q. Le Hua Xuan et al. / Management Science Letters 9 (2019) 287
2012). In 1997, Toney and Powers clarified that standardized process within the mean of approaches
and procedures is a success factor. Then, Thamhain (1998) studied the use of project management tools
and techniques. They concluded that project management tools and techniques contribute conditionally;
depending on the integration of project managers into their projects as well as the acceptance and learn-
ing pace of the project team. Thamhain (1998) and Raz and Michael (2001) have shown that the use of
risk management tools contributed with a higher level of performance for projects in Israeli high-tech
industries. In 2002, White and Fortune explored the relationship between “the tools and techniques
usage” and “project outcomes ad project success”. By using specific tools and techniques, it supported
the core project’s success criteria “on time, to budget and to specification” to be clearer and more
achievable. Ahmed and Hassan (2003) argued that applying appropriately the management practices
can ensure the quality performance; and together with the better the implementation, the higher the
improvements of business results. A proper implementation of project management processes has been
proven specifically in innovation management as a key critical success factor. Chemuturi (2013) argued
that project may find difficulties or unable to achieve the targets without the application of PM tools
and techniques. The use of those PM practices may allow the PM team to keep the project on track,
maintain the project constraints and deliver customer’s needs precisely.
In sum, an appropriate application of PTTs contributes greatly to improve the success factor of projects.
2.3 Possible challenges and obstacles that organizations may face when applying Project Manage-
ment tools and techniques
2.3.1 Governance
Governance is closely related to the decision-making process (Garland, 2009). It is one of the crucial
elements that affect the application of tools and techniques when managing projects. For that reason,
the management team is responsible to choose an appropriate collection of tools and techniques. There-
fore, there will be an arising concern that project’s governance will be one of the obstacles when the
management team do not have the knowledge or the expertise in applying and using project manage-
ment tools and techniques. Loo (2002) emphasized that an organization without a PM “champion”
principles is seen as a bottleneck in completing project successfully or attaining success. Therefore, the
project governance and the individuals involved in it play a crucial role in the process of applying PTTs.
On the other hand, corruption is one of the challenges to accomplish good governance (Pillay, 2004;
Mungiu-Pippidi, 2015). Unfortunately, it has been mentioned as one of the concerning obstacles in
Vietnamese business environment that may strongly affect to the decision making process of projects
(Nguyen & van Dijk, 2012; Wischermann, 2011).
2.3.2 Adoption process
The adoption process can be different depending on the size, culture, organizational structure of the
organization itself and also the project. Therefore, the adoption process could be varied or standardized
in relationship with the requirements of the tools and techniques or the mentioned above elements. The
absence of knowledge related to PM is a concern in Vietnam (Tam & Hadikusumo, 2016; Nguyen et
al., 2016). Therefore, to adopt PTTs properly in Vietnam, the adoption process would be one of the
challenges to criticize.
2.3.3 Technology & Knowledge
When applying a new terminology, technology and knowledge will be a big concern. The reason is that
they are closely related to the quality and also the effectiveness of the project’s outcomes or specifi-
cally, it could also impact the project’s performance because of effective/ineffective application
(PMBOK, 2017). The outstanding concern about Vietnam is the knowledge foundation about true
meaning of PM. Shortage in professional skills, skilful PM labour force, and experienced PM expertise
288
limits the technology and knowledge flow in Vietnam. Lack of essential knowledge and technology is
one of the reasons for project failure (Desouza & Evaristo, 2004).
2.3.4 Stakeholders
Different stakeholders share different interests. Thus, stakeholder management will also be a challenge
when organization has to adopt new tools and techniques (Ponnappa, 2014). To manage and balance
the differences between the stakeholder’s references, background to convince them about the effective-
ness or advancement of a new terminology. That would be also a big concern that the project manage-
ment team has to pay attention to solve.
2.3.5 General view about the use of Project Management tools and techniques in Vietnam
Vietnam is an attractive destination to Official Development Assistance (ODA) and Foreign Direct
Investment (FDI) fund (Thi & Swierczek, 2010). In recent years, Vietnam experiences a dynamic
growth that has boosted the national economy and development (Dang et al., 2012). It is the fact that
many of the projects have to stop working or suffer incompletion or become useless despite a huge
investment due to corruption or bad management. Government-funded projects that faced delays or
inefficiency may suffer a huge decrease in citizens trust level (Le-Hoai et al., 2008). Especially, Trans-
parency International (2016) ranked Vietnam as the 113th corrupted country.
Consequently, projects delay and budget overruns have become common problems in Vietnam (Long
et al., 2004). There are several reasons cleared out as the causes for the poor performance of projects
in Vietnam such as inadequate designs, corrupted contractors, poor estimation and change manage-
ment, external environment issues and more importantly, improper use of techniques and tools have
been highlighted (Long et al., 2004). Hence, applying project management processes or procedures
may face obstacles; especially, in developing countries where project management awareness is still
limited. There are several concerning problems identified within project environment in developing
countries (e.g. Yanwen, 2012; Dvir et al., 2003):
- Wrongly identifying or preparing procedures
- Inappropriate analysis with the national agencies or operating ministries
- Insufficient feasibilities studies and technical appraisal to provide essential information needed
- Unclear objectives and project’s outputs
Nguyen (2007) also mentioned that developing countries face challenges to create an effective and
smooth sailing transfer in project management technology and especially, it has been a big concern in
Vietnam. Vietnam shares a desire in accelerating the effectiveness of their projects in all industries;
however, it is being suffered from many problems related to project management tools, techniques and
methodologies. Furthermore, the project management in term of risk, quality, cost, time, resources,
risk, integration, scope, communication and procurement also faces obstacles. However, the most dis-
cussed was poor management (Nguyen et al., 2004; Nguyen, 2007). More importantly, (Nguyen, 2007)
highlighted that the low level of professional training and together with the out-of-date current meth-
odologies in managing projects have become the core problems to deal with if the country wants to
step forwards a modern project management environment. Nguyen (2007) discussed that there is an
urgent need in Vietnam as well as in emerging and developing countries about the improvement of all
facets in project management operations. Nguyen (2007) suggested that the enhancement could be
achieved through the proper implementation of project management in several aspects. To sum up the
preliminary preview of literature, there are several tools of PM used to identify the importance and also
the impact on project performance in Vietnam. It was also highlighted that a proper implementation of
PTTs could bring positive results for the project outcomes and acts as a success factor. Nonetheless,
there are also concerning obstacles, which that threat the advancement of PM in some particular aspects.
Vietnam, a developing country, has been suffering an absence of modern PM studies, research and
Q. Le Hua Xuan et al. / Management Science Letters 9 (2019) 289
knowledge foundation to produce efficiency in projects. Especially, when the economy is being in-
vested by many international projects, the challenges in PM have been enlarged with many problems.
3. Methodology, Research Design and Strategies
The research was conducted in two main phases. The first phase was conducted by interviews with
different companies in Vietnam. The second phase was to launch a survey to enrich the information
that the researchers needed. This can be considered as a mixed method (Saunders et al., 2016). The two
main phrases will result in the collection of primary data. However, this research essentially required
the secondary research data as well in order to enhance the quality and precision of the collected pri-
mary data (Saunders et al., 2016). This secondary data were not be mainly used throughout the analysis
and discussion section but they were be used as an effectively supportive tool for the collected data.
The interviewees were carefully selected from five different Vietnamese firms conducted with struc-
tured questionnaires providing qualitative data. This way, data could be assessed to be more reliable
and more precise due to the individual face-to-face interview and their positions in management level
giving a good quality source of data. 51 other respondents who were involved in the online survey from
BOS were selectively picked from Vietnamese business students and staff. A wider range in numbers
of respondents offers a better accuracy to the quantitative data and helps structuring the visible graphs
as well as figures for analysis.
Table 2
Profile of the interviewees
Company Industry Org.
Structure
Type of project Respondent's
position
Educational level
Joint Venture National Occasional Half-
Half
Full-
term
Sunrise Tourism (VN-JP) √ Department
Manager
International Master
degree
SG3 Sanitary
ware √ Director National Bachelor
SG3 Sanitary
ware National √ General Manager National Bachelor
VNUS Education (VN-US) √ Marketing Manager National Bachelor
Vin-Vin Real estate National √ Branch Manager National Bachelor
Talent Human
resource National √ Manager International Master
degree
Table 2 illustrates the position and education background of the interviewees. The interviews were
carried out between May and June 2017 and all companies were small and medium (SME) size, and
the respondents were from Ho Chi Minh City; which is the biggest city in the country and also an
economic hub of Vietnam.
3 Analysis
4.1 People awareness about PM tools & techniques in Vietnam
To analyze the use of PTTs, it would be relevant to study about the awareness of people about PTTs.
The reason is that once people know about PTTs, then they would learn about to use it. The data was
collected from staff in several companies; however, their titles were not “Project Officer” or “Project
Team Member”. They were just staff in different company’s departments involved in firm projects.
The survey as stated above, collected in different business sectors, not “fully-organized” in project
environment companies. Therefore, they were not “professional-trained” project staff; this is the reason
why the researchers studied first about their awareness of PTTs.
Table 3
Number of projects that respondents have got involved in
No. of involved projects Percentage (%)
1-5 62.70
5-10 23.60
10-15 7.80
15 and above 5.90
290
As shown from Table 3, the majority among 51 respondents were involved in a small number of pro-
jects where more than half of them were accounted for 62.7% participated in 1 to 5 projects during their
working life.
Table 4
The acknowledgement about specific PTTs
Tool's name Percentage (%)
Yes No Maybe
Work Breakdown Structure 49 42.80 8.20
Product Breakdown Structure 37.50 52.10 10.40
Probability Impact Matrix 34 51.10 14.90
Feasibility Study 34.80 58.70 6.50
Stakeholder Power/ Interest Matrix 40 44.40 15.60
Risk Register 49 42.80 8.20
Gantt Chart 55.30 38.30 6.40
Other 5 62.50 32.50
Next, the acknowledgement about specific PTTs has been identified from Table 4. Overall, it could be
discussed that the awareness of “specific names” of Project Management tools and techniques was low
(Table 4). Overall, it would be unreasonable to argue that Vietnamese companies are not using tools at
all to manage their project. There are tools being used; however, they could be in a different concept
or design in which the next part is going to be investigated.
4.2 The use of PM tools and techniques in Vietnam
Table 6 and Table 7 summarize the use of SDCA and also specific PTTs in each interviewed company.
When asked whether or not tools and techniques are being used to manage projects in Vietnam, 72.5%
of the respondents indicated that they had implemented tools and techniques in their past projects. It is
noticeable that “PTTs” were not asked in this question, it was just the general term of tools and tech-
niques. However, this indicator is in contrast with the acknowledgement of the specific PTTs in Table
4. This could be explained that they use tools and techniques, but they are not real “Project Management
tools and techniques”. This could be the specifically designed tools or applications provided from the
company. As a result, it was proven with a significant response with 80.4% rate in Table 5. Company’s
customized application helps them manage their tasks and projects easily because it provides crucial
data and sharing information based on the history record or customer satisfaction. The senior and junior
levels that participated in interview and survey questionnaire shared their similarity in the use of tailor
made application. They found the essential usefulness needed that enhances their working speed and
productivity.
Table 5
Specific tools apart from PTTs
S
p
ecific tool Percenta
g
e
(
%
)
S
p
ecificall
y
desi
g
ned com
p
an
y
's a
pp
licatio
n
80.40
Other tool 19.60
Table 6
The use of specifically designed company’s application and other specific tools from the management level
*Tools
Company SDCA WBS PBS PIM FS SPIM RR GC
Sunrise Yes Yes Yes Yes Yes
SG3 (1) Yes Yes Yes
SG3 (2) Yes Yes Yes
VNUS No Yes Yes Yes
Vinvin Yes Yes Yes Yes
Talent Yes Yes Yes Yes
*SDCA: Specifically designed company’s application; WBS: Work Breakdown Structure; PBS: Product Breakdown Structure; PIM: Probability/ Impact
Matrix; FS: Feasibility Study; SPIM: Stakeholder Power/ Interest Matrix; RR: Risk Register; GC: Gantt Chart
Q. Le Hua Xuan et al. / Management Science Letters 9 (2019) 291
From the management point of view, 5 out of 6 have agreed on the importance of SDCA in managing
their company’s projects. To discover whether there is a difference or similarity between manager and
staff and Table 7 demonstrates data in the use of specific tools in junior level.
Table 7
The use of specific tool
Tool's name Percenta
g
e
(
%
)
Yes
N
o
N
ot sure
Work Breakdown Structure 48 37.50 14.50
Product Breakdown Structure 31.30 47.90 20.80
Probability Impact Matrix 30 48.70 21.30
Feasibility Study 32.60 39.10 28.30
Stakeholder Power/ Interest Matrix 28 45.70 26.30
Risk Registe
r
36 44.90 19.10
Gantt Chart 44.70 34.00 21.30
Othe
r
5 64.30 30.80
Table 8
Frequency of usage in each tool (%)
Tools Rarely
(0-20%)
Occasionally
(20-40%)
Sometimes
(40-60%)
Usually (60-
80%)
Always
(80-100%)
Work Breakdown Structure 46.80 6.40 17 17 12.80
Product Breakdown Structure 57.80 13.30 13.30 8.90 6.70
Probability Impact Matrix 55.30 19.10 17 8.50 0
Feasibility Study 50 15.20 17.40 13.1 4.30
Stakeholder Power/ Interest Matrix 55.60 13.30 20 8.90 2.20
Risk Register 44.90 18.40 22.40 12.30 2
Gantt Chart 38.80 19.10 12.80 10.60 18.70
Other 75 11.10 8.30 0 5.60
More specifically, Work Breakdown Structure and Gantt chart also performed a high frequency of
usage among the other tools. However, from a general point of view, the majority of results show that
PTTs were rarely applied in their project.
4.3 The role and importance of PM tools and techniques in Vietnam
Several attributes related to the importance of applying PTTS were asked in Table 9, relevance with
the explanation from the “Use” and “Acknowledgement” about PTTs were clearly shown. Respondents
preferred the ease of use from PTTs, therefore, Gantt chart is the most favorable among other tools.
Table 9
The importance of each attribute in using and applying PTTs (%)
Importance Level Easy to use
and apply Low cost
Not require
professional
training
Improve the
effectiveness of the
project
Well-known
Not important 2.10 8 9.80 0 12.50
Slightly important 2 24 21.60 2 31.30
Quite important 30.60 46 45.10 20.40 27.00
Very important 42.90 18 13.70 26.50 22.90
Extremely important 22.40 4 9.80 51.10 6.30
Table 10
The importance of factors that impacts respondent’s likelihood to use the PTTs (%)
Not
important
Slightly
important
Quite
important
Very
important
Extremely
important
Many professional organizations recommend 4 22 46 24 4
Enhance the productivity and effectiveness of the
project 3.90 9.80 17.60 21.60 47.10
Save time and cost, resource 3.90 3.90 23.50 37.30 31.40
Becoming more professional in your field 2 6.10 44.90 38.80 8.20
Have been applied worldwide and positive results
have been shown 6 16 38 22 18
292
Table 11
Summary of factor(s) impact
Com
p
an
y
Factor
(
s
)
im
p
act the willin
g
ness in a
pp
l
y
in
g
PTT
Sunrise Effectiveness
,
demand
,
save time and cost
SG3 (1) Effectiveness
SG3
(
2
)
Com
p
an
y
’s demand, save time and cost
VNUS Result performance
Vinvin Convenience, productivity and reduction in workloa
d
Talent Effectiveness
“Effectiveness” from the application of PTTs will persuade the management level to adapt the new
features. 3 out of 6 managers agreed on the “Effectiveness” factor. If the tool will “Save time and cost”
for the project, 2 managers will take them into consideration of application. “Even well-known tools
that has been applied worldwide by many different companies, it may not work here (in Vietnam), so
let’s say the already proven effectiveness in Vietnam will impact greatly on my willingness to use
tools” discussed by the Talent Company manager.
4.4 Obstacles and challenges in adopting and/ or using PM tools and techniques in Vietnam
There are difficulties that organizations are being dealt with when using PTTs. The reason is that 76.5%
of respondents said “Yes” as they have experienced difficulties when using tools and techniques in
managing their projects. This significant figure could possibly be one of the most relevant explanations
for the reason why Vietnamese firms hesitate in executing PTTs.
Table 12
The challenges of effective implementation of PTTs
Com
p
an
y
Challen
g
es
Sunrise Communication
,
Technolo
gy
and Knowled
g
e mana
g
ement
SG3 (1) Communication, Governance, Generations
SG3 (2) Decision making process
–
Governance, communication
VNUS Communication, logical order of tasks, stakeholders
Vinvin Effective communication, staff ex
p
erience
Talent Communication, experience and knowledge, stakeholders
All of the managers considered “Communication” as one of the main preventions of project success.
“Usually I think it is hard to convince the stakeholders to use tools according to my experience” Talent
Company.
Table 13
Critical challenging aspects in applying PTTs
Challen
g
es Percenta
g
e
(
%
)
Governance 17.80
Adoption Process 27.80
Technology and Knowledge 40
Stakeholde
r
13.30
Othe
r
1.10
What stands out from the results given in Table 13 is that “Technology and Knowledge” represents
40% of the response rate. The causes of this have been the subject of the unbalance labor skill specifi-
cally in term of implementing new international tools. There would be a huge gap for Vietnamese staff
to catch up with the modern trends of PTTs. In addition, this barrier will be very concerning when
integrated into national companies. Then, almost one third of the respondents said that “Adoption pro-
cess” had challenged them in applying PTTs. Indeed, this obstacle is closely related to the previous
one. When the essential knowledge required is low, the process in accommodating new practices will
be more problematic. Low technology, lack of expertise, pilot projects in testing PTTs effectiveness in
Vietnam and unfamiliarity with professional PTTs are potential risks that threatening companies to
Q. Le Hua Xuan et al. / Management Science Letters 9 (2019) 293
implement PTTs. On the other hand, the complicated “Governance” in Vietnam, which still has many
occurring problems, challenges the project team in persuading the crucial “Stakeholder” to make deci-
sion on PTTs adoption.
5. Discussion, Conclusion and Recommendations
5.1 Discussion
5.1.1 Discussion from survey results
{Research question 1: What PM tools and techniques are used in Vietnamese organizations?}
There is a strong relationship between the “Frequency of usage”, the “Acknowledgement” and the
“Use” of specific tools. The percentage supports each other consistently; especially in term of “Gantt
chart”. It shows that Gantt chart always has a high ranking in all of them; therefore, this could be
understood that Gantt chart is one of the most popular tools that has been used in Vietnam. The repre-
sentation of Work Breakdown Structure also highlighted the use of PTTs in Vietnam. It is possibly
clarified due to the design, the ease in using of Gantt chart that delivers the essential and basic infor-
mation of project to the users (Nurre & Weir, 2017). In addition, another reason is that among the
respondents, their companies are not fully organized in a project environment, therefore, they think
simply in managing their projects. Thus, they only need a simple and basic tool that provide them
enough of their essential information.
Moreover, another reason is that the tools that were asked in an “Academic” names or in its professional
term, which may lead to difficulty to understand. However, once the concept was explained, people
found them closely related to what they were using and applying. For instance, once the researchers
explained the concept and definition of “Work Breakdown Structure” or “Product Breakdown Struc-
ture”, the respondents realized that they were using the same concept within their project. However,
they did not call them “academically” as “Work Breakdown Structure”, they just simply named it as
checklist or “Working tasks”. This could be explained because they were not professionally trained as
a project staff to be well-acknowledged about PTTs. Hence, they discovered the tools by themselves
with the same concept of the professional ones to make ease in managing and controlling their project.
An explanation could be argued as companies in Vietnam rarely applied proper professional PTTs into
their projects, therefore, they would hesitate when implementing something new into their organiza-
tions. Staff found their comfort zone in managing their workflow through the support of “Specifically
designer’s company application”. Additionally, the outcome would be challenging to access or esti-
mate nationally because of many differences in technology, knowledge transfer process and expertise.
In other words, when it comes to professional training, companies would hardly find standardized ex-
pertise to provide training for their staff and hence, international expert or expatriate will be taken into
consideration. Then, another hesitation created in company budget.
Critically discussed, the term “low cost” here does not mean that the tools should be inexpensive. It
should be understood as saving money or budget friendly in applying PTTs because companies always
compromise with cost efficiency strategy. Therefore, a reasonable price that delivers expected project’s
outcomes to the company would be highly preferred to be applied.
Moreover, the survey also included an open-ended question asking about their opinions in “advantages”
and “encouragement” in applying and using PTTs. There is a different explanation in words, however,
the general ideas said that they prefer tools that “effective, convenient, ease in using and managing,
save time and cost”. So from those answers, the trend in using PTTs could be slightly analyzed. Viet-
namese people prefer a simple tool that is easy to use and apply. The majority of staff among companies
294
are not professionally trained project staff and hence, they need an efficient tool, simple, not too so-
phisticated and minimum required in training. This could be discussed at the current circumstance in
Vietnam only when the real term of “Project Management” has not truly understood.
5.1.2 Discussion from interview results
{Research question 1: What PM tools and techniques are used in Vietnamese organizations?}
From the result of the survey, it has shown that Gantt chart is the most widely known tool within the
project environment. More specifically, all of the interviewees said that they could not manage their
project properly without the “concept of Gantt chart”. The author states it as “the concept of Gantt
chart” because people are using exactly the same concept of Gantt chart that contains specific tasks,
period of time needed to be done that task, milestone. However, the managers did not call them “aca-
demically” as a Gantt chart. They have their own language to name it such as: “timeline, “working
tasks” or “checklist”. Only a manager from Sunrise Company totally acknowledged, understood and
applied “Gantt chart” on his management by MS Project. The use of the Gantt chart was familiar and
regularly was applied in his working routine. With 10 years’ academic education aboard he has obtained
the knowledge of the “Gantt chart” academically as well as carried it out in some parts of his career.
He assessed that it would be challenging to apply the PTTs into Vietnamese firms due to the increasing
concern in time, costs and other resources. It was clarified that the proper training would be essentially
required for lack-of-skilled staff in Project management aspect. This could be linked with the outstand-
ing obstacle that is “Technology and knowledge” with 40% response rate illustrated in Table 13. In
general, academic and professional terms of PM have an impact regarding to organizational knowledge
outcome. Accounted for it is an unbalance in knowledge base related to PM intelligence. In order to
harmonize and accelerate the knowledge outcomes of PM, three learning processes need to be pro-
gressed and experienced: experience accumulation, knowledge articulation and knowledge codification
(Prencipe & Tell, 2001).
Interestingly, in 2002, White and Fortune captured the “real world” experiences of project management
practices in the UK. They launched a nation-wide survey to Project Managers with 23.7% response
rate. The result came up with a presentation of Gantt chart as the most favorable aids (Fortune & White,
2002). Moreover, the research also clarified that most of their respondents used only a small number
of project management practices such as tools, methods or techniques. Another research came from
Doskočil (2016) stated that Gantt chart had been used the most in Czech Republic companies. This
consequence is such an ideal connection with the majority of the author interviewing result, which has
been discussed precisely above. The early invention could be a reasonable explanation for the applica-
tion of Gantt chart in the main stream of management. No matter what is the company background or
nationality, when they find convenience, then they implement and practice Gantt chart. However, ar-
guments are still being raised when several topics discuss that Gantt chart is not suitable or applicable
for complex or mega projects (Abbasi & Al-Mharmah, 2000; Radwan, 2000; Li & Zhang, 2012) in
which the workload is massive. Meanwhile, this study contains no interview with big size thing such
as mega projects; so the result appears in contrast with some papers. There are several opinions about
the use of PTTs from other managers that were participated in the interview. What the respondents
from management level are doing totally fits the academic definition of “Project” but it is not called as
“A project” in Vietnam. They communicate it as “A plan” or “Working plan” as translated from Viet-
namese language. They all assume that “Project” should be applied for a bigger size of work such as
building a house or shopping mall (construction related). Hence, the management will deal with a
“written plan”, “working plan” or “communication plan” that includes essential steps or basics infor-
mation collected from company’s history records. This misconception could be attributed to the low
level of using PTTs in Vietnam. According to Ofori (2013) Vietnam is not alone in this misconception
about “Project”. Ghana, one of the developing countries, also has experienced and witnessed the na-
tion’s infrastructure industries fulfilled with projects (Ofori, 2013). Automatically, the concept also
limited in that small aspect. However, with the increasing development of business environment, the
country has responded positively to accept the multi-faceted nature of PM and PTTs approaches to
Q. Le Hua Xuan et al. / Management Science Letters 9 (2019) 295
achieve business advancement. Hopefully, this trend should be followed in Vietnam to gain more ben-
efits. On the other hand, the use of “specifically designed application” has a significant result from the
questionnaire and so does the interviews. All of the participated managers said that they enjoy using
the company’s tool or application. It provides convenience in finding necessary information and more
importantly, because it is tailor made, it satisfies all the needs and demands in the workplace. Moreover,
there is confidential information that could only be shared through company’s database but could not
be done by some of the PTTs such as VIP customer’s information or special requirements in some
cases. The manager from Vinvin Company shared that she had not experienced difficulties in managing
her “plan”. And she found that the ongoing managing tool is efficient, effective and risk-free so she did
not think of any new tool to replace it. Similarly, other managers have the same ideas when they were
asked about the experience in using their current tools. “In my company, we use our experience and
history records to manage our project, and it is efficient enough for us, we believe” said the Director
from SG3 company. Exceptionally, the manager from Sunrise Company who usually works with inter-
national partners and branches had a different opinion. As an internationally trained manager, he stated
that company’s application is helpful; however, together with the support from PTTs, manager could
boost the productivity and could achieve higher than expected outcomes. The customized tool is a must
but PTTs were essential to reach the peak of fruitful result and performance. Hence, there is a contra-
diction in mindset between nationally and internationally trained manager in thinking about and using
PTTs. Overall, authentic Vietnamese business people are not well aware of PTTs because they have
been provided enough tools in completing their jobs at a certain point of regular level. Especially, the
manager from Talent Company has been working with many Project Managers in different industries,
she reflected that the overall performance of PM in Vietnam “staff just simple calls it (project) as tasks,
they have their task or group task and just do without any planning or support from tool because they
think it is just a task so they only look at the body of the process but if the boss says this is a project,
they will do it another way. They will start from the beginning; they will study about the market and
evaluate the outcome accordingly to the boss’s orders. I believe that managers should clearly distin-
guish and characterize a project… So the Project people in Vietnam could better understand it”. In
short, PTTs have not achieved a popular usage among Vietnamese companies. Representing as a de-
veloping country that still has many concerning problems in all aspects. The term of “Project Manage-
ment” is not new in Vietnam, however, to truly apply and understand an in depth meaning of PM and
its practices requires a tremendously huge amount of time, investment and effort. Being young, a bit
slow in pace and lack of experience in the race of globalization could be a reasonable explanation for
the passive adaption in PM. Vietnam endeavors in achieving economic advancement and therefore,
sooner or later, PM and its tools, techniques will have a chance to support the Vietnamese business and
also the national economy. Maybe in the future, the term would be more highly acknowledged and
mastered academically and critically. Consequently, the trend in using PTTs might be different and the
importance of PTTs might improve significantly.
5.1.3 Combined discussion from interview and survey result
{Research Questions 2: What are the challenges and obstacles in adopting and/or using PM tools and
techniques in Vietnamese organizations?}
“Effective communication leads to effective performance” said the manager from Sunrise Company.
However, inadequate communication is one of the main blockages of project management smooth flow.
The majority of interviewees really appreciate sufficient communication process as well as networking
to maintain the goodwill of their business. Ineffective communication could be explained by the dis-
similarity in educational background, working experience and understanding level. Besides, applying
PTTs challenges project executive in distributing sufficiently and adequately the related essential in-
formation of all the staff. Thus, misunderstanding and miscommunication could not be avoided. 54%
of respondents from a research conducted in Ghana also agreed that “Effective communication” (Table
6) in projects plays a critical success factor (Ofori, 2013). More importantly, according to Bakar et al.
(2017) review, (Pinto & Slevin, 1988; Pinto & Slevin, 1989; Belassi & Tukel, 1996; Hyväri, 2006;
296
Andersen et al., 2006), all of them highlighted the involvement of “Communication” as one of the
project’s critical success factors. From the management level point of view in Vietnam, lacking of
effective communication may be one of the main causes for poor PM performance. The dearth of pro-
ject critical success factor has been clarified for the general case of ineffective project performance,
failure to achieve project outcomes in Vietnam.
Table 14
Project success factor in Ghana Source: Adapted from Ofori (2013)
Facto
r
Fre
q
uenc
y
Percenta
g
e
(
%
)
Effective communication
,
coordination and commitment 54 34.60
Top management support 31 19.90
Effective planning 25 16
Experienced and competent personnel 22 14.10
Teamwork 14 9
Good leadership 10 6.40
This obstacle also interprets better for the biggest challenge; namely “Technology and Knowledge”
from Table 14. According to the manager from SG3 Company, she debated “Only senior people prefer
tools to administer their project, junior people just simply need an order from the management level”.
Critically, the unbalance in “Technology and Knowledge” among organizational structure and indi-
viduals is the core consideration to apply strategically new tools and techniques.
Until recently, PM has not been upgraded to achieve an academic professional level. Business people
who have to deal with “Projects” had to learn from their own experiences or making mistake, suffering
loss or inefficiency. “We (the management level) always have a daily meeting together, discuss and
figure out the strategy to manage our plan –“project”, we use our own experience to analyze the prob-
lem and solve it” said the Director from SG3 Company. Additionally, the Talent Company manger
highlighted that “In Vietnam, I think, I takes a really long to train people to use that (PTTs) purpose-
fully. Project members like to do what they think, what they remember form their experience” Hence,
there is clearly an absence of true understanding and practice about PM professional skills that leads to
the wrong identification in managing and establishing PM strategy. In order to ensure the successful
project performance, both the project management level and staff must have the requisite understanding
of PM, which will firstly, sharing and clarifying the expected outcomes of projects. After that, when
the agreement among parties have been established, it creates the ease in communicating and tracking
the project’s process and leads to a more effective working environment. Staff will be motivated when
they receive clear instruction and requirement from the senior level. Consequently, a better flow of
“Knowledge and Information” among different layers of the project will be built. PM is such a legiti-
mate approach in business administration. Over the world, it is has performed as a crucial tool for the
realization of business objectives across several different industries. The term Project Management
should be judged as an important approach to lead not only Vietnamese but also developing countries
business operations to the success door of project.
5.2 Conclusions
The conclusion on the use of PM tools and techniques and concerning obstacles in Vietnam will be
summarized together in this part. The overall desire of the research is to study about the use of Project
Management tools and techniques. To accomplish this, several objectives must be implemented. First
of all, due to the low level of information on what kind of PTTs are being used in Vietnam, it is critical
to analyze the level of usage about Project Management term in Vietnamese business environment. The
second objective is about exploring the application of PTTs in Vietnam. And the final objective is about
identifying the obstacles that has interfered organizations in implementing PTTs. To provide essential
and supporting evidence for the above objectives, both primary data and secondary data have been
collected, interpreted, analyzed and discussed. Primary data provided by the result received from the
researcher’s interview and questionnaire survey with a total of 57 participants. Meanwhile, secondary
Q. Le Hua Xuan et al. / Management Science Letters 9 (2019) 297
data was gathered through many trustworthy sources such as journal articles, reports and so on. After
a journey of analyzing and combining information to justify the research questions; there is a brief
summary below that is closely associated with the research questions and objectives.
In terms of PTTs that have been used in Vietnam, Gantt chart has performed as the most widely applied
over there. People acknowledge the importance of time, the essential tasks should be considered and
the amount of time to invest in; hence, they have been practicing “the concept of” Gantt chart and Gantt
chart regularly. Similarly, Work Breakdown Structure also has the same situation in the implementation
process and application. Likewise, it represented as a well-known tool and concept to adapt in Viet-
namese business. However, organizations also face difficulties in applying and using PTTs. The man-
agement level found challenges in communication process in implementing adequately PTTs to the
staff level. Meanwhile, “Technology and Knowledge” stands out as the most critical barrier interrupted
company’s staff to acknowledge PTTs. Another discovery was found about the real understanding of
PM in Vietnam. Even though the country is executing many advance strategies to accomplish promis-
ing economic growth. The country is an attractive destination for international investors and conse-
quently, “Projects” will greatly contribute and penetrate greatly in several industries. However, it could
be a slight misconception in the real meaning of “Project Management” that acted as one of the pre-
ventions in effective project result. The definition and acknowledgement of Project Management
should go further beyond the current assumption that limited only in “infrastructure” industry only. The
concept of Project Management could be better performed and brought more benefits to the country if
it had been exercised in a better level. Achieving that level may create more significant economic
success for the country.
This research studied the use of Project Management tools and techniques in different business sectors.
Therefore, it has contributed a better overview about the “Project Management” picture in Vietnam.
Moreover, it is a new discovery about the understanding and also awareness of business people about
Project Management practices. People will have a better acknowledgement about the term “Project”
that could have been appeared in every single corner of business, not only in infrastructure or construc-
tion industry. Reading this paper may provide readers a better point of view about a more precise def-
inition of Project Management and its tools, techniques. Together with that, there are also benefits
provided from applying PTTs that companies could enjoy. Moreover, it also reflected the different
Vietnamese points of view about PM that have been observed as an understatement. For that reason,
projects in Vietnam are still unable to overcome their hardship. Several recommendations have been
contributed to support the PM circumstance in Vietnam.
5.3 Recommendations for further research
There are several suggestions for future research in developing the understanding and concept of Pro-
ject Management in Vietnam. From the government side especially related departments or institutions,
they should improve and spread out the true definition of “Project Management, to help people perceive
better about its definition and the benefits it could have while using and applying it appropriately.
Especially in departments running huge projects should study better about the advantage provided from
PTTs. It is understandable that the country is still facing many problems in completing project success-
fully; however, step by step from the simple thing could help less or more. For companies, organiza-
tions or enterprises, they should star changing their concept and mindset about “Project Management”
and then learn it and realize the assistance it could support working process. Once again, there has been
a movement within the organizational environment: moving from “managing projects” to “manage-
ment by projects” (Melton, 2011). The management level could be amazed when their workload could
flow beautifully with the help of “Project Management” and its tools, techniques. The trial may require
so much time, efforts and resources but the result may pay off. Companies worldwide are also getting
familiar with Project Management and positive results have been shown. Different organizational struc-
ture could have different taste and implementation in PM and PTTs, after all, the final result may satisfy
their expectations. In short, examining further and applying better the PTTs could enhance positively
several aspects of achievement. The author suggest future researchers to expand the topic to a wider
298
collection of industries as well as the size of participants to collect data. Studying about neighboring
countries and region would be also recommended.
Acknowledgement
The authors greatly appreciate the financial support from Asia University, Saigon Institute of Technol-
ogy and Khai Thanh Trade and Production Joint Stock Company.
References
Abbasi, G. Y., & Al-Mharmah, H. (2000). Project management practice by the public sector in a de-
veloping country. International Journal of Project Management, 18(2), 105-109.
Ahmed, S., & Hassan, M. (2003). Survey and case investigations on application of quality management
tools and techniques in SMIs. International Journal of Quality & Reliability Management, 20(7),
795-826.
Andersen, E. S., Dyrhaug, Q. X., & Jessen, S. A. (2002). Evaluation of Chinese projects and compari-
son with Norwegian projects. International Journal of Project Management, 20(8), 601-609.
Andersen, E. S., Grude, K. V., & Haug, T. (2009). Goal directed project management: effective tech-
niques and strategies. Kogan Page Publishers.
APM. (2017). What is stakeholder management? | APM. Retrieved from
https://www.apm.org.uk/body-of-knowledge/delivery/integrative-management/stakeholder-man-
agement/
Bakar, A. A., Razak, A. A., Abdullah, S., & Awang, A. (2009). Project management success factors
for sustainable housing: a framework. In International Conference Of Construction Industry.
Belassi, W., & Tukel, O. I. (1996). A new framework for determining critical success/failure factors in
projects. International journal of project management, 14(3), 141-151.
Carstens, D. S., Richardson, G. L., & Smith, R. B. (2016). Project management tools and techniques:
A practical guide. CRC Press.
Chapman, R. J. (1998). The effectiveness of working group risk identification and assessment tech-
niques. International Journal of Project Management, 16(6), 333-343.
Chemuturi, M. (2013). Mastering IT project management: best practices, tools and techniques.
Chua, D. K. H., Wang, Y., & Tan, W. T. (2003). Impacts of obstacles in East Asian cross-border con-
struction. Journal of Construction Engineering and Management, 129(2), 131-141.
Cooke-Davies, T. (2002). The “real” success factors on projects. International journal of project man-
agement, 20(3), 185-190.
Crawford, L., Pollack, J., & England, D. (2006). Uncovering the trends in project management: Journal
emphases over the last 10 years. International journal of project management, 24(2), 175-184.
Dang, C. N., Le-Hoai, L., & Lee, Y. D. (2012). Critical success factors of large design-build projects
in Vietnam. Journal of Construction Engineering and Project Management, 2(3), 30-39.
Desouza, K. C., & Evaristo, J. R. (2004). Managing knowledge in distributed projects. Communica-
tions of the ACM, 47(4), 87-91.
Dey, P. K. (2001). Integrated approach to project feasibility analysis: a case study. Impact Assessment
and Project Appraisal, 19(3), 235-245.
Doskočil, R. (2016). The Level of Use of Project Management Methods, Techniques and Tools and
Their Impact on Project Success-Selected Region of Czech Republic. Periodica Polytechnica Social
and Management Sciences, 24(1), 14-24.
Duy Nguyen, L., Ogunlana, S. O., & Thi Xuan Lan, D. (2004). A study on project success factors in
large construction projects in Vietnam. Engineering, Construction and Architectural Manage-
ment, 11(6), 404-413.
Dvir, D., Raz, T., & Shenhar, A. J. (2003). An empirical analysis of the relationship between project
planning and project success. International journal of project management, 21(2), 89-95.
Er, M. (2017). Management of construction projects in Vietnam: an activity theory analysis. Interna-
tional Journal of Engineering and Technology.
Q. Le Hua Xuan et al. / Management Science Letters 9 (2019) 299
Fortune, J., & White, D. (2006). Framing of project critical success factors by a systems model. Inter-
national journal of project management, 24(1), 53-65.
Fortune, J., White, D., Jugdev, K., & Walker, D. (2011). Looking again at current practice in project
management. International Journal of Managing Projects in Business, 4(4), 553-572.
Frame, J. D. (2014). Project Management Tools and Techniques: A Practical Guide. Project Manage-
ment Journal, 45(4), e4-e4.
Gardiner, P. D. (2005). Project management: A strategic planning approach. Macmillan International
Higher Education.
Hydari, H. (2012). The virtual project management office: Best practices, proven methods. Project
Management Journal, 43(5), 102-102.
Hyväri, I. (2006). Success of projects in different organizational conditions. Project management jour-
nal, 37(4), 31-41.
Indelicato, G. (2010). Work breakdown structures: The foundation for project management excel-
lence. Project Management Journal, 41(3), 101-101.
Jacquemin, A., & Bainbridge, B. (2005). Perceptions of development partners and evidence on aid
effectiveness: Viet Nam case study. WWW] http://www. dfid. gov. uk/mdg/aideffectiveness/newslet-
ters/vietnam-aid-effectiveness. pdf (1/7/07).
Kirk, A. (2012). Data Visualization: a successful design process. Packt Publishing Ltd.
Konstantinou, E., & Müller, R. (2016). The role of philosophy in project management.
Larson, E., & Gray, C. (2011). Project management (5th ed.). New York, NY: McGraw-Hill.
Le-Hoai, L., Dai Lee, Y., & Lee, J. Y. (2008). Delay and cost overruns in Vietnam large construction
projects: A comparison with other selected countries. KSCE journal of civil engineering, 12(6), 367-
377.
Li, Z. X., & Zhang, L. L. (2012). A Study on multi-project management based on gantt chart and
network planning technique. In Applied Mechanics and Materials (Vol. 174, pp. 2854-2860).
Ling, F. Y. Y., & Bui, T. T. D. (2009). Factors affecting construction project outcomes: case study of
Vietnam. Journal of Professional Issues in Engineering Education and Practice, 136(3), 148-155.
Ling, F. Y. Y., & Tran, H. N. (2012). Undesirable project management practices adopted to achieve
project outcomes: a case study of Vietnam. International Journal of Project Organisation and Man-
agement, 4(2), 153-170.
Long, N. D., Ogunlana, S., Quang, T., & Lam, K. C. (2004). Large construction projects in developing
countries: a case study from Vietnam. International Journal of project management, 22(7), 553-561.
Loo, R. (2002). Working towards best practices in project management: a Canadian study. Interna-
tional Journal of Project Management, 20(2), 93-98.
Melton, T. (2011). Project Management Toolkit: The Basics for Project Success: Expert Skills for Suc-
cess in Engineering, Technical, Process Industry and Corporate Projects. Elsevier.
Mukherjee, M., & Roy, S. (2017). Feasibility Studies and Important Aspect of Project Management.
Mungiu-Pippidi, A. (2015). Corruption: Good governance powers innovation. Nature
News, 518(7539), 295.
Murphy, A., & Ledwith, A. (2007). Project management tools and techniques in high-technology
SMEs. Management research news, 30(2), 153-166.
Nguyen, N. M. (2007). The Challenges of transferring modern project management principles and
methodologies to developing countries. In PMI Global Congress.
Nguyen, T. T., & Van Dijk, M. A. (2012). Corruption, growth, and governance: Private vs. state-owned
firms in Vietnam. Journal of Banking & Finance, 36(11), 2935-2948.
Nguyen, T. P., Van Tam, N., & Parnell, K. E. (2016). Community perspectives on an internationally
funded mangrove restoration project: Kien Giang province, Vietnam. Ocean & Coastal Manage-
ment, 119, 146-154.
Norman, E., Brotherton, S., & Fried, R. (2011). Work breakdown structures. Hoboken, N.J.: John
Wiley & Sons.
Nurre, S. G., & Weir, J. D. (2017). Interactive Excel-based Gantt chart schedule builder. INFORMS
Transactions on Education, 17(2), 49-57.
300
Ofori, D. F. (2013). Project management practices and critical success factors–a developing country
perspective. International Journal of Business and Management, 8(21), 14.
Patil, R., Grantham, K., & Steele, D. (2012). Business risk in early design: A business risk assessment
approach. Engineering Management Journal, 24(1), 35-46.
Pillay, S. (2004). Corruption–the challenge to good governance: a South African perspective. Interna-
tional Journal of Public Sector Management, 17(7), 586-605.
Pinto, J. K., & Slevin, D. P. (1988). Critical Success Factors in Effective Project implementation. Pro-
ject management handbook, 479.
Pinto, J. K., & Slevin, D. P. (1989). Critical success factors in R&D projects. Research-technology
management, 32(1), 31-35
Ponnappa, G. (2014). Project Stakeholder Management. Project Management Journal, 45(2), e3-e3.
PMBOK. (2017). Project Management Body of Knowledge. 6
th
ed., Project Management Institute PMI.
Prencipe, A., & Tell, F. (2001). Inter-project learning: processes and outcomes of knowledge codifica-
tion in project-based firms. Research policy, 30(9), 1373-1394.
Raydugin, Y. (2013). Project risk management: Essential methods for project teams and decision mak-
ers. John Wiley & Sons.
Radwan, A. (2000). Computerised dynamic Gantt-chart for maintenance scheduling and manage-
ment. International Journal of Computer Applications in Technology, 13(3-5), 251-260.
Raz, T., & Michael, E. (2001). Use and benefits of tools for project risk management. International
journal of project management, 19(1), 9-17.
Saunders, M., Lewis, P., & Thornhill, A. (2016). Research Methods for Business Students. Harlow
(Essex): Pearson.
Shaltry, P. E. (2008). Impact on project management of allied disciplines: Trends and future of project
management practices and research. Project Management Journal, 39(2), 111-111.
Tam, N. T., & Hadikusumo, B. H. (2016). Modelling of trust and working relationship in construction
project management: a case study of Vietnam. International Journal of Project Organisation and
Management, 8(4), 366-395.
Teller, J., Kock, A., & Gemünden, H. G. (2014). Risk management in project portfolios is more than
managing project risks: A contingency perspective on risk management. Project Management Jour-
nal, 45(4), 67-80.
Thamhain, H. J. (1998). Integrating project management tools with the project team. Long Beach, USA.
Thamhain, H. (2013). Managing risks in complex projects. Project management journal, 44(2), 20-35.
Thi, C. H., & Swierczek, F. W. (2010). Critical success factors in project management: implication
from Vietnam. Asia Pacific Business Review, 16(4), 567-589.
Toney, F., & Powers, R. (1997). Best practices of project management groups in large functional or-
ganizations. Project Management Inst.
Transparency International. (2016). Corruption Perceptions Index 2016. Retrieved from
https://www.transparency.org/news/feature/corruption_perceptions_index_2016
Westerveld, E. (2003). The Project Excellence Model®: linking success criteria and critical success
factors. International Journal of project management, 21(6), 411-418.
White, D., & Fortune, J. (2002). Current practice in project management—An empirical study. Inter-
national journal of project management, 20(1), 1-11.
Wischermann, J. (2011). Governance and civil society action in Vietnam: Changing the rules from
within—potentials and limits. Asian Politics & Policy, 3(3), 383-411.
Yanwen, W. (2012). The study on complex project management in developing countries. Physics Pro-
cedia, 25, 1547-1552.
© 2019 by the authors; licensee Growing Science, Canada. This is an open access ar-
ticle distributed under the terms and conditions of the Creative Commons Attribution
(CC-BY) license (http://creativecommons.org/licenses/by/4.0/).