In this paper, an offshore airborne wind energy (AWE) farm consisting of three non-reversing pumping mode AWE systems is modelled and simulated. The AWE systems employ permanent magnet synchronous generators (PMSG). A direct interconnection technique is developed and implemented for AWE systems. This method is a new approach invented for interconnecting offshore wind turbines with the least number of required offshore-based power electronic converters. The direct interconnection technique can be beneficial in improving the economy and reliability of marine airborne wind energy systems. The performance and interactions of the directly interconnected generators inside the energy farm internal power grid are investigated. The results of the study conducted in this paper, show the directly interconnected AWE systems can exhibit a poor load balance and significant reactive power exchange which must be addressed. Power control strategies for controlling the active and reactive power of the AWE farm are designed, implemented, and promising results are discussed in this paper.
energies
Article
Power Control of Direct Interconnection Technique
for Airborne Wind Energy Systems
Mahdi Ebrahimi Salari *, Joseph Coleman and Daniel Toal
Centre for Robotics & Intelligent Systems, University of Limerick, Limerick V94 T9PX, Ireland;
joseph.coleman@ul.ie (J.C.); daniel.toal@ul.ie (D.T.)
*Correspondence: mahdi.ebrahimisalari@ul.ie; Tel.: +353-(0)89-254-7896
Received: 15 October 2018; Accepted: 11 November 2018; Published: 13 November 2018


Abstract:
In this paper, an offshore airborne wind energy (AWE) farm consisting of three
non-reversing pumping mode AWE systems is modelled and simulated. The AWE systems
employ permanent magnet synchronous generators (PMSG). A direct interconnection technique
is developed and implemented for AWE systems. This method is a new approach invented for
interconnecting offshore wind turbines with the least number of required offshore-based power
electronic converters. The direct interconnection technique can be beneficial in improving the
economy and reliability of marine airborne wind energy systems. The performance and interactions
of the directly interconnected generators inside the energy farm internal power grid are investigated.
The results of the study conducted in this paper, show the directly interconnected AWE systems
can exhibit a poor load balance and significant reactive power exchange which must be addressed.
Power control strategies for controlling the active and reactive power of the AWE farm are designed,
implemented, and promising results are discussed in this paper.
Keywords:
airborne wind energy; direct interconnection technique; load sharing control; active
power; reactive power exchange; non-reversing pumping mode
1. Introduction
Airborne wind energy (AWE) is a promising technology to overcome the technical and the
economic constraints of conventional wind turbines for harnessing the stronger and more consistent
winds present at higher altitudes. This technology utilises a tethered free-flying kite or glider or
flying turbine (in some design approaches) to reach altitudes unreachable for conventional wind
turbines. It eliminates the requirement for civil structures such as towers to elevate the system into the
wind. Since the first patent of airborne wind energy by Van Gries in 1938 [
1
], several types of AWE
systems have been invented and introduced by researchers and engineers in different universities
and companies [
1
4
]. The non-reversing pumping-mode AWE system employing a kite or a glider
for harnessing the wind energy is the focus of this paper [
5
]. Non-reversing pumping mode AWE
systems have been initially developed at the University of Limerick, Ireland [
5
7
]. In this type of
pumping mode AWE system, a kite or glider is tethered to a ground station consisting of a tether drum
coupled to a generator and a fractional scale recovery motor. The operation cycle is divided into two
phases, a power phase and a recovery phase. During the power phase, the generator is mechanically
connected to the tether drum and generates electrical power from the tension profile provided by the
flying wing. At the maximum tether length, the operation must be switched to the recovery phase.
During the recovery phase, the generator is mechanically bypassed by an overrunning clutch, and the
tether drum is reversed by the recovery motor to recover the tether to its initial length [
5
]. Use of a
separate fractional scale motor for the recovery process is the principal deference of the non-reversing
pumping mode AWE systems compared to the conventional pumping mode AWE devices where
Energies 2018,11, 3134; doi:10.3390/en11113134 www.mdpi.com/journal/energies
Energies 2018,11, 3134 2 of 17
they reverse the generator for use as a motor for the recovery process. Reversing the generator in the
conventional pumping mode procedure creates difficulty for utility-scale grid interconnection due to
the inefficiencies of stopping a large generator and reversing the system as a motor [
5
]. A variation
on the concept of using a separate motor and generator for the recovery phase and power phase
are considered by the researchers at TU Delft [
8
]. The non-reversing pumping mode AWE system is
illustrated in Figure 1(see [5] for greater detail).
Compared to the conventional wind turbines, the need for less mechanical and civil construction
has made AWE systems an ideal technology for floating offshore wind energy systems where the
size of offshore construction is significantly critical [
8
10
]. A factor which is more important when
reported studies show increasing attention to the offshore wind resources due to higher wind energy
availability, less environmental effects and less land limitation in comparison with on-land wind
energy systems [
11
,
12
]. For instance, the potential of Ireland for the installation of offshore and on-land
wind energy systems by 2050 is 30 GW and 11–16 GW, respectively [
13
], almost double the capacity for
offshore wind compared to on-land wind. Furthermore, the Irish maritime area is ten times larger than
the country’s landmass providing an exceptional land area for the installation of floating wind energy
systems [14].
The direct interconnection technique is a new approach to improve the cost and availability of
offshore wind energy systems. Pican et al. first introduced the direct interconnection technique (DIT) in
2011 for conventional offshore wind turbines [
15
,
16
]. In this technique, unlike the conventional approach,
all the offshore units are directly interconnected to each other without any power electronic converter.
After dispatching the generated power to shore, the farm power is converted in compliance with grid
codes by a back to back converter or several paralleled back to back converters. Given that the power
electronic converters possess a high rate of failure among the wind turbine sub-assemblies [
17
,
18
] and
given high expenses of off-shore operations for offshore located back to back converters, this method
could provide a significant improvement in the economy and the reliability of the offshore airborne
wind energy systems. The direct interconnection technique and the conventional approach for off-shore
power integration are illustrated in Figure 2. The first DIT implementation attempt for AWE systems
is reported in [
5
]. In [
5
], a DIT algorithm is implemented on an offshore AWE farm simulation model
proving the initial feasibility of this technique for pumping mode AWE system. The research work of [
5
]
is followed by [
19
] to investigate the performance of the directly interconnected AWEs under normal and
fault conditions. However, there remain many questions about the efficiency and power control of the
directly interconnected AWE systems that this current paper answers.
Energies 2018, 11, x FOR PEER REVIEW 2 of 18
conventional pumping mode AWE devices where they reverse the generator for use as a motor for
the recovery process. Reversing the generator in the conventional pumping mode procedure creates
difficulty for utility-scale grid interconnection due to the inefficiencies of stopping a large generator
and reversing the system as a motor [5]. A variation on the concept of using a separate motor and
generator for the recovery phase and power phase are considered by the researchers at TU Delft [8].
The non-reversing pumping mode AWE system is illustrated in Figure 1 (see [5] for greater detail).
Compared to the conventional wind turbines, the need for less mechanical and civil
construction has made AWE systems an ideal technology for floating offshore wind energy systems
where the size of offshore construction is significantly critical [8–10]. A factor which is more
important when reported studies show increasing attention to the offshore wind resources due to
higher wind energy availability, less environmental effects and less land limitation in comparison
with on-land wind energy systems [11,12]. For instance, the potential of Ireland for the installation of
offshore and on-land wind energy systems by 2050 is 30 GW and 11–16 GW, respectively [13], almost
double the capacity for offshore wind compared to on-land wind. Furthermore, the Irish maritime
area is ten times larger than the country’s landmass providing an exceptional land area for the
installation of floating wind energy systems [14].
The direct interconnection technique is a new approach to improve the cost and availability of
offshore wind energy systems. Pican et al. first introduced the direct interconnection technique (DIT)
in 2011 for conventional offshore wind turbines [15,16]. In this technique, unlike the conventional
approach, all the offshore units are directly interconnected to each other without any power
electronic converter. After dispatching the generated power to shore, the farm power is converted in
compliance with grid codes by a back to back converter or several paralleled back to back converters.
Given that the power electronic converters possess a high rate of failure among the wind turbine
sub-assemblies [17,18] and given high expenses of off-shore operations for offshore located back to
back converters, this method could provide a significant improvement in the economy and the
reliability of the offshore airborne wind energy systems. The direct interconnection technique and
the conventional approach for off-shore power integration are illustrated in Figure 2. The first DIT
implementation attempt for AWE systems is reported in [5]. In [5], a DIT algorithm is implemented
on an offshore AWE farm simulation model proving the initial feasibility of this technique for
pumping mode AWE system. The research work of [5] is followed by [19] to investigate the
performance of the directly interconnected AWEs under normal and fault conditions. However,
there remain many questions about the efficiency and power control of the directly interconnected
AWE systems that this current paper answers.
Figure 1. Simplified schematic of a direct drive non-reversing pumping-mode airborne wind energy
system.
Figure 1.
Simplified schematic of a direct drive non-reversing pumping-mode airborne wind
energy system.
Energies 2018,11, 3134 3 of 17
Energies 2018, 11, x FOR PEER REVIEW 3 of 18
(a)
(b)
Figure 2. Conventional approach and direct interconnection technique for an off-shore AWE farm:
(a) conventional interconnection method; and (b) direct interconnection technique.
This paper aims to evaluate and optimise the power control of the directly interconnected
non-reversing pumping mode AWE systems. Considering AWE systems are directly interconnected
to the main bus of the energy farm without any power electronic converter, the power control of the
internal grid is an important question as it is a highly dominant factor on the efficiency and
performance of the AWE energy farm. In this regard, this research focuses on the power control of
the directly interconnected AWE generators inside the internal power grid of an energy farm. Three
non-reversing pumping mode AWE systems are modelled and simulated as a minimum viable
offshore energy farm. The AWE generators are directly interconnected to the main bus of the energy
farm in accordance with the proposed algorithm and by use of automatic frequency and
synchronisation controllers. The interaction of the directly interconnected AWE systems inside the
internal power grid is studied. Active power, reactive power, power factor, voltage sag and total
harmonic distortion (THD) are measured and analysed for the internal power grid of the AWE
energy farm. A reactive power compensator (RPC) is designed and implemented to improve the
reactive power exchange inside the energy farm internal grid. Also, a load sharing controller (LSC)
controls the active power and load balance. Comparing the power generated by the directly
interconnected non-reversing pumping mode AWE systems before and after adding the LSC and
RPC shows significant improvements in voltage and current oscillation reduction, load balance, and
reduction in reactive power of the internal power grid.
2. Simulation Model
The power system diagram of the modelled off-shore AWE farm is illustrated in Figure 3. This
model is also used in [19] for investigation on the implementation of DIT for AWE systems. For more
information regarding the mathematical description of the model see [19]. As can be seen, the farm
consists of three non-reversing pumping mode AWE systems. In this model, permanent magnet
synchronous generators (PMSG) are used for the electrical power generation. Each AWE system is
equipped with an automatic frequency controller (AFC). The AFC in conjunction with the kite flight
controller attempts to regulate the incoming torque from the kite to achieve the operating frequency.
The AFC is a proportional-integral (PI) controller providing control signals to the flight controller to
keep the generator’s frequency within the predefined range of operating frequency. The direct
interconnection algorithm is demonstrated in Figure 4. After reaching the desired frequency, the
automatic synchronisation controller (ASC) starts to work. The ASC compares the frequency,
voltage amplitude and voltage angle of the generator and the main bus and once they meet the
synchronisation criteria (equal frequencies, equal voltages and equal voltage angles), it interconnects
the corresponding AWE unit with the main bus. The ASC comprises three hysteresis controllers
(on/off control action). Each hysteresis controller controls one of the synchronisation criteria (i.e.,
frequency, voltage amplitude and voltage angle). The ASC does not generate the breaker
synchronisation command signal unless all three on/off controllers generate an “on” signal at their
outputs.
Before the interconnection, each system is connected to a local resistive dump load, and after
the main bus interconnection, the generator is connected to the load along with the other
Figure 2.
Conventional approach and direct interconnection technique for an off-shore AWE farm:
(a) conventional interconnection method; and (b) direct interconnection technique.
This paper aims to evaluate and optimise the power control of the directly interconnected
non-reversing pumping mode AWE systems. Considering AWE systems are directly interconnected
to the main bus of the energy farm without any power electronic converter, the power control of
the internal grid is an important question as it is a highly dominant factor on the efficiency and
performance of the AWE energy farm. In this regard, this research focuses on the power control of
the directly interconnected AWE generators inside the internal power grid of an energy farm. Three
non-reversing pumping mode AWE systems are modelled and simulated as a minimum viable offshore
energy farm. The AWE generators are directly interconnected to the main bus of the energy farm
in accordance with the proposed algorithm and by use of automatic frequency and synchronisation
controllers. The interaction of the directly interconnected AWE systems inside the internal power grid
is studied. Active power, reactive power, power factor, voltage sag and total harmonic distortion (THD)
are measured and analysed for the internal power grid of the AWE energy farm. A reactive power
compensator (RPC) is designed and implemented to improve the reactive power exchange inside
the energy farm internal grid. Also, a load sharing controller (LSC) controls the active power and
load balance. Comparing the power generated by the directly interconnected non-reversing pumping
mode AWE systems before and after adding the LSC and RPC shows significant improvements in
voltage and current oscillation reduction, load balance, and reduction in reactive power of the internal
power grid.
2. Simulation Model
The power system diagram of the modelled off-shore AWE farm is illustrated in Figure 3.
This model is also used in [
19
] for investigation on the implementation of DIT for AWE systems.
For more information regarding the mathematical description of the model see [
19
]. As can be seen,
the farm consists of three non-reversing pumping mode AWE systems. In this model, permanent
magnet synchronous generators (PMSG) are used for the electrical power generation. Each AWE
system is equipped with an automatic frequency controller (AFC). The AFC in conjunction with the
kite flight controller attempts to regulate the incoming torque from the kite to achieve the operating
frequency. The AFC is a proportional-integral (PI) controller providing control signals to the flight
controller to keep the generator’s frequency within the predefined range of operating frequency.
The direct interconnection algorithm is demonstrated in Figure 4. After reaching the desired frequency,
the automatic synchronisation controller (ASC) starts to work. The ASC compares the frequency,
voltage amplitude and voltage angle of the generator and the main bus and once they meet the
synchronisation criteria (equal frequencies, equal voltages and equal voltage angles), it interconnects
the corresponding AWE unit with the main bus. The ASC comprises three hysteresis controllers (on/off
control action). Each hysteresis controller controls one of the synchronisation criteria (i.e., frequency,
voltage amplitude and voltage angle). The ASC does not generate the breaker synchronisation
command signal unless all three on/off controllers generate an “on” signal at their outputs.
Energies 2018,11, 3134 4 of 17
Before the interconnection, each system is connected to a local resistive dump load, and after the
main bus interconnection, the generator is connected to the load along with the other interconnected
AWEs. Table 1shows the specifications of the modelled offshore AWE farm. The nominal frequency of the
farm is 18.6 Hz. Controlling the frequency of the farm within an appropriate range around the nominal
value is critical for efficient power generation considering the wind speed and the rated frequency and
speed of the system components such as the generators. The operation cycle of the AWE systems is
120 s with a duty cycle of 80% which means each generation unit operates 96 s in the power phase of
operation and 24 s in the recovery phase of the operation. To achieve a continuous power at the main bus
a 26 s delay between the operations of the generators is implemented. The simulation is performed by
MATLAB/Simulink Simscape Power Systems software, version number 9.2.0.556344 (R2017a).
Energies 2018, 11, x FOR PEER REVIEW 4 of 18
interconnected AWEs. Table 1 shows the specifications of the modelled offshore AWE farm. The
nominal frequency of the farm is 18.6 Hz. Controlling the frequency of the farm within an
appropriate range around the nominal value is critical for efficient power generation considering the
wind speed and the rated frequency and speed of the system components such as the generators.
The operation cycle of the AWE systems is 120 s with a duty cycle of 80% which means each
generation unit operates 96 s in the power phase of operation and 24 s in the recovery phase of the
operation. To achieve a continuous power at the main bus a 26 s delay between the operations of the
generators is implemented. The simulation is performed by MATLAB/Simulink Simscape Power
Systems software, version number 9.2.0.556344 (R2017a).
Figure 3. Power system diagram of the simulated offshore non-reversing pumping mode AWE farm.
Table 1. Simulation model specification [19].
PMSG nominal frequency (Hz) 18.6
PMSG flux linkage (Wb) 6.86
PMSG stator resistance (mΩ) 47
PMSG number of pole pairs 45
Dump loads resistance (Ω) 10
Main load resistance (Ω) 3.75
AWE period (s) 120
AWE duty cycle (%) 80
AWE cycle phase delay (s) 26
Transmission line length (km) 50
Transmission line inductance (mH/km) 0.39
Transmission line capacitance (μF/km) 0.34
Figure 3. Power system diagram of the simulated offshore non-reversing pumping mode AWE farm.
Table 1. Simulation model specification [19].
PMSG nominal frequency (Hz) 18.6
PMSG flux linkage (Wb) 6.86
PMSG stator resistance (m) 47
PMSG number of pole pairs 45
Dump loads resistance () 10
Main load resistance () 3.75
AWE period (s) 120
AWE duty cycle (%) 80
AWE cycle phase delay (s) 26
Transmission line length (km) 50
Transmission line inductance (mH/km) 0.39
Transmission line capacitance (µF/km) 0.34
Energies 2018,11, 3134 5 of 17
Energies 2018, 11, x FOR PEER REVIEW 5 of 18
Figure 4. Direct interconnection algorithm.
Figure 4. Direct interconnection algorithm.
Energies 2018,11, 3134 6 of 17
Figure 5shows the torque provided by the kite and the tether to the generator. The torque is
modelled as a constant torque with two fluctuating components added to it; a sinusoidal torque
representing the periodic manoeuvre of the wing in figure-of-eights inflight and a band-limited
white noise torque describing the wind turbulence. Given that the AWE technology is still under
development and most AWE projects are in the prototype stage, large datasets of kite test results for
modelling the torque from the kite and tether are not available yet. Hence, it is difficult to model
the actual shaft torque generated by the kite. However, comparing the torque in Figure 5with the
represented results in [
5
,
20
23
], shows the torque in Figure 5can be considered comparable to the
torque in experimental systems.
Energies 2018, 11, x FOR PEER REVIEW 6 of 18
Figure 5 shows the torque provided by the kite and the tether to the generator. The torque is
modelled as a constant torque with two fluctuating components added to it; a sinusoidal torque
representing the periodic manoeuvre of the wing in figure-of-eights inflight and a band-limited
white noise torque describing the wind turbulence. Given that the AWE technology is still under
development and most AWE projects are in the prototype stage, large datasets of kite test results for
modelling the torque from the kite and tether are not available yet. Hence, it is difficult to model the
actual shaft torque generated by the kite. However, comparing the torque in Figure 5 with the
represented results in [5,20–23], shows the torque in Figure 5 can be considered comparable to the
torque in experimental systems.
Figure 5. Generator input mechanical torque availability from the kite and tether.
3. Simulation Results
The frequency of the generators for 600 s is demonstrated in Figure 6. AWE1 starts to work at t = 0,
and AWE2 and AWE3 launch the operation with 26 s delay at t = 26 s and t = 52 s, respectively. With
the operation of each generation unit, automatic frequency controller and automatic synchronisation
controller are activated to prepare the corresponding system for the main bus interconnection. As
can be seen in Figure 6, AWE2 is integrated into the main bus at t = 51.69 s, and AWE3 joins the main
bus at t = 79.45 s. Since the incoming torque from the wing is highly oscillatory, it is not possible to
achieve a constant frequency. However, the AFCs can control the steady state frequency within a
reasonable range (less than 5% error) around the operational frequency. After interconnecting all
generation units to the main bus, the generators are synchronised, and one AFC can control the main
bus frequency. Hence, AFC1 is considered as the main bus frequency controller, and if AFC1 is in the
recovery phase or faulty, AFC2 operates as the backup main bus controller.
Figure 6. Frequencies of generators.
Figure 5. Generator input mechanical torque availability from the kite and tether.
3. Simulation Results
The frequency of the generators for 600 s is demonstrated in Figure 6. AWE1 starts to work at t =
0, and AWE2 and AWE3 launch the operation with 26 s delay at t = 26 s and t = 52 s, respectively. With
the operation of each generation unit, automatic frequency controller and automatic synchronisation
controller are activated to prepare the corresponding system for the main bus interconnection. As can
be seen in Figure 6, AWE2 is integrated into the main bus at t = 51.69 s, and AWE3 joins the main bus
at t = 79.45 s. Since the incoming torque from the wing is highly oscillatory, it is not possible to achieve
a constant frequency. However, the AFCs can control the steady state frequency within a reasonable
range (less than 5% error) around the operational frequency. After interconnecting all generation units
to the main bus, the generators are synchronised, and one AFC can control the main bus frequency.
Hence, AFC1 is considered as the main bus frequency controller, and if AFC1 is in the recovery phase
or faulty, AFC2 operates as the backup main bus controller.
Energies 2018, 11, x FOR PEER REVIEW 6 of 18
Figure 5 shows the torque provided by the kite and the tether to the generator. The torque is
modelled as a constant torque with two fluctuating components added to it; a sinusoidal torque
representing the periodic manoeuvre of the wing in figure-of-eights inflight and a band-limited
white noise torque describing the wind turbulence. Given that the AWE technology is still under
development and most AWE projects are in the prototype stage, large datasets of kite test results for
modelling the torque from the kite and tether are not available yet. Hence, it is difficult to model the
actual shaft torque generated by the kite. However, comparing the torque in Figure 5 with the
represented results in [5,20–23], shows the torque in Figure 5 can be considered comparable to the
torque in experimental systems.
Figure 5. Generator input mechanical torque availability from the kite and tether.
3. Simulation Results
The frequency of the generators for 600 s is demonstrated in Figure 6. AWE1 starts to work at t = 0,
and AWE2 and AWE3 launch the operation with 26 s delay at t = 26 s and t = 52 s, respectively. With
the operation of each generation unit, automatic frequency controller and automatic synchronisation
controller are activated to prepare the corresponding system for the main bus interconnection. As
can be seen in Figure 6, AWE2 is integrated into the main bus at t = 51.69 s, and AWE3 joins the main
bus at t = 79.45 s. Since the incoming torque from the wing is highly oscillatory, it is not possible to
achieve a constant frequency. However, the AFCs can control the steady state frequency within a
reasonable range (less than 5% error) around the operational frequency. After interconnecting all
generation units to the main bus, the generators are synchronised, and one AFC can control the main
bus frequency. Hence, AFC1 is considered as the main bus frequency controller, and if AFC1 is in the
recovery phase or faulty, AFC2 operates as the backup main bus controller.
Figure 6. Frequencies of generators.
Figure 6. Frequencies of generators.
Energies 2018,11, 3134 7 of 17
The generated power at the main bus is demonstrated in Figure 7. At the start, only AWE1 is
interconnected with the main bus and generates 105 kW electrical power. After the interconnection of
AWE2 and AWE3, the electrical power at the main bus increases to 235 kW and 350 kW respectively.
However, the power generated by each generator is discontinuous. The total power at the main bus
is continuous due to the applied time delay between the operation of the AWE systems. Due to the
fluctuations in incoming torque from the wing, the active power at the main bus is highly oscillatory.
Hence, the utilisation of a power electronic converter before interconnection to the load or the grid
is proposed as necessary. According to Figure 8, the RMS value of the phase voltage at the main
bus is 564 V, and the peak value of the main bus voltage is 810 V. Figure 9shows the measured
root-mean-square (RMS) current at the terminals of the generators and the main bus. As can be seen,
after the interconnection of all generators to the main bus, total current at the main bus changes
between 210 A to 260 A. In Figure 9, the power phase and the recovery phases of the operation are
highlighted by green and red colours, respectively.
Energies 2018, 11, x FOR PEER REVIEW 7 of 18
The generated power at the main bus is demonstrated in Figure 7. At the start, only AWE1 is
interconnected with the main bus and generates 105 kW electrical power. After the interconnection
of AWE2 and AWE3, the electrical power at the main bus increases to 235 kW and 350 kW
respectively. However, the power generated by each generator is discontinuous. The total power at
the main bus is continuous due to the applied time delay between the operation of the AWE systems.
Due to the fluctuations in incoming torque from the wing, the active power at the main bus is highly
oscillatory. Hence, the utilisation of a power electronic converter before interconnection to the load
or the grid is proposed as necessary. According to Figure 8, the RMS value of the phase voltage at
the main bus is 564 V, and the peak value of the main bus voltage is 810 V. Figure 9 shows the
measured root-mean-square (RMS) current at the terminals of the generators and the main bus. As
can be seen, after the interconnection of all generators to the main bus, total current at the main bus
changes between 210 A to 260 A. In Figure 9, the power phase and the recovery phases of the
operation are highlighted by green and red colours, respectively.
Figure 7. Generated active power of the farm at the main bus.
Figure 8. Main bus RMS voltage.
Figure 7. Generated active power of the farm at the main bus.
Energies 2018, 11, x FOR PEER REVIEW 7 of 18
The generated power at the main bus is demonstrated in Figure 7. At the start, only AWE1 is
interconnected with the main bus and generates 105 kW electrical power. After the interconnection
of AWE2 and AWE3, the electrical power at the main bus increases to 235 kW and 350 kW
respectively. However, the power generated by each generator is discontinuous. The total power at
the main bus is continuous due to the applied time delay between the operation of the AWE systems.
Due to the fluctuations in incoming torque from the wing, the active power at the main bus is highly
oscillatory. Hence, the utilisation of a power electronic converter before interconnection to the load
or the grid is proposed as necessary. According to Figure 8, the RMS value of the phase voltage at
the main bus is 564 V, and the peak value of the main bus voltage is 810 V. Figure 9 shows the
measured root-mean-square (RMS) current at the terminals of the generators and the main bus. As
can be seen, after the interconnection of all generators to the main bus, total current at the main bus
changes between 210 A to 260 A. In Figure 9, the power phase and the recovery phases of the
operation are highlighted by green and red colours, respectively.
Figure 7. Generated active power of the farm at the main bus.
Figure 8. Main bus RMS voltage.
Figure 8. Main bus RMS voltage.
Energies 2018,11, 3134 8 of 17
Energies 2018, 11, x FOR PEER REVIEW 8 of 18
Figure 9. AWE farm currents.
When a directly interconnected AWE unit operates in the recovery phase, it stops power
generation and operates as an unloaded synchronous motor. This condition leads to the increase of
power generation by other generators to compensate the power shortage, so that power in the main
bus is continuous. However, the increase in the power generation is not equal. For instance, between t
= 96 s and t = 120 s when AWE1 is in the recovery phase, AWE2 and AWE3 change their generated
Figure 9. AWE farm currents.
When a directly interconnected AWE unit operates in the recovery phase, it stops power
generation and operates as an unloaded synchronous motor. This condition leads to the increase of
power generation by other generators to compensate the power shortage, so that power in the main
bus is continuous. However, the increase in the power generation is not equal. For instance, between t
= 96 s and t = 120 s when AWE1 is in the recovery phase, AWE2 and AWE3 change their generated
Energies 2018,11, 3134 9 of 17
current to around 59 A and 200 A, respectively. Improper power flow and uneven contribution in the
generated current can be harmful to the farm power system by increasing the risk of a pole-slipping
fault [
24
26
] and increasing the power losses and current inconsistency due to the circulating current
between the generators [
27
]. A load sharing controller (LSC) is designed and developed to maintain
the load balance in the farm power network. The control diagram of the farm is illustrated in Figure 10.
The LSC measures and compares the current at the main bus and the generated current by each
interconnected generator. If the LSC recognises that a generator is loaded more than other generators it
tries to correct the generator contribution by regulating the mechanical torque applied to the generator.
The LSC consists of three proportional controllers (P-controllers). Each P-controller controls the power
contribution of one AWE unit. Considering the load and the number of power phase and recovery
phase AWEs, the LSC estimates each unit’s share to set the reference values of P-controllers.
The mechanical torque regulation can be performed by sending a command signal to the kite
controller which alters the trajectory and aerodynamic properties of the wing. Figure 11 demonstrates
the generators and the bus currents after adding the LSC. As can be seen, the load is divided
equally between the generators. For instance, between t = 96 s and 120 s when AWE1 is in the
recovery phase, the generated currents by AWE2 and AWE3 increase evenly to 110 A. As mentioned,
after interconnection of all generators to the main bus, AFC1 operates as the pilot controller to
control the farm frequency. In the load sharing strategy, AWE1 is the only generation unit which is
permitted to generate slightly more than other generators for the frequency regulation. Comparing
Figures 9and 11 shows the implementation of the LSC causes a significant reduction in the main bus
current fluctuations.
Energies 2018, 11, x FOR PEER REVIEW 9 of 18
current to around 59 A and 200 A, respectively. Improper power flow and uneven contribution in the
generated current can be harmful to the farm power system by increasing the risk of a pole-slipping
fault [24–26] and increasing the power losses and current inconsistency due to the circulating current
between the generators [27]. A load sharing controller (LSC) is designed and developed to maintain
the load balance in the farm power network. The control diagram of the farm is illustrated in Figure 10.
The LSC measures and compares the current at the main bus and the generated current by each
interconnected generator. If the LSC recognises that a generator is loaded more than other generators it
tries to correct the generator contribution by regulating the mechanical torque applied to the
generator. The LSC consists of three proportional controllers (P-controllers). Each P-controller controls
the power contribution of one AWE unit. Considering the load and the number of power phase and
recovery phase AWEs, the LSC estimates each unit’s share to set the reference values of P-controllers.
The mechanical torque regulation can be performed by sending a command signal to the kite
controller which alters the trajectory and aerodynamic properties of the wing. Figure 11 demonstrates
the generators and the bus currents after adding the LSC. As can be seen, the load is divided equally
between the generators. For instance, between t = 96 s and 120 s when AWE1 is in the recovery phase, the
generated currents by AWE2 and AWE3 increase evenly to 110 A. As mentioned, after interconnection of
all generators to the main bus, AFC1 operates as the pilot controller to control the farm frequency. In the
load sharing strategy, AWE1 is the only generation unit which is permitted to generate slightly more
than other generators for the frequency regulation. Comparing Figures 9 and 11 shows the
implementation of the LSC causes a significant reduction in the main bus current fluctuations.
Figure 10. AWE farm control diagram.
Figure 10. AWE farm control diagram.
Energies 2018,11, 3134 10 of 17
Energies 2018, 11, x FOR PEER REVIEW 10 of 18
Figure 11. AWE farm currents with LSC active.
In Figures 9 and 11, it can be observed that when a directly interconnected AWE unit is in the
recovery phase, the PMSG exchanges about 74 A current with the main bus of the internal power
grid. This circulation is due to the reactive power exchange between the idling recovery phase
generator and the other generators. To elaborate, during the recovery phase the generator is
mechanically decoupled from the kite and the tether drum, but it remains electrically connected to
Figure 11. AWE farm currents with LSC active.
In Figures 9and 11, it can be observed that when a directly interconnected AWE unit is in the
recovery phase, the PMSG exchanges about 74 A current with the main bus of the internal power grid.
This circulation is due to the reactive power exchange between the idling recovery phase generator and
the other generators. To elaborate, during the recovery phase the generator is mechanically decoupled
from the kite and the tether drum, but it remains electrically connected to the main bus. In this
Energies 2018,11, 3134 11 of 17
condition, the permanent magnet synchronous generator operates as an unloaded synchronous motor.
This unloaded synchronous motor draws a small amount of active power and exchanges a significant
amount of reactive power to stay synchronised with the other generators. The reactive power exchange
can be seen in Figure 12. As an illustration, between t = 96 s and t = 120 s, AWE1 is in the recovery
phase, and it exchanges 125 kVAR leading reactive power with the main bus. During the same time,
it can be seen that the reactive powers of AWE2 and AWE3 are increased to 62 kVAR and 63 kVAR
lagging, respectively. This reactive power exchange between the recovery phase AWE and the power
phase AWEs reduces the power factor of the generators. Also, it results in increased power losses by
increasing the current flow through the internal power grid equipment such as transmission lines,
generators, transformers and circuit breakers. A reactive power controller (RPC) is developed and
implemented for each AWE unit. The RPC consists of a variable capacitor bank parallel to the terminals
of the generator, and a controller tracking the reactive power exchanges. If an RPC detects any lagging
reactive power at the output of an AWE unit, it switches the appropriate number of capacitors to the
generator terminal to compensate the lagging reactive power. In Figure 3, the capacitor banks are
specified by C1, C2, and C3 for AWE1, AWE2, and AWE3 respectively. After adding RPC to each AWE
unit, the reactive power exchange is limited to the synchronous machine and the shunt capacitor banks
connected to the machine terminals, and it is not exchanged between the AWE units through the farm
internal power grid anymore.
Energies 2018, 11, x FOR PEER REVIEW 11 of 18
the main bus. In this condition, the permanent magnet synchronous generator operates as an
unloaded synchronous motor. This unloaded synchronous motor draws a small amount of active
power and exchanges a significant amount of reactive power to stay synchronised with the other
generators. The reactive power exchange can be seen in Figure 12. As an illustration, between t = 96 s and
t = 120 s, AWE1 is in the recovery phase, and it exchanges 125 kVAR leading reactive power with the
main bus. During the same time, it can be seen that the reactive powers of AWE2 and AWE3 are
increased to 62 kVAR and 63 kVAR lagging, respectively. This reactive power exchange between the
recovery phase AWE and the power phase AWEs reduces the power factor of the generators. Also, it
results in increased power losses by increasing the current flow through the internal power grid
equipment such as transmission lines, generators, transformers and circuit breakers. A reactive
power controller (RPC) is developed and implemented for each AWE unit. The RPC consists of a
variable capacitor bank parallel to the terminals of the generator, and a controller tracking the
reactive power exchanges. If an RPC detects any lagging reactive power at the output of an AWE
unit, it switches the appropriate number of capacitors to the generator terminal to compensate the
lagging reactive power. In Figure 3, the capacitor banks are specified by C1, C2, and C3 for AWE1,
AWE2, and AWE3 respectively. After adding RPC to each AWE unit, the reactive power exchange is
limited to the synchronous machine and the shunt capacitor banks connected to the machine
terminals, and it is not exchanged between the AWE units through the farm internal power grid
anymore.
Figure 12. AWE farm reactive power exchange without RPC active.
Figure 13 demonstrates the reactive power exchange inside the energy farm internal power grid
after adding the RPCs. As can be seen, when an AWE unit is in the recovery phase, the amount of
exchanged reactive power with other generators is decreased by 95%. For instance, when AWE1 is in
the recovery phase (between t = 96 and 120) the exchanged reactive power with the AWE2 and
AWE3 (except during the transient time of the phase transmission) is 6.5 kVAR approximately.
During this period, the lagging reactive power is compensated by RPC2 and RPC3. Similarly, when
AWE2 and AWE3 operate in the recovery phase, the lagging reactive power is compensated by
RPC1 and RPC3 for the AWE2 recovery phase, and RPC1 and RPC2 for the AWE3 recovery phase,
and the circulating reactive power is decreased significantly. This reactive power compensation can
improve the capacity of the AWE energy farm for providing more active power to the load/grid by
reducing the circulating current inside the internal power grid. Figure 14 shows the farm currents
after the utilisation of RPCs. Compared to Figure 11, the current exchange of the recovery phase
AWE with the main bus has decreased from 74 A to 3.5 A, which is a 95.27% reduction in the
circulating current.
Figure 12. AWE farm reactive power exchange without RPC active.
Figure 13 demonstrates the reactive power exchange inside the energy farm internal power grid
after adding the RPCs. As can be seen, when an AWE unit is in the recovery phase, the amount of
exchanged reactive power with other generators is decreased by 95%. For instance, when AWE1 is in
the recovery phase (between t = 96 and 120) the exchanged reactive power with the AWE2 and AWE3
(except during the transient time of the phase transmission) is 6.5 kVAR approximately. During this
period, the lagging reactive power is compensated by RPC2 and RPC3. Similarly, when AWE2 and
AWE3 operate in the recovery phase, the lagging reactive power is compensated by RPC1 and RPC3
for the AWE2 recovery phase, and RPC1 and RPC2 for the AWE3 recovery phase, and the circulating
reactive power is decreased significantly. This reactive power compensation can improve the capacity
of the AWE energy farm for providing more active power to the load/grid by reducing the circulating
current inside the internal power grid. Figure 14 shows the farm currents after the utilisation of RPCs.
Compared to Figure 11, the current exchange of the recovery phase AWE with the main bus has
decreased from 74 A to 3.5 A, which is a 95.27% reduction in the circulating current.
Energies 2018,11, 3134 12 of 17
Energies 2018, 11, x FOR PEER REVIEW 12 of 18
Figure 13. AWE farm reactive power exchange with RPC active.
Table 2 compares the average power factors of the AWE units before and after the use of RPCs.
In this table, “+” indicates a lagging power factor, and “” represents a leading power factor. A
significant improvement in the power factor can be seen by adding RPCs to the farm. For instance,
without RPC, the average power factor of the AWE1 during the recovery phase is 0.01 leading while,
by RPC, it is corrected to 0.83 lagging. The power factor improvement can be observed for AWE2
and AWE3 as well. The average power factor of AWE2 and AWE3 over the recovery phase is
improved from the weak value of 0.01 leading to 0.70 and 0.72 lagging, respectively. Additionally,
the average power factor of the power phase AWEs when one AWE unit operates in the recovery
phase is improved to the value of 1.
Figure 15 shows a voltage sag investigation at the main bus of the energy farm. According to
the IEEE 1159 standard, voltage sag is a voltage drop to between 10 to 90% of the nominal voltage
lasting more than half of a cycle and less than one minute [28]. Voltage sag can happen as a result of
events such as short circuit fault, the start of induction motors and variations in the load [28]. This
type of voltage drop can be a critical problem since it can affect the proper operation of the power
system causing damage to the power grid and end-user equipment [28]. Furthermore, it may lead to
unwanted protection system trips [28]. In DIT, the transition of an interconnected generator from the
power to recovery phase and vice versa cases, variations in the mechanical torque and speed of the
tethered wing, and the switching operation of the capacitor banks (after adding RPCs) can
potentially cause voltage sag in the energy farm power network. The represented voltage sag analysis in
Figure 15 compares voltage sag events with and without the LSC and RPC for 600 s of the simulation
at the main bus of the internal power grid. In this figure, the term ‘N’ represents how many times
each voltage sag event has happened. Figure 15a shows that without the LSC and RPCs, a total of 22
voltage sag events have occurred. Among them, the most intensive is the sag to 45% with the
duration of 119.18 cycles and a repetition of four times. The longest voltage sag is 238.36 cycles with
a magnitude of 65% and repetition five times. The sag to 89% is the most frequent voltage sag event
with 13 repetitions and duration of 106.14 cycles. Figure 15b represents voltage sag analysis after
adding the LSC and RPCs. The number of voltage sag events is reduced to 11; a 50% improvement in
the number of voltage sag events. In Figure 15b the most intensive event is a sag to 85% with a
duration of 1.30 cycles, compared to the most intensive sag before adding LSC and RPCs (Figure
15a) 88.88% and 98.90% improvement in the magnitude and duration is achieved, respectively.
Additionally, Figure 15b shows that the longest sag with LSC and RPCs is 55.68 cycles while without
the LSC and RPCs it was 238.36 cycles, i.e., a 76.64% improvement.
Table 2. Average power factors of AWE units with and without RPC.
Power Phase Recovery Phase AWE1 AWE2 AWE3
Without RPC With RPC Without RPC With RPC Without RPC With RPC
AWE2, AWE3 AWE1 0.01 +0.83 +0.95 +1 +0.94 +1
AWE1, AWE3 AWE2 +0.94 +1 0.01 +0.70 +0.95 +1
AWE2, AWE1 AWE3 +0.94 +1 +0.95 +1 0.01 0.72
Figure 13. AWE farm reactive power exchange with RPC active.
Table 2compares the average power factors of the AWE units before and after the use of
RPCs. In this table, “+” indicates a lagging power factor, and “
” represents a leading power factor.
A significant improvement in the power factor can be seen by adding RPCs to the farm. For instance,
without RPC, the average power factor of the AWE1 during the recovery phase is 0.01 leading while,
by RPC, it is corrected to 0.83 lagging. The power factor improvement can be observed for AWE2 and
AWE3 as well. The average power factor of AWE2 and AWE3 over the recovery phase is improved
from the weak value of 0.01 leading to 0.70 and 0.72 lagging, respectively. Additionally, the average
power factor of the power phase AWEs when one AWE unit operates in the recovery phase is improved
to the value of 1.
Figure 15 shows a voltage sag investigation at the main bus of the energy farm. According to the
IEEE 1159 standard, voltage sag is a voltage drop to between 10 to 90% of the nominal voltage lasting
more than half of a cycle and less than one minute [
28
]. Voltage sag can happen as a result of events such
as short circuit fault, the start of induction motors and variations in the load [
28
]. This type of voltage
drop can be a critical problem since it can affect the proper operation of the power system causing damage
to the power grid and end-user equipment [
28
]. Furthermore, it may lead to unwanted protection system
trips [
28
]. In DIT, the transition of an interconnected generator from the power to recovery phase and
vice versa cases, variations in the mechanical torque and speed of the tethered wing, and the switching
operation of the capacitor banks (after adding RPCs) can potentially cause voltage sag in the energy farm
power network. The represented voltage sag analysis in Figure 15 compares voltage sag events with and
without the LSC and RPC for 600 s of the simulation at the main bus of the internal power grid. In this
figure, the term ‘N’ represents how many times each voltage sag event has happened. Figure 15a shows
that without the LSC and RPCs, a total of 22 voltage sag events have occurred. Among them, the most
intensive is the sag to 45% with the duration of 119.18 cycles and a repetition of four times. The longest
voltage sag is 238.36 cycles with a magnitude of 65% and repetition five times. The sag to 89% is the
most frequent voltage sag event with 13 repetitions and duration of 106.14 cycles. Figure 15b represents
voltage sag analysis after adding the LSC and RPCs. The number of voltage sag events is reduced to 11;
a 50% improvement in the number of voltage sag events. In Figure 15b the most intensive event is a sag
to 85% with a duration of 1.30 cycles, compared to the most intensive sag before adding LSC and RPCs
(Figure 15a) 88.88% and 98.90% improvement in the magnitude and duration is achieved, respectively.
Additionally, Figure 15b shows that the longest sag with LSC and RPCs is 55.68 cycles while without the
LSC and RPCs it was 238.36 cycles, i.e., a 76.64% improvement.
Energies 2018,11, 3134 13 of 17
Energies 2018, 11, x FOR PEER REVIEW 14 of 18
Figure 14. AWE farm currents after using RPCs active.
Figure 14. AWE farm currents after using RPCs active.
Table 2. Average power factors of AWE units with and without RPC.
Power Phase Recovery Phase AWE1 AWE2 AWE3
Without RPC With RPC Without RPC With RPC Without RPC With RPC
AWE2, AWE3
AWE1 0.01 +0.83 +0.95 +1 +0.94 +1
AWE1, AWE3
AWE2 +0.94 +1 0.01 +0.70 +0.95 +1
AWE2, AWE1
AWE3 +0.94 +1 +0.95 +1 0.01 0.72
Energies 2018,11, 3134 14 of 17
Figure 16 investigates the total harmonic distortion (THD) of the main bus current before and
after implementation of the LSC and RPCs. THD is an index showing the signal distortion due to
harmonics. Current THD can be determined by Equation (1) as the ratio of the cumulative harmonics
to the fundamental frequency of the current [29].
THDI(%) = (s
i=2
Ii)/I1×100 (1)
where Ii is the RMS value of i-th order harmonic and I
1
is the RMS value of the fundamental frequency
of the current.
In Figure 16a it can be observed that without the implementation of the LSC and RPCs the main
bus current THD can rise to 65.3%. Figure 16b shows the maximum current THD is decreased to 27.94%
by the use of LSC and RPCs which is a 57.21% decrease in current THD at the main bus. This significant
improvement in the THD of the power generated by the directly interconnected generators is highly
effective in the reduction of core losses in power transformers and electrical machines lowering the
thermal stress on the farm internal power grid equipment [
30
]. However, this THD is still unsuitable
for electric power consumers as according to the IEEE Std. 519-1992 the current THD at the point
of common coupling (PCC) with the infinite power grid must be below 5% [
30
]. Hence, THD must
be reduced to less than 5% for the grid interconnection by the implementation of one or several
paralleled back to back power electronic converters in the onshore substation before integration with
the infinite power grid. As mentioned, such converters are, in any case, required for frequency and
voltage compliance.
Energies 2018, 11, x FOR PEER REVIEW 15 of 18
(a)
(b)
Figure 15. Voltage sag events at the main bus: (a) Voltage sag events without LSC and RPCs; and
(b) voltage sag events with the LSC and RPCs active.
(a)
(b)
Figure 16. Current THD at the main bus: (a) Current THD without LSC and RPCs; and (b) current
THD with LSC and RPCs active.
4. Discussion and Conclusions
The direct interconnection technique is a novel approach for the integration of offshore airborne
wind energy systems. In this technique, transferring the power electronic converters from the
offshore site to shore can significantly improve the economy and reliability of the offshore AWE
farms. However, this paper shows that the elimination of the power electronic converters from the
terminals of the generators and the integration of AWE generators directly to the offshore main bus
can lead to less controllability and, hence, reduced power factor, significant reactive power exchange
between the generators, poor load balance, and wild fluctuations in voltage and current.
Accordingly, a DIT internal power grid needs power controllers to improve the efficiency and
reliability of generated power. It is shown that without controlling the contribution of each
generator in the active power generation, the load is divided unequally between the generators. This
uneven load sharing loads some generators more than other generators and can be harmful to the
overloaded generators and the internal power grid equipment, such as transformers, breakers, and
capacitors.
The reactive power exchange between the directly interconnected airborne wind energy
systems has been analysed. It is shown that when an AWE unit operates in the recovery phase, it
exchanges a considerable amount of reactive power with other interconnected machines to stay
synchronised with them. This reactive power exchange causes a significant circulating current
within the AWE energy farm leading to a reduced active power capacity of the energy farm and
increased power losses of the internal power grid equipment such as transmission lines and
transformers.
Figure 15.
Voltage sag events at the main bus: (
a
) Voltage sag events without LSC and RPCs; and (
b
)
voltage sag events with the LSC and RPCs active.
Energies 2018, 11, x FOR PEER REVIEW 15 of 18
(a)
(b)
Figure 15. Voltage sag events at the main bus: (a) Voltage sag events without LSC and RPCs; and
(b) voltage sag events with the LSC and RPCs active.
(a)
(b)
Figure 16. Current THD at the main bus: (a) Current THD without LSC and RPCs; and (b) current
THD with LSC and RPCs active.
4. Discussion and Conclusions
The direct interconnection technique is a novel approach for the integration of offshore airborne
wind energy systems. In this technique, transferring the power electronic converters from the
offshore site to shore can significantly improve the economy and reliability of the offshore AWE
farms. However, this paper shows that the elimination of the power electronic converters from the
terminals of the generators and the integration of AWE generators directly to the offshore main bus
can lead to less controllability and, hence, reduced power factor, significant reactive power exchange
between the generators, poor load balance, and wild fluctuations in voltage and current.
Accordingly, a DIT internal power grid needs power controllers to improve the efficiency and
reliability of generated power. It is shown that without controlling the contribution of each
generator in the active power generation, the load is divided unequally between the generators. This
uneven load sharing loads some generators more than other generators and can be harmful to the
overloaded generators and the internal power grid equipment, such as transformers, breakers, and
capacitors.
The reactive power exchange between the directly interconnected airborne wind energy
systems has been analysed. It is shown that when an AWE unit operates in the recovery phase, it
exchanges a considerable amount of reactive power with other interconnected machines to stay
synchronised with them. This reactive power exchange causes a significant circulating current
within the AWE energy farm leading to a reduced active power capacity of the energy farm and
increased power losses of the internal power grid equipment such as transmission lines and
transformers.
Figure 16.
Current THD at the main bus: (
a
) Current THD without LSC and RPCs; and (
b
) current
THD with LSC and RPCs active.
Energies 2018,11, 3134 15 of 17
4. Discussion and Conclusions
The direct interconnection technique is a novel approach for the integration of offshore airborne
wind energy systems. In this technique, transferring the power electronic converters from the offshore
site to shore can significantly improve the economy and reliability of the offshore AWE farms. However,
this paper shows that the elimination of the power electronic converters from the terminals of the
generators and the integration of AWE generators directly to the offshore main bus can lead to less
controllability and, hence, reduced power factor, significant reactive power exchange between the
generators, poor load balance, and wild fluctuations in voltage and current. Accordingly, a DIT internal
power grid needs power controllers to improve the efficiency and reliability of generated power. It is
shown that without controlling the contribution of each generator in the active power generation,
the load is divided unequally between the generators. This uneven load sharing loads some generators
more than other generators and can be harmful to the overloaded generators and the internal power
grid equipment, such as transformers, breakers, and capacitors.
The reactive power exchange between the directly interconnected airborne wind energy systems
has been analysed. It is shown that when an AWE unit operates in the recovery phase, it exchanges a
considerable amount of reactive power with other interconnected machines to stay synchronised with
them. This reactive power exchange causes a significant circulating current within the AWE energy
farm leading to a reduced active power capacity of the energy farm and increased power losses of the
internal power grid equipment such as transmission lines and transformers.
A load sharing controller is designed and implemented to control the load balance inside the
farm. The LSC measures and compares the generated current of each generator and the total bus
current to maintain load balance. Comparing the generated current before and after adding LSC shows
a significant improvement in the farm load flow. With LSC included, the generators give an equal
contribution to the load demand, and even when a unit is in recovery the generated power from the
other generators increases equally in response to the power shortage.
Reactive power controllers (RPC) are developed and implemented for each AWE unit to control
the reactive power exchange. The reactive power exchange before and after adding RPCs is compared.
The simulation results show that the use of RPCs considerably decreases the reactive power exchange
between the directly interconnected AWE systems. Additionally, it causes a significant power factor
improvement and 95% reduction in the amount of circulating current inside the internal power grid.
Voltage sag and THD have been investigated. It is shown that by the appropriate control of active
and reactive power for directly interconnected pumping mode AWE systems it is possible to make
a reduction of 57.21% and 50% in current THD and the number of voltage sag events, respectively.
Similarly, considerable improvements in the magnitude and duration of voltage sag events are achieved
by the implementation of the LSC and RPCs.
Controlling active and reactive power is a critical factor for improving the reliability and efficiency
of the directly interconnected airborne wind energy systems. This research has achieved a notable
improvement in the quality of power inside the internal power grid for the directly interconnected
AWE systems by the design and implementation of appropriate active and reactive power controllers.
However, due to the variable mechanical power input from the AWE kites, this power still requires
on-shore power electronic converters (back to back converters) prior to integration with the infinite
power grid or load.
This paper focuses on the ground station of AWE systems and assumes that the AWE’s kite is
ideally controllable for torque regulation. Due to the lack of experimental test results, it is not possible
to understand how far the kite and flight controller can collaborate with the controllers of the direct
interconnection technique. In future work, this must be investigated by adding an aerodynamic model
of kite including feasible flight controllers to the current AWE farm model and the experimental testing
of DIT on real AWE devices. Moreover, in the future this research work plans to study the integration
of the directly interconnected pumping mode AWE systems to the infinite power grid via back-to-back
power electronic converters.
Energies 2018,11, 3134 16 of 17
Author Contributions:
M.E.S. carried out the reported research work, writing the paper and revisions. J.C. and
D.T. supervised the research work, revisions, and language editing. The content of this paper is discussed by the
authors, and they all contributed to the final manuscript.
Funding:
This work is supported by the project AWESCO (H2020-ITN-642682) funded by the European Union’s
Horizon 2020 research and innovation programme under the Marie Skłodowska-Curie grant agreement No. 642682.
This publication has emanated from research supported in part by a research grant from Science Foundation
Ireland (SFI) under MaREI Grant No. 12/RC/2302.
Conflicts of Interest: The authors declare that the publication this article has no conflict of interest.
References
1.
Mendonça, A.K.S.; Vaz, C.R.; Lezana, A.G.R.; Anacleto, C.A.; Paladini, E.P. Comparing Patent and Scientific
Literature in Airborne Wind Energy. Sustainability 2017,9, 915. [CrossRef]
2.
Cherubini, A.; Papini, A.; Vertechy, R.; Fontana, M. Airborne wind energy systems: A review of the
technologies. Renew. Sustain. Energy Rev. 2015,51, 1461–1476. [CrossRef]
3.
Salari, M.E.; Coleman, J.; Toal, D. Airborne wind energy—A review. In 3rd International Congress on Energy
Efficiency and Energy Related Materials (ENEFM2015); Oral, A.Y., Oral, B., Banu, Z., Eds.; Springer International
Publishing: Berlin/Heidelberg, Germany, 2016; pp. 81–92. ISBN 978-3-319-45677-5.
4.
Diehl, M. Airborne Wind Energy: Basic Concepts and Physical Foundations. In Airborne Wind Energy;
Ahrens, U., Diehl, M., Schmehl, R., Eds.; Springer: Berlin/Heidelberg, Germany, 2013; pp. 3–22. ISBN
978-3-642-39965-7.
5.
Coleman, J.; Ahmad, H.; Pican, E.; Toal, D. Modeling of a synchronous offshore pumping mode airborne
wind energy farm. Energy 2014,71, 569–578. [CrossRef]
6.
Coleman, J.; Pican, E.; Ahmad, H.; Toal, D. Experimental Developments of a Pumping Mode Kite Power
Demonstrator with Non-reversing Generator. In Proceedings of the Airborne Wind Energy Conference
(AWEC2013), Berlin, Germany, 10–11 September 2013.
7.
Coleman, J.; Ahmad, H.; Toal, D. Development and Testing of a Control System for the Automatic Flight of
Tethered Parafoils. J. Field Robot. 2017,34, 519–538. [CrossRef]
8.
Fechner, U.; Schmehl, R. Model-based efficiency analysis of wind power conversion by a pumping kite power
system. In Airborne Wind Energy; Ahrens, U., Diehl, M., Schmehl, R., Eds.; Springer: Berlin/Heidelberg,
Germany, 2013; pp. 249–269. ISBN 978-3-642-39965-7.
9.
Archer, C.L.; Monache, L.D.; Rife, D.L. Airborne wind energy: Optimal locations and variability. Renew.
Energy 2014,64, 180–186. [CrossRef]
10.
Heptonstall, P.; Gross, R.; Greenacre, P.; Cockerill, T. The cost of offshore wind: Understanding the past and
projecting the future. Energy Policy 2012,41, 815–821. [CrossRef]
11.
Global Wind Energy Council. Wind Global Wind Report-Annual Market Update 2017. Available online:
http://files.gwec.net/files/GWR2017.pdf (accessed on 1 November 2018).
12.
Colmenar-Santos, A.; Perera-Perez, J.; Borge-Diez, D.; Palacio-Rodríguez, C. Offshore wind energy: A review
of the current status, challenges and future development in Spain. Renew. Sustain. Energy Rev.
2016
,64, 1–18.
[CrossRef]
13.
SEAI. Wind Energy Road Map-Introduction to the Wind Energy Roadmap to 2050. Available online: https:
//www.seai.ie/resources/publications/Wind_Energy_Roadmap_2011-2050.pdf (accessed on 1 November 2018).
14.
Ireland Department of Communication, Energy and Natural Resources, Ireland’s Transition to a Low
Carbon Energy Future 2015–2030. Available online: https://www.dccae.gov.ie/en-ie/energy/publications/
Documents/2/Energy%20White%20Paper%20-%20Dec%202015.pdf (accessed on 1 November 2018).
15.
Pican, E.; Omerdic, E.; Toal, D.; Leahy, M. Analysis of parallel connected synchronous generators in a novel
offshore wind farm model. Energy 2011,36, 6387–6397. [CrossRef]
16.
Toal, D.; Pican, E.; Leahy, M. Improvements in and Relating to Wind Farms. European Patent EP2647098,
2 December 2010.
17.
Spinato, F.; Tavner, P.J.; Van Bussel, G.J.W.; Koutoulakos, E. Reliability of wind turbine subassemblies.
IET Renew. Power Gener. 2009,3, 1–15. [CrossRef]
18.
Zhao, Y.; Li, D.; Dong, A.; Kang, D.; Lv, Q.; Shang, L. Fault Prediction and Diagnosis of Wind Turbine
Generators Using SCADA Data. Energies 2017,10, 1210. [CrossRef]
Energies 2018,11, 3134 17 of 17
19.
Salari, E.M.; Coleman, J.; Toal, D. Analysis of Direct Interconnection Technique for Offshore Airborne Wind
Energy Systems under Normal and Fault Conditions. Renew. Energy 2019,131, 284–296. [CrossRef]
20.
Van der Vlugt, R.; Peschel, J.; Schmehl, R. Design and experimental characterization of a pumping kite power
system. In Airborne Wind Energy; Ahrens, U., Diehl, M., Schmehl, R., Eds.; Springer: Berlin/Heidelberg,
Germany, 2013; pp. 403–425. ISBN 978-3-642-39965-7.
21.
Bormann, A.; Maximilian, R.; Kövesdi, P.; Gebhardt, C.; Skutnik, S. Development of a three-line
ground-actuated airborne wind energy converter. In Airborne Wind Energy; Ahrens, U., Diehl, M., Schmehl, R.,
Eds.; Springer: Berlin/Heidelberg, Germany, 2013; pp. 427–436. ISBN 978-3-642-39965-7.
22.
Fritz, F. Application of an automated kite system for ship propulsion and power generation. In Airborne Wind
Energy; Ahrens, U., Diehl, M., Schmehl, R., Eds.; Springer: Berlin/Heidelberg, Germany, 2013; pp. 359–372.
ISBN 978-3-642-39965-7.
23.
Ruiterkamp, R.; Sieberling, S. Description and preliminary test results of a six degrees of freedom rigid
wing pumping system. In Airborne Wind Energy; Ahrens, U., Diehl, M., Schmehl, R., Eds.; Springer:
Berlin/Heidelberg, Germany, 2013; pp. 443–458. ISBN 978-3-642-39965-7.
24.
Klempner, G.; Kerszenbaum, I. Operation and Maintenance of Large Turbo Generators; John Wiley & Sons:
Hoboken, NJ, USA, 2004; pp. 27–32. ISBN 0-471-61447-5.
25.
Berdy, J. Out of Step Protection for Generators, GE Publication No. GER-3179. Available online: https:
//store.gegridsolutions.com/FAQ/Documents/CEB/GER-3179.pdf (accessed on 2 October 2018).
26.
Bai, W.; Lee, D.; Lee, K.Y. Stochastic Dynamic AC Optimal Power Flow Based on a Multivariate Short-Term
Wind Power Scenario Forecasting Model. Energies 2017,10, 2138. [CrossRef]
27.
Laughton, M.A.; Warne, D.J. Electrical Engineer’s Reference Book; Elsevier: London, UK, 2003; ISBN
9780750646376.
28.
IEEE Standards Board. 1159-1995-IEEE Recommended Practice for Monitoring Electric Power Quality;
The Institute of Electrical and Electronics Engineers Inc.: New York, NY, USA, 1995.
29.
Blooming, T.M.; Carnovale, D.J. Application of IEEE STD 519-1992 Harmonic Limits. In Proceedings of the
Pulp and Paper Industry Technical Conference, Appleton, WI, USA, 18–23 June 2006. [CrossRef]
30.
Ellis, R.G. Power Systems Harmonics: A Reference Guide to Causes, Effects and Corrective Measures.
An Allen-Bradley Series of Issues and Answers, Rockwell International Corporation. Available
online: http://literature.rockwellautomation.com/idc/groups/literature/documents/wp/mvb-wp011_
-en-p.pdf (accessed on 2 October 2018).
©
2018 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access
article distributed under the terms and conditions of the Creative Commons Attribution
(CC BY) license (http://creativecommons.org/licenses/by/4.0/).
... Coleman et al. [8,6,7] present initial research work for the implementation of a DIT algorithm for offshore AWE systems. The research is followed by Salari et al. [24,23] to develop a comprehensive DIT for marine pumping mode AWE systems considering the in-depth power control, operation and electrical performance of directly interconnected AWE generators under nominal and fault conditions. This paper presents an experimental investigation of DIT for nonreversing pumping mode AWE systems. ...
... However, controlling the load balance using LSC can improve the reactive power operation; still, the improved reactive power is not yet at a satisfactory level and further reactive power control and compensation strategies must be implemented. The authors have already suggested a solution for DIT reactive power compensation using computer simulation models in a prior work, [24]. More experimental studies for reactive power control of the DIT will be carried out and reported in future work. ...
Article
Full-text available
Airborne wind energy is a new approach to reach the stronger and more consistent winds at higher altitudes. In this paper, the interconnection of pumping mode airborne wind energy systems inside an energy farm is investigated. An experimental rig hardware setup has been designed and built to model an AWE farm in small scale. A direct interconnection system has been developed and examined on the experimental test rig. The direct interconnection technique (DIT) is a new method developed for the interconnection of marine wind energy systems within an energy farm, without requiring offshore-based power electronic converters. DIT relocates power electronic converters from the offshore site to the shore substation by interconnecting marine generators directly to a common bus. This method makes possible significant improvements to the economy and reliability of marine renewable energy systems. In this paper, for the first time, the direct interconnection technique is investigated experimentally for physically emulated pumping mode airborne wind energy systems. The construction of the experimental rig hardware setup is described, and the laboratory test results for the direct interconnection of airborne wind energy systems are presented and discussed.
... The idea is demonstrated using interior permanent magnet synchronous machine (IPMSM), which is rewinded as a DTM. In [33], the authors design power control strategies for controlling the active and reactive power of an AWE farm. ...
Article
Full-text available
An airborne wind energy system (AWES) can harvest stronger wind streams at higher altitudes which are not accessible to conventional wind turbines. The operation of AWES requires a controller for the tethered aircraft/kite module (KM), as well as a controller for the ground station module (GSM). The literature regarding the control of AWES mostly focuses on the trajectory tracking of the KM. However, an advanced control of the GSM is also key to the successful operation of an AWES. In this paper we propose a cascaded control strategy for the GSM of an AWES during the traction or power generation phase. The GSM comprises a winch and a three-phase induction machine (IM), which acts as a generator. In the outer control-loop, an integral sliding mode control (SMC) algorithm is designed to keep the winch velocity at the prescribed level. A detailed stability analysis is also presented for the existence of the SMC for the perturbed winch system. The rotor flux-based field oriented control (RFOC) of the IM constitutes the inner control-loop. Due to the sophisticated RFOC, the decoupled and instantaneous control of torque and rotor flux is made possible using decentralized proportional integral (PI) controllers. The unknown states required to design RFOC are estimated using a discrete time Kalman filter (DKF), which is based on the quasi-linear model of the IM. The designed GSM controller is integrated with an already developed KM, and the AWES is simulated using MATLAB and Simulink. The simulation study shows that the GSM control system exhibits appropriate performance even in the presence of the wind gusts, which account for the external disturbance.
Article
An investigation of the effects of wind gusts on the directly interconnected wind generators is reported, and techniques toward the mitigation of the wind gust negative influences have been proposed. Using a directly interconnected system approach, wind turbine generators are connected to a single synchronous bus or collection grid without the use of power converters on each turbine. This bus can then be transformed for transmission onshore using High Voltage Alternating Current, Low-Frequency Alternating Current or High Voltage Direct Current techniques with shared power conversion resources onshore connecting the farm to the grid. Analysis of the potential for instability in transient conditions on the wind farm, for example, caused by wind gusts is the subject of this paper. Gust magnitude and rise time/fall time are investigated. Using pitch control and the natural damping of the high inertial offshore system, satisfactory overall system performance and stability can be achieved during these periods of transience.
Conference Paper
Full-text available
This paper is a review of airborne wind energy systems. Airborne wind energy may be considered as an appropriate replacement for wind turbines in the future because of its unique characteristics. Different technologies in this field are discussed.
Article
Full-text available
Direct interconnection is a novel technique for interconnecting offshore airborne wind energy (AWE) generators which facilitates the removal of power converters from the offshore generation site. In this technique, unlike the conventional approach, all generators are interconnected directly and after dispatching the generated power to shore, a back to back converter or several paralleled back to back converters change the generated power to grid-compliant power. Considering that the high expenses of offshore operations for back to back converter repair and maintenance and the higher accessibility of shore-side back to back converters, this technique can improve the reliability and economy of the energy generation system. This research aims to implement and study the practicality and reliability of the direct interconnection approach for offshore non-reversing pumping mode airborne wind energy generator systems. The interaction of direct interconnected AWEs in normal and fault conditions is investigated, and synchronisation, frequency control and load sharing control of the AWE farm are examined and discussed.
Article
Full-text available
The deterministic methods generally used to solve DC optimal power flow (OPF) do not fully capture the uncertainty information in wind power, and thus their solutions could be suboptimal. However, the stochastic dynamic AC OPF problem can be used to find an optimal solution by fully capturing the uncertainty information of wind power. That uncertainty information of future wind power can be well represented by the short-term future wind power scenarios that are forecasted using the generalized dynamic factor model (GDFM)-a novel multivariate statistical wind power forecasting model. Furthermore, the GDFM can accurately represent the spatial and temporal correlations among wind farms through the multivariate stochastic process. Fully capturing the uncertainty information in the spatially and temporally correlated GDFM scenarios can lead to a better AC OPF solution under a high penetration level of wind power. Since the GDFM is a factor analysis based model, the computational time can also be reduced. In order to further reduce the computational time, a modified artificial bee colony (ABC) algorithm is used to solve the AC OPF problem based on the GDFM forecasting scenarios. Using the modified ABC algorithm based on the GDFM forecasting scenarios has resulted in better AC OPF' solutions on an IEEE 118-bus system at every hour for 24 h.
Article
Full-text available
The fast-growing wind power industry faces the challenge of reducing operation and maintenance (O&M) costs for wind power plants. Predictive maintenance is essential to improve wind turbine reliability and prolong operation time, thereby reducing the O&M cost for wind power plants. This study presents a solution for predictive maintenance of wind turbine generators. The proposed solution can: (1) predict the remaining useful life (RUL) of wind turbine generators before a fault occurs and (2) diagnose the state of the wind turbine generator when the fault occurs. Moreover, the proposed solution implies low-deployment costs because it relies solely on the information collected from the widely available supervisory control and data acquisition (SCADA) system. Extra sensing hardware is needless. The proposed solution has been deployed and evaluated in two real-world wind power plants located in China. The experimental study demonstrates that the RUL of the generators can be predicted 18 days ahead with about an 80% prediction accuracy. When faults occur, the specific type of generator fault can be diagnosed with an accuracy of 94%.
Article
Full-text available
Airborne Wind Energy (AWE) is a renewable energy technology that uses wind power devices rather than traditional wind turbines that take advantage of the kinetic wind energy, and remain in the air due to aerodynamic forces. This article aims to compare the scientific literature with the patents on wind power with tethered airfoils, to obtain better insights into the literature of this area of knowledge. The method used in this study was a comparative bibliometric analysis, using the Web of Science and Derwent Innovations Index databases, and the Network Analysis Interface for Literature Review software and VosViewer. It was possible to verify the main authors, research centers and companies, countries and journals that publish on the subject; the most cited documents; the technological classes; and the networks of collaborations of this work. It was also possible to identify that researches on wind energy with tethered airfoils began their studies in the late 1970s with the first patent apparently dated from 1975 by the inventors Dai and Dai. The first scientific publication was in 1979 by authors Fletcher and Roberts, followed by Loyd in 1980. United States is the country that presented the highest number of patents and scientific papers. Both scientific papers and patents set up networks of collaboration; that is, important authors are interacting with others to establish cooperative partnerships.
Chapter
Full-text available
Airborne Wind Energy (AWE) is a new approach to harvest stronger wind streams at higher altitudes for renewable energy. This paper reviews recent developments in this field. Conventional wind energy and current constrains for its development are discussed and airborne wind energy as an appropriate solution in the literature is reviewed. Different AWE technologies are reviewed and appraised and other related issues such as transmission and curtailment are discussed.
Article
Full-text available
This paper presents the design and testing of a control system for the robotic flight of tethered kites. The use of tethered kites as a prime mover in airborne wind energy is undergoing active research in several quarters. There also exist several additional applications for the remote or autonomous control of tethered kites, such as aerial sensor and communications platforms. The system presented is a distributed control system consisting of three primary components: an instrumented tethered kite, a kite control pod, and a ground control and power takeoff station. A detailed description of these constituent parts is provided, with design considerations and constraints outlined. Flight tests of the system have been carried out, and a range of results and system performance data from these are presented and discussed.
Article
Offshore wind energy generation has experienced an important growth in the last five years, reaching currently an installed capacity of almost 8000 MW. The most important references in this type of technology are Denmark, Holland, Sweden, Germany and United Kingdom. In Spain, previsions for technology, have been set at around 750 MW of installed power during the period 2011–2020. However, Spanish coastal features, social opposition to installations near the coast and lack of a stable regulatory environment guaranteeing the investments are factors which are restraining the development of this technology. This paper presents a brief review of the state of the art of offshore wind technology and it describes the most frequently used types of turbines, transmission systems and support structures in Europe. It also presents the current situation and the expected growth of offshore wind power facilities, introducing the characteristics of the operational – and under construction – windfarms. Finally, it analyses particular problems and solutions for its development in Spain which can be extrapolated to countries with similar circumstances.
Chapter
Ampyx Power develops a pumping kite system with a rigid aircraft that is attached to the tether by a single attachment point. This unbridled configuration allows three degrees of freedom (DOF) for the aircraft attitude and three for the position. The total system can be described by these 6 DOF. Operating the pumping kite system requires a novel view on conventional flight control. A tether based reference frame is introduced that in effect decouples the longitudinal and lateral motion which can then be designed independently allowing the highly dynamic motion of the glider to be controlled through simple control schemes. Furthermore the longitudinal motion is constrained through the tether of which the tangential velocity is controlled by the generator providing an additional control input besides the elevator to control longitudinal motion. Flight tests demonstrate that using the tether based flight control system reasonably simple and commonly used control methods provide satisfactory flight performance. This paper gives an overview of the system components and control strategy and gives a brief overview of preliminary flight tests and performance.
Article
Tethered wings that fly fast in a crosswind direction have the ability to highly concentrate the abundant wind power resource in medium and high altitudes, and promise to make this resource available to human needs with low material investment. This chapter introduces the main ideas behind airborne wind energy, attempts a classification of the basic concepts that are currently pursued, and discusses its physical foundations and fundamental limitations.