This paper presents the construction of Airshell, a small timber gridshell prototype erected by employing a pneumatic formwork. Inspired by the work of Frei Otto and Dante Bini, the technique is based on a pneumatic membrane and an Arduino® board – the former used as dynamic formwork and the latter to monitor both the structure height and the membrane pressure throughout the process. The prototype was erected in Pesaro, Italy, in December 2016; the design replicates a gridshell built in Lecce in 2009 by the Italian company Gridshell.it, which was built through a more conventional push-up technique. A comparison between the two erection methods is therefore proposed in terms of construction speed and accuracy/precision of the built form. Design and technological aspects, as well as time frame and budget of the proposed construction technique are detailed within the text. The paper also discusses the relationship between the digital simulation of the erection process, which was already formulated by Liuti et al. in 2015, and the actual results achieved.
Content may be subject to copyright.
Proceedings of the IASS Annual Symposium 2017
“Interfaces: architecture.engineering.science”
25 - 28th September, 2017, Hamburg, Germany
Annette Bögle, Manfred Grohmann (eds.)
Copyright © 2017 by Alessandro LIUTI, Sofia COLABELLA, Alberto PUGNALE
Published by the International Association for Shell and Spatial Structures (IASS) with permission.
The Airshell prototype: a timber gridshell erected through a
pneumatic formwork
Alessandro LIUTI*, Sofia COLABELLAa, Alberto PUGNALEb
* Faculty of Architecture, Building and Planning,
University of Melbourne, MSD Building, 3010 VIC, Australia
aliuti@student.unimelb.edu.au
a Structural Xploration Lab, EPFL, Fribourg
b Faculty of Architecture, Building and Planning, University of Melbourne
Abstract
This paper presents the construction of Airshell, a small timber gridshell prototype erected by
employing a pneumatic formwork. Inspired by the work of Frei Otto and Dante Bini, the technique is
based on a pneumatic membrane and an Arduino® board – the former used as dynamic formwork and
the latter to monitor both the structure height and the membrane pressure throughout the process.
The prototype was erected in Pesaro, Italy, in December 2016; the design replicates a gridshell built in
Lecce in 2009 by the Italian company Gridshell.it, which was built through a more conventional push-
up technique. A comparison between the two erection methods is therefore proposed in terms of
construction speed and accuracy/precision of the built form.
Design and technological aspects, as well as time frame and budget of the proposed construction
technique are detailed within the text. The paper also discusses the relationship between the digital
simulation of the erection process, which was already formulated by Liuti et al. in 2015, and the actual
results achieved.
Keywords: gridshell, active bending, timber, pneumatic formwork, prototyping, form-finding
1. Introduction
In shell and gridshell architecture, analytical surfaces, as well as reverse hanging models and other
form-finding methods have been used for decades, if not centuries, as the main driver of the design
process. However, although the structural forms that result from these methods are intrinsically
faithful to the nature - and behaviour - of construction materials, they do not necessarily translate into
built forms straightforwardly or in a rational way.
1.1. Interfaces between conception and implementation
Heinz Isler’s projects are prime examples of distance between the conceptual design of structural
forms and their execution into built forms; despite his concrete shells were theoretically clear on
paper, they required a complex, labour-intensive actualisation through the preparation of doubly
curved formworks and curved steel reinforcement meshes. The concrete bridge over the Basento
River, designed by Sergio Musmeci, is another project of this kind; where the shape of the bridge itself
is the perfect representation of a minimal surface, the lack of elegance in the final construction reveals
a missing synergy between conceptual design and the practical implementation of an idea.
But that is not always the case. A strong relationship between aesthetics and technology, or better an
interface between “art and science of building”, is present in Pier Luigi Nervi’s projects, where the
development of a construction technique accompanies the emergence of architectural form.
Proceedings of the IASS Annual Symposium 2017
Interfaces: architecture.engineering.science
2
Félix Candela’s work can be read from a similar perspective. His structures primarily use geometric
forms, in particular hyperbolic paraboloids. As ruled surfaces, these geometries are describable as a set
of straight lines that ‘rule’ a surface, and can therefore be erected using simple formwork that does not
require the presence of curved elements.
This relationship - or better interface - between engineering and architecture was pushed even further
by Frei Otto’s timber gridshell project for the Multihalle in Mannheim; in this case, physical models
form finding was used not only to design the structure, but also to reproduce, to a certain degree, the
actual building erection principle. It is a well-oiled synergy – or better interface – between theory and
practice that also characterises the Binishell system patented by Dante Bini. Similar to Isler’s
pneumatic models, Bini managed to find structural form by means of an inflatable membrane; on top
of it, most importantly, he successfully scaled up the concept to bend a flat slab of concrete and steel
reinforcement mesh into a three-dimensional thin shell. The Binishell architecture is clearly based on
geometric intersections and cuts of pneumatic structures, and represents another example where low-
end technology and construction processes allowed ideas to emerge - not vice-versa.
In this framework, the project described in this paper takes inspiration from Frei Otto’s and Dante
Bini’s work and proposes a new interface between the design and construction of timber gridshells.
Applications of pneumatic formworks to shell structures date back to the 40s with the early works of
Wallace Neff; however, applications to active-bending gridshell structures were only envisioned in
literature (Otto et al. [5], Quinn and Gengnagel [7], Liuti and Pugnale [3], Quinn et al. [8], Liuti et al.
[4]). A prototype, called Airshell, was erected in Pesaro in December 2016 by means of an inflatable
membrane and an Arduino board to monitor the erection process. Details about the technique and
results are discussed in the following sections.
2. A design-and-construction framework for bending-active gridshells
The overall design of Airshell (Figure 1) replicates the geometry of an existing timber gridshell, called
Woodome1, which was designed and built in Lecce in 2009 by Gridshell.it (Pone et al. [6]). This
structure measured 7.5m x 7.5m x 3.3m and was erected through a “push-up” method consisting of
props and ropes eventually braced by a double set of steel cables. The flat grid of orthogonal laths
was assembled on site from nine macro-moduli, made of four layers of timber, two per each direction.
These layers were connected with M6 zinc-plated bolts, so to realise hinged connections. The gridshell
edges were constrained using soil-filled 0.5m x 1.4m flowerpots.
Figure 1: the built Airshell prototype. [Image: A. Liuti]
Proceedings of the IASS Annual Symposium 2017
Interfaces: architecture.engineering.science
3
With a budget of approx. AU$8,000, the authors were granted access to the Woodome1 documentation
drawings, and obtained feedback on the final structure behaviour, as well as issues related to erection,
from the designers. This opportunity permitted directed focus to the implementation of a pneumatic
erection technology, and to make a direct comparison between the two construction methods – push-
up vs. pneumatic – applied on structurally similar gridshell structures.
Airshell’s design-and-construction workflow was based on D'Amico et al. [1], Liuti et al. [4], Pone et
al. [6], so that design, manufacturing and construction could iteratively inform one another throughout
the process (Figure 2). By embedding the pneumatic formwork at both the design and construction
scales, form finding could be implemented and replicated with accuracy.
The gridshell wireframe was digitally modelled in the parametric CAD Rhinoceros® – Grasshopper®
environment, where also the erection simulation was performed. By using the interactive
physics/constraint solver Kangaroo2, the gridshell was modelled as a spring system made of two
orthogonal mats of parallel polylines; these were given a bending stiffness adjusted according to an
equivalent section and then connected at the nodes with hinge-like joints. In parallel, the pneumatic
membrane was modelled from a closed mesh sphere as a spring system; form finding was adjusted to
match the archetypical shape of Woodome1, but also considering the contribution given by the
pneumatic formwork (Liuti et al. [4]).
Setting the diameter of the pneumatic formwork to 5.20m offered a dual benefit. On the one hand, it
allowed reaching the target maximum rise of 3.3m while maximising the area of contact between
pneumatic membrane and gridshell. On the other hand, it permitted manufacturing a regular, well-
known geometry, this avoiding collateral manufacturing problems and costs (Figure 4).
To monitor prototyping and strengthen the critical interface between the analogical and digital
domains, a feedback system using control sensors was implemented. The erection height and pressure
were therefore recorded in real time using two Arduino boards (Figure 5).
Of note, within this research project, a relevant aspect was to use prototyping as a technical tool for
seeking, testing and validating a proof of functionality for the initially envisioned system (Stark et al.
2009 [9], Kamrani and Nasr 2010 [2]).
Figure 2: Keeping an open-ended design to construction framework allowed the form finding process to inform,
and at the same time to be informed, by pneumatic inflation simulations. [Image: A. Liuti]
Proceedings of the IASS Annual Symposium 2017
Interfaces: architecture.engineering.science
4
3. Prototyping
Prototyping was implemented sustainably, in accord with the philosophy that underpins the nature of
timber gridshells. A “lightweight” impact on the planet should also minimise the overall energy
consumption involved in the process – thus preference was given to local markets for sourcing
materials and facilities.
Woodome1 was built using a Sweet Chestnut typical of southern Italy. An extensive market research,
aimed to seek a compatible timber breed with little nodes, high durability and good elasticity, led to
pick European Silver Fir or Abies Alba – a Pine breed which commonly grows in central and southern
Europe. Bending resistance tests were performed prior to construction, to get information on the
allowable radius of curvature, given that 1.4m was the minimum radius detected in Woodome1.
Given the high repetition of cutting, drilling and slotting to be repeated for over 250 laths,
manufacturing was divided in two steps. First, raw planks were visually selected to avoid knots and
defects, sectioned and cut to length in 250 laths with artisanal workshop tools – such as saw tables and
table planners; tolerance of ± 2mm. Second, due to the need for a ± 0.1mm precision, these laths were
processed in an industrial workshop by means of CNC milling machines (Figure 3).
Where the main focus of the first step was to assess the quality of the material, precision could be
looser; oppositely, in the second step it became pivotal to provide manufacturing precision and rapid
processing times, so that a large number of operations could be carried out while minimising error
propagation – namely between 7 and 12 holes or slots per lath, times 250 laths.
In order to bypass the slight differences in size of the many laths during the CNC milling, each lath
was lodged in a template jig, so to register to a single milling origin. This way, the relative position of
the holes and slots was univocally determined. After drilling and slotting, each lath was rounded and
sanded to ease painting and finishing.
In parallel, custom-designed steel ground connections were fabricated being steel-and-rod shoes
(anchored with nuts and bolts to the corner nodes of the gridshell) and a fixed system of plates, forks
and rails (strapped with filleted rods to the foundation slabs). These were designed to perform a dual
function: first, to act as a horizontal linear roller during the forming process; second to interlock the
supports with pinned joints once reached the final position (Figure 7).
Figure 3: preliminary and industrial processing; right, the milling of two laths in the jig. [Image: A. Liuti]
Proceedings of the IASS Annual Symposium 2017
Interfaces: architecture.engineering.science
5
Respectively, the steel shoes were secured to the profiles rails to create roller joints; such a bond
was secured through a cable-and-pulley system anchored to the foundations. Once in their final
position, the rod of the shoes could slide in the fork of the ground plate and lock in position as a
hinged support; after this, winged fastenings would act to prevent vertical displacements, while still
allowing potential rotations related to active bending.
It is worth mentioning that the system features polar-symmetric quadrants; this permitted carrying
engineering design for supports on the single, most penalised, condition and extend it to the rest of the
ground connections. Such forces were extrapolated from a FEA carried in parametric FE solver
Karamba®, and processed, according to Eurocode 7, assuming good founding material.
In parallel, a cable system made by inextensible cables was engineered to allow a smooth transition
from the initial to the final geometry. Hereafter, a specific focus is made first on the engineering and
manufacturing of the pneumatic formwork and, second, on the development of the feedback system.
3.1. The pneumatic formwork
The pneumatic formwork engineering was premised by seeking to minimise fabrication time and
overall cost. These objectives suggested to minimise the sphere volume, while optimising the number,
distribution and length of welds. For this reason, a regular discretisation of a spherical shape was
chosen over more irregular solutions.
Given such premises, the area of contact between the sphere and the gridshell had to be maximised
throughout the whole erection process, making sure the membrane pressure could act homogeneously
and constantly on the gridshell laths. Iterative trial-and-error simulations allowed the selection of a
sphere with 2.6m radius.
It then became relevant to determine the amount of pressure required to perform the actual gridshell
erection. Such a pressure () had to overcome the combination of the gridshell self-weight (
) and
the necessary bending actions (), while not exceeding the maximum pressure
 at which the
membrane would fail:


 .
Figure 4: The membrane was virtually discretised into equal slices and unrolled for manufacturing – so that the
flat patches could be cut and welded together; swelling test at the bottom right. [Image: A. Liuti]
Proceedings of the IASS Annual Symposium 2017
Interfaces: architecture.engineering.science
6
Assuming a minimum contact area equal to the projection of the sphere on the ground level, the first
action to contrast (
) was evaluated as the sum of the distribution of the gridshell’s dead weight over
the contact area to the membrane’s dead weight, as per (1):

∙
 0.13
 (1)
Conservatively, the contribution related to the bending actions () was evaluated by reductive means
to avoid uncertainties related to the simulation procedures; this simplified system was modelled in the
FE platform Karamba®, under Euler-Bernoulli assumptions, as a grid of elements subject to a linear
load q. A prescribed displacement was imposed to the four free edges, to meet the target rise of 3.3m
on such static system, the distributed load was found by imposing the equilibrium between internal
and external actions. Finding the value of q, the pressure value could be written as per (2):
~
10
 (2)
was determined as the maximum allowed pressure action associated to the maximum tensile
strength of the PVC-coated membrane – a Ferrari Précontraint 920 S2. Prudently, the upper limit was
set 20% below 1atm, so that a suitable range of erection pressure could be framed between 101 mBar
< P < 800mBar. For practical purposes, the ideal erection pressure was assessed as P = 120mBar.
Hence, to optimise manufacturing, the following considerations were made: (1) minimising the waste
of fabric; (2) minimising the number of welds given a prefixed welding length and, hence, reducing
the overall welding time. Preliminary explorations led to discretise the sphere, according to the
meridians, into 12 identical slices. Having an array of identical elements led to a reduction of the
manufacturing imprecisions and a simplification of the cutting patterns to a set of planar polylines.
Welds were tested against traction, resisting concentrated loads up to 250Kg.
3.2. Assembly and calibration of the monitoring system
Monitoring the erection procedure required the identification of key-parameters to describe the
bending / swelling performances during the erection process. Regarding the gridshell, the position of
the edge supports was mechanically controlled by means of the aforementioned system of rails and
plates; the structure rise was measured at the central point (that is, the expected apex). For the
pneumatic formwork, it was essential to monitor the inner membrane pressure and keep it within the
admissible range of values.
Figure 5: The Arduino® emitter and receiver during testing (left) and on site (right). [Image: A. Liuti]
Proceedings of the IASS Annual Symposium 2017
Interfaces: architecture.engineering.science
7
For the monitoring system, a receiver Arduino® board was connected to a PC, so that the data
received via Wi-Fi could be plotted on screen and stored in a *.csv format file (Figure 6). The emitting
Arduino® board, instead, was placed inside the pneumatic membrane prior to inflation; on such a
device, two sensors were embedded: a distance ultrasonic sensor, and a barometric sensor.
The pressure modulus consisted of a piezo-resistive sensor, type BMP 180. Such a sensor provides an
absolute measurement of the atmospheric pressure. The distance modulus was an ultrasonic sensor, set
at the centre of the deflated membrane, at the global coordinates (0,0,0). By pointing up towards the
zenith of the pneumatic membrane, it was possible to coincidentally monitor the maximum rise point
of the gridshell. Through echolocation, rays were cast over a relatively flat surface and reflected
within an approximately 20º field of view.
As the emitter broadcast from inside a sealed space for a considerable amount of time, a Wi-Fi
antenna and a 7800mAh power bank were inbred on the board. Having the emitting board inside the
membrane also provided the benefit of neglecting interference in data monitoring related to variations
in outdoor air density and temperature.
4. The gridshell takes shape
After the nine doubly-layered structural moduli were assembled off site, site preparation focused on
laying the footings, arranging the twelve ground connection plates, the four rails and a few dead
weights around the working area. Then, the membrane was aligned at the centre of the gridshell
footprint and the Arduino® emitter was lodged inside it in the proper position (Figures 6-7).
Subsequently, the moduli were laid over the membrane and bolted together in a continuous flat
configuration. Loosely bolted M6 nuts and bolts allowed, on the one hand, the orthogonal laths to
rotate around the normal axis of each joint and, on the other hand, the parallel laths to slide onto each
other along their main axis.
Figure 6: Bottom, trends of pressure (red) and rise (black) throughout the erection; top, key-moments: from the
left, preparation, intermediate stage and final goal; the initial noise in the rise graph is related to surface
wrinkles. Erection time lapse video available on: https://youtu.be/6flPMmNxUVA. [Image: A. Liuti]
Proceedings of the IASS Annual Symposium 2017
Interfaces: architecture.engineering.science
8
After running a quick test, the actual erection took place by switching on and off the compressor at
hourly intervals. Once the rise reached 1.7m, pumping was suspended to let the timber absorb and
dissipate the imposed changes in curvature (Figure 6). After repeating a second swelling session for
one hour, the structure was left to rest again at a rise of 2.2m. At this point, a critical curvature was
reached, imposing a longer resting time before running the last swelling session. Once the goal of
3.3m was surpassed, the blower was kept going for a while to counteract marginal deflation effects.
To freeze the form-found configuration, the rod bars attached to the steel shoes were slotted in the
steel plates and secured with winged flanges; this way, the roller connections were transformed into
hinged ones. After this operation, the pneumatic membrane was kept in pressure for a day while
tightening the joints and applying the shear blocks in the lower parts of the structure; this allowed
preventing possible failures before tightening and bracing were finalised.
4.1. Comparison of the two erection methods
As in any bending-active structure, the final behaviour and stability over time of a gridshell are
determined by many factors included in the forming process – such as overall geometry, connection to
the ground, bracing direction and so forth; this is one of the reasons why the simulation of the
construction process, as well as the determination of intermediate stages of deformation, is paramount
to prevent any condition of local overstress.
In order to prevent such harmful conditions, the geometries of both Woodome1 and Airshell were
designed to be doubly symmetrical throughout the whole forming phase, to avoid the generation of
valleys, sudden changes in curvature and local stress peaks.
Woodome1 was pushed up by means of props and ropes. Preventing humps and sags, a set of hoop tie-
cables, and an orthogonal set of cables on the ground, were used to move the boundaries to their final
position and to reach the requisite height. Nevertheless, once each boundary reached a 1.20m
displacement towards the centre of the structure, the central area of the gridshell could not rise
accordingly along the z axis. Props were used to reach the desired rise and curvature; however, given
the small area suitable for the props to be arranged, these could not be placed in a symmetric layout.
On the one hand, the hoop tie-cable successfully preserved deformation symmetry throughout the
process; on the other hand, however, the props induced slight dissymmetrical actions. Nevertheless,
the final result was not affected by the asymmetrical pushing action, mainly because of the action and
presence of the hoop tie –replaced with a bracing set of steel cables once the final shape was reached.
Pushing up the lattice by means of props, also required workers to operate under the unfinished, and
non-stabilised, structure. By contrast, remotely controlling the pneumatic formwork ensured a safer
working environment, as well as reduced the use of manpower throughout the forming process.
For the pilot project Woodome1, however, the cheap and labour-intensive technologies applied, were
necessary to fulfil fast actions over unexpected events, and to set up a protocol for the fast assembling
of a small timber gridshell.
A second major improvement in Airshell was the combination of a rail system and a real-time
feedback system the first used to guide the boundaries along trajectories of imposed displacements,
the second used to monitor the erection sequence easily and precisely. The manual shift operated in
the Woodome1, on the one hand, required a constant series of time-consuming distance measurements
between the four lines; on the other hand, it occurred also in minor positioning errors.
This second feature, however, can backfire since the final position of the supports must be correctly
calculated and, due to material imperfections or unexpected contingencies, it becomes hard to correct
such a position later in the erection process. This aspect shall be further deepened by implementing a
more flexible system of ground connections.
Proceedings of the IASS Annual Symposium 2017
Interfaces: architecture.engineering.science
9
Overall, advantages in using a pneumatic membrane to gently shape the flat grid pertain both the
possibility of avoiding false deformations throughout the process, and, subsequently, avoiding
overstressing the laths. Where these two factors often are responsible for fatigue cracks, in any case
potential breakages can always occur during the erection phase due to timber defects, human error, or
a project fail.
Furthermore, a comparison between the preparation of the two erections systems would imply more
resources required for the pneumatic formwork; however, a pneumatic solution offers a good potential
for replicability. It is to be considered also that a fixed pneumatic shape can only be adopted to a given
scale / range of gridshell geometries; nevertheless, the technology has potential to be scaled to larger
structures.
5. Conclusion
Airshell was built in Pesaro, Italy, in December 2016 as the product of a collaboration between
institutions – the University of Melbourne, Politecnico di Milano and the University of Naples
“Federico II” – and private companies – such as Gridshell.it, Grottaroli and Green2.
The use of a pneumatic erection technology allowed replicating, during construction, the form-finding
simulations which were developed in the design phase; this operation was carried out with a
reasonable amount of precision and reducing the number of workers and resources required on site.
A response was developed also in terms of rapid construction, as little preparation was required on site
prior to erection; this was mainly related to the design choice of using a closed air-tight membrane,
which could be deployed and be ready to use. Differently from the Binishell system, in which a
foundation concrete edge ring was necessary to perform the erection, this system could more flexibly
adapt to conditions where site preparation is unfeasible.
Figure 7: details of the diagonal bracing and shear blocks (left), ground connection (right). [Image: A. Liuti]
Proceedings of the IASS Annual Symposium 2017
Interfaces: architecture.engineering.science
10
In this perspective, using a closed pneumatic membrane allows for ease of transport, deployment and
construction system set up – in a way that no high-end technology, no skilled workers and no
extensive times for preparation are required on site. Furthermore, this pneumatic formwork can be
packed after the usage and reused on a different project, minimising the impact of such a device in the
economy of a possible series of gridshells. The use of an integrated monitoring system allowed
transposing analogic into digital data, so that such an interface became a resource in automating the
design and erection framework.
As an endnote, the construction of gridshell structures still copes with further contingencies such as:
the unpredictability of timber due to its hardly-standardisable behaviour (anisotropic and scattered
with nodes); the huge amount of labour required by the joint connections (tightening and placing the
shear blocks); the difficulty of providing everyday functions to such manufactures.
Acknowledgements
The realisation of Airshell was possible thanks to the precious contributions of: Prof Alessandra
Zanelli (Politecnico di Milano, Textiles Hub); Prof Sergio Pone (University of Naples “Federico II”,
Gridshell.it); Serge Ferrari, Flexible composite materials; Grottaroli, wood engineering solutions;
Green2. A special thanks to all the volunteers, workers and supporters of the Airshell team. The
authors also express their gratitude to Blair Gardiner, who kindly proofread the final version of the
paper and provided valuable feedback.
References
[1] D'Amico, B., Kermani A., Zhang H., Pugnale A., Colabella S. and Pone S., Timber gridshells:
Numerical simulation, design and construction of a full-scale structure. Structures, 2015; 3; 227-
235.
[2] Kamrani, A. K. and Nasr E. A., Engineering design and rapid prototyping, Springer Science &
Business Media, 2010.
[3] Liuti, A. and Pugnale A., Erection of post-formed gridshells by means of inflatable membrane
technology, in Proceedings of the 49th International Conference of the Architectural Science
Association. Living and Learning: Research for a Better Built Environment (ASA 2015), 2015,
678–687.
[4] Liuti, A., Pugnale A. and D'Amico B., Building timber gridshells with air: Numerical simulations
and technique challenges, in Proceedings of the Third International Conference on Structures
and Architecture (ICSA 2016), 2016; 251-258.
[5] Otto, F., Hennicke J. and Matsushita K., Gitterschalen gridshells. Institut für Leichte
Flächentragwerke, IL, 1974; 10; 340.
[6] Pone, S., Colabella S., D’Amico B., Lancia D., Fiore A. and Parenti B., Timber post-formed
gridshell: digital form-finding/drawing and building tool, in Proceedings of the International
Association for Shell and Spatial Structures symposium 2013. Beyond the Limits of Man, 2013
[7] Quinn, G. and Gengnagel C., A review of elastic grid shells, their erection methods and the
potential use of pneumatic formwork, Mobile and Rapidly Assembled Structures IV, 2014.
[8] Quinn, G., Gengnagel C. and Williams C., Comparison of Erection Methods for Long-Span
Strained Grid Shells, in Proceedings of the International Association for Shell and Spatial
Structures symposium 2015. Future visions, 2015.
[9] Stark, R., Beckmann-Dobrev B., Schulze E.-E., Adenauer J. and Israel J. H., Smart Hybrid
Prototyping zur multimodalen Erlebbarkeit virtueller Prototypen innerhalb der
Produktentstehung, in BWMM symposium 2009. Der Mensch im Mittelpunkt Technischer
Systeme, 2009; 437-443
... Erection/bending is a key construction task for bending-active structures since this is often when the most penalising loading conditions arise. Erection/bending is meant to replicate form-finding and gradually/homogeneously distribute bending actions on the flat elements; whereas currently available methods can vary according to the scale, the structural typology, and the material system, five main erection methods can be outlined: the "incremental method", the "lift-up method", the "push-up method", the "ease-down method", and the "pneumatic falsework method" [1,8,11]. ...
... The Airshell project (2016) illustrates that the pneumatic falsework erection enables to bypass some of these setbacks; pneumatic forming replicates form-finding at a 1:1 scale, providing a homogeneous distribution of bending forces, and streamlining and automating the whole erection process. [8]. ...
... The Airshell gridshell provided a more radical interface; at a first level of integration, 1:1 pneumatic forming blended the generative construction principle within the design and vice-versa, bypassing further a-posteriori engineering. Furthermore, the use of Arduino ® distance sensors provided a real-time digital monitoring interface, streamlining the whole erection/bending process [8]. In the perspective of incremental innovation, augmented-reality/mixed-reality interfaces can provide a more flexible real-time digital monitoring system; this could provide a more precise control over the position of each single nodes in space (even for larger structures), reduce the use of shop drawings, and real-time layer digital information on top of the physical parts (i.e. ...
Conference Paper
Full-text available
This paper overviews the design-to-construction interfaces in bending-active structures, which still show considerable gaps and discontinuities between the increasingly precise computational-based design stages and the often artisanal/empiric manufacturing and construction stages. Such discrepancies can either introduce redundant structural elements or develop highly resource-intensive construction methods. The first part of the paper reviews a selection of historical and recent built structures through multi-criteria matrixes that analyse the relationship between structural typologies, generative approaches, construction methods, lifespan , and material systems. Drawing from these considerations, the paper then focuses on the interfaces between design simulations and construction, emphasising on the monitoring/controlling of the bending process. Conclusively, a small-scale experimental application opens speculations upon the future of bending-active structures, augmented reality, and interactive prototyping/manufacturing. 1. Typologies, lifespan, and scale in bending-active structures Bending-active structures comprise several lightweight/ultra-lightweight structural typologies which are obtained by elastically deforming an initially straight/flat set of load-bearing elements (the "released configuration"); among these: gridshells, plate structures, and textile hybrid structures. As the term bending-active refers to a physical behaviour rather than to a specific structural typology, both material and geometrical features, as well as detailing and construction methods, can vary considerably. Each material system allows for different construction methods, which must account for the scale, lifespan, and budget, of each structure [1, 6, 13]. The following review shows that, when design informs manufacturing and construction seamlessly (and vice-versa), bending-active systems can facilitate the tasks of manufacturing, assembly, and dismantling. These lightweight/ultra-lightweight structures can demand a "lighter" or "heavier" amount of resources during construction, since it is not always easy to replicate or scale the design process in a simple manner; construction methods, moreover, still seem underdeveloped in comparison to design methods, which, on the contrary, are currently evolving rapidly due to materials and computational advancements. When design, manufacturing and construction are well thought through, these structures can be used (and re-used) for both the short-term and the long-term; however, given the experimental nature of bending-active structures, the consistent advancements in design and materials, and the limited applications to architecture, it can be difficult to account for manufacturing/construction aspects in the design phase, and vice-versa. Whereas having initially flat elements can simplify the manufacturing process, it also requires careful material and structural considerations across both the stages of design, manufacturing, and construction. A suitable bending-active material must enable for large deformations during construction (thus low bending stiffness) while providing enough load-bearing properties during
... For these outstanding characteristics, GFRP profiles have been widely used in the elastic gridshell structures during the last decade, inaugurating a new era for this type of structure [5,8,[11][12][13]. Now that the shape forming of plane grid needs to be well controlled during the construction process, the construction method is always a crucial issue for the elastic gridshells [14][15][16][17]. Fernandes et al. made a comprehensive review in [15] on the practical construction methods for elastic gridshells, among which the lifting construction method is later proposed by Peloux et al. [13] for GFRP elastic gridshells. ...
... (3) Compute the F ix , F iy and F iz for each discrete element by Eqs. (15), (16) and (17), respectively. (4) Calculate the deformed curves of the discrete elements loaded by F ix , F iy and F iz . ...
Article
The GFRP elastic gridshell is a type of spatial structure composed of long continuous hollow GFRP members and has been used in large-span roof structures. The elastic gridshell achieves its shape as the result of elastic deformations during the construction process of lifting or pushing. The shape-forming mechanism of such structures is very complicated due to significant geometric non-linearity. This research aims to propose analytic formulations to estimate the structural features of the GFRP elastic gridshell under lifting construction. An analytical theory, considering the large geometric deformations, is first presented for analyzing single lifted member. , Based on the given theory and an iteration process, a form-finding method is further proposed for predicting the deformation, nodal forces and bending moment of biaxial symmetrical GFRP elastic gridshells during the lifting construction. The form-finding method is realized on the Matlab platform and a cases study is carried out. Finite element analysis is further conducted to validate the accuracy and practicability of the proposed method. Results show that, the analytic theory is highly accurate for the analysis of lifted members, and the proposed form-finding method is applicable in predicting the structural behaviors of GFRP elastic gridshells for which the lifting construction is adopted.
... Another key decision relating to the design of the cushion is whether it should be untethered or tethered. Untethered or free-standing cushions could take the form of a sphere, as trialled by Liuti [64]. This approach was rejected on the following grounds: -A spherical cushion will always result in less contact area between the cushion and the grid for all typical architectural shell shapes leading to higher internal pressures which are harder to maintain, monitor and detail for. ...
Thesis
Full-text available
Elastic gridshells are celebrated for their striking biomimetic curves, long spans and efficient material usage. Constructed from a grid mechanism of slender beams, an elastic gridshell is assembled on a flat surface then repositioned into its final curved shape after which stabilising elements are added and the structure becomes a stiff load-bearing shell. While elastic gridshells are efficient in their built-state, the established methods with which to erect them (‘lift up’, ‘push up’ and ‘ease down’) are associated with substantial complexity, cost and time which inhibit their adoption. The central research question of this thesis asks whether elastic gridshells can be erected by means of pneumatic falsework (i.e. ‘inflate’), if so how and what would be the implications of doing so. The work presented in this thesis proves that the pneumatic erection of elastic gridshells is not only feasible but can offer many advantages (such as speed of erection, structural robustness and architectural qualities) over existing shelters for humanitarian, event and architectural applications. A literature review is presented on the historical precedent for this novel method. The computational challenges of simulating the complex erection process are investigated in depth leading to the development of bespoke simulation methods based on the novel application of a projection-based dynamic relaxation solver. Case studies and a benchmark compare state-of-the-art finite element solvers based on both global and local stiffness revealing their quantitative and qualitative differences giving some indication as to the future of finite element modelling for the built environment in engineering, research and education. Innovative prototypes of augmented and virtual reality engineering tools for education are presented as wider reaching applications of the novel simulation method developed for this thesis. The simulation methods developed to answer the central research question deliver valuable findings relating to the scope of feasibility and the practical execution of the novel method including: suitable shapes and sizes of shells, ‘trigger’ pressures required, the function and importance of tethering cables during erection, development and detailed analysis of erection sequences and identification of material suitability and performance criteria. One small and two full-scale physical prototypes were built which validate the novel computational methods to a high level of precision, offer practical detailing solutions and demonstrate the architectural and humanitarian potential within the pneumatic erection of elastic gridshells.
Article
The barrel vault elastic gridshell is a type of spatial structure composed of long continuous solid timber or hollow GFRP members and achieves its shape from elastic deformations during the construction process of lifting or pushing. The shape forming mechanism of elastic gridshells is very complicated due to significant geometric non-linearity. This research aims to propose analytic formulations to estimate the deformed shapes of barrel vault elastic gridshells considering the mechanical properties of structure. Simplified model of a single member subjected to distributed loads and concentrated forces was established for theoretical analysis, from which the deformations and bending moments of the structure were calculated. Finite element models were further established to validate the accuracy of the proposed approach, and both simple cantilever beams and spatial barrel vault elastic gridshells were employed as investigation objects. Various cases of dimensional parameters were covered so that the wide applicability of such analytical method can be verified. Results show that the derived performance indexes of all members are very close to the results from finite element analysis, indicating that the proposed theoretical approach is effective and efficient in predicting the structural behaviors of barrel vault elastic gridshells when lifting construction method is adopted.
Article
Elastic gridshells are celebrated for their striking biomimetic curves, long spans and efficient material usage. They are efficient in their built state but their established erection methods (using cranes, jacking towers or scaffolding) are associated with substantial complexity, cost and time which inhibit their adoption. The pneumatic erection of elastic gridshells offers a novel solution which aims to alleviate such drawbacks. A holistic approach, tackling design, computation and fabrication in unison, was necessary to realise this novel erection method. This paper focuses on the computational methods developed for the structural design and analysis of two full-scale prototypes. Findings relate to the method’s scope of feasibility, suitable shapes and sizes, ‘trigger’ pressures required, erection sequence and identification of material suitability and performance criteria.
Article
We present X-shells, a new class of deployable structures formed by an ensemble of elastically deforming beams coupled through rotational joints. An X-shell can be assembled conveniently in a flat configuration from standard elastic beam elements and then deployed through force actuation into the desired 3D target state. During deployment, the coupling imposed by the joints will force the beams to twist and buckle out of plane to maintain a state of static equilibrium. This complex interaction of discrete joints and continuously deforming beams allows interesting 3D forms to emerge. Simulating X-shells is challenging, however, due to unstable equilibria at the onset of beam buckling. We propose an optimization-based simulation framework building on a discrete rod model that robustly handles such difficult scenarios by analyzing and appropriately modifying the elastic energy Hessian. This real-time simulation method forms the basis of a computational design tool for X-shells that enables interactive design space exploration by varying and optimizing design parameters to achieve a specific design intent. We jointly optimize the assembly state and the deployed configuration to ensure the geometric and structural integrity of the deployable X-shell. Once a design is finalized, we also optimize for a sparse distribution of actuation forces to efficiently deploy it from its flat assembly state to its 3D target state. We demonstrate the effectiveness of our design approach with a number of design studies that highlight the richness of the X-shell design space, enabling new forms not possible with existing approaches. We validate our computational model with several physical prototypes that show excellent agreement with the optimized digital models.
Conference Paper
Full-text available
This paper describes a new erection technique for post-formed timber gridshells which takes advantage of inflatable membrane technology. Consolidated construction techniques for timber gridshells are based either on “pull-up” / “push-up” (i.e. Mannheim Multihalle) or “ease-down” behavior (i.e. Downland Open Air Museum). However, these techniques show shortcomings already at small scale. When applied to large scale, a lack of a standardised, cost-effective erection method implies that techniques have to be reinvented every time. When construction becomes expensive and laborious, gridshells become affordable only for exceptional projects, such as the Downland Museum or the Mannheim Multihalle. These are among the reasons why gridshells are not widely applied, even if they enable covering large spans with a minimum amount of material; they are built from basic technologies though self-construction; they are fast to construct; they are entirely recyclable. In this work, an inflatable membrane is designed and used to erect a gridshell prototype with a footprint of 55m2. Inspiration comes from the work by architect Dante Bini, who realised thousands of inflatable concrete domes worldwide.
Conference Paper
Full-text available
In this paper, a detailed comparison is carried out between established ('lift up', 'push up' and 'ease down') as well as novel ('inflate') erection methods for strained grid shells by means of FE simulations and a 3D-scanned scaled physical model in order to evaluate key performance criteria such as bending stresses during erection and the distance between shell nodes and their spatial target geometry. These investigations were carried out on a case study of a dome with a 30m span, 10m pitch and constant double curvature. A detailed description is provided of the developed simulation approach, which makes particular use of contact springs for a structural system subject to large deformations, in the SOFiSTiK FE software environment. It is shown for the 'lift up' and 'push up' methods, that maximum bending stresses are most likely to occur during the erection process and not during end-state static load cases. This risk of beam-overstressing for existing erection methods along with challenges caused by modern safety restrictions, scaffolding costs and build duration can be drastically reduced or even eliminated by making use of inflated pneumatic cushions for the erection of strained grid shells. Furthermore it is argued that the use of pneumatic falsework has the potential to once again facilitate large-span (300) strained grid shell structures such as have not been realised since the likes of the extraordinary " Multihalle Mannheim " (Happold and Liddell [1]). It is claimed that the overriding constructional benefits of strained grid shells, such as low material usage and fabrication simplicity, are undermined by the methods typically used for their erection.
Article
Full-text available
Timber gridshell structures, such as the Multihalle for the federal garden festival in Mannheim or the Downland Museum, have been the result of a creative–generative process that indissolubly ‘welded’ the structural contribution to that of form exploration. The challenging design and construction issues have been typically addressed and resolved in several inventive ways. However, still now, form-finding and erection of timber gridshells present many difficulties. In this regard, this paper aims to provide a series of novel steps to address some of the main design and construction issues that are associated with ‘actively-bent’ timber gridshell structures. First, the main characteristics of the construction process of timber gridshells are described and the basic theoretical concepts for its numerical simulation, through Dynamic Relaxation method, are introduced. Second, a practical method for sizing the laths' cross-section is presented. Third, a new erection technique for timber gridshells is proposed and applied to the construction of a full scale (prototype) structure, the Toledo gridshell 2.0. Fourth, a new bracing system for the same structure, which was built at the Faculty of Architecture, University of Naples Federico II in June–July 2014, is explained and discussed. The paper also highlights the need for further application to validate the techniques explained here, with particular attention being paid for the construction of large scale free-form structures.
Conference Paper
Full-text available
The evolution of elastic grid shells has observed significant progress in the fields of computational form-finding, structural analysis and to some extent buildability since their inception in the 1960s. While the engineering precision of built elastic grid shells has increased on the whole (most notably Chiddingstone Orangery & Savill Gardens), the size and span of modern elastic grid shells has decreased. Furthermore, building costs per square metre for such structures have also increased. Despite an increase in the frequency of elastic grid shells built in Europe over the last two decades, fuelled in part by academic curiosity, the low sample makes interpreting trends in their adoption rate difficult. Nonetheless the failure for more widespread adoption in the built environment of this low-tech, large-span building technology may be attributable to the increased serviceability demands of modernised building codes coupled with limitations or apprehension caused by health and safety legislation. While the idea has been considered before, it is argued in this paper that the use of air-inflated membrane cushions for the erection of elastic grid shells has the potential to significantly reduce the demands on structural performance of the nodes and beams when compared with the crane and cable erection method and that when compared with the scaffolding erection method, the air-inflated cushion approach can offer paralleled safety but at a fraction of the time and cost. It is believed that this technique offers a way to once again facilitate largescale, low-cost elastic grid shell buildings in the modern built environment such as have not been since the likes of the Multihalle Mannheim.
Conference Paper
Full-text available
This research deals with design, structural analysis and construction of timber post-formed gridshells. Starting from the scale modelling experience, from 1:20 to 1:1 scale, a digital form-finding strategy was early developed with a Building Process Finite Element (FEA) simulation (GBP-FEAs), with which a real scale experimental structure was designed (and built). Then in a further experimentation building the digital form finding was performed with aid of a graphical algorithm editor (Gfft – Gridshell form finding tool), that uses generative algorithms. At present time both strategies are used together: with the Gfft a “correct” form – and the correspondent flat square mesh is searched, structural analyzed and improved; then GBP-FEAs finding out the resulting stresses ratio at every deformation stage. The next goal to achieve is the development of an integrated software to design a “correct” gridshell without any knowledge of FEA or graphic algorithms software's.
Conference Paper
Construction has always been a fascinating and challenging aspect of timber gridshells. So far, only three techniques have successfully been used for the erection of such structures: the so-called ‘lift-up’, ‘push-up’ and ‘ease-down’ (Quinn et al. 2015). Inflatable Membrane Technology is here proposed as a new solution and is tested by means of numerical simulations on a simple case study. As a matter of fact, IMT reduces the timber lath’s stress during erection and guarantees an optimal shape control. It also seems suitable to post-form more challenging gridshell geometries, but this aspect still deserves further investigations and experiments.
Chapter
This chapter presents the concepts of design for manufacturing and assembly. Product design is the first step in manufacturing and is where the critical decisions are made that will affect the final form and cost of the product. Design for manufacturing and assembly concentrates on simplifying designs while also evaluating assembly improvements to further enhance the overall design for manufacturability and quality. DFMA is a product development process and improvement methodology that provides a systematic process to achieve improved product design, robustness, and cost reductions through simplifications of the overall design. Finally, many case studies are shown for the purpose of understanding the concepts presented in this chapter.
  • F Otto
  • J Hennicke
  • K Matsushita
  • Gitterschalen Gridshells
Otto, F., Hennicke J. and Matsushita K., Gitterschalen gridshells. Institut für Leichte Flächentragwerke, IL, 1974; 10; 340.
Smart Hybrid Prototyping zur multimodalen Erlebbarkeit virtueller Prototypen innerhalb der Produktentstehung
  • R Stark
  • B Beckmann-Dobrev
  • E.-E Schulze
  • J Adenauer
  • J H Israel
Stark, R., Beckmann-Dobrev B., Schulze E.-E., Adenauer J. and Israel J. H., Smart Hybrid Prototyping zur multimodalen Erlebbarkeit virtueller Prototypen innerhalb der Produktentstehung, in BWMM symposium 2009. Der Mensch im Mittelpunkt Technischer Systeme, 2009; 437-443