ArticlePDF Available

Causes of building failures in Africa: A case study on collapsing structures in Kenya

Authors:
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE)
e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 11, Issue 3 Ver. VII (May- Jun. 2014), PP 09-10
www.iosrjournals.org
www.iosrjournals.org 9 | Page
Causes of building failures in Africa: A case study on collapsing
structures in Kenya.
Jackson Musyoka Kioko
(A Bachelor of technology student & a Kenyan scholar, Civil Engineering department at National Institute of
Technology-Warangal, India)
Abstract: This article elaborates the various causes of building failure in Africa, particularly Kenya. In
addition to various causes that lead to collapse of buildings, Lack of African code of practice can also be a
factor that should be put in consideration. Most codes of practice used in African countries are foreign codes
either from Britain or Indian codes yet we use local materials for construction.
Keywords: building; code of practice; collapse; Life & properties; materials.
I. Introduction
The cases of building failures and consequent collapse of structures in Kenya had reached an alarming
stage in the past few years. Reporting collapsed buildings in the country was comparable to flood disaster,
earthquake and aeroplane clash considering the loss of life and destruction of property in different parts of the
country. As I prepare this article, there is a sense of relief in the country as far as building collapsing is concern,
not because people have stopped doing construction work, but as a result of safety measures currently being
practiced in the construction industry along with tight government precautions. The aim of this article is to
elaborate various cases that occurred in the country leading to loses of lives and properties. It also mentions the
causes which could have caused such incidents, along with various suggestions which were not included in
speculations.
II. Collapsed buildings.
A five-storey building under construction collapsed in the central business district in Nairobi, in
January 2013. The building began to sway, then quickly
collapsed, killing at least 11 and injuring dozens. More than
280 construction workers were inside when the unfinished
structure in central Nairobi came down. Over 200 people were
trapped under the debris of the collapsed structure. Several
people remained trapped for hours and could be seen signalling
for help from under the debris with their hands. At least 90
people were pulled out of the rubble alive, but six of those later
died of their injuries Bystanders, including children, were
injured by collapsing material.
In kisumu city, a building adjacent to Imperial Hotel
tumbled down when workers were preparing to call it a day.
Most of the victims were day labourers and the construction
manager was said to have run away immediately the incident
occurred. Efforts to reach him remained futile as his phone
was off after the incident. Scores of people were still trapped
inside the debris even as rescue efforts led by the Kenya Red
Cross, fire fighters and police continued overnight.
Another incident occurred in which a 4-storey building that
was partly under use though under construction in Mlolongo, along
Mombasa Road, collapsed in on Saturday 9th June 2012, leading to the
deaths of five people and injury of ten others. It took the Fire Services
ssUnit, the Kenya Police and other stakeholders an overnight search
and rescue operation where by five bodies were finally retrieved from
the rubbles and ten injured people rescued and taken to the Hospital.
The operation took almost 36 hours.
Fig 2: collapsed five storey building in Nairobi
Fig 1: collapsed four storeys in kisumu,
Kenya.
Causes of building failures in Africa: A case study on collapsing structures in Kenya.
www.iosrjournals.org 10 | Page
III. Reasons suggested to have caused the failures
All the above incidences resulted to loss of lives
and property, but the question that begs many answers is
why do these buildings collapsed, and how will this be
brought to an end?
A number of reasons had been given to explain why these
buildings had collapsed and these include reasons like the
concrete mix ratio being not right, lack of enough
planking and strutting in place to uphold excavations, the
column spacing being too wide, poor reinforcement, the
slenderness ratio being too high, cost cutting by
contractors by changing recommended concrete mix or
reducing the amount of reinforcement recommended
and a multitude of other reasons.
Generally, building failures occurs due to use of
sub-standard building materials, poor workmanship by
contractors, use of incompetent contractors, faulty construction methodology, heavy downpour, non compliance
with specifications or standards by developers and contractors, lack of supervision, poor inspection &
monitoring, structural defects, defective design/structure, illegal conversion and alterations.
IV. Recommendation and suggestions
As responsible professionals in the built environment, I think it is good for the construction companies
to emphasize the need for use of qualified personnel in all construction activities as a step towards restoring
sanity in the industry. The tragedies are likely to keep occurring if left unchecked as construction activities
increase. The inability of Kenyan construction industry of having its own code of practice is another factor that
should be put into consideration. This would have taken into account the quality of the local materials used in
construction. For instance, it is important for the aggregates used in making concrete to be free from impurities
and the sand used to be free from silt and clay. Presence of impurities in concrete reduces its comprehensive
strength hence this aspect should be highly monitored while doing construction.
V. Conclusion
In order to reduce the incidences of building collapse in any country, the national society of engineers
and other government agencies should work on availing a code of practice which will match on the local
materials used in a particular region. They should also make sure that the client employs a qualified engineer to
supervise the project. The government should also play a key role of ensuring that all projects meet the required
standards before they are laid on site. Any sort of corruption, poor governance or poor construction materials
that do not meet the required standards of construction will always lead to loss of lives and properties.
References
[1] Kenya Red cross Society documentary 2013:-
http://www.crisocial.net/index.php?option=com_hwdvideoshare&task=viewvideo&Itemid=8&video_id=584
[2] Kenya digital standard news on collapsed structures in the various parts of the country.
http://www.standardmedia.co.ke/?articleID=2000075293
[3] 2012-2013: Concrete technology class-notes on major causes of building failure through various case studies on durability of
concrete structure by Prof. Rathish Kumar Pancharathi, National Institute of Technology, Warangal, Department of
Civil Engineering, India.
Author
Jackson M. Kioko
Civil Engineering Department,
506 004, National Institute of Technology, Warangal
Andhra Pradesh, India.
E-Mail: jackrosemk@gmail.com
Fig 3: Trapped workers in a collapsed 4-storey building.
... Regulating land use by adopting good building codes, for example, through government sectors responsible for urban and land use planning have shown capacity to reduce disaster risk that governments need to make. They can address many disaster risks such as seismic risk or underlying disaster risks as a result of rapid urbanization and construction of buildings that does not meet safety standards in the continent (Kioko, 2014). ...
... Interviewees reported and in congruence with Kioko (2014) that a number of non-approved buildings such as housing and public infrastructure projects have shown to pose the risk of collapse due to a variety of reasons. The factors responsible for the poor state of the construction industry in Africa include faulty design, use of poor concrete mix ratio, limited planking and strutting, too wide column spacing cost cutting by constructors and changing recommended concrete mix ratio among other reasons. ...
... The factors responsible for the poor state of the construction industry in Africa include faulty design, use of poor concrete mix ratio, limited planking and strutting, too wide column spacing cost cutting by constructors and changing recommended concrete mix ratio among other reasons. Countries in the continent, for instance, can enhance resilience of the build environment by strengthening the capacity of the responsible sector to regulate and enforce the building codes and land use plans in urban areas, train artisans involved in the construction of buildings and ensure there is compliance with the required construction standards (Kioko, 2014). In agriculture sector, adopting new technologies and crop varieties that are resilient to climate variability and change and drought can contribute to enhancing food security and resilience to sustainable development in Africa's dry lands (Omoyo, et al., 2015). ...
Article
Full-text available
Disaster risk reduction (DRR) strategies are critical for formalizing effective disaster risk reduction. The overall objective of this study was to assess the progress the African Union member states are making in developing DRR strategies as required by Target E of the Sendai Framework. The study used both qualitative and quantitative approaches where an in-depth desk review of DRR strategies and online questionnaires were administered to 53 respondents. The findings shows about 68 % of the AU member states have national strategies and 35 % have sub national strategies but generally there is sluggish progress in updating DRR strategies in accordance with Sendai Framework Target E. Weak technical and institutional capacities, inadequate funds, limited decentralization of DRR and poor governance are key challenges hampering their implementation. Governments in Africa and partners should pay immediate attention to accelerate development of risk-informed strategies to achieve the aspirations of the Sendai Framework.
... Recent research [91,96] analysed East African building codes provisions and found them overall insufficient and not consistent with the actual seismic ground acceleration. Even uniquely due to gravity loads, buildings' collapses have become dangerously common [96,97]. ...
... As claimed by the scientific literature [87,91,96,98] and confirmed by the interviews conducted in this study, a specific structural building code in Tanzania does not exist and it is common practice to build with no reference to any building standard whatsoever [91,99]. In some occasions designers may refer to foreign building codes [87,91,97], mostly the old British Standard, likely due to the fact that Tanzania was formerly a British territory. ...
Article
Full-text available
To cope with earthquakes, resistant housing is crucial. Too often essential construction techniques are not applied in the most vulnerable contexts. Local construction stakeholders have a major responsibility in reducing vulnerability of the built environment. This exploratory study investigates current seismic risk awareness in the region of Iringa (Tanzania) and discusses its implications for disaster resilience policy and practice. This medium seismic hazard risk area presents an interesting case-study to map risk awareness of key construction stakeholders. Our analysis covers seismic risk maps, governmental policy documentation and stakeholder awareness data. Data collection across 17 villages includes a poll with 21 mason and 15 school principals, and 5 interviews with a district engineer, a contractor, an architect and two homeowners. This sample illustrates the severe lack of risk awareness in Iringa. Our evidence reveals limited risk awareness across all community-based stakeholders, including absent risk awareness of local masons. High risk awareness was found in national governmental policy documents. We conclude that local seismic risk awareness is influenced by: (i) absent structural building codes that consider seismic forces, (ii) lack of risk communication campaigns by the government or NGOs, (iii) and limited freedom of speech linked to natural hazards. Our findings advocate for enhancement of risk awareness by: (i) development of a Tanzanian structural building code with recommendations for seismic resistance, (ii) better risk communication strategies to bridge the knowledge gap between governmental departments and communities, and (iii) exclusion of natural hazards from the list of prohibited communication topics in legislation.
... Concrete is the single most widely used construction material in Kenya [1] and cement paste plays a major role in binding the aggregates, which account for majority of the constituents of concrete. Hence, the properties of cement dictate the performance and reliability of Concrete structures. ...
... Human error may be responsible for loss of lives in collapsed buildings under construction, like the 2006 site in Nairobi that resulted in 16 deaths and over 200 injured (Mutugi & Maingi, 2011). It may have also caused, the collapse of a five-storey building under construction in central business district in Nairobi in 2013, killing 11 people and injuring dozens (Kioko, 2014). In Mlolongo, a four storey building collapsed in June 2012 due to poor workmanship leading to 5 deaths and 10 injuries. ...
Article
Purpose: Instability of buildings is a global phenomenon that results in loss of lives, wasted infrastructure and injuries. Most of the existing literature has concentrated on technical causes of instability of buildings and recommended technical solutions that have not been successful in taming the problem. The purpose of this study was to examine non-technical secondary causes that lead to instability of buildings in Kasarani Sub-county, Nairobi County, Kenya. The study specifically sought to address the following objectives: To determine the influence of social facets on stability of multistorey buildings; To examine the influence of economic facets on stability of multistorey buildings; To determine the influence of environmental facets on stability of multistorey buildings; To examine the influence of political facets on stability of multistorey buildings. Methodology: The study adopted the Joint Committee’s Structural Reliability Theory and Robert Giacalone’s with Mark Promislo’s Ethical Impact Theory to guide it. The study used survey research design with the target population being 7,373 participants from Kasarani sub-county. The sample size was 365 respondents which was determined from Krejicie and Morgan’s formula and it included 262 developers, 87 contractors and 16 building professionals. The study used a structured questionnaire to collect quantitative data. Validity of the instrument that is concerned with whether the instrument measures what it is supposed to measure was achieved through use of content validity which draws an inference from test scores to a large domain of items similar to the ones in the test. Reliability of the instrument which is concerned with whether the results are consistent was achieved through conducting a pilot study and checked by use of the Cronbach Alpha’s reliability coefficient. The independent variable was secondary facets while the dependent variable was stability of multistorey buildings. The intervening variable was enforcement of bylaws. Results: All the secondary facets (social, economic, environmental and political) were found to be statistically significant having a p-value less than 0.05 and F = 13.846, which is more than F Critical of 3.09. The study yielded a regression model of Y = 1.053 + 0.174X1 + 0.166X2 + 0.200X3. The study found that secondary facets play a significant role in stability of multistorey buildings including social, economic, environmental and political ones. Addressing these and other secondary facets could go a long way in addressing the menace of building collapses. Policy recommendation: It is recommended that the various stakeholders in the construction industry address each of the secondary facets as indicated in the report.
... Regulating land use by adopting good building codes, 381 for example, through government sectors responsible for urban and land use planning have shown 382 capacity to reduce disaster risk that governments need to make. They can address many disaster risks 383 such as seismic risk or underlying disaster risks as a result of rapid urbanization and construction of 384 buildings that does not meet safety standards in the continent (Kioko, 2014). can contribute to enhancing food security and resilience to sustainable development in Africa's dry 397 lands (Omoyo, et al., 2015). ...
Preprint
Full-text available
Disaster risk reduction (DRR) strategies are critical for formalizing effective disaster risk reduction. The overall objective of this study was to assess the progress the Africa Union member states are making in developing DRR strategies as required by Target E of the Sendai Framework. The study used both qualitative and quantitative approaches where in-depth desk review of DRR strategies and online questionnaires were administered to 53 respondents. The findings show about 68% of the AU member states have national strategies and 35% have sub-national strategies but generally, there is sluggish progress in updating DRR strategies in accordance with Sendai Framework Target E. Weak technical and institutional capacities, inadequate funds, limited decentralization of DRR and poor governance are key challenges hampering their implementation. Governments in Africa and partners should pay immediate attention to accelerate the development of risk-informed strategies to achieve the aspirations of the Sendai Framework.
... Boateng (2020b) linked building collapse to the engagement of unqualified builders or contractors and poor management in the early stages of the building lifecycle. Kioko (2014) associated the building failure in Kenya to the use of inferior construction materials, poor mixing of building materials, and corruption. Taiwo and Afolami (2011) attributed the structural failure and collapse of buildings in Nigeria to engagement of unqualified structural engineers, architects, and contractors; failure to conduct soil and load-bearing capacity testing; bad construction practices; use of inferior building materials; non-enforcement of and non-adherence to building regulations; and unauthorized conversion of building uses. ...
Article
Full-text available
The study investigated the perceived causes of structural failure of public buildings, frequency of stability checks, stability checking procedures, measures to enhance public building stability checks and the roles of facility managers in the Accra Metropolis of Ghana. Following a comprehensive literature review, the study employed a structured questionnaire survey and gathered the opinions of sixty-seven facility managers on the facility management practices. Following statistical pretesting of the dataset for reliability, distribution and agreement among the responses, the study analysed the dataset using mean scoring and weighted analysis. The analysis showed that external building inspectors rarely inspect stability checks of the studied public buildings in Accra. It is also found that both reactive and proactive stability checking protocols are implemented in public buildings in Accra, but inadequate knowledge of facility managers limits technical stability checks. The study further revealed that stability checks of public buildings can be enhanced through incorporating site and location conditions into the design early upfront, active engagement of facility managers in the design and construction of public buildings, adequate budgetary provisioning for planned maintenance of public buildings, and encouraging appropriate use of public buildings. This paper, to the best of the authors’ knowledge, represents the first attempt to comprehensively examine the causes of structural failure of public buildings, frequency of stability checks, stability checking procedures, measures to enhance public building stability checks and the roles of facility managers in Ghana, from the perspective facility management.
... The problem was fuelled by the fact that most of such constructions were constructed without building permit from the urban authorizes which could have controlled the quality in case there was issuing of the permit . The result of non compliance to standards and specification has been reported to be the cause of a number of buildings to collapse in some African countries such as indicated by Kioko(2014)in Kenya and in Nigeria by Chendo & Obi (2015). ...
Research
Full-text available
Abstract To preserve quality of built housing units one requires strict adherence to specifications for both materials and workmanship. Informal craftsmen in developing countries are the major providers of labour in both formal and informal construction work. Their continued use suggests for adequate competence in their training/learning or mentorship systems or quality is being sacrificed for cheap labour. For informal learning to provide the required understanding, skills and competence it should include an appropriate knowledge transfer for building specifications failure of which may compromise the ultimate quality of the structures built. This study therefore evaluates the appropriateness of informal knowledge transfer of specifications and analyses whether such transfers influences the degree of compliance to specification in informal construction practices. Based on the fact that the population of informal craftsmen is not known sample size of 417 craftsmen was drawn from the population which was assumed to be large. For that purpose a linear logistic regression model was implemented with compliance indicator as a dependent variable and knowledge and other control variables as independent variables. It was observed that although knowledge transfer matters for the attainment of higher level of compliance to building specification, what matters most is that knowledge transferred on building specification need to be appropriate to achieve higher levels of compliance. The study has established that informal construction practices are genuine routes/media for transferring knowledge on construction specification.
Article
Full-text available
This study investigated concrete quality issues at eleven multistory building construction sites in Kumasi metropolis amid several cases of multistory building collapses in Ghana. The objective was to understand key aspects of concrete quality problems at multistory building construction sites in Ghana to help recommend strategies for improving building safety standards. Apart from observing construction practices at the eleven construction sites, fresh concrete and constituent materials were sampled from four of the sites. The materials were used to produce concrete cube specimens, generally replicating the mixing ratios utilized at the sites. The site- and laboratory-produced concrete was tested for 28-day compressive strength. The site observations indicated that aggregate sourcing, stockpiling and batching practices promoted variability in concrete quality. Concrete production at the sites followed the recipe method (nominal mixing ratios), employing either low-capacity concrete mixers or hand-mixing. Consolidation, curing and quality control testing of concrete were not regular practices, and segregation and honeycombs were common. The sites determined adequacy of mixing water by visual evaluation of concrete workability. Had water content been properly determined and measured, the compressive strength of the site-produced concrete, which ranged from 10 MPa to 18 MPa, could have been 26–100% higher. The compressive strengths of the site-produced concrete were 26–60% less than the minimum 28-day characteristic compressive cube strength of 25 MPa required for structural use in buildings in Ghana. If an appropriate water content had been used at the sites, the compressive strengths could have still been less than the specified 25 MPa by 9%, on average. These findings suggested that low concrete quality was a real issue and could pose significant building failure risk or performance inadequacy. While the Ghana Building Code contains several specifications that potentially promote high building construction quality, their enforcement was non-existent or weak. A collaborative system of construction quality assurance and training encompassing local government agencies, professional associations and laboratories of higher educational and research institutions is recommended to help improve access to material testing resources and high-quality technical expertise, as well as to disincentivize willful violation of construction regulations.
Article
Full-text available
The purpose of the study was to examine the influence of selected government regulations on implementation of public infrastructure projects by the Rural Electrification and Renewable Energy Corporation (REREC) in Nairobi county Kenya. The study adopted a descriptive research design with a target population of 481 permanent employees of REREC, the study settled for a sample size of 140 respondents obtained using a stratified random sampling method. Research questionnaires were administered to the employees at REREC headquarters within Nairobi. Descriptive statistics involved frequency distribution, percentages, mean and standard deviation. Inferential analysis involved OLS regression. The regression analysis revealed that financial regulations, construction standards and codes and competence of project team had a significant positive influence on the implementation of public infrastructure projects whereas environmental regulations and county government licensing exhibited a negative influence on the implementation of public infrastructure projects. The study, therefore, concluded that the selected government regulations considered under the study had a significant influence on the implementation of public infrastructure projects by REREC. Based on the findings, the study recommends that the management of REREC should ensure that they do not contravene any of the environmental regulation. Secondly, the study recommends that REREC must continue to invest in new construction technologies and observe standards recommended in the construction codes and standards books. Thirdly, the study suggests that the management of REREC must adhere to the Public Financial Management Act and the Public Procurement and Assets Disposal Act. The study also recommends that the county government should adopt standard licensing procedures. Finally, the study recommends that the management at REREC should continue recruiting highly qualified employees for its vacant positions.
Article
There have been increasing cases of buildings failures in Kenya, with many reported cases of buildings collapsing and causing loss of lives. Like other industries in the country, the building and construction industry is governed by legal frameworks. However, while such laws exist, not much has been written on legal frameworks and how they mitigate building failures in the country. The current study therefore sought to investigate this relationship, basing its arguments on institutional theory. Quantitative data was collected from 275 respondents from 11 counties that have been the worst hit by building failures in the country. Findings from the study indicate that even though legal frameworks have a significance effect in mitigating building failures, there exist obsolete laws, as well as multiple regulatory frameworks in the country which compound the challenges that exist within this industry. Implications from the study are given.
ResearchGate has not been able to resolve any references for this publication.