Content uploaded by David Ato Quansah
Author content
All content in this area was uploaded by David Ato Quansah on Jan 24, 2019
Content may be subject to copyright.
1876-6102 © 2016 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license
(http://creativecommons.org/licenses/by-nc-nd/4.0/).
Peer-review by the scientific conference committee of EEIC | CIEE 2016 under responsibility of Guest Editors.
doi: 10.1016/j.egypro.2016.12.108
Energy Procedia 106 ( 2016 ) 97 – 110
ScienceDirect
1st Energy Economics Iberian Conference, EEIC | CIEE 2016, February 4-5, Lisbon,
Portugal, APEEN (www.apeen.org) and AEEE (www.aeee.es)
Solar Photovoltaics in sub-Saharan Africa – Addressing
Barriers, Unlocking Potential
David A Quansaha,b,c, Muyiwa S Adaramolab,*, Lena D Mensaha,c
aDepartment of Mechanical Engineering, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana
bRenewable Energy Group, Department of Ecology and Natural Resource Management,
Norwegian University of Life Sciences, Ås, Norway
cThe Energy Centre, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana
*Corresponding author: Tel. +4767231793; Fax.: +4764965801; Emails: muyiwa.adaramola@nmbu.no (MSA) and
david.ato.quansah@nmbu.no (DAQ)
Abstract
Africa is endowed with significant amounts of renewable energy (RE) resources, including solar energy. It receives
some of the highest levels of annual radiation globally. Yet Africa remains the poorest region of the world, in terms
of energy access – in contrast with its endowment. This reality, of abundant sunlight, leads some to have an almost
fairy-tale idea about solar photovoltaic (PV) technology and its current role in enhancing access to energy in Africa.
In this paper, some of the barriers facing solar PV energy systems development in most countries in Africa are
discussed, and recommendation are made on how to address some of these barriers.
© 2016 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of [name organizer]
Keywords: Utility.scale PV systems, levelised cost of electricity, reserve margins, solar home systems, feed.in tariff
1. Introduction
The International Energy Agency (IEA) in 2014 estimated that about 620 million people in Africa,
representing two-thirds of the continent’s population of approximately 1 billion, do not have access to
electricity [1]. In several countries, (Mauritania, Guinea, Burkina Faso, Niger, Chad, Central African
Republic, D. R. Congo, etc.) more than three-quarters (75%) of the population has no electricity. With
15% of global population, Africa remains the most energy poor region in the world, contributing just
Available online at www.sciencedirect.com
© 2016 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license
(http://creativecommons.org/licenses/by-nc-nd/4.0/).
Peer-review by the scientific conference committee of EEIC | CIEE 2016 under responsibility of Guest Editors.
98 David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110
about 2.4% of global GDP. As shown in Table 1, countries in the OECD region have average annual per
capita electricity consumption of over 8000kWh, however, the average for Africa is just around 590kWh,
20% of the global average and 7% of what pertains in OECD economies. The picture becomes gloomier
when the data is analysed to exclude the Maghreb Regions (Algeria, Egypt, Libya, Morocco, and Tunisia)
and South Africa. These countries together constitute about 20% of Africa’s population, but generate and
consume more than 75% of electricity on the continent, and have a per capita consumption of over 2000
kWh/year. This leaves the rest of Africa, predominantly sub-Saharan Africa (SSA), with annual per capita
consumption of around 170 kWh [3]. This energy situation stands in contrast with the vast energy
resources that Africa is blessed with, both conventional and non-conventional.
Table 1: Key World Energy and Economic Indicators for 2014.
Region/Country/Economy
Population
(Million)
%
World
Pop.
GDP
(Bn
2005$)
Share
of
Global
GDP
(%)
Electricity
Cons. Per
Capita
(kWh)
Cons per
capita
against
global
avg.(%)
World
7036
100
54588
100
2,972.57
100
OECD
1254
18
39490
72.3
8,090.11
272
Middle East
213
3
1430
2.6
3,708.92
125
Non-OECD Europe and
Eurasia
341
5
1644
3.0
4,551.32
153
China
1358
19
4756
8.7
3,488.22
117
Asia
2320
33
3568
6.5
892.67
30
Non-OECD Americas
467
7
2369
4.3
2,096.36
71
Africa
1083
15
1331
2.4
591.87
20
Data source - [2]
Because of the triple and inter-connected effects of improved technology, reduction in photovoltaic
(PV) module cost and policy initiatives, solar energy is expected to contribute substantially to the future
global energy supply. Due to the geographical location of sub-Saharan Africa, its contribution to global
supply of energy using solar could be more significant, if adequate infrastructure is available. The global
cumulative installed capacity is noted to increase rapidly from 3700 MW in 2004 to over 177 GW in 2014
[4]. In terms of installed cumulative solar power, the top five countries as of the end of 2014 were
Germany, China, Japan, Italy, and USA, with installed capacity of 38.2 GW, 28.1 GW, 23.3 GW, 18.5
GW and 18.3 GW, respectively. Despite the fact that most parts of Africa receive in excess of 2000 kWh
(see Figure 1) of global solar radiation annually, the continent has not seen substantial development in
solar energy power plants. It may be interesting to know that the cumulative installed solar PV power
plant in Germany (a country located in a temperate region), in 2014 for example, was more than total
installed capacity from all energy resources in individual countries in sub-Saharan Africa (except South
Africa).
In view of this remarkable resource endowment, many have questioned why solar energy is not
leading the way in Africa’s electrification, particularly, in the face of rapid uptake of the technology at the
global level. The objectives of this paper are to highlight and examine some of the factors that holding
back the deployment of Solar PV technologies on the continent. The issues discuss in the paper would
David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110 99
assist policy makers, project developers and the donor community to view the potential contribution of
PV to energy access, energy supply and diversification within the context of the existing financial, social
and technical constraints.
This paper is organized into three Sections. Section 1 reviews the energy situation in Africa in
comparison with the rest of the world and contrasts its energy situation with its resource endowment. It
also presents the motivation and objective of this paper. Using information from relevant literature,
documented country experiences, publicly available data and authors’ experience with the technology,
Section 2 of this paper examines in some detail, key issues impacting the development of Solar PV on the
continent and is discussed under three sub-sections, each dedicated to one of the application modes (off-
grid, decentralized grid-connected and large-scale utility). The paper concludes in Section 3 by offering
some suggestions in respect of the various application modes and the challenges they currently encounter
on the continent.
Figure 1: Global Solar Radiation Map for Africa and Middle East [5]
100 David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110
2. Solar PV in Africa –The issues
The section presents barriers to large-scale development of solar PV in Africa, especially in sub-
Saharan Africa, under the following common development scale of solar PV systems: off-grid (stand-
alone) systems, distributed and decentralised systems and centralised (utility) scale systems. The energy
cost profile for solar PV applications shown in Figure 2 depicts how the nature of application influences
the cost of electricity. In general, the investment cost and cost of energy decreases as the scale of PV
systems increases.
2.1. Off-grid systems
There is an ongoing global effort by the United Nations (UNs) and World Bank, with a number of
partners to provide access to sustainable energy for all by the year 2030 under the Sustainable Energy for
All (SE4All) initiative [6]. The role of solar PV technologies in providing access to electricity in a least-
cost approach (on a life-cycle basis), advancing the SE4All agenda and other national energy access
programmes need to be well-studied in various national and community-specific contexts. Some authors
[7-10] have discussed the minimum electricity requirements for households and service levels. However,
the IEA [11] recently has adopted a definition that considers electricity access to involve a threshold of
250 and 500 kWh/year for rural and urban households, respectively. It is considered that this amount of
electricity should be able to serve a 5-member household by powering for five hours a day, a floor fan, a
mobile telephone and two compact fluorescent light bulbs for the rural households. Additional appliances
such as an efficient refrigerator, a second mobile telephone and another appliance, such as a small
television or a computer could be included for urban households. Energy access programmes for off-grid
locations should, therefore, endeavour to meet these minimum service levels.
Fig 2: Solar PV application and cost of electricity (Authors’ Construct)
It should be highlighted, that, Solar PV technology applications in off-grid mode contributes in a
double way to the attainment of the SE4All objective – increasing both energy access and renewable
energy mix. The off-grid energy systems can be defined as an energy systems that is not connected to a
local, regional or national electricity transmission and distribution system (grid). Due to their mode of
connection, off-grid systems are generally referred to as stand-alone systems. With an average electricity
access rate of just over 30% in Africa (Baurzhan and Jenkins [12], Adams et al., [13]), a large population
are without the electricity grid, and can currently only benefit from solar through off-grid applications.
David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110 101
The potential applications of solar PV in off-grid systems are shown in Figure 3, and samples of practical
applications (shown in Figure 4) include solar home systems (SHS), solar lanterns and mobile phone
charging systems. While these systems often replace inferior and health-threatening options such as
kerosene lamps, dry cells, candles and sometimes-outright darkness, they represent the highest-cost end
of solar PV applications.
Figure 3: Types of off-grid solar PV systems and their components ((Authors’ sketch)
Figure 4: Off-Grid Solar PV Systems (left – Solar lantern
a
, Right – Solar Home System
b
(Schematic))
The IEA reports in its publication - Pico Solar PV Systems for Remote Homes [14], - that these Pico
systems could cost as much as $20/W ($20,000/kW). In Kenya, for example, the cost of energy from solar
home systems was reported as between $1 - $7.6/kWh, depending on the battery type used [15]. Some
reasons for the generally high cost of these systems include the fact that they must always come with
a
http://www.solagenpower.com/SolarLanterns.html
b
http://www.zimsolar.co.uk/L1_rural_solar_systems.htm
102 David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110
battery storage (which significantly increases the cost), underdeveloped markets and supply chains [16]
[17]. The cost of PV with battery storage remains very high, and even in relatively developed markets
such as Germany and US, such systems are hardly cost-competitive with grid-tied PV-inverter option
(since cost of battery is avoided) and the cost of electricity from the utility grid. Projections from charts
made available by IRENA (International Renewable Energy Agency) in Figure 5 indicate that, while grid-
parity was reached for private households in Germany in 2011, parity for systems that include battery
storage will have to wait until sometime in 2016 to be competitive. A similar study by the Rocky
Mountain Institute (RMI) [18], shows that a significant segment of American electricity consumers will
have to wait for up to 30 years for PV with storage to become competitive with grid-based electricity (see
Fig 6).
Figure 5: Grid parity of PV-storage in Germany [19]
Figure 6: Grid Parity Timeline for Residential Customers [18]
The key issues facing small-scale off-grid solar PV systems in most African countries are lack and
access to financial support. Although, recent years have seen the development of several innovative
micro-financing schemes in support of the delivery of off-grid PV solutions to many rural communities in
Africa, these micro-credit schemes, nonetheless, only make it easier to pay for systems whose energy
delivery cost remain the highest. Since some of the off-gird packages come in low wattage units, and are
David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110 103
designed to go for as low as US$36 or less [14], the extremely high cost of energy that these end-users are
paying tends to be obscured. Solar PV with battery storage currently occupies niche spaces such as
remote telecoms repeater stations and off-grid vacation homes for the generally well-to-do [20]. It should
be mentioned that, even though the investment cost of these systems are relatively cheap, most rural
dwellers living on less than US$2 per day, and hence, they cannot afford these systems without financial
assistance [12, 21).
2.2. Distributed and decentralized systems
Grid-connected systems typically comprise solar modules and grid-type inverters while the grid serve as
the storage facility, thus avoiding the cost of batteries. They are usually installed utilising rooftop spaces
and (and car parks), and are designed to feed into the distribution utility grid (with configurations that
allow self-consumption). In this arrangement, when the PV produces more electricity than needed, the
surplus electricity is fed into the grid while, electricity is taken from the grid when it produces less
electricity than needed. Figure 7 shows the schematic of a typical grid-connected solar PV system.
Because they avoid the cost of batteries, they significantly reduce system cost (installation cost), and,
therefore, the cost of electricity generated is lower than systems with battery storage. Small grid-
connected systems mounted on rooftops have been responsible for powering the phenomenal growth of
solar PV in Germany and other leading countries around the world (Figure 8). They have been
incentivized by schemes such as (micro) Feed in Tariffs (FiTs) and net-metering schemes. By close of
2014, the number of countries with feed-in policies had risen from 34 in 2004 to 108 [4]. The main key
barriers to decentralised solar PV are low grid coverage and unreliable grids as well as absence of
enabling regulations, institutional frameworks and policies in most SSA countries. These barriers are
briefly discussed below.
Figure 7: Schematic of a Residential Grid-Connected PV System (http://www.mathworks.com/)
104 David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110
Figure 8: PV Systems Annually Installed in Germany [22]
2.2.1 Low grid coverage and unstable grids
With rather low levels of electrification, a very significant proportion of the population in Africa
simply do not currently have this lower-cost PV application as an option, as argued in section 1; the
estimated two-thirds without electricity in Africa can only currently utilize PV in off-grid mode. This
consequently limits the extent to which grid-connected applications could be deployed in most Africa
countries. In countries such as Ghana, South Africa, Nigeria and the countries of the Maghreb region,
where grid coverage and electrification rates are high, the reliability (power outage) and stability of the
grid are major obstacles. The World Bank estimates that African manufacturing enterprises experience
power outages on average 56 days per year [23]. Figure 9 from the World Bank Enterprise Surveys shows
the frequency and duration of outages of occurrence in selected regions. On average, number of power
outages in SSA region is 8.3 times in a month and each lasted for 5 hours per outage compared with 6.3
times and 2.8 hours per outage, respectively.
Figure 9: Power Outage Statistic in Africa and Other Regions [24]
David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110 105
System owners in OECD and other developed economies tend to use grid-connected solar PV
(supported by Government incentives) to reduce consumption from grid and reduce utility bills. Africa's
grids, however, are characterised by high downtimes and cannot serve as storage batteries. Since grid-
connected systems are designed to disengage from the grid when it is down, the high power outage rates
of the distribution networks in Africa means that such PV systems will stop generating when the grid is
down. In the absence of loads such as pumps, which are able to operate directly on the output of PV
systems, the installation produces no energy even when the sun is shining. Additional investment in
battery and Islanding systems add significantly to cost and complexity of the systems’ design and
operation. A major need in Africa is reliable power for domestic users and businesses, and this need is
technology-blind. In the service of this need, viable technology options include gensets (gasoline and
diesel based) and solar PV with battery storage. Gensets are commonplace because they are cheaper to
purchase and even though levelized cost of electricity (LCOE) is higher than solar PV (with storage) in
some instances, it is, from a practical point of view, a more accessible option than the alternative, in
which one pays now for electricity to be used in several years to come. Generator ownership rate among
enterprises is SSA countries is the highest in the world (see Figure 10).
Figure 10: Generator ownership among enterprises [24]
2.2.2 Absence of enabling regulations and policies
Although many African governments are beginning to put in place supportive regulations and policies,
the framework that guides interconnection with the distribution network and spelling out sell-back rates
and periods of accounts balancing between customers and the distribution utility does not exist in several
countries. Tunisia is reported to have a net-metering system in place [25]. Ghana has also recently
developed its net metering code [26], while Kenya and South Africa are developing such regulations [25],
[27]
c
. In addition to the absence of required regulations, technical capacity, for example in the installation
and management of bi-directional meters and implementation of new or adapted information management
systems are lacking. Further, the general absence of investment support and long-term, low interest rate
credit (as pertains elsewhere) implies that systems have to be equity financed (and most often paid for
prior to installations). The alternative is to finance with short-term, high interest loans, with rates as high
as 30% p.a. [28].
c
South African National Electricity Regulator
106 David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110
2.3. Centralised/utility scale projects
Centralised (utility) scale PV systems are usually in the order of megawatts, and are developed by power
generation utilities (both state and private). In 2010, the West African island of Cape Verde
commissioned a 7.5 MW solar PV power plant, which was reputed to be Africa's largest at the time [29].
Since then, several African countries either have commissioned plants of similar scale, or concluded
contracts for construction. Selected projects are shown in Table 2. The potential for utility-scale solar PV
in Africa is enormous. Studies by IRENA [30] suggest a theoretical annual electricity generation potential
of 660,000 TWh for Solar PV in Africa. This is approximately 900 times the current annual generation of
750 TWh on the continent. A study by the United Nations Environment Programme (UNEP), which
investigated the potential for solar electricity trade in West Africa, estimated that about 1% of land in
Ghana could generate up to 16700 GWh of electricity per year [31].
Table 2: Solar PV Projects across Africa
Country
Capacity, MW
Year
Project Developers/Funding Agencies
Egyptd
50
2015
New & Renewable Energy Authority (NREA)
Burkina
Fasoe
30
2014
SONABEL, EIB, EU
Nigeriaf
30
2013
Nigeria National Energy Council
Zambiag
100
2015
Energy Zambia Limited (IEZL)/General Electric/ Rhino
Engineering/Belectric
Kenyah
320
2015
TARDA (Kenya), Ultra Clean Energy Solutions and
Hitachi India.
The cost of solar PV continues to drop, and in 2014/15, tenders in Brazil, Dubai and Panama yielded
electricity prices as low as $0.06/kWh - $0.087/kWh [4]. These bright prospects, notwithstanding, key
barriers need to be surmounted for Africa's power sector to realise the potential contribution of Solar PV
at the utility scale. The major barriers to large assimilation of centralised solar PV system relate to
technical capacity of grid infrastructure and reserve capacity in most SSA countries. The solar resource
varies significantly throughout the day and is not available in the night. This variation in resource
availability directly affects the output of power plants, and presents significant challenges for grid
managers who must keep electricity transmission and distribution systems balanced and stable. An IEA
report on the integration of variable renewable resources into electricity grids [32] emphasizes the need
for grid systems to have flexibility resources to manage the intermittency of electricity productions from
d
http://www.pv-magazine.com/news/details/beitrag/egypt-unveils-50-mw-pv-project-and-50-mw-module-fab_100019986/#axzz3k1TUJVhY
e
http://www.eib.org/infocentre/press/releases/all/2014/2014-201-west-african-solar-project-gets-eur-23m-eib-backing.htm
f
http://www.pv-magazine.com/news/details/beitrag/nigeria-partners-with-germany-on-420-mw-solar-projects_100013206/#ixzz3k1fUmtIr
g
http://www.agenceecofin.com/solaire/1606-29816-zambie-general-electric-entamera-bientot-la-construction-de-la-centrale-solaire-de-kumi-kumi-
zuba
h
http://www.greentechlead.com/solar/tarda-plans-320-mw-solar-park-in-kenya-28222
David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110 107
variable renewable resources. The report identifies dispatchable power plants with the ability to ramp
output up and down on demand as the largest source of flexibility in current power systems.
African grids are characterized by very low or no reserve margins, and countries like Ghana and South
Africa have been shedding load because of inadequate levels of generation. This situation puts constraints
on the potential of solar PV at the utility scale. In spite of the rapid growth of solar PV, globally, it still
constitutes a rather small amount of generation in national grid networks, partly due to grid-integration
challenges (See Table 3). The EU, which is world leading in solar installations, accounts for just about
7% of its installed capacity and 2.1% of generation with solar PV, and this is dominated by small
distributed systems as shown in Figure 8. The challenge of integration and potential impact on national
grid led authorities in Ghana (for example), in 2014, to impose a cap of 150 MW for utility scale solar PV
in the national grid, in capacities not exceeding 20 MW per single installation [33].
Table 3: Levels of Solar PV Integration in Regional Networks
Region
Installed Capacity (Total), GW
% Solar (Capacity)
% Solar (Generation)
Global
5683
1.70%
0.4
EU
960
7.20%
2.1
OECD Americas
1356
0.10%
0.2
OECD Asia Oceania
454
2.20%
0.5
Source: [34]
i
i
The Energy Technology Systems Analysis Programme (ETSAP) is an Implementing Agreement of the International Energy
Agency (IEA), first established in 1976.
108 David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110
Another barrier to the large-scale development of centralised solar PV installation is the issue of
Power Purchase Agreements (PPAs). The PPAs signed by utilities have had issues with bankability
without government guarantees. Early MW-Scale projects in Africa, registered in countries such as Cape
Verde and Ghana had significant government-level involvement [29, 35]. In Ghana, for example, the
Electricity Company of Ghana (ECG), is mandated by the Renewable Energy Law of 2011 to sign Power
Purchase Agreements (PPAs) with investors under the Feed-in-tariff programme, which is currently at
$Cent 18.25 - 20.14/kWh depending on whether the installation has grid-stability systems [36, 37]. Yet,
the ECG has continuously made operating losses over the past years [38] and has had difficulties in
honouring payments to its power suppliers in the conventional power sector [39]. In the absence of
government guarantees, the poor financial integrity of the power utilities makes their ability to honour
long-term PPAs questionable. This constitutes a major barrier to the development of this segment of Solar
PV Projects. A transition from government-led and largely donor-supported PV investments to a regime
that takes advantage of private capital and the continuous decline in PV prices is unlikely to take place in
Africa despite the passage of renewable energy laws and the publication of Feed-in-tariffs. Financially
viable utilities and off-takers are critical to this transition.
3. Concluding Remarks
In the case of off-grid systems, which typically come in low wattage and have restrictive usage, they
must clearly be seen as interim and transitional solutions. Additionally, they must be delivered with
significant levels of grant financing as a means of ensuring equity between those in off-grid locations and
grid-connected communities. It should be noted that in most African countries grid infrastructure is
usually publicly financed (including funds from taxes of off-grid dwellers). Therefore, effort should be
made either to extend grid or to develop community-based micro/mini (hybrid) grids depending on
economics and other strategic considerations within the national context. High quality electricity, beyond
basic lighting and mobile-phone charging services, is a pre-requisite for the growth of enterprises and an
escape from the vicious cycle of poverty for millions in Africa. A transition from small solar home
system (SHS), pico-watt lighting and phone-charging solutions to national grid or mini-grid (RE-
based/RE-supported) systems should be accomplished as quickly as practicable. It is proposed that the
target year of the SE4All initiative (2030) be adopted in this transition.
For the distributed and decentralized systems, regulations need to be developed for this segment of PV
applications, as many of the current arrangements focus on large MW-scale PV systems. This segment
holds enormous prospect in unlocking the potential of solar power in Africa, and opening up participation
by thousands of homes and organizations.
To enable power grids in Africa to integrate significant shares of large-scale centralized power plant,
there is the need to invest in strengthening transmission infrastructure. The new transmission
infrastructure should have a portfolio of dispatchable power technologies (both conventional and non-
conventional) that have the ability to ramp up and down at the required rates in response to fluctuations
that Solar PV plants introduce to the interconnected systems. This implies improving reserve margin of
the power systems.
Acknowledgements
David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110 109
The authors thank the Norwegian Agency for Development Cooperation (NORAD) for supporting
research collaboration between KNUST and NMBU through the EnPe programme.
References
[1] IEA, “Africa Energy Outlook,” OECD/IEA, Paris, 2014.
[2] IEA, “Key World Energy Statistics,” IEA, Paris, 2014b.
[3] US EIA, “International Energy Statistics,” 2014. [Online]. Available:
http://www.eia.gov/cfapps/ipdbproject/iedindex3.cfm?tid=2&pid=2&aid=9&cid=r6,&syid=2008&eyid=2012&unit=BKWH#.
[Accessed 16 February 2015].
[4] Renewables 2015 Global Stauts Report http://www.ren21.net/wp-content/uploads/2015/07/REN12-
GSR2015_Onlinebook_low1.pdf [Accessed 26 Feb 2016]
[5] GeoSun Africa, “Solar Maps,” 2013.
[6] UN, “Sustainable Energy for All Website (SE4All),” 2011. [Online]. Available:
http://www.se4all.org/sites/default/files/l/2013/09/SG_Sustainable_Energy_for_All_vision_final_clean.pdf. [Accessed 19 Feb
2016].
[7] Bazilian M, Nussbaumera P, Rogner H-H, Brew-Hammond A, Foster V, Pachauri S, et al.: Energy access scenarios to 2030 for
the power sector in sub-Saharan Africa. Utilities Policy, p. 1–16, 2012.
[8] Shyu C-W: Ensuring access to electricity and minimum basic electricity needs as a goal for the post-MDG development agenda
after 2015. Energy for Sustainable Development, p. 29–38, 2014.
[9] Bhattacharyya SC: Energy access programmes and sustainable development: A critical review. Energy for Sustainable
Development, p. 260–271, 2012 S.
[10] Pachauri S, Rao ND, Nagai Y, Riahi K.Access to Modern Energy Assessment and Outlook for Developing and Emerging
Regions. IIASA, Laxenburg, Austria, 2012. Available on: http://pure.iiasa.ac.at/10145/ (Accessed 19 February 2016)
[11] OECD/IEA, “World Energy Outlook - Defining and modelling energy access,” 2015. [Online]. Available:
http://www.worldenergyoutlook.org/resources/energydevelopment/definingandmodellingenergyaccess/. [Accessed 19 February
2016].
[12] Baurzhan S, Jenkins GP. Off-grid solar PV: Is it an affordable or appropriate solution for rural electrification in Sub-Saharan
African countries? Renewable and Sustainable Energy Reviews 60 (2016) 1405–1418
[13] Adams S, Klobodu EKM, Opoku EEO. Energy consumption, political regime and economic growth in sub-Saharan Africa.
Energy Policy 96 2016) 36–44
[13] IEA, “Pico Solar PV Systems for Remote Homes: A new generation of small PV systems for lighting and communication,”
IEA, 2013.
[14] Pode R. Financing LED solar home systems in developing countries. Renewable and SustainableEnergy Reviews, p. 596–629,
2013
[15] NORPLAN/NORAD, “Cost Competitiveness of Rural Electrification Solutions,” NORPLAN/NORAD, 2012
[16] GIZ, “Workshop Report: Last Mile Distribution of Off-grid Solar Products: Support Needs, Concerns, and Opportunities,” GIZ,
Addis Ababa, 2013
[17] RMI, “The Economics of Grid Defection When and Where Distributed Solar Generation Plus Storage Competes with
Traditional Utility Service,” Rocky Mountain Institute, 2014
[18] IRENA, “Renewable Power Generation Costs in 2014,” IRENA, 2014
[19] IEA, “Trends 2013 in Photovoltaic Applications,” IEA, 2013b
[20] REN21, “RENEWABLES 2015 - GLOBAL STATUS REPORT,” REN21 Secretariat, Paris, 2015
[21] Ngetha H, Sasaki M, Taheri M, Mathenge S. Energy Transitions for the Rural Community in Kenya’s Central Highlands: Small
Scale Solar Powered Systems. Energy Procedia 79 (2015) 175 – 182
[22] Fraunhofer ISE, “PHOTOVOLTAICS REPORT,” 2015
[23] World Bank, “Fact Sheet: The World Bank and Energy in Africa,” The World Bank Group, 2013
[24] World Bank, “Enterprise Surveys, What Businesses Experience - Infrastructure,” 2015
[25] energypedia, “Net Metering,” 2015
[26] Energy Commission Ghana, “Net Metering Sub-Code for Connecting Renewable Energy Generating Systems to the
Distribution Network in Ghana,” Energy Commission Ghana, Accra, 2015f.
[27] NERSA, “Small-Scale Embedded Generation: Regulatory Rules,” NERSA, 2015
[28] Government of Ghana, “Scaling-up Renewable Energy Program (SREP) in Ghana Investment Plan,” 2015
[29] ECREEE, “Largest Solar PV in Africa inaugurated in Praia,” http://www.ecreee.org/, Praia, 2010.
[30] IRENA, “Estimating the Renewable Energy Potential in Africa - A GIS-based approach,” 2014b.
[31] UNEP, “Ghana Solar Export Potential Study,” UNEP, Geneva, 2015
[32] IEA, “Harnessing Variable Renewables: A Guide to the Balancing Challenge,” 2011
[33] IEA-ETSAP/IRENA, “Renewable Energy Integration in Power Grids,” IEA-ETSAP and IRENA, 2015.
[34] PURC, “Publication of Feed in Tariffs and Capacity Cap for Electricity Generated from Renewable Energy Sources,” PURC
(Ghana Gazette), 2014.
110 David A Quansah et al. / Energy Procedia 106 ( 2016 ) 97 – 110
[35] Lahmeyer International GmbH, “PV-Greenfield in the Northern regions: Experiences in Consulting for Ghana’s public utility,”
GIZ, 2013.
[36] PURC, “Publication of Feed-In-Tariffs and Capacity Caps for Elecctricity Generated from Renewable Energy Sources,” PURC,
Accra, 2014
[37] Government of Ghana, “Renewable Energy Act (Act 832) 2011,” Ghana Publishing Company Ltd, Assembly Press, Accra,
2011
[38] ECG, “Electricity Company of Ghana - 2012 Annual Report & Financial Statements,” ECG, 2013
[39] News Ghana , “Electricity Company Of Ghana Mounting Debt Causes Scare,” 2013. [Online]. Available:
http://www.newsghana.com.gh/electricity-company-of-ghana-mounting-debt-causes-scare/. [Accessed 23 February 2016].