The author highlights the phenomena of pretended agreement or failure to manage agreement in decision
making, drawing from Harvey (1988) in what is popularized as the Abilene Paradox. It is a situation of
organizational members failing to manage intrapersonal differences with a group decision. With gaps in
team work and communication, members agree when individually they don’t. A case of academic staff is
illustrated. We discuss the symptoms and possible solutions, providing insights for further studies in
various contexts. An earlier version of this paper was presented at the International Academy of African
Business and Development conference, May 2009.
INTRODUCTION
In management studies and practice, there is high emphasis on how to manage conflict and
disagreement in organizations to ensure smooth work relationships. There is a rich bundle of literature
related to conflict, its sources, dimensions and how to manage it. Equally in practice, many organizations
have policies and guidelines to minimize the effects of conflict, both intrapersonal and inter-personal.
Little is however illustrated or known of ‘managing agreement’. There are scanty scholarly studies on
managing agreement though there are several illustrated models of the decision process (Mann, et al,
1997). Even in organizational policies and regulations it would be difficult to find guidelines on how to
manage agreement after the decision has been taken. However, Harvey (1988) documented a case that has
been popularized as the Abilene Paradox. It is drawn from his 1974 experience in a family setting. The
Abilene paradox is a journey that individuals as well as organizations make, wasteful, costly and at times
disastrous, when they fail to manage agreement. This paper, with not so much literature on the paradox
itself, uses illustrations where individuals in a perceived teamwork process, make decisions when
individually none of them agrees to it. We used an unstructured investigation to document a case where
faculty members at Makerere University Business School made full of the journey to Abilene. The
outcome of this experience has pitted team work in the academic staff association and broken down the
social cohesion. The case enabled us to illustrate some symptoms of pretended agreement and hints on
how to avoid the behavior. With several evidences of trips to Abilene pointed at by our informants, the
paper provides an insight and we suggest formal studies into this management dilemma in organizations
and individuals. Theory building will help save organizations the costs involved.
CONCEPTUAL BACKGROUND
Decision-making is a key element in managing organizations. Operations may get to stand still when
there is failure or delay to make a decision. Many organizations have policy guidelines for decision-
106 Journal of Mana
g
ement Polic
y
and Practice vol. 11(5)
making. When those involved in this process fail to agree conflicts will arise. This will be resolved using
available organizational policy framework. Anderson and Polkinghorn (2008) posited that managing
complex relationships and interdependence are necessary in managing conflict in decision processes.
However there is a less explored concept of how to manage agreement. Many meetings are bogged down
by the decision process and agreement may only be perceived. In such situations, little attention is put on
how to manage neither the process nor the outcome of the decision. Swinton (2005) argued that effective
communication in business meetings is about disagreement, expressing opinions, voicing concerns and
harnessing the energy to create a solution that people want and care about. Gully et al (2006) emphasized
that effective decision making is a process that has to be built, with clear and transparent commitment that
is maintained through effective communication. De Cole (2005) called the decision process a continuous
engagement, tagging it a meta-process. A serious gap arises in the agreed decision when team members
individually do not agree with the group decision. However this may be revealed later. This is the concept
that Harvey (1988) defined as pretended agreement. It is a common limitation in team building and group
decision making. The explanation may range from cultural values, personality issues, and team building
gaps, organizational rigidities, and lack of policy framework to poor managerial skill in steering the
decision process. For instance Stainer and Stainer (2003) pointed at the role religions could have in
decision making as they form the basis of beliefs, values and morality. Gully et al (2006) illustrated
Hofstede (1994)’s four culture dimensions of collectivism versus individualism, power distance, conflict
avoidance and masculinity versus femininity, as individual and situational conditioning factors in decision
making. Harvey (1988) argued that the attention that organizations put on conflict management should
equally be for the management of agreement.
Reasons why people actually speak against their own desires are both social and psychological. They
are rooted in dynamics of intra and interpersonal relationships. It is believed, according to Harvey (1988)
that people behave in this manner because they are afraid of the unknown. It is generally to do with fear
of loneliness, being left out, separation, and alienation. This discussion is extended by Larrick (1993) and
Mann, et al (1997) who emphasized fear for embarrassment from publicly made decisions, regrets, loss of
reputation and self esteem, failure and disappointment. To avoid these, people will actually act against
their best interests, hoping to be part of the whole. Group members may then turn to maximize their
expected outcomes and to maintain a positive self-image. In many organizations, members tend to believe
that any decision or action is better than none at all. Various Scholars agree that this situation also occurs
when members are deciding under the situation of uncertainty or risk – when there is partial information
or none at all respectively. The drive to act together, to be seen as a team, overrides the need to be explicit
about group assumptions, desires, opinions, and even facts (Holden, 1999, Tung, 1998). This rises what
Psychologists call action anxiety, social conformity or social cognition. The members are held up in
fantasies wandering what could be the group reactions if they spoke out their minds – in disagreement of
what everyone thinks is agreement! Anderson and Polkinghorn (2008, pg 189) posited that decisions that
are based on sound technical opinions are easier to accept than if they are based on the dictum of “my
opinion counts more than yours”. Lopes (1987) discussed a dichotomy between decision makers who are
risk averse and those who are risk seekers reflecting opportunities and constraints people see in the
decision as affecting their behavior.
Individuals have different decision making algorithms and there are different group-think patterns
(Rich and Art 1999, Anderson 1999). Michel (2008) emphasized this point as a well known phenomenon
from social psychology that people are reluctant to voice minority opinions. When a whole group of
people seems to agree on a course of action but one person has doubts about it, there is a bit of
psychological hurdle to speak against it. The resultant behavior is pretended agreement. Such scenario,
with its realities and ramifications is just one case of the many that account for decision inefficiencies in
the public service in Uganda (Bagire, 2008). Pretended agreement is enshrined in immature team
processes (Kathryn, 1999). Teamwork is assumed to be an obvious outcome of people being assigned
tasks to work on together while as in essence it is a process through stages of team building that should be
well guided by those in higher authority. This will minimize what Mc Avoy and Butler (2006) called
group think behavior. Tung (1998) posited that group decision making is a complex process that should
Journal of Mana
g
ement Polic
y
and Practice vol. 11(5) 107
incorporate diverse individual views into a blended final decision. Dyer and Forman (1992)’s model of
group decision is based on consensus, voting or compromising, mean of individual ideas and combining
results. The first two elements in this model could possibly account for pretended agreement. Hoppe
(2003) illustrated that pretended agreement is common in academic leadership where faculty colleagues
are tied to opinions of others and faculty who manage by agreement. In a nut shell, decision processes
will often put members into situations destined to repeat unsatisfying and dysfunctional behavior if they
do not check the decision process hence the genesis of failure to manage agreement.
THE PARADOX
Harvey (1988), in The Abilene Paradox and other Meditations on Management, provides the following
illustration of his experience in failure to manage the decision process that manifested into pretended
agreement.
Four adults were seated on a porch in 104-degree heat in the small town of Coleman, Texas, some 53
miles from Abilene. They were engaged in as little motion as possible, drinking lemonade, watching the
fan spin lazily, and occasionally were playing the odd game of dominoes. The characters were a married
couple that had paid a courtesy call on the wife’s parents. At some point, without meaning it, the father
suggested that they could have a drive to Abilene to eat at a cafeteria. The son-in-law thought this was a
crazy idea but did not see any need to upset the old man, so he let the idea pass on and so did the two
women. They all got in the un- air-conditioned car and drove through a dust storm to Abilene. They ate a
mediocre lunch at the cafeteria and returned to Coleman exhausted, hot, and generally unhappy with the
experience. None of them expressed insight on the trip. It was until they returned home that it was
revealed that none of them really wanted to go to Abilene–they just went along because each one of them
thought the others were eager to go. Naturally, everyone saw this miss in agreement as someone else’s
problem! When they opened up, every one denied having supported the trip, including the father- in- law!
The writer, thus concludes, “Here we were, four reasonably sensible people who, of our own volition, had
just taken a 106-mile trip across a godforsaken desert in a furnace-like temperature through a cloud-like
dust storm to eat unpalatable food at a hole-in-the-wall cafeteria in Abilene, when none of us had really
wanted to go. In fact, to be more accurate, we’d done just the opposite of what we wanted to do. The
whole situation simply didn’t make sense. It was paradoxical!”
EXPLORING THE PARADOX IN UGANDA
The approach we used to illustrate the paradox was real case analysis and unstructured interviews with
randomly purposively selected officers various organizations known to be key in decision processes. We
sought their views on the constructs of pretended agreement, namely the decision process, members’
views on the decision after the meeting, the atmosphere during and after the meeting and follow up
actions. This unstructured investigation involved 68 informants and was to be a basis to document the
cases of pretended agreement. An astounding experience among the academic staff at Makerere
University Business School then formed the basis for this paper. All our informants posited that this
behavior is paradoxical and they had experienced it in many situations. Pretended agreement had led to
various costs like severe conflicts, bad image, financial loss and faults suffered by their organizations and
themselves individually. The underlying reasons revealed by our inquiry were in concert with the
literature reviewed, like Mullins (2005) who stated that inertia in organizational decision making leads to
increased costs, reduced competitiveness and individual demoralization. The informants reechoed a
common belief among employees that the organization is not theirs and would leave someday. Many
decision makers hold that organizational decisions should not stall because an individual has differences
if others seem to agree. Thus among our respondents individuals had gone by the perceived agreement of
the others. The lack of adequate information in decision processes was also cited. Leaders and managers
tended to use inadequate information to manipulate others. Members were made to believe that all is well.
108 Journal of Mana
g
ement Polic
y
and Practice vol. 11(5)
Also pertinent is feeling internal inadequacy where a team player assumed that his or her dissent will
reveal the lack of appreciation for the guidelines available towards a decision. Informants revealed that
organizational members are also held in this ransom where they do not have adequate information and
individually think opposing the idea will be a show of self-ignorance and disrespect. There was a socio-
cultural dimension related to the many trips to Abilene in Ugandan organizations. Many Ugandans are
held in the maze of cultural beliefs against a show of individual dissent when a gap has been identified.
Culturally, those interviewed agreed, when in a meeting and an elder of a sort has presented a decision
direction it is not right to vehemently oppose him or her. Conflict avoidance was another common reason
for this behavior. Meetings are just one forum that brings together organizational members. It is believed
to be wrong to oppose a colleague at a meeting when other aspects of organizational life could need
reliance on each other. Pretended agreement was used as a way of preserving relationships for a rainy
day. A network of such thinking was feared to have led to high decision costs. Organizational structures
were also cited in the evidences that contributed to pretended agreement. The tall bureaucratic setups are
prone to pretense due to complexities in reaching the final decision. At the operational level members
believe that the top echelons would be more critical while as the latter consider that the former were more
analytical in the pre-decision work. Structures that do not provide checks and balances in decision taking
often fall prey to this. Respondents also shared a lot of experiences on how meetings are poorly managed
in Ugandan organizations. There are hidden agendas, poor attendance, held in a rush, communication is
received late, work documents are circulated late or never given out, facilities are poor, at times the
agenda is very long, some members are denied chance to contribute, audibility is wanting, attendance is at
times not checked and worst, meetings always start late and by the time of decision making members are
exhausted and agree with any idea put forward.
THE CASE OF PRETENDED AGREEMENT AMONG MUBS ACADEMIC STAFF
This is a documented case of mismanaged or pretended agreement whose investigation is the backbone
to this paper. It is a case among the academic staff at Makerere University Business School (MUBS). We
illustrate it for the reader to relive the events as they occurred for critical internalization of the paradox.
Events of that day are still in the mind of some academic staff but no one wishes to talk loud about
them, possibly hindered by the subjudice principle of not commenting on issues before the courts of law
or more strongly not to talk about actions of past leaders of the MUBS Academic Staff Association
(MUBASA). The atmosphere at the campus had been tense over several weeks. It was one such afternoon
on 18th September 2006 that a meeting of MUBASA had been called to deliberate on the issues at stake.
The wrangle between MUBS, hither to an affiliate college, and her parent institution, Makerere
University had reached fever pitch. The events had swallowed in cabinet, parliament, the national council
of higher education and the high court. MUBS council had declared independence and instituted
structures in effect of a university status. This followed a high court ruling in a case that involved a
former student at MUBS against Makerere University. The High court judge in the ruling had expressed a
legal opinion that MUBS was in letter and status an independent university. On the basis of this MUBS
council had taken the position. The mass media was having a field day. High level meetings and court
redresses had taken place. The Ministry of Education as the voice of government on the matter
pronounced that the development would not be recognized. MUBASA executive did not wish to act in
isolation of members’ views. The meeting had been called to consult on the events and decide way
forward by staff in lieu of council decision. The attendance was exceptionally high. The meeting
supported the position taken by council but was concerned with the move by the Ministry of Education to
block the process. In the course of deliberations a proposal emerged, was aptly discussed and a
consensus vote taken. The resolution was passed to sue the Ministry of education for interfering in a high
court pronouncement. The Executive was mandated to get a lawyer to handle the case. Each member of
the association would contribute Ushs 30,000 towards the legal costs, deducted directly by the salaries
office. No objection at the meeting was raised to the pertinent issues in the decision. The meeting ended
Journal of Mana
g
ement Polic
y
and Practice vol. 11(5) 109
and lecturers exited with a distrustful atmosphere. While a few were in a jovial mood, many others
gathered in small groups as if to open the debate on the decision. Others walked away seemingly
dejected.
From this author’s previous review of Harvey’s work in a 1998 MBA class assignment on team
building in which the Abilene paradox had featured, the surrounding atmosphere manifested pretended
agreement in the meeting that had just ended. The events were symbolic of a trip to Abilene. A few days
later, when the storm had settled, the events were recorded and an investigation conducted. It was
revealed that there were pains among many individuals at that meeting. The interviewed lecturers
wondered whether such a decision was ever wise and called for. Unanswered questions ranged from the
wisdom in the decision to the likely outcome. There were individual concerns on the cost of the suit and
the Shs.30,000 deductions from members’ remuneration to pay legal fees. The staff would have instead
asked the School to pay for such litigation; did individual employees need to commit their labored earning
for such a cause? In normal public service system would a government department drag to the courts of
law the parent ministry? If MUBASA won, what would be the group benefits? Were the association
leadership sworn respondents in such a circumstance? Many such questions made the decision indeed
paradoxical, but it was too late.
The investigation revealed that many of the academic staff including some on the association
executive never thought such a decision was wise. Individually they did not support it. For various
personal reasons, it was not wise to object. This response was chorused by several of our informants who
attended the association meeting. Later on, one lecturer broke the ice and circulated an email distancing
him-self from such a group decision. He quoted his personal conscience and legal profession. But, it was
too late; the dusty trip to Abilene had been taken, and at a high cost. His email raised fresh thinking of
whether the lecturers were fighting a battle that was on their front line. It gave credence to this author’s
effort to document this case into a scholarly piece of work. The case of MUBASA against the Minister is
still before the courts of law, unresolved. Many sections of the suit were however, negated by the cabinet
decision that MUBS still belonged to Makerere university as an affiliate and could not proceed with
establishing university structures though exercising financial and administrative autonomy. The more
severe cost of this pretended agreement was the breakdown in the cohesion that bound MUBASA. The
association has gradually gotten to its lowest ebb since that day.
SYMPTOMS AND RESOLVING OF PRETENDED AGREEMENT IN ORGANIZATIONS
We point out key manifestations that meetings or groups experience when under pretended agreement.
Individuals in failing to manage agreement effectively are submissive, restless and at times hostile. It is
common that sub-groups form in the meeting, there is lack of initiative to the agenda, combative or
blaming positions become frequent. In such circumstance, members fail to communicate their desires
and/or beliefs to one another, and, most importantly, sometimes even communicate the very opposite of
their wishes based on what they assume are the desires and opinions of others. Senge (1994) explained
that communication comes from the inside of the person and once there is internal pressure not to do, but
one has to do so, the result is wrong expression of the intended message. Organizational policies on
meetings, decisions, conflict management, among others are found lacking at that very moment and will
often be placed in the background. Members will start to make incorrect assumptions about the outcome
of the decision with expressions of frustration, fatigue, and anger, exasperation, assumed excitement or
compliment. Gully Et al (2006) put emphasis to stakeholder dialogue and to be aware of the moral
aspects to the decision. Avoiding trips to Abilene should become among urgent managerial issues of
focus. What is needed first is to build a system of healthy and effective organizations. This could be
through task designs, role identity, process clarity and organizational structures. This was illustrated by
Harvey (1988) when he argued that structures are important in avoiding unwarranted decision making.
Gully et al (2006) agreed with this position and posited the need to be aware of the evolving values and
priorities, to understand the stages of growth and lifecycle as they all will lead to structure changes.
110 Journal of Mana
g
ement Polic
y
and Practice vol. 11(5)
Glaringly this did not occur at the MUBASA meeting, agreeing with the findings of Hoppe (2003) on
leadership among academics. Building new communication habits and getting beyond fears of
information sharing in meetings is emphasized by Swinton (2005) who adds simple tips like to stick to the
agenda, to have one person speaking at a time, taking comprehensive notes and having a good conductor.
Openness in meetings or decision-making requires individual resolve to refuse being victimized on
grounds related to the decision. If this is in-built among individual psyche it will be hard to be absorbed
into decisions one does not agree with. In the MUBASA case, some staff revealed that they feared to be
seen as opposing the wave of change that had swept the structures of the institution. When one member
distanced himself openly from the decision, there were replies blaming him for being reactionary, a
coward, and anti-progress! The majority of the members stood on the fence. Gully et al (2006) argued for
management to take time to think, deliberate and conceptualize – never to sacrifice logic for urgency in
decision making. Alienation in teamwork processes leads to individuals wanting to keep the spirit.
Scenarios of mismanaged agreement are prevalent in immature teams. As teams mature members become
open and easily identify amongst themselves manifestations of pretended agreement. Organizations
should undertake team building exercises. Rich and Ross (1999) posited that this approach builds a
system of dialogue in the decision process where members test the agreement so far reached by raising
assumptive dilemmas to the action being proposed. Team leaders should first let open doors to any
decision suggestion, implore members to critique the proposed action and galvanize thinking. This out
rightly dissuade individuals who would pretend to agree. The MUBASA presidium tried this pointer but
the decision environment caught them off guard and was swept into the paradox. Some scholars propose
tactical delays which may reveal the width of the pretended agreement. Members may open up before the
cost is incurred. If the MUBASA Executive had tactically delayed to get the lawyer to start the court
process, on reason of technical consultations, it would have been possible to detect the paradox that
engulfed the decision. De Colle (2005) illustrated a ten step model for ethical decision making. The
elements that must be emphasized are to identify and map all key stakeholders in the decision, assess
issues at stake, identify corporate values of the decision, assess current commitments, review policies and
prioritize issues, among others. This model could have worked for MUBASA.
CONCLUSION AND MANAGEMENT IMPLICATIONS
Management of agreement should be given equal weight as managing conflict in running
organizations. Conflicts lead to wastage and bitter relationships and mismanaged agreement has equally
worse consequences. This paper explored the concept and paradox of pretended agreement. It was found
to be an outcome of mismanaging agreement as well as inability to manage the decision process. Decision
making being a routine activity in organizations, the paper raises serious concerns. Managers should give
attention to team building, communication and building organizational structures that provide for decision
checks and balances. For the academic community, the paper has raised interest for empirical studies to
enumerate the constructs in pretended agreement and how they could be measured. The manuscript was
based on a real life documented case involving academic staff at Makerere University Business School in
Uganda. The experience and work of Harvey (1988) popularized as Abilene Paradox formed the
conceptual under pinning. The discussion was blended with rich literature on decision processes that are
important for managers. There are key lessons on handling relationships and decision processes. We
propose documenting such cases for teaching, research and policy development. Management is an
integrated process that encompasses individuals with different perceptions and competencies.
Understanding of this paradox is important for management development in leadership training, self
efficacy, team building, organizational communication and management decision simulations. The paper
has provided an insight for further research that could document practices, reasons thereof and develop
models to save organizations the costs of pretended agreement in their operations. Where pretended
agreement may be tested to bring out appropriate policy direction and good results for organizations,
further empirical tests could build this approach as another model of decision making. The ideas in this
Journal of Mana
g
ement Polic
y
and Practice vol. 11(5) 111
paper may have been limited by the scope of the investigation and the concept being in nascent stages of
its development in academic literature.
Note: Bagire Vincent is A Lecturer in the Faculty of Management at Makerere University Business
School, Kampala, Uganda, and a PhD candidate (Strategic Management) at the University of Nairobi,
Kenya.
REFERENCES
Anderson Jr. Lee L. and Brian Polkinghorn (2008). Managing Conflict in construction megaprojects:
Leadership and third party principles. Conflict Resolution Quarterly. Vol. 26. No.2. DOI:10:1002/crq.229
Bagire V. (2008). Pretended Agreement and Decision Inefficiencies in the Public Service. Paper presented
at the Annual Conference of the International Association of Schools and Institutes of Administration,
July 14-19, 2008. Kampala, Uganda.
De Colle S. (2005). A stakeholder management model for ethical decision making. International Journal
of Management Decision Making. 6. 299 – 314.
Dyer, R.F. and Forman, E.H (1992). Group decision support with the analytical hierarchy process. In
Tung Y. Alex (1998). Time Complexity and Consistency Issues in using the AHP for making Group
decisions. Journal of Multi-Criteria decision Analysis.7, 144-154.
Gully Alan, Lorice Stainer and Alan Stainer (2006). Responsible business decisions: an over-arching
framework. Journal of Public Affairs. 6:185 – 196. DOI:10:1002/pa.231
Harvey, B. Jerry (1988). The Abilene Paradox and other Meditations on Management, JOSSY- BASS,
San Francisco.
Holden Steve (1999). Reactions to the Abilene Paradox. Association of Research Libraries. Washington,
DC. Retrieved February 16, 2009 from www.arl.org/index.htlm.
Hoppe L. Sherry (2003). Identifying and Nurturing Potential Academic Leaders. New Directions for
Higher Education. No. 124. 1 – 12.
Kathryn, J. Deiss (1999). Revisiting the Abilene Paradox, Is management of agreement an issue?
Retrieved February 12, 2009, from www.novahrm.wikispaces.com
Larrick, R.P. (1993). Motivational factors in decision theories. The role of self-protection. Psychological
Bulletin.113, 440 – 50.
Lopes, L.L (1987). Between hope and fear. The psychology of risk. Advances in Experimental Social
Psychology. 20. 255 – 95.
Mann Leon, Paul Burnett, mark Radford and Steve Ford (1997). The Melbourne Decision making
Questionnaire: An instrument for measuring patterns for coping with Decision conflict. Journal of
Behavioral decision making. Vol. 10. 1 – 19.
McAvoy J and T.Butler (2006). Resisting the change to user stories: a trip to Abilene, International
Journal of Information Systems and Change management, 1(1) 48-61.
112 Journal of Mana
g
ement Polic
y
and Practice vol. 11(5)
Mullins S. (2005). Ethical crisis management? International Journal of Management and Decision. 6. 372
– 381.
Rick Ross and Art Kleiner, "The Left-Hand Column," in The Fifth Discipline Field book, 246-50, cited by
Kathryn (1999) in Revisiting the Abilene Paradox. Retrieved February 12, 2009 from
www.novahrm.wikispaces.com
Senge Peter (1994). The Fifth Discipline Field book: Strategies and Tools for Building a Learning
Organization, Doubleday, New York.
Stainer A. and Stainer L.(2003). Management decision making – an ethical perspective. In Gully Alan,
Lorice Stainer and Alan Stainer (2006). Responsible business decisions: an over-arching framework.
Journal of Public Affairs. 6:185 – 196. DOI:10:1002/pa.231
Steve Freeman, et al (2004). Applications to Other Ways of Group Decision Making. Retrieved February
12, 2009 from www.arl.org/index.htlm. ARL, Washington, DC.
Swinton Lyndsay (2005) The Abilene Paradox: 7 tips for effective communication in Business meetings,
Management for the Rest of Us, October 2005. Retrieved February 16, 2009 from www.mftrous.com
Tom Anderson (1999). Reactions to the Abilene Paradox. Association of Research Libraries, Washington
DC. Retrieved February 12, 2009 at www.crmlearning.com/Abilene-paradox also available at
www.arl.org/index.htlm.
Tung Y. Alex (1998). Time Complexity and Consistency Issues in using the AHP for making Group
decisions. Journal of Multi-Criteria decision Analysis.7, 144-154.
Journal of Mana
g
ement Polic
y
and Practice vol. 11(5) 113
... This is often revealed shortly after the meeting when individuals open up. This is confirmed in Bagire's (2009) empirical illustration of a meeting that was flawed with pretended agreement and the scenic upshot that resulted into wastage of valuable organizational resources and interpersonal conflict. ...
... This was observed at one of the universities and confirmed by cases from other organizations. We confirmed the case as highlighted by Bagire (2009) in an earlier study of management in Ugandan organizations. This was a case where university lecturers in a meeting of their academic staff association passed a resolution to sue the Ministry of Education for preventing a high court order that had pronounced that the affiliated college in which they taught was free to declare itself a separate university. ...
Article
Full-text available
Purpose – The purpose of this paper is to examine the management and benefits of meetings so as to draw conclusions on their effectiveness in organizations given the increasing discontent about their set up. Design/methodology/approach – The study was a cross-sectional survey, data were collected from 325 respondents in 22 service organizations in Kampala, using a questionnaire and participant observations; the instrument was tested for reliability and analysis done using descriptive and statistical techniques. Findings – The key finding was that policy regarding meetings and reasons for convening them jointly account for 57 percent variations in the benefits organizations have. The way meetings are conducted was found to have no significant effect, contrary to anecdotal evidences. The internal and external contextual factors did not affect the effectiveness of meetings. In general meetings have benefited organizations but the discontent on how they are managed is still high. Research limitations/implications – The lack of analytical and local literature on the study variables limited this study. There were also methodological challenges especially operationalization of variables, sampling and choice of respondents. Practical implications – The study underpins policy as a key factor for effectiveness of meetings; the literature supported this account. For governance boards there is need to review policy on meetings; and for managers, the paper emphasizes the need for improving how meetings are convened, conducted and the follow up action. The study has provided rich ground for scholars; the authors have extended the debate on meetings, brought into view an African context and made it possible for further studies. Social implications – Meetings involve many people in the organization and affect entire operations. There are critical personal factors that are pertinent in the outcome of meetings. The finding that personal factors do not have a significant relationship with effectiveness of meetings should not be applauded till further investigations and conceptualization is done in similar contexts. There are social implications on if meetings are not managed well as the authors have established like time wastage, employee motivation and poor management among others. Originality/value – Many papers that the authors accessed on meetings were on organizational experiences from western countries, the authors have made an original focus on Uganda and underpinned the debate on management development in Africa. The authors have also examined and provided an empirical basis for understanding effectiveness of meetings using key factors of policy, preparation, conduct and contextual factors.
... This is often revealed shortly after the meeting when individuals open up. This is confirmed in Bagire's (2009) empirical illustration of a meeting that was flawed with pretended agreement and the scenic upshot that resulted into wastage of valuable organizational resources and interpersonal conflict. ...
... This was observed at one of the universities and confirmed by cases from other organizations. We confirmed the case as highlighted by Bagire (2009) in an earlier study of management in Ugandan organizations. This was a case where university lecturers in a meeting of their academic staff association passed a resolution to sue the Ministry of Education for preventing a high court order that had pronounced that the affiliated college in which they taught was free to declare itself a separate university. ...
Article
Full-text available
Abstract Purpose – The purpose of this paper is to examine the management and benefits of meetings so as to draw conclusions on their effectiveness in organizations given the increasing discontent about their set up. Design/methodology/approach – The study was a cross-sectional survey, data were collected from 325 respondents in 22 service organizations in Kampala, using a questionnaire and participant observations; the instrument was tested for reliability and analysis done using descriptive and statistical techniques. Findings – The key finding was that policy regarding meetings and reasons for convening them jointly account for 57 percent variations in the benefits organizations have. The way meetings are conducted was found to have no significant effect, contrary to anecdotal evidences. The internal and external contextual factors did not affect the effectiveness of meetings. In general meetings have benefited organizations but the discontent on how they are managed is still high. Research limitations/implications – The lack of analytical and local literature on the study variables limited this study. There were also methodological challenges especially operationalization of variables, sampling and choice of respondents. Practical implications – The study underpins policy as a key factor for effectiveness of meetings; the literature supported this account. For governance boards there is need to review policy on meetings; and for managers, the paper emphasizes the need for improving how meetings are convened, conducted and the follow up action. The study has provided rich ground for scholars; the authors have extended the debate on meetings, brought into view an African context and made it possible for further studies. Social implications – Meetings involve many people in the organization and affect entire operations. There are critical personal factors that are pertinent in the outcome of meetings. The finding that personal factors do not have a significant relationship with effectiveness of meetings should not be applauded till further investigations and conceptualization is done in similar contexts. There are social implications on if meetings are not managed well as the authors have established like time wastage, employee motivation and poor management among others. Originality/value – Many papers that the authors accessedon meetings were on organizational experiences from western countries, the authors have made an original focus on Uganda and underpinned the debate on management development in Africa. The authors have also examined and provided an empirical basis for understanding effectiveness of meetings using key factors of policy, preparation, conduct and contextual factors. Keywords Africa, Decision making, Uganda, Management, Meetings, Pretended agreement Paper type Research paper
Article
Full-text available
Bu araştırmanın amacı okullardaki Abilen paradoksunu nedenleri ve sonuçları bağlamında incelemektir. Araştırma nitel araştırma desenlerinde biri olan fenomolojinin hermeneutik modelindedir. Araştırmanın çalışma grubunu amaçlı örnekleme yoluyla seçilen 2021-2022 eğitim öğretim yılında Erzurum il merkezindeki okullarda görev yapan 27 öğretmen oluşturmaktadır. Görüşmede veriler görüşme yöntemi ile elde edilmiştir. Elde edilen veriler içerik analizi yöntemiyle çözümlenmiştir. Araştırma sonuçlarına göre okullarda yüksek düzeyde Abilen paradoksu vardır. Öğretmenler özellikle yasal zorunluluklar, gruptan dışlanma korkusu ve sorumluluktan kaçma gibi nedenlerle istemedikleri veya inanmadıkları karar ve uygulamalara katılmak zorunda kalmaktadırlar. Okullarda öğretmenlerin iradesi ve inancı dışında alınan kararlar ve uygulamalar çoğu zaman başarısızlıkla sonuçlanmaktadır. Bu durumun verimsizlik, sinizm, zihinsel sıkıntı, motivasyon eksikliği, güvensizlik, olumsuz iklim ve başarısızlık gibi örgütleri ve okulları etkileyen sonuçları vardır. Bu sorunlara çözüm olarak çalışanların bilgilendirilmesi, kararlara katılması, özerklik verilmesi ve yönetişim kurallarının uygulanması önerilmektedir.
Article
Full-text available
This paper discusses the role of stakeholder management for improving ethical decision-making processes within organisations. It presents the key concepts and approaches developed within stakeholder theory and analyses their implications from a management perspective. The concept of ''stakeholder corporation'' is introduced, and the need for effective engagement with stakeholders discussed under two different perspectives of stakeholder theory, namely the instrumental vs. the normative approach. In the conclusion, a ten-step model for stakeholder management is presented as a ''management tool'' that could be applied to improve decision-making processes within any organisation, by enabling managers to identify and respond to legitimate stakeholders' interests.
Article
Full-text available
Reviews the standard economic and cognitive models of decision making under risk and describes the psychological assumptions that underlie these models. Important motivational factors that are typically underemphasized by the standard theories are then reviewed, including the motivation to protect one's self-image from failure and regret. An integrated view of decision making is offered on the basis of a more comprehensive set of psychological assumptions. (PsycINFO Database Record (c) 2012 APA, all rights reserved)
Article
When a decision is required with a degree of urgency that overrides the normal democratic process, there is a crisis. For example, if in the interests of ''internal efficiency'' a manager starves a project or department of vital resources, staff will find ''work-round'' solutions to achieve their various objectives. But if there is a knock-back effect and the project or department subsequently fails, the manager under crisis conditions can, and probably would, demand, at a higher cost to the business, significantly more resources than originally denied. However, the impact of this disruption is that the manager is more likely to be complimented on initial prudence and the subsequent timeliness and incisiveness of actions taken when, in reality, resources are squandered, programmes are disrupted and morale is devastated. Where situations are allowed to develop to a critical point by inactivity or self-interest, the inefficient, self-seekers and politically motivated are promoted at the expense of the organisation, profit and progress.
Article
This chapter discusses the psychology of risk: what risk is (if it is anything at all), how people think about it, what they feel about it, and what they do about it. The chapter describes the way psychologists think about risk: how they study it, what tasks they use, what factors they vary, and what models they build (or borrow) to describe risk-taking behavior. Technically, the word risk refers to situations in which a decision is made whose consequences depend on the outcomes of future events having known probabilities. Psychological studies of risky choice (it is the term used conventionally to refer to all but the most extreme instances of ignorance or ambiguity) fall into two groups. At one extreme are the studies run by mathematically inclined experimental psychologists in which subjects make decisions about gambles described in terms of amounts and probabilities. At the other extreme are studies run by personality psychologists, who are mostly interested in individual differences in risk taking. A theory of risky choice is presented in the chapter that attempts to meld the strengths of both approaches. Empirically and methodologically it is tied to the experimental approach to risky choice. But theoretically it is more strongly tied to motivational approaches.
Article
Agile software development projects embrace change, yet change is problematic in any software development project. Resistance to change is a common trait and software developers are not different than other organisational actors in this regard. The resistance to change is often inexplicable, even to those who are resisting. This paper describes a case study, which examines the changes to the IS development environment wrought by the introduction of a new software development methodology. One aspect of the new methodology involves the use of user stories in place of traditional requirements documentation. The findings of this longitudinal study illustrated that developers’ commitment to the use of user stories diminished greatly, ranging from initial commitment to skepticism, to virtual abandonment. To explain the underlying reasons for the reduction in commitment, the authors used the theory of competing commitments. Competing commitments are typically subconscious forces that work against behaviours and actions that social actors were previously committed to. Further to the use of the competing commitment process, this paper’s analysis of the software development project suggested the presence of the Abilene paradox influencing the diminishing commitment. Under the Abilene paradox, the actors themselves cannot adequately explain why the change is resisted. The use of competing commitments enabled the actors to discover themselves why the change is resisted.
Article
Two different ways of using the AHP in making group decisions are compared and evaluated. The first method combines different experts’ opinions before applying an eigenvalue method to obtain final weights for decision alternatives. The second, in contrast, derives each expert's rating for the decision alternatives before combining them. Both methods take into account the relative importance of different experts in making decisions. Comparison and evaluation of these two methods are made by using two criteria: time complexity and consistency indices. A numerical example is provided to illustrate the use of these two methods, and results of a mathematical simulation are presented for comparing the time complexity in different-sized problems. © 1998 John Wiley & Sons, Ltd.
Article
Selecting and nurturing academic leaders requires identifying effective leadership characteristics and providing experiences for potential candidates that both test and develop them.
Article
Contemporary businesses face increasing pressures on formulating, implementing and monitoring their strategic policies. Their long-term success in attaining these strongly relies on developing a proactive two-way, or even multi-way, stakeholder dialogue to become aware of the moral aspects of decisions. Openness and transparency should help to provide stakeholders with information on how and why particular courses of action have been adopted. In order to be effective and efficient, responsible business decision-making requires the willpower and commitment by management to implement, monitor and evaluate the ethical action which ought to be based on the organisation's evolving values and priorities. Although inclusive relationships may be accomplished in several ways, the normative interpretation of stakeholder theory is the most appropriate methodology to enable moral judgement to be made. An over-arching framework is presented to assess, review and re-balance the different techniques for any business to achieve its intended outcomes through the triple bottom line. Copyright
Article
This article examines the importance of conflict resolution skills and techniques when managing the complex relationships and interdependence necessary for large-scale construction projects. Partnering between multiple public and private organizations is often required in order for these projects to succeed. The authors examine the specific partnering skills that contributed to the success of the Woodrow Wilson Bridge project.
Article
A study was conducted to examine the factorial validity of the Flinders Decision Making Questionnaire (Mann, 1982), a 31-item self-report inventory designed to measure tendencies to use three major coping patterns identified in the conflict theory of decision making (Janis and Mann, 1977): vigilance, hypervigilance, and defensive avoidance (procrastination, buck-passing, and rationalization). A sample of 2051 university students, comprising samples from Australia (n=262), New Zealand (n=260), the USA (n=475), Japan (n=359), Hong Kong (n=281) and Taiwan (n=414) was administered the DMQ. Factorial validity of the instrument was tested by confirmatory factor analysis with LISREL. Five different substantive models, representing different structural relationships between the decision-coping patterns had unsatisfactory fit to the data and could not be validated. A shortened instrument, containing 22 items, yielded a revised model comprising four identifiable factors-vigilance, hypervigilance, buck-passing, and procrastination. The revised model had adequate fit with data for each country sample and for the total sample, and was confirmed. It is recommended that the 22-item instrument, named the Melbourne DMQ, replace the Flinders DMQ for measurement of decision-coping patterns.