"Cable" as a high nonlinear element, has a unique characteristic of having high flexibility and load-carrying capacity. Cables are widely utilised in strengthening and upgrading of bridges. The successful experience in application of cables in bridges can be extended to building. The main purpose of this paper is to investigate the efficiency of using cables in RC structures for retrofitting purposes. Different methods for rehabilitating individual elements (simplified rehabilitation method) and the whole building (systematic rehabilitation method) are discussed and the effectiveness of application of cables in the structural stiffness is investigated. In order to reach this goal, a reinforced concrete frame designed first. This frame was vulnerable to damage under ground excitation of a high seismic zone. The frame was then modelled and systematically rehabilitated with cables applying three different strategies. After analysing the models, the effects of each retrofitting strategy in structural behaviour, plastic hinge formation, performance point and storey displacement was investigated. Based on the results, cables can be used to improve the behaviour and upgrade the stiffness of the system. Especially, it could be used temporarily for building during the construction or for temporary structures.
Content may be subject to copyright.
Use of Cables in Rehabilitation of Reinforced Concrete Buildings
Reza Hassanli*, Sina Hassanli**
* School of Natural and Built Environments, University of South Australia,
(reza.hassanli@unisa.edu.au)
** Department of Mechanical Engineering, Amirkabir University of Technology, Tehran, Iran
(sina.hassanli@aut.ac.ir)
ABSTRACT
"Cable" as a high nonlinear element, has a unique characteristic of having high flexibility and load-
carrying capacity. Cables are widely utilised in strengthening and upgrading of bridges. The
successful experience in application of cables in bridges can be extended to building. The main
purpose of this paper is to investigate the efficiency of using cables in RC structures for retrofitting
purposes. Different methods for rehabilitating individual elements (simplified rehabilitation
method) and the whole building (systematic rehabilitation method) are discussed and the
effectiveness of application of cables in the structural stiffness is investigated. In order to reach this
goal, a reinforced concrete frame designed first. This frame was vulnerable to damage under ground
excitation of a high seismic zone. The frame was then modelled and systematically rehabilitated
with cables applying three different strategies. After analysing the models, the effects of each
retrofitting strategy in structural behaviour, plastic hinge formation, performance point and storey
displacement was investigated. Based on the results, cables can be used to improve the behaviour
and upgrade the stiffness of the system. Especially, it could be used temporarily for building during
the construction or for temporary structures.
KEYWORDS
Cable; Rehabilitation; Nonlinear; Pre-stressing; Pushover Analysis
INTRODUCTION
Application of cables in bridge (Figure 1) is a practical way to improve the behaviour and increase
its capacity. This paper aimed to extend this idea and apply it to buildings for rehabilitational
purposes. As usually the cost of replacement of vulnerable structures is high, the development of
new rehabilitation and strengthening techniques is required to increase the life of many existing
structures. Although there are number of repair and strengthening techniques for reinforced
concrete structures, unfortunately, the majority of them are too expensive, time consuming and
require the interruption of use of the structure whilst works are carried out. Hence, there is a
pressing need for the development of improved, low cost and less disruptive techniques, which will
make necessary interventions in many structures economically viable. It should be kept in mind that
the cost of retrofitting buildings is the primary factor which deters many private owners from
executing essential works.(Frangou and Pilakoutas, 1995; Moghaddam et al., 2007)
Pre-tensioning provides the RC member with an immediate and active load-carrying capability.
Tensioning of an external cable is an appropriate technique to prestress the reinforced concrete
member and is a convenient method to reduce the effect of low tensile strength in concrete. The
main advantages of external restressing are reducing deflection, providing high fatigue and impact
resistance and crack free members and the ability to restress, distress and exchange any external
prestressing cable. On the other hand main disadvantages of external prestressing are:
- Applicable for members with a considerable section depth.
- Exposure to environmental influences (fire, vandalism, aggressive chemicals etc.).
- Difficulties in handling of the tensioning devices
For both "Simplified Rehabilitation Method" and "Systematic Rehabilitation Method" ( FEMA356-
2000), it seems that cables are able to improve the member and structure.
(a)
(b)
Figure 1. (a) Rehabilitation of a bridge with cables, DYWIDAG-systems international (b) Bracing
of a tree
SIMPLIFIED REHABILITATION METHOD
In simplified rehabilitation method the focus is on the rehabilitation of structural members
individually.
Rehabilitation of beams
Cable as shown in Figure 2 is capable of enhancing the flexural capacity of a beam. This method is
common in rehabilitation of bridges but is rarely used in buildings, due to small dimension of
beams’ depth in ordinary buildings. Pre-tensioned cables impose a compression force to the beam,
which is favourable because of low tensile strength in concrete. Figure 2 shows an appropriate way
of increasing positive and negative capacity of a beam by using external cables.
Figure 2. Rehabilitation of beams with cables
Rehabilitation of columns
In moment resisting frames, cables can be used to increase flexural capacity, the same procedure as
mentioned for the beams. Another technique is to confine the concrete columns by post- tensioning
high-strength packaging straps around the column (by application of standard strapping machines
used in the packaging industry) and subsequently locking their ends in metal clip. (Moghaddam et
al. 2007) The low cost of strip and speed and ease of application of the strapping technique make
this method efficient for use as a repair and strengthening technique for RC structural members. An
RC column would normally require six man days’ work to be jacketed whilst a maximum of two
days’ work is required for external strapping, which clearly demonstrates the cost saving when
using the proposed technique.( Frangou and Pilakoutas, 1995; Moghaddam et al. 2007)
Rehabilitation of footings
Generally rehabilitation of footing is highly expensive and requires extensive and time-consuming
operation. A frequent technique of strengthening the flexural capacity is to raise the height of the
footing. This method causes reduction in the storey effective height, which might results in
architectural deficiencies and serviceability problems. It seems that in single, strip and mat footings,
cable could effectively improve the flexural capacity. The advantage of the method is that it does
not reduce the storey effective height and also could be used to increase both negative and positive
moment capacity (Figure 3)
(a)
(b)
(c)
Figure 3. Rehabilitation of foundations
(a) strip footing (b) mat footing (c) single
footing
Rehabilitation of slabs
In all standards there are some limitations to prevent excessive deformation and probable shaking of
slabs. (Usually by limiting the slab thickness) If excessive sagging and vibration is observed, slab
should be repaired. Raising the height of the slabs is a common method but as discussed before it
has some disadvantages. Cable can be used in slabs as well as footings. The procedure includes:
punching two side of the slab, passing a cable, pre-tensioning and anchoring the cable properly to
the surface of the slab. The number and diameter of cables required, depend on dimensions and
thickness of the slab and magnitude of loads applied to it. In two-way slabs, this method can be
used in two main directions.
SYSTEMATIC REHABILITATION METHOD
In order to do systematic rehabilitation, a building should be regarded as a unit and the objective is
to improve the behaviour of the building in general rather than individual members. If the structure
can not undergo the displacement equal to the displacement of performance point without extensive
damage, the lateral stiffness and strength of the structure is not adequate. The required capacity can
be obtained by strengthening the lateral stiffness of the system. One of the most common methods
to enhance lateral stiffness is bracing the building with inclined steel members. Although this
method is widely used in steel frames, its advantages made it practical in reinforced concrete frames
(Khaloo and Mohseni, 2008). Cables, as well as steel, can also be used as bracing elements inside
(internal bracing) and outside (external) the concrete frames.
This paper investigates the effectiveness of cables for systematic rehabilitational purposes and its
ability to enhancing the structural lateral stiffness. It could be used temporarily for building during
the construction or for temporary structures. The main idea of the this method is taken from a
method of bracing of trees (Figure 1(b))
MODELIING
In order to investigate the effectiveness of of using cables, the behaviour of a 4-story frame is
investigated before and after rehabilitation with cables. In the first step the initial model was
designed based on the Iranian Building codes. The mass and vertical loads were evaluated and
applied to the structure according to Iranian building codes. Vertical loads consisted of line loads
and point loads applied on the beams and joints respectively. This frame was designed for moderate
lateral load, therefore it was vulnerable to damage under ground excitation of a high seismic zone
The designed model was a 4-story three-span frame with 3 meters story height and 5 meters span
length. Rectangular concrete section of 40cm*40cm and 30cm*60cm was used for columns and
beams, respectively. The dimensions and details of reinforcement of beams and columns were the
same for all stories. The initial weak frame then systematically rehabilitated with three strategies:
- Rehabilitation with x-bracing cable elements (Figure 4(b))
- Rehabilitation with inclined-bracing cable elements (Figure 4(c))
- Rehabilitation with both inclined-bracing and x-bracing elements (Figure 4(d))
The adequacy and performance of each strategy was then investigated by pushover analysis.
(a)
(b)
(c)
(d)
Figure 4. (a) Initial frame, (b) frame with X-bracing, (c) frame with inclined-bracing, (d) frame
with inclined- bracing and X-bracing
ANALYSIS
In order to perform non-linear pushover analysis, hinge properties of the components determined
first. Hinge properties contain the plastic rotation values that a component’s end can carry and the
acceptable plastic rotation varies depending on the structural performance level (i.e. immediate
occupancy, life safety, collapse prevention and etc). For this research hinge properties were taken
from ATC-40 and FEMA-356 based on the component type and failure mechanism. (ATC-40 2000,
FEMA-356 2000) Failure mechanism of all components is assumed as flexure failure and all
components were assumed to be properly reinforced against shear failure. Hoop spacing of all
components was considered to be sufficient to provide conforming section features, so that all
failure mechanisms were controlled by flexure. Four and two types of hinge properties were
assigned to the columns and beams respectively base on FEMA-356. Five-precent of the component
length from the edges assumed as hinge locations. Cables assumed to be force-controlled members.
Table 1 shows acceptance criteria for plastic hinges, defined for columns and beams.
Table 1. Plastic hinge properties
Member
a
b
c
IO
LS
CP
Column
0.018
0.028
0.2
0.004
0.013
0.018
0.02
0.03
0.2
0.005
0.015
0.02
0.14
0.23
0.2
0.003
0.011
0.014
0.15
0.025
0.2
0.003
0.012
0.015
Beam
0.02
0.04
0.2
0.005
0.01
0.02
0.023
0.045
0.2
0.008
0.018
0.023
After adding required cables in the model, hinge parameters and properties were assigned to the
elements and pushover analysis ran to obtain the capacity curve of the structure. Frames were
subjected to gravity and lateral loads and the distribution of lateral load assumed to be linear. In
static nonlinear analysis, the behaviour of the structure is characterized by capacity curve. (Base
shear versus roof displacement) The obtained capacity curves of investigated models versus
spectral displacement coordinates are illustrated in Figure 5. Table 2 also presents the tabulated
displacements and consequent base shears corresponding to different methods. For the
determination of performance point and building capacity level, spectrum method was used. In this
method the capacity and demand spectrum of the earthquake were plotted together in Acceleration
Displacement Response Spectrum (ADRS) format.
Table 2. Displacement and base
shear of the performance point
Frame
Displacement (m)
Bases shear (kg.f)
Initial Frame
0.44
106331
X-bracing
0.41
143725
Incline Bracing
0.33
156437
Inclined+
Xbracing
0.27
167942
Figure 5. Capacity Curve and Performance point
Comparing performance point of four frames, the frame retrofitted with both inclined-bracing and
X-bracing methods exhibits higher strength. The base shear changed from 1063kN in the initial
from to 1679kN in the frame with incline and X bracing. Figure 5 shows that as it was expected, the
lateral stiffness of the frame with both incline and X bracing was considerably greater than the
initial frame. The inclined-bracing was more efficient than x-bracing in strengthening the lateral
stiffness. The distribution of plastic hinge in the expected performance level is shown in Figure 6. It
demonstrates the stage in which the displacement of the control point of the roof reaches the
performance point displacement. Table 3 presents the number and type of plastic hinge for different
performance level.
(a)
(b)
(c)
(d)
(e)
Figure 6. Hinge distribution at performance
level (a) initial frame, (b)frame with x-
bracing, (c)frame with inclined-bracing,(d)
frame with inclined- bracing and X-bracing
(e) hinge specification colour
Table 3. Comparison of hinges at the final step
Frame
A to B
B to IO
IO to LS
LS to CP
CP to C
C to D
D to E
Beyond E
Initial
Frame
46
20
9
1
0
8
0
0
X-bracing
47
22
7
2
0
6
0
0
Incline
Bracing
57
17
5
0
0
5
0
0
Inclined+
X-bracing
63
19
2
0
0
0
0
0
At the performance point there are 8, 6 and 5 plastic hinges between C to D level (Figure 6.e), in the
initial, x-bracing and inclined-bracing frame respectively. For the frame retrofitted with both
inclined-bracing and x-bracing members, there is not any plastic hinge beyond LS level.
Step-by-step pushover analysis and comparing the frames shows that:
Generally, first plastic hinges formed at the end of the middle span beam of the first storey.
The plastic hinges in columns formed firstly in the middle span columns of topmost storey
followed by side columns in the first storey. None of the columns exhibit force-control hinges and
brittle behaviour.
• Sequence of formation of hinges was almost the same in all models. The effective time period of
initial frame, frame with X-bracing, frame with inclined-bracing cables and frame retrofitted with
both inclined-bracing and X-bracing members, was 2.22, 2.03, 1.57, 1.40 respectively.
Figure 7 compares the story displacements and inter-story drifts in different models. In the model
with the inclined and X-bracing, the roof displacement and drift was reduced by 38% compared
with the initial frame. It shows the ability of retrofitting strategies to decrease the storey drift.
(a)
(b)
Figure 8. (a) Story displacement and (b) Comparative displacement
CONCLUSIONS
The research concluded that cables are capable of enhancing the lateral stiffness of structures and
could be applied temporarily for building during the construction or for temporary structures.
Performance based analysis done for different rehabilitation strategies confirmed that as bracing
members, cables can increase the structural lateral stiffness. However the effectiveness of each
strategy is different. Roof displacement in frame retrofitted by x-bracing, inclined-bracing and both
inclined-bracing and x-bracing was 10%, 27% and 38% fewer than that of initial frame, respectively.
REFERENCES
ATC, (2000), Evaluation and Retrofit of Concrete Building, ATC-40, Volume 1and 2, Report NO.SSC 96-01.
Badous, M. and Burdet O., (2000), Comparison of Internal and External Prestressing for Typical Highway Bridges,
16th congress of IABSE, Lucerne.
BHRC, (2005), Iranian code of practice for seismic resistance design of buildings: Standard no.2800 (3rd edition),
Building and Housing Research Centre.
FEMA 356, (2000), Prestandard and commentary for the seismic rehabilitation of buildings. Washington (DC):
Federal Emergency Management Agency.
Frangou, M. and Pilakoutas, K., (1995), structural repair/strengthening of RC columns, Construction and building
materials, 9, 259-266.
Khaloo A.R and Mohseni M. Mehdi, (2008), Nonlinear seismic behaviour of RC frames with RC braces, Asian Journal
of Civil Engineering (Building and Housing), Vol. 9, No.6, PP 577-592.
Sofi A. and Muscolino G. B., (2002), Dynamic Analysis of Prestressed Cables with Uncertain Pretension, Meccanica
37: 6784.
Structural Engineering Association of California (SEAOC), (1995) Performance Based Seismic Engineering of
Buildings, Sacramento, California.
Moghaddam H., Samadi M. and Mohebbi S. (2007), RC Members Strengthening by lateral post-tensioning of external
metal strips, International Earthquake Samposium, Kocaeli, PP 454-462
Sap-2000 tutorial (October 2006), Linear and Nonlinear Static and Dynamic Analysis and Design of Three-
Dimensional Structures, Version 11.0
Wu, I. W. J., Cai C. S and Chen S. R. (2004), Experiments on reduction of cable vibration using MR dampers, 17th
ASCE Engineering Mechanics Conference
ResearchGate has not been able to resolve any citations for this publication.
Article
Full-text available
The majority of concrete buildings in the regions of high seismicity in Iran do not meet seismic code requirement, and many of these buildings are vulnerable in severe earthquakes. Concerns for seismic strengthening of concrete grew considerably in the recent years, and has been accelerated since the Bam earthquake 2004. This paper presents the results of experimental and analytical study on the application of strapping technique for retrofitting of concrete columns. Experimental program included axial compressive tests on cylindrical and prismatic small-scale columns which were actively confined by pre-stressed metal strips. Test Results showed significant increase in strength and ductility of columns due to active confinement with metal strips. The effect of various parameters such as pretensioning force in the strip, number of strip layers wrapped around the specimens and spacing of confining strips on strength of concrete is studied. Nonlinear Finite element models of tested specimens were also made and analyzed. The observed stress-strain behavio rs of columns with different levels of confinement are compared to those obtained from finite element method.
Article
Full-text available
The susceptibility of the majority of the existing building stock to structural damage largely depends on the quality of design, detailing and construction. In many cases, the engineer can extend the life span of a building structure by utilizing simple repair/strengthening techniques. The choice of the repair/strengthening technique becomes, therefore, the decisive factor, since high cost would deter many building owners from executing essential repair works. In this paper, a cost effective and efficient technique for strengthening rc columns is described. The proposed technique involves post-tensioning metal strips around reinforced concrete columns, by using a strapping machine. The preliminary results of the experimental work carried out at Sheffield University indicate that such strengthening can increase member strength and ductility to higher levels than those possible by conventional reinforcement, at only a fraction of the time and cost required by alternative techniques.
Article
An experimental study is described in this paper on cable vibration control with a MR damper. The performance of this damper is obtained experimentally with different loading frequencies and currents. A 7.16m-long stay cable with a prototype-to-model scale factor of eight is established for the vibration control study. Frequencies of the stay cable under different tension forces are measured and compared with those obtained through theoretical calculation. Then, by hanging a mass in the middle of the cable and by cutting the connecting rope, a free vibration control test is carried out and the acceleration time histories of the middle point and the 1/4 th point of the cable are measured while the MR damper with different inside currents is installed at the 1/4 th point. Also, a shaker is installed at 2.3% of the cable length close to the lower end to simulate a forced vibration control test. The measured data show that the damper is good for cable vibration control within its working current range (zero to maximum) though beyond some value, the control effect stays almost the same with increased current. It is also observed that the damper can reduce cable vibration under a variety of excitation frequencies, especially for the resonance cases.
Article
Braced frames, besides other structural systems, such as moment resisting frames or shear walls, have been an effective and valuable method to enhance structures against lateral loads. In wind or seismic excitations, inclined elements react as truss web elements which would bear compression or tension stresses. This axial reaction results in less moments and therefore smaller sizes in beam and column sections with respect to members in similar moment resisting frame. However, low tensile strength of concrete material, made it a challenge to use in inclined members. In practice, there have been various methods to consider this defect such as disengagement of brace elements in tension or utilization of prestressed braces. The purpose of this article is to study the nonlinear response of reinforced concrete frames which contain reinforced concrete braces as the major structural elements against earthquake loads. The advantages of nonlinear behavior in reinforced concrete elements and their adequate energy absorption in cyclic loading are taken into account. Also stiffness and strength degradation of structural members under cyclic loading is considered. Two different braced frames with K and X braces are analyzed numerically for four, eight and twelve story buildings. This study focuses on evaluation of strength, stiffness, ductility and energy absorption of reinforced concrete braced frames and comparison with similar moment resisting frames and frames with shear wall. Results are plotted in diagrams and discussed extensively. According to this study it is concluded that besides effective lateral stiffness rising in reinforced concrete braced frames, there is a considerable amount of energy dissipation during earthquake loading.
Article
This paper deals with finite element dynamic analysis of prestressed cables with uncertain pretension subjected to deterministic excitations. The theoretical model addressed for cable modeling is a two-dimensional finite-strain beam theory, which allows us to eliminate any restriction on the magnitude of displacements and rotations. The dynamic problem is formulated by referring the motion to the inertial frame, which leads to a simple uncoupled quadratic form for the kinetic energy. The effect of the externally applied stochastic pretension is approximately described by means of an uncertain axial component of stress resultant, which is assumed constant along the cable in its dead load configuration. The so-called improved perturbation approach is employed to solve this stochastic problem, obtaining two coupled systems of nonlinear deterministic ordinary differential equations, governing the mean value and deviation of response. An efficient and accurate iterative procedure is proposed to obtain the solution of these equations. In order to investigate the influence of random pretension on structural response, few numerical applications are presented and results are discussed.
Evaluation and Retrofit of Concrete Building
ATC, (2000), Evaluation and Retrofit of Concrete Building, ATC-40, Volume 1and 2, Report NO.SSC 96-01.
Iranian code of practice for seismic resistance design of buildings: Standard no
BHRC, (2005), Iranian code of practice for seismic resistance design of buildings: Standard no.2800 (3rd edition), Building and Housing Research Centre.
Prestandard and commentary for the seismic rehabilitation of buildings
FEMA 356, (2000), Prestandard and commentary for the seismic rehabilitation of buildings. Washington (DC): Federal Emergency Management Agency.
Comparison of Internal and External Prestressing for Typical Highway Bridges
  • M Badous
  • O Burdet
Badous, M. and Burdet O., (2000), Comparison of Internal and External Prestressing for Typical Highway Bridges, 16th congress of IABSE, Lucerne.