In complex networks characterized by the presence of private tanks, water managers usually apply intermittent distribution, thus reducing the water volumes supplied to the users, or use Pressure Reduction Valves (PRV) for controlling pressure in the network. The application of Pump As Turbines (PATs) appears as an alternative and sustainable solution to either control network pressure as well as to produce energy. In the present paper, the hydrodynamic model, already presented by De Marchis et al. (2011) was further developed introducing the dynamic analysis of PATs. The model was applied to a district of Palermo network (Italy) characterized by intermittent distribution and by inequities among the user in term of water supply.
Content may be subject to copyright.
Procedia Engineering 70 ( 2014 ) 439 448
Available online at www.sciencedirect.com
1877-7058 © 2013 The Authors. Published by Elsevier Ltd.
Selection and peer-review under responsibility of the CCWI2013 Committee
doi: 10.1016/j.proeng.2014.02.049
ScienceDirect
12th International Conference on Computing and Control for the Water Industry, CCWI2013
Energy recovery in water distribution networks. Implementation of
pumps as turbine in a dynamic numerical model
M. De Marchisa,, C.M. Fontanazzaa,G.Freni
a,A.Messineo
a, B. Milicia,E.Napoli
b,V.
Notaroa,V.Puleo
b,A.Scopa
a
aUniversit`a di Enna Kore, Cittadella Universitaria, Enna - 94100, Italy
bUniversit`a di Palermo, Viale delle Scienze, Palermo - 90128, Italy
Abstract
In complex networks characterized by the presence of private tanks, water managers usually apply intermittent distribution, thus
reducing the water volumes supplied to the users, or use Pressure Reduction Valves (PRV) for controlling pressure in the network.
The application of Pump As Turbines (PATs) appears as an alternative and sustainable solution to either control network pressure
as well as to produce energy. In the present paper, the hydrodynamic model, already presented by De Marchis et al. (2011)
was further developed introducing the dynamic analysis of PATs. The model was applied to a district of Palermo network (Italy)
characterized by intermittent distribution and by inequities among the user in term of water supply.
c
2013 The Authors. Published by Elsevier Ltd.
Selection and peer-review under responsibility of the CCWI2013 Committee.
Keywords: Pump as Turbine (PAT); water distribution network; method of characteristic; intermittent distribution; energy saving.
1. Introduction
Energy plays an important role in almost all areas of human and commercial activities. In Water Distribution
Networks (WDNs), the operational costs are growing especially in most developing countries, where an increase of
the water demand occurs. The energy used to pump and treat water for urban residents and industry represents the
2-3% of the world’s energy consumption which could be reduced by at least 25 % through cost-eective actions.
The strong connection between water and energy in WDN gives rise to programs, such as Watergy (Barry (2007)),
whose aim is to realize significant energy, water and monetary savings through technical and managerial changes.
Several researches were carried out in order to investigate the possibility to recover energy in water distribution
networks, considering mini- and micro-hydropower plants. Unfortunately, the high equipment costs prevent them
from having a widespread application in water systems. Considering that pumps are relatively cheap and simple
machines, characterized by reduced maintenance cost and readily available in most developing countries, since 1930,
several studies investigated the possibility to use pumps in a reverse mode, as hydraulic turbines. The studies clearly
Corresponding author. Tel.: +39-0935-536438 ; fax: +39-0935-536710
E-mail address: mauro.demarchis@unikore.it
© 2013 The Authors. Published by Elsevier Ltd.
Selection and peer-review under responsibility of the CCWI2013 Committee
440 M. De Marchis et al. / Procedia Engineering 70 ( 2014 ) 439 – 448
showed that the use of PATs can be considered a good alternative for power generation. Despite of this, until now
some issues are still open and need further analysis. Recently, Laghari et al. (2013) showed that among the renewable
energy sources, large hydropower, biomass (Messineo et al. (2012)), solar heating system, wind and mini-hydro and
waste-to-energy plants (Messineo and Marchese (2008)) are able to cover a significant amount of electricity demand.
Unfortunately, the mini-hydro energy production represents the minor contribution despite its technology is mature,
reliable and more ecient than others kind of renewable energy. Furthermore, Laghari et al. (2013) showed that
almost the 60% of the installed mini-hydro capacity in the word is achieved by Chine, while Italy cover only a quote
of 3 %. The huge costs of civil construction, electromechanical equipment and the long delay in approval processes
suggest using PATs which have lower equipment cost in respect to the common hydraulic turbines.
One of the most interesting experimental research has been conducted by Derakhshan and Nourbakhsh (2008b),
where some relations were derivedto predict the Best Eciency Point (BEP) on several low specific-speed centrifugal
PATs. The experiments, where four PATs were tested, clearly showed that centrifugal pump can operate as turbine with
dierent rotational speeds, variousheads and flow rates without any mechanical problem. Singh and Nestmann (2010)
carried out experimental analysis to explore wide range of PAT shapes. They accurately characterize these eects
with respect to internal hydraulic variables over the complete operating region of the PAT. Furthermore they tried to
develop a theoretical model that involves the external operating variables on the PAT and the internal variables, using
fundamental hydraulic and turbo machine laws. More recently, Nautiyal et al. (2011) carried out an experimental
investigation of centrifugal pump to study its characteristics in pump and turbine mode operation.
More recently some interesting analysis were focused to analyse reverse operation of centrifugal pumps through
Computational Fluid Dynamics (CFD). Unfortunately, until now CFD techniques are not successful to predict the
correct performance of PATs. Derakhshan and Nourbakhsh (2008a) compared theoretical, experimental and CFD
results of a PAT but large deviations were observed between CFD and experimental results, showing that further
eorts are required. A similar analysis was later achieved by Yang et al. (2012a) who, investigating on PATs
performance using theoretical, CFD and experimental methods, showed that further analysis with experimental or
theoretical technique are required to well capture the pump as turbine performances. This issue was also pointed
out by Nautiyal and Kumar (2010) in their review on pumps working as turbine. The authors stated, in fact, that
despite the intense eorts carried out by several researchers, until now, the CFD is not yet an acceptable technique.
Later, on the contrary, Carravetta et al. (2012) stated that the CFD technique can be considered a valid alternative to
experiment when there is a lack of the pump producers’ characterization of PAT performance. Similar results were
already obtained by Fecarotta et al. (2011) who compared CFD simulations and experiments, predicting the behaviour
of a turbo machine both in pump and in turbine mode. However, they found that the reliability of the solution depends
on the type of the flow regime condition and on the resolution of the computational grid. CFD investigations were
also carried out by Yang et al. (2012b), who, comparing the experimental result with the numerical one, found that
numerical results over predict the experimental data. Anyway the general trend of the eciency, pressure head and
shaft power curves were well captured.
Recently, PATs were investigated in terms of economic benefits. Arriaga (2010) presented the concept of Pump
as Turbine as a viable technical and economical alternative for the further pico-hydro development in the Lao PDR
located in South East Asia. Carravetta et al. (2012), through the comparison between experimental and CFD analysis,
proposed a design method based on a Variable Operating Strategy (VOS) to predict the PATs behaviour and to find
the optimal solution which maximizes the produced energy in WDNs. Later, Carravetta et al. (2013) extended the
VOS methodology to investigate on best economic eciency between an hydraulic regulation (HR) or an electrical
regulation (ER), founding that HR is more flexible and ecient than ER. Recently, Puleo et al. (2013) analysed the
PATs application in a real case through the development of an hydraulic model. They investigate on the potential
energy recovery from the use of centrifugal PATs in a WDN characterized by the presence of private tanks and
intermittent service. The results showed that the energy production can be low and also discontinuous, questioning
its ecacy, highlighting that further studies are required to investigate the possibility and the eciency of the PATs to
recover energy from the WDN. Fontana et al. (2012) presented a management strategy with two main folds: pressure
control to reduce water losses and energy production. The authors applied, in a real water distribution network, a
system of PRVs and PATs. Specifically, they tried to substitute the optimal location of PRVs with PATs, showing a
really attractive profits and capital payback period. Despite the eciency of PATs is lower than conventional hydro-
turbines, a recent analysis carried out by Motwani et al. (2013) and based on the comparison between the annual life
441
M. De Marchis et al. / Procedia Engineering 70 ( 2014 ) 439 – 448
cycle cost (ALCC) of a PAT and a of a Francis turbine, showed that the ALCC is very less for PAT than that of Francis
turbine, thus justifying further eorts in the study of PATs applications.
The present paper analyses the potential energy recovery obtained by the use of PAT devices installed in a water
distribution network with private tanks. To this aim, the Method of Characteristics (MOC), used to predict the water
head and the flow rate in WDN, was improved, introducing a module able to simulate the PATs recently investigated,
through experimental analysis, by Derakhshan and Nourbakhsh (2008b). The model was applied to a district of
Palermo network (Italy), characterized by intermittent distribution and by inequities in user water supply. A manage-
ment strategy was performed, based on the economic analysis, and the payback period was calculated.
2. Methodology
The numerical model used to investigate on the eciency of PATs in real WDNs is the hydrodynamic model
already presented by De Marchis et al. (2010) and De Marchis et al. (2011). The model was updated including a
specific integrated module able to take into account PATs devices. In the following some details on the hypotheses
and the equations of the hydraulic and PAT models are reported.
2.1. Hydrodynamic model
The numerical model is based on the resolution of the momentum and continuity equations, through the method of
characteristic. Due to the specific feature of the proposed model, occurring especially during the phase of filling of
the pipes, some simplifying assumptions were needed. Based on the Liou and Hunt (1996) study, it is assumed that
the air pressure at the water front is always atmospheric and the wave-fronts are always perpendicular to the pipe axis
and coincident with the cross sections. For detailed discussion of the above hypothesis see (De Marchis et al. (2010,
2011). The 1D unsteady flow of the compressible liquid in the elastic pipe is described by the following system of
equations:
gδh
δs+VδV
δs+δV
δt+gJ +g
cVsinθ=0(1)
g
cVδh
δs+cδV
δs+g
c·δh
δt=0(2)
where tis the time, Vis the velocity averaged over the pipe cross-section, his the water head, gis the acceleration
due to gravity, cis the celerity of pressure waves, θis the slope of the pipeline, while
J=Js+Ju(3)
represents the head loss per unit length due to steady and unsteady friction, respectively. The steady friction
contribution is calculated according to the classical Darcy-Weisbach equation:
Js=f·V·|V|
2·g·D(4)
where Jsis the Darcy-Weisbach friction factor and, both with the velocity V, is calculated dynamically at each time
step. On the other hand, Ju, according to the formulation of Brunone et al. (1991), later modified by Vitkovsky et al.
(2006), can be calculated according to:
Ju=k
gδV
δt+c·φA
δV
δs(5)
where kis a coecient obtained dynamically in function of the flow regime, as will be shown in the following,
while φais a coecient depending on the sign of the convective acceleration. Specifically, φA=+1ifV δV
δs0; -1 if V
442 M. De Marchis et al. / Procedia Engineering 70 ( 2014 ) 439 – 448
δV
δs¡ 0. Introducing Eq.5 into Eq.1 and applying the MOC approach, the momentum and continuity partial dierential
equations can be transformed into ordinary dierential equations, known as compatibility equations:
(1 +k)dV
dt +αg
c
dh
dt +gJs+g
cαVsinθ=0(6)
(1 +k)dV
dt βg
c
dh
dt +gJs+g
cβVsinθ=0(7)
where αand βare k+2kφA
2and k+2+kφA
2, respectively.
The compatibility equations are valid along the proper positive and negative characteristic lines of equation that,
introducing the unsteady friction model, read:
C+:ds
dt =+c
α(8)
C:ds
dt =c
β(9)
In the proposed numerical model the coecient kwas calculated at each time step toward the Vardy and Brown
(2003)formulation, given by:
k=c
g(10)
with
c=
7.41
Relog14.3
Re0.05 for Re 0
0.047 for Re <0
(11)
The Eq.6 and 7 can be solved through the finite dierence technique. Following the notation used in Fig. 1, these
equations read:
hi,n+1
jhi,n
jm +1+k
α
c
g(Vi,n+1
jVi,n
jm)+c
αJi,n
jm +Vi,n
jm senθiΔti=0(12)
hi,n+1
jhi,n
jv +1+k
β
c
g(Vi,n+1
jVi,n
jv )+c
βJi,n
jv +Vi,n
jv senθiΔti=0 (13)
where Vi,n+1
jand hi,n+1
jare the velocity and the water head in the j-th section (of abscissa ( j1)Li/Ni)ofthei-th
pipe at the time step tnt;jmand jvare the sections upstream and downstream to the j-th section, respectively.
The time step advancement Δtn
i, function of the length and of the celerity of the i-th pipe, is calculated for each
pipe and then the minimum value is chosen as the unique time step integration:
Δtn
i=min1Δtn
i=miniLn
i
Nici(14)
When the velocity of the water front Vi,n+1
jis calculated, the filling process is updated according to:
Ln+1
i=Ln
i+Vi,n+1
N·Δt(15)
where Ln+1
iis the length of the water column inside the partially empty i-th pipeline at the time tn+1. The com-
patibility equations for the pipelines connected to the node are resolved together with the continuity equation at each
443
M. De Marchis et al. / Procedia Engineering 70 ( 2014 ) 439 – 448
Fig. 1. Space-time scheme for two-pipe of dierent diameter with the same number of section N and dierent time step Δti
junction node, and the discharge provided to user tanks is calculated as a function of the water head. Specifically, the
discharge Qj,up at the j-th node entering the tank connected to the node can be obtained as:
Qj,up =CvA2g·(hi
jhj,tank)(16)
where Cvis the non-dimensional float valve emitter coecient, Ais the valve eective discharge area, hi
jis the water
head at the j-th node and hi
j,tank is the height of the private tank. Although more complex methods were considered in
the past to relate coecients Cvand a to valve-openingrates, here constant values were used forboth of the coecients
(see, Criminisi et al. (2009)) which have been calibrated experimentally.
2.2. PAT module
As previously discussed, the hydrodynamic model is coupled with a numerical module able to reproduce the
PATs installation in the pipes of WDN. In the present analysis, several manufacturers catalogues were investigated to
identify pumps satisfying the given turbine operating conditions (head and flow). The characteristic curves achieved
by Derakhshan and Nourbakhsh (2008a) and Derakhshan and Nourbakhsh (2008b) through experimental analysis
were applied. Specifically, dimensionless head and power curves of a PAT can be estimated using the equations:
Ht
Hbt
=1.0283 Qt
Qtb 2
0.5468 Qt
Qtb +0.5314 (17)
Pt
Pbt 0.3092 Qt
Qtb 3
2.1472 Qt
Qtb 2
0.8865 Qt
Qtb +0.0452 (18)
where H (m), P (W), Q (m3/s) are head, power, flow rate, respectively. Subscripts tand bare related to turbine and
Best Eciency Point. Following, among others, Derakhshan and Nourbakhsh (2008a) and Derakhshan and Nour-
bakhsh (2008b), the PATs parameter are related to the specific rotational speed n(rps). Specifically, dimensionless
head, discharge and power curves can be obtained through the equations:
φ=g·H
n2·D2
imp
;ψ=Q
n·D3
imp
;π=P
ρ·n3·D5
imp
(19)
where Dimp is the impeller diameter.
The BEP is achieved maximizing the eciency according to the equation:
η=Ptb
ρ·g·Qtb ·Htb
(20)
444 M. De Marchis et al. / Procedia Engineering 70 ( 2014 ) 439 – 448
As suggested by Derakhshan and Nourbakhsh (2008a) the prediction method is acceptable for centrifugal pumps
with N (rpm) 60.
With the aim to combine water saving with current renewable energy policies, PATs are coupled with Pressure
Reducing Valves (PRVs).
3. The case study
The proposed numerical model has been applied on one of the 17 distribution networks of Palermo city (Sicily),
designed to deliver about 400 l/capita/d but the actual mean consumption is about 260 l/capita/d that supply around
35,000 inhabitants (11300 users). The network was built by polyethylene pipes and their diameters ranging from
110 to 400 mm. Additional details on the analysed network can be found in De Marchis et al. (2010). The current
configuration of the network is characterized by significant inequality in the distribution of water resources during
intermittent supply. As demonstrated by De Marchis et al. (2010), the WDN can be subdivided in two main regions
by geodetic elevation. To improve the clarity, in Fig. 2 the sub-network characterized by lowest elevation has been
delimited through dotted lines, while the highest geodetic region is indicated through a continuous line. The network
orography suggests the possibility to introduce some PATs in the network pipes connecting the two main regions. The
PATs, reducing the head, should also reduce the inequality among the users. As demonstrated by De Marchis et al.
(2011), in fact, in the deepest network zone the user supplies is particularly higher than the disadvantaged nodes.
The analysed WDN is characterized by six pressure cells and two electromagnetic flow meters (Fig. 1). The
pressure data were used for model calibration and validation, showing the ability of the proposed hydraulic model
to reproduce the behaviour of a real network (see De Marchis et al. (2010, 2011) for the validation tests. As can
be observed in the Fig. 2, the two sub zones are connected by mean of three main pipes, one located close to the
supply node, the second located in a middle zone, while the third is about 1.5 km far from the inlet node. Several
numerical experiments were carried out to evaluate the convenience of PATs installation. Here the results of four tests
are analysed. Specifically, in the test case 1, as shown in Fig. 3a the PAT has been simulated in the pipe connected to
the supply node, having a diameter of 400 mm. In the second test case shown in Fig. 3b, the PAT has been installed
in the pipe of the network closest to the inlet node, having a diameter of 150 mm. The third scenario is referred to the
PAT installed in the connection pipe, between the highest and lowest geodetic sub-zone, located in the middle of the
WDN, see Fig. 3c. Finally, in the last test case the PAT is installed in the pipe, linking the two sub network, far from
the supply node as shown in Fig. 3d.
Fig. 2. Case study network scheme. The continuous blue line delimits the region with the highest elevation, the dashed blue line delimits the region
with the lowest elevation.
445
M. De Marchis et al. / Procedia Engineering 70 ( 2014 ) 439 – 448
(a) (b)
(c) (d)
Fig. 3. Position of the PATs and closed pipes on network mains: Test case 1 (a), test case 2 (b), test case 3 (c) and test case 4 (d). The blue lines are
highlight the boundaries of the two main region of the network.
4. Results and discussions
The analysis here reported is aimed to check the validity of the installation of PATs in real WDN through numerical
modelling. With the aim to reduce the cost of installation and maximize the PATs eciency, a numerical model able
to guide the water managers should be very attractive. In the following, a preliminary analysis is discussed in light
of the capital payback period, exploring the four dierent position of installation specified in the lass section. The
economic analysis has been carried out considering a produced energy cost equal to 0.22 euro/kWh, as it is the average
value for the renewable produced energy in Italy. The Energy Generation Equipment (EGE) has been evaluated taking
into account the PAT cost, the generator cost and the related electrical equipment. The PAT cost has been calculated
according to the BEP of the power of the PAT. Specifically, based on market analysis, the EGE cost has been estimated
considering 2000 euro/kW for each turbine power installed Pinst . The Civil Works cost (CW) should be added too.
According to Fontana et al. (2012) CW has been calculated 30 % the EGE costs. In order to make a preliminary but
complete analysis of capital payback period (CPP), the maintenance costs MC have to be considered. In literature, it
is suggested a quote range between 10-15% of the total cost (EGE+CW). Here the highest value is chosen. The CPP
is thus calculated as the ratio between the total installation cost (EGE+CW) and the Annual Finantial saving (AF)
446 M. De Marchis et al. / Procedia Engineering 70 ( 2014 ) 439 – 448
expressed in euro/year. AF is calculated as the product of the energy cost ( 0.22 euro/kWh) and the Average Yearly
Energy Production (AYEP) subtracting the MC (see Eq.21).
CPP =EGE +CW
AF ;AF =0.22 AYEP MC;MC =0.15 ·(EGE +CW)(21)
Table 1. Economic feasibility of PATs installation in a WDN: Cost and capital payback period analysis .
Test case Pinst (kW)AYEP(kWh/year)EGE(euro)CW(euro)MC(euro)AF(euro/year)CPP(years)
Test case 1 8.59 65,156 17,176 5,152 3,349 10,984 2,03
Test case 2 1.88 12,763 3,764 1,129 734 2,073 2,36
Test case 3 3.55 19,740 7,098 2,129 1,384 2,958 3,12
Test case 4 2.62 10,019 5,247 1,574 1,023 1,181 5,78
Table 2. PATs characteristic in turbine mode.
Test case Qtb (m3/s)Htb (m)Ptb (kW)
Test case 1 0.16 6.27 7.30
Test case 2 0.026 8.43 1.60
Test case 3 0.038 10.9 3.02
Test case 4 0.033 10.4 2.23
In Table 1 the costs for the four scenarios are summarized. In the above analysis the PAT power installed Pinst was
calculated starting from the Ptb and considering an overall eciency of 85%.
In Table 2 some details on the BEPs of the four test cases are added.
The results of the economic analysis show a general eciency of the energy recovery, with an attractive payback
period almost 2.5 years, at least for the scenario 1, 2 and 3. Similar results were obtained by Fontana et al. (2012).
As shown in Fig. 3, in these three test cases the PATs are located in pipes close to the supply pipe. This should
be attributed to the higher discharge values than the test case 4. In this last case, in fact, a CPP almost twice of
the first three installation is verified. In the four case the PAT has been installed in a pipe located far from the inlet
node, thus the lower energy production can be attributed to reduced flow rate driving through. The Average Yearly
Energy Production (AYEP) values, reported in Table 1, were calculated integrating the energy production during a
24-hour simulation describing the average yearly conditions. The energy production time series for all test cases are
reported in Fig. 4. As it can be observed in the figure, at 5:00 a.m., where the minimum value of averaged daily
user demand is achieved, the lowest energy production is verified in all cases. This is clearly due to the fact that the
reduced consumptions cause a reduced flow rate in the WDN. It is interesting to observe that despite in the test case 1
the higher values of energy production are registered, the CPP is almost the same of the test case 2. The increase of
the Pinst generate an augmentation of EGE and MC costs. This is a clear evidence that a preliminary detailed analysis
of the network in term of energy production, should be very attractive to maximize the overall system eciency. As
shown in the Fig. 4, the PATs were activated after two hours from the beginning of the simulation. Thus, the period
of the pipes filling process was neglected. Obviously, in water distribution system characterized by continuos supply
the economic benefits should increase. In order to check the eect of the PATs installation among the users in Fig.
5 the values of the water volume supplied at each node, for the dierent test cases here considered is plotted. To
improve the clarity the test case TC0, where the numerical model runs without PAT installation, is added too. It can
be observed that the test case 2 seems to be the best choice in term of water resources. The total water resources
supplied to the users in the test case 2 is, in fact, the 85% of the total water volume supplied in the TC0.IntheTC1
the service percentage is reduced to the 80%. This could be attributed to the global pressure reduction occurring in all
the network, when the PAT is installed in the inlet pipe. In the TC3and TC4the PATs increase the supply to the 77%
and 74%, respectively. Fig. 5 shows that the TC2installation causes a drastic reduction of water supply in the nodes
25 to 35, while these nodes are not aected by water reduction in the test cases 3 and 4. In the nodes from 70 to 80
the opposite holds. This particular condition suggests to explore the possibility to install PATs working alternatively.
447
M. De Marchis et al. / Procedia Engineering 70 ( 2014 ) 439 – 448








            
















            


Fig. 4. Left: Power production for the four test cases. during 24-hour simulation. Right: Average daily user demand pattern adopted in the
numerical simulations.











                 


    
Fig. 5. Water volume supplied in each node during a day. Case TC0represents the case without PAT installation.
Some analysis are focusing on this issue, thus to maximize the PATs eciency and reduce the inequities in the water
resource. Despite the present analysis can be considered only a preliminary investigation, some really interesting
features were pointed out, showing that PATs installation can be considered strategic in terms of renewable energy
production.
5. Conclusions
In the study, a dynamic mathematical model for intermittent networks was integrated with a model able to analyse
the presence of PATs in water distribution network. The model demonstrated to be robust and to correctly represent
the impact of energy recovery on water supply distribution. Four dierent scenarios were analysed involving PATs in
order to identify the most suitable solution in terms of energy power production without compromising the hydraulic
performance of the network in terms of service delivery. The analysis showed that a really attractive capital payback
period can be achieved, if the PATs are installed in the pipes located close the water supply node. In this case, in
fact, coherently with some literature findings, CPP of about 2.5 years was achieved. The maximum eciency can
be reached is the PATs are installed in the main pipe, despite the highest cost of installation and maintenance. The
economic benefits are considerably reduced when the PATs are placed in disadvantage pipes, in term of discharge. In
448 M. De Marchis et al. / Procedia Engineering 70 ( 2014 ) 439 – 448
the test case 4, where the PAT is installed far away from the inlet node, the CPP is almost twice the others cases. The
results obtained are dependent on the specific case of study and further validation should be provided by additional
monitoring and through the comparisonof the numerical simulations with a field survey. Nevertheless, the preliminary
results show the attractiveness of the numerical model to evaluate the best PATs position.
Acknowledgements
The Authors would like to acknowledge the Italian Research Project POR FESR Sicily 2007-2013 - Measure
4.1.1.1 SESAMO - SistEma informativo integrato per l’acquisizione, geStione e condivisione di dAti aMbientali per il
supportO alle decisioni for providing financial support to the presented research.
References
Arriaga, M., 2010. Pump as turbine - A pico-hydro alternative in Lao People’s Democratic Republic. Renewable Energy, 35, 1109-1115.
Barry, J. A., 2007. WATERGY: Energy and Water Eciency in Municipal Water Supply and Wastewater Treatment Cost-Eective Savings of
Water and Energy, 1-44.
Brunone, B., Golia, U.M., Greco, M., 1991. Some remarks on the momentum equations for fast transients. Hydraulic transients with column
separation (9th and last round table of the IAHR Group), IAHR, Valencia, Spain, 201-209.
Carravetta, A., Del Giudice, G., Fecarotta, O., Ramos, H., 2012. Energy Production in Water Distribution Networks: A PAT Design Stra tegy.
Water Resources Managment 26(13), 3947-3959.
Carravetta, A., Del Giudice, G., Fecarotta, O., Ramos, H., 2013. PAT Design For Strategy Energy Recovery In Water Distribution Networks By
Electrical Regulation. Energies 6, 411-424.
Criminisi, A., Fontanazza, C.M., Freni, G., and La Loggia, G., 2009. Evaluation of the apparent losses caused by water meter under-registration in
intermittent water supply. Water Science & Technology, 60(9), 2373-2382.
De Marchis, M., Fontanazza, C.M., Freni, G., La Loggia, G., Napoli, E., Notaro, V., 2010. A model of the filling process of an intermittent
distribution network. Urban Water Journal 7(6), 321-333.
De Marchis, M., Fontanazza, C.M., Freni, G., La Loggia, G., Napoli, E., Notaro, V., 2011. Analysis of the impact of intermittent distribution by
modelling the network-filling process. Journal of hydroinformatics 13(3), 358-373.
Derakhshan, S., Nourbakhsh, A., 2008(a). Theoretical, numerical and experimental investigation of centrifugal pumps in reverse operation. Exper-
imental Thermal and Fluid Science 32, 1620-1627.
Derakhshan, S., Nourbakhsh, A., 2008(b). Experimental study of characteristic curves of centrifugal pumps working as turbines in dierent specific
speeds. Experimental Thermal and Fluid Science 32, 800-807.
Fecarotta, O., Carravetta A. and Ramos, H.M., 2011. CFD and comparisons for a pump as turbine: Mesh reliability and performance concerns.
International Journal of Energy and Environement, 2(1), 39-48.
Fontana, N., Giugni, G. & Portolano, D., 2012. Losses Reduction and Energy Production in Water-Distribution Networks. Journal of Water
Resources Planning and Management, 138(3), 237-244.
Laghari, J.A., Mokhlis, H., Bakar, A.H.A., Hasmaini, M., 2013. A comprehensive overview of new designs in the hydraulic, electrical equipments
and controllers of mini hydro power plants making it cost eective technology. Renewable and Sustainable Energy Reviews, 20, 279-293.
Liou, C.P. & Hunt, W.A., 1996. Filling of pipelines with undulating elevation profiles, Journal of Hydraulic Engineering, 122(10), 534-539.
Messineo, A., Marchese, F., 2008. Performance evaluation of hybrid RO/MEE systems powered by a WTE plant, Desalination, 229, 82-93.
Messineo, A.,Volpe, R., Marvuglia, A., 2012. Ligno-cellulosic biomass exploitation for power generation: A case study in Sicily, Energy, 45,
613-625.
Motwani, K.H., Jainb, S.V., & Patel, R.N., 2013. Cost analysis of pump as turbine for pico hydropower plants - a case study. Procedia Engineering,
51, 721-726.
Nautiyal H., Kumar, A., 2010. Reverse running pumps analytical, experimental and computational study: a review. Renew. Sustain. Energy Rev.,
14, 2059-2067.
Nautiyal H., Varun V., Kumar, A., Yadav S., 2011. Experimental Investigation of Centrifugal Pump Working as Turbine for Small Hydropower
Systems. Energy Science and technology, 1, 79-86.
Puleo, V., Fontanazza, C.M., Notaro, V., De Marchis, M., Freni G. and La Loggia G., 2013. Pumps as turbines (PATs) in water distribution networks
aected by intermittent service. Journal of Hydroinformatics, DOI:10.2166/hydro.2013.200 .
Singh, P., Nestmann, F., 2010. An optimization routine on a prediction and selection model for the turbine operation of centrifugal pumps. Experi-
mental Thermal and Fluid Science, 34, 152-164.
Vardy, A. E. & Brown, J. M. B., 2003. Transient turbulent friction in smooth pipe flows. Journal of Sound and Vibration, 259(5), 1011-1036.
Vitkovsky J. P., Bergant, A., Simpson, A. R., & Lambert, M. F., 2006. Sistematic evaluation of one-dimensional unsteady friction models in simple
pipelines. Journal of Hydraulic Engineering-Asce, 132(7) 696-708.
Yang, S.S., Derakhshan, S., Kong, F.Y., 2012(a). Theoretical, numerical and experimental prediction of pump as turbine performance. Renewable
Energy, 48, 507-513.
Yang, S.S., Kong, F.Y., Jiang W.M., Qu X.Y., 2012(b). Eects of impeller trimming influencing pump as turbine. Computers & Fluids, 67, 72-78.
... Almost all aspects of human and commercial activities depend heavily on energy. In many industrial applications, several operational modes have a huge potential for energy losses [1]. In light of this, even though it is receiving considerable attention, the significant value of recovering extra energy in modern industrial process applications is not being given the attention it merits. ...
... Additionally, relationships were created using experimental data in order to forecast the Best Efficiency Point (BEP) for a number of centrifugal pumps with low specific speeds (N s < 60). The Method of Characteristics (MOC) was used to forecast the water head and flow rate in WDN, and Marchis et al. [1] examined the potential energy recovery using PAT in WDN by establishing a numerical model that could replicate the PATs analyzed by Derakhshan and Nourbakhsh [6]. The proposed numerical model was adopted on one of the seventeen distribution networks of Italy (Palermo city). ...
... According to Fontana et al. [35], the civil work (CW) portion of the EGE expenses is estimated to be 30%. Maintenance Costs (MC) must be taken into account in order to do a basic but comprehensive study of the Capital Payback Period (CPP) [1]. In the literature, it is advised to utilize a range between 10 and 15% of the overall cost (EGE + CW). ...
Article
Full-text available
The throttling process is frequently encountered in many industrial practices utilizing Pressure Reducing Valves (PRVs). This process is typically used to control pressure and flow in pipeline networks. The practice of utilizing PRVs is considered simple and cheap in terms of installation cost and control. It dissipates the excess fluid energy that can be used for other purposes. This paper studies the feasibility of utilizing the Pump as Turbine (PAT) concept to partially recover the excess power dissipated from PRVs located at the discharge lines of refined product shipping pumps at one of the hydrocarbon distribution facilities in Saudi Arabia. Multiple PAT installation layouts have been studied to achieve this goal, selecting the optimum option to maximize the power recovery. The final selection of PAT was conducted to achieve a reasonable payback period. A new method for predicting the pump performance in reverse mode was developed depending on the manufacturer’s pump performance curves. The comparison of the proposed model with experimental data and previous models for three modes of operation reveals that the proposed model in this paper’s results either have the minimum deviation or the second minimum deviation out of all models. In the case of flow ratio prediction, the predicted deviation is merely 3.83%, −1.14%, and 1.35% in three modes of operation. For power prediction, the proposed model is the best and the only reliable model out of all with the least deviation of −7.48%, 0.07%, and −3.16% in three modes of operation. The economic analysis reveals the Capital Payback Time (CPP) for five optimum PATs is around 5 years. The new method was also validated against previous models showing more precise performance prediction of multistage centrifugal pumps running in turbine mode.
... Novara et al. [22] proposed a cost model based on 343 pumps and 286 generators in which the cost of the PAT is related to flow and head drop at the BEP. Other authors considered the cost of both PAT and generator as a function of the power at the BEP [23,24]. Notwithstanding the models available in the literature, PAT selection remains very much an open issue due to flow variability in a WDN and a lack of detailed information and analysis about installation and maintenance costs. ...
... The total investment cost was calculated as the sum of costs of the following: In LAY1 featuring no electrical regulation, the inverter cost was not provided. The annual cost is due to maintenance and was assumed at 15% of investment cost, as suggested by De Marchis et al. [23] and Fontana et al. [24]. ...
... In LAY1 featuring no electrical regulation, the inverter cost was not provided. The annual cost is due to maintenance and was assumed at 15% of investment cost, as suggested by De Marchis et al. [23] and Fontana et al. [24]. ...
Conference Paper
Full-text available
While pressure reducing valves (PRVs) have been widely used in water distribution networks (WDNs) to reduce water leakage, research in recent years has focused on the use of turbines instead of PRVs as the means for enabling both pressure reduction and energy production. However, in WDNs daily continuous variability of flow discharge and upstream head make PAT selection a challenging issue. The present paper describes an innovative approach for optimal PAT selection in systems with hydraulic and/or electrical regulation. The methodology was also applied to a district of the Benevento, Italy, WDN, showing the effectiveness of the proposed approach. The findings showed the optimal pumps lie in the vicinity of the maximum of the produced energy. Furthermore, considering weekday pattern instead of long-period pattern gives reliable results only if the PAT system operated with hydraulic regulation.
... Literature has shown that the use of PATs can be considered a good alternative for energy recovery in WSS (Marchis et al. 2014). On the other hand, the main challenges in analyzing a PAT are: (1) selecting the appropriate PAT when the available recovered head as a function of flow over time is known but shows large amplitudes; (2) determining the PAT operating point considering the necessary flow rate (Q), head (H ), and efficiency (η) when the pump is selected; and (3) estimating the characteristics, efficiency, and operating curves that are rarely provided by the supplier (Sánchez et al. 2020). ...
... When evaluating the efficiency at the operating point of the pumping station, the method they suggested modified the pump choice (Ebrahimi et al. 2021). Four centrifugal pumps were studied by Derakhshan and Nourbakhsh (Marchis et al. 2014) in both direct and reverse modes at speeds below 60 rpm. The results of their investigation showed that the decrease of the specific speed results in a lower head and discharge at the ratio turbine's BEP for identical pump values. ...
Article
Full-text available
Power generation from fossil fuels has long had a negative impact on the environment. Nowadays, a paradigm shift in power generation is being witnessed, with increasing investment in renewable energy sources. Despite this progress, efficient energy storage is still limited. Given this challenge, pumped storage technology can be one of the viable solutions. This involves storing gravitational energy by pumping water into a reservoir at a higher altitude, which is later converted into electrical energy using a turbine. This paper studies a pump hydro storage system (PHS) operation in water supply systems (WSSs), with the aim of minimizing operating costs and evaluating its effectiveness. Replacing conventional pumps with pump-as-turbines (PATs) provides a flexible and cost-effective approach. The proposed methodology aims to optimize the operation of these PATs considering dynamic energy prices. The developed computational model was applied to different operational scenarios and analyzed in terms of cost-effectiveness. The results show that the lower the average ratio between time-differentiated purchase and fixed sell energy tariffs, the greater the optimization potential of using PAT. In the WSS case study analyzed, energy cost reductions of 43.4–68.1% were achieved, demonstrating the effectiveness of PHS in WSS particularly for energy tariffs with large variations.
... De Marchis et al. [126] proposed the numerical model which has been applied to the WDNs of Palermo city (Sicily). To identify the most suitable solution in terms of energy power production without compromising the hydraulic performance of the network in terms of service delivery. ...
Article
Full-text available
Pumps as Turbines (PATs) are known for their ability to replace conventional turbines in Pico/micro-hydropower plants. However, selecting a suitable pump and estimating its performance in reverse mode is a challenging task. The overall efficiency of PATs is also lower when compared to purpose-made turbines. Numerous attempts have been made to analyze the performance of PAT in power-generating applications, and many scholars have presented their research on performance improvement and economic analysis. In this paper, a detailed review is conducted to show the historical development and current status of PAT technology. The review also presents the findings of performance prediction, performance improvement techniques, and economic analysis. The results of the literature survey demonstrate that the choice of an appropriate pump for a specific application significantly affects the performance of the PAT system. Among the various options, the Shear Stress Transport (SST) k-ω and standard k-ε turbulence models are widely used for simulating the pump as a turbine. Blade grooving and blade tip rounding are recognized as the most promising techniques for improving efficiency, with gains of 4.91% and 4.00%, respectively. Except for impeller diameter trimming, blade modification techniques proposed by various scholars have a significant impact on the efficiency of PATs; however, further research is needed to investigate the economic advantages of impeller modification.
... Carravetta et al. (2014b) proposed the use of microhydroelectric plants in WDSs based on a combination of a PAT, two regulating valves and two pressure meters, with simple automation rules. Thereafter, Marchis et al. (2014), Marchis and Freni (2015) and Marchis et al. (2016) applied hydrodynamic models that solve differential equations known as compatibility equations to simulate PAT behaviour. The studies indicate that payback is associated with the position of PAT. ...
Article
Energy recovery and pressure management are essential to achieve sustainable improvements in the development of water distribution systems (WDS). An alternative that has been studied worldwide is the use of pumps as turbines (PAT) replacing pressure reducing valves (PRV) to conciliate pressure control and energy production. This work aims to investigate the current and most recent literature regarding the use of PAT, addressing technical and economic implications that the technical-scientific community has analyzed. The search terms used in the Scopus and Web of Science databases were {‘pump as turbine’ AND ‘water supply network’, ‘water distribution network’ OR ‘water distribution system’}. A total of 59 papers were analyzed, highlighting the operation of PAT as well as selection and location methods, with the evaluation of electricity production, decreased leaks, and especially a suitable cost/benefit ratio. The review indicates that PAT have been infrequently used in real systems. However, the application is greatly feasible from the technical and economic points of view, and in a scenario of variable-speed PAT, the amount of energy produced is high. Future research should be directed to the optimization of new PAT settings so they can better deal with the operational variations in the systems.
... The inverter cost was not included in LAY1 since it does not have electrical regulation. The annual cost is primarily associated with maintenance and was assumed to be 15% of the investment cost, as recommended by De Marchis et al. [24] and Fontana et al. [1]. ...
Article
Full-text available
Although pressure reducing valves (PRVs) have traditionally been employed to regulate pressure and reducer water leakage, researchers have been increasingly investigating the strategy of micro-hydropower generation using pumps as turbines (PATs) to enable both pressure reduction and energy production as an alternative strategy in water distribution networks (WDNs). However, due to the continuous variability of flow discharge during the day, selecting the optimal PAT remains a challenging issue. To address this, the authors have developed HYPER, a freely available software app that implements an innovative approach for selecting the most suitable PAT in systems that involve both hydraulic and/or electrical regulation. In enabling the identification of the PAT parameters that maximize energy production, HYPER thus provides a fast and effective PAT selection tool. The effectiveness of the proposed approach was further demonstrated with application to a real WDN. Four operational patterns varying in terms of available flow and head drop were considered, showing that the most efficient pumps consistently tended to be located in close proximity to the maximum produced energy. Furthermore, the results confirmed that hydraulic regulation and coupled hydraulic/electric regulation-based installation layouts represent the best solutions in terms of energy produced. The solely electrical regulation option, given its poor flexibility, returns in all cases lower energy production with the lower adaptability of commercial pumps.
... As a result, the 'energy-for-water' perspective has become a major research focus recently, when designing and operating the WDSs (Hamiche et al., 2016). These studies can be classified into three categories based on the energy supplied for WDSs: (1) studies aiming at reducing energy consumption and GHG emissions when designing the WDS (Luna et al., 2019;Wu et al., 2010); (2) studies considering energy saving from pump operations (Behandish & Wu, 2014;Marchi et al., 2012), energy recovery through micro hydro-turbines, pump as a turbine, etc. (Ávila et al., 2022;De Marchis et al., 2014;Sitzenfrei & Rauch, 2015;Tricarico et al., 2018), and energy efficiency improvement measures (Ramos et al., 2011);and (3) studies seeking renewable energy as sources of energy supply for the system, such as solar photovoltaic (Carrillo-Cobo et al., 2014;Giudici et al., 2019;Olcan, 2015) and wind (Rehman & Sahin, 2012). Instead of making adjustments on components within the WDS, renewable energy integration focuses on improving the system energy performance from an energy supply side of view. ...
Article
Full-text available
Electricity is one of the essential requirements for the economic development of a country. In Ethiopia, more than half of the total population does not have access to electric power. Micro-hydropower (MHP) is one of the most feasible renewable energy options for providing reliable electricity to rural areas. However, in low-income countries such as Ethiopia, the high price of a purpose-made turbine to generate electricity from MHP resources is difficult. This paper presents the feasibility study of a pump as a turbine (PAT) for MHP applications with and without impeller blade modification. The analysis was conducted in terms of initial investment cost, the net present value, payback periods, and the cost of energy. Decreasing blade thickness, blade tip rounding, adjusting blade inlet angle, and blade grooving, then comparing the result with PAT without modification and cross-flow turbine are the modification techniques considered in this research. Based on the projected system lifetime, the equivalent cost of power for the PAT and cross-flow turbines are 0.065 and 0.100 $/kWh respectively. The cross-flow turbine's payback period is 6.04 years, which is significantly longer than the PATs payback period of 3.42 years. From the entire study, it can be concluded that the MHP coupled with PAT provides a lower payback period and cheaper power production. Whereas, impeller blade modification has no significant advantage from the economic point of view. Generally, the impeller modification cost needs to be less than or equal to 25% of the initial cost of the PAT to use the less cost advantage of the PAT.
Article
To address the challenges of the energy transition, reducing consumption and optimizing energy production is crucial for all industrial sectors. In the future, water issues will be as important as energy issues, making the optimization of water supply systems critical. The water sector represents large energy consumption for pumping and heating. In regards to this consumption, water systems have a great potential for energy recovery through hydroelectric production or thermal energy recovery. This article aims to quantify the energy potential of water supply systems, which has not been well understood until now. The energy potential of these systems encompasses hydropower recovery and thermal potential, including heat recovery and cold recovery. For that, a method is developed to estimate this potential, including the recoverable power, its location, and its temporal variation. The method can be used for hydroelectricity production, as well as for heat and cold recovery. For a whole year, the results indicate a hydraulic potential of 15MWh km⁻¹, and respectively 1650MWh km⁻¹ for heat recovery and 766MWh km⁻¹ for cold recovery.
Chapter
Purpose: This study looked at the potential energy recovery and economic feasibility of producing electricity from water distribution networks (WDN) and water transmission networks (WTN) using a Pump as a turbine (PaT) in the Western Region of Ghana. Design: To determine energy recovery viability, seven WDNs and one WTN were evaluated in MS excel using primary and secondary data. This enabled us to estimate the power potential as well as the annual energy generation from the networks. The economic feasibility of the energy generated was determined by finding the net present value (NPV) and Payback period (PP). Discount rate variation influence on NPV was also determined. Findings: According to the findings, Inchaban Headworks WTN has the highest annual energy generation potential, with a capacity of 71 MWh and could power 96 households. This system has an NPV of €8,130.75 and €3,231.19 at 5% and 10% discount rates, respectively. The total annual generation from the remaining systems could generate 70 MWh of electricity for about 94 households annually. Implications/Research Limitations: The study was limited to water supply networks of the Ghana Water Company Limited (GWCL) in the Western Region of Ghana. Practical Implication: The outcome of the study can be advanced to implement PaTs installation on water supply networks in Ghana and Africa at large for water infrastructure sustainability. Originality/Value: Previous research has not thoroughly examined the energy recovery potential of WTN and WDN in Ghana and Africa context. As a result, the study aims to promote innovation in water supply and management for the long-term sustainability of water infrastructure in Ghana and Africa at large.
Article
Full-text available
In this paper, basic unsteady flow types and transient event types are categorised, and then unsteady friction models are tested for each type of transient event. One important feature of any unsteady friction model is its ability to correctly model frictional dissipation in unsteady flow conditions under a wide a range of possible transient event types. This is of importance to the simulation of transients in pipe networks or pipelines with various devices in which a complex series of unsteady flow types are common. Two common one-dimensional unsteady friction models are considered, namely the constant coefficient instantaneous accelerationbased model and the convolution-based model. The modified instantaneous accelerationbased model, although an improvement, is shown to fail for certain transient event types. Additionally, numerical errors arising from the approximate implementation of the instantaneous acceleration-based model are determined, suggesting some previous good fits with experimental data are due to numerical error rather than the unsteady friction model. The convolution-based model is successful for all transient event types. Both approaches are tested against experimental data from a laboratory pipeline.
Article
Full-text available
During the past few years, issues concerning sustainable management of water distribution systems have attracted interest through an integrated policy aimed at reducing leakage through a pressure management strategy. Pressure reducing valves (PRVs) are often used in water networks to prevent the downstream hydraulic grade from exceeding a set value, although they must be adequately located to maximize their effectiveness. In recent years, the application of turbines or pumps operating as turbines (PATs) appeared as an alternative and sustain-able solution to control network pressure and produce energy. In the present paper, PRVs and PATs were used within a district in a Naples' water distribution network and showed large potential revenues and an attractive capital payback period. DOI: 10.1061/(ASCE)WR.1943-5452.0000179. © 2012 American Society of Civil Engineers.
Article
Full-text available
In the management of water distribution networks, large energy savings can be yielded by exploiting the head drop due to the network pressure control strategy, i.e., for leak reductions. Hydropower in small streams is already exploited, but technical solutions combining efficiency and economic convenience are still required. In water distribution networks, an additional design problem comes out from the necessity of ensuring a required head drop under variable operating conditions, i.e., head and discharge variations. Both a hydraulic regulation (HR)—via a series-parallel hydraulic circuit- and an electrical regulation (ER)—via inverter- are feasible solutions. A design procedure for the selection of a production device in a series-parallel hydraulic circuit has been recently proposed. The procedure, named VOS (Variable Operating Strategy), is based on the overall plant efficiency criteria and is applied to a water distribution network where a PAT (pump as a turbine) is used in order to produce energy. In the present paper the VOS design procedure has been extended to the electrical regulation and a comparison between HR and ER efficiency and flexibility within a water distribution network is shown: HR was found more flexible than ER and more efficient. Finally a preliminary economic study has been carried out in order to show the viability of both systems, and a shorter payback period of the electromechanical equipment was found for HR mode.
Article
Full-text available
The energy scenario in rural, remote and hilly areas of India is characterized by inadequate, poor and unreliable supply of energy services. In such regions, the load density is low and extension of grid system is totally uneconomical, hence the small hydropower schemes can provide a solution for the energy problems besides solar photovoltaic, which is not available throughout the day. The main hindrance in implementing such hydropower schemes is high initial cost of conventional hydro turbines. The cost of these plants can be brought down by using centrifugal pump in turbine mode in context of various advantages associated with the pumps viz. low initial and maintenance cost, ready availability, simple construction etc. However, the efficiency of pump as turbine (PAT) is lower than that of conventional hydro turbines. For commercial justification of PAT technology, a cost analysis of 3 kW capacity pico hydropower plant was carried out by considering PAT and Francis turbine as a prime mover. The hydro turbine test rig was developed by installing PAT and its performance characteristics were plotted. The annual life cycle cost (ALCC) analysis was carried out based on initial cost of the project, capital recovery factor and annual expenses. Based on the analysis, the ALCC and the cost of electricity generated per unit were found to be very less for PAT than that of Francis turbine, which has justified the use of PAT for the case under consideration.
Article
Full-text available
Pump operating as turbine (PAT) is an effective source of reducing the equipment cost in small hydropower plants. However, the manufacturers provide poor information on the PAT performance thus representing a limit for its wider diffusion. Additional implementation difficulties arise under variable operating conditions, characteristic of water distribution networks (WDNs). WDNs allow to obtain widespread and globally significant amount of produced energy by exploiting the head drop due to the network pressure control strategy for leak reductions. Thus a design procedure is proposed that couples a parallel hydraulic circuit with an overall plant efficiency criteria for the market pump selection within a WDN. The proposed design method allows to identify the performance curves of the PAT that maximizes the produced energy for an assigned flow and pressure-head distribution pattern. Finally, computational fluid dynamics (CFD) is shown as a suitable alternative for performance curve assessment covering the limited number of experimental data.
Article
An experimental investigation of centrifugal pump has been carried out to study its characteristics in pump and turbine mode operation. By using the experimental results of tested pump and pumps of some previous researchers, new correlations have been developed by using its best efficiency and specific speed in pump mode. Values obtained from the derived correlations show good match with experimental results. These correlations would be very helpful for the performance prediction of pump working as turbine. Key words: PAT; Centrifugal pump; Specific speed; Best efficiency point
Article
A hydraulic model was developed in order to evaluate the potential energy recovery from the use of centrifugal pumps as turbines (PATs) in a water distribution network characterized by the presence of private tanks. The model integrates the Global Gradient Algorithm (GGA), with a pressure-driven model that permits a more realistic representation of the influence on the network behaviour of the private tanks filling and emptying. The model was applied to a real case study: a District Metered Area in Palermo (Italy). Three different scenarios were analysed and compared with a baseline scenario (Scenario 0 - no PAT installed) to identify the system configuration with added PATs that permits the maximal energy recovery without penalizing the hydraulic network performance. In scenarios involving PAT on service connections, the specification of PAT operational parameters was also evaluated by means of Monte Carlo Analysis. The centralized solution with a PAT installed downstream of the inlet node of the analysed district, combined with local PATs on the larger service connections, proves to be the most energy-efficient scenario.
Article
Insufficient understanding of the correlation between pump and pump as turbine (PAT) performance is a major problem encountered in the PAT selection and design. Therefore, establishment of accurate PAT performance prediction methods is necessary. In this paper, theoretical analysis of the relationship between pump and PAT performance was first performed. A theoretical method of predicting PAT performance is developed using theoretical analysis and empirical correlation. In the next step, computational fluid dynamics (CFD) was adopted in the direct and reverse modes performance prediction of a single stage centrifugal pump. To give a more accurate CFD result, all domains within the PAT control volume were modeled and hexahedral structured mesh was generated during CFD simulation. Complete performance curves of its pump and turbine modes were acquired. To verify the accuracy of theoretical and numerical prediction methods, the pump was manufactured and tested on a PAT open test rig. Results comparison and discussion of the theoretical, numerical and some other methods with experimental data were carried out. Eventually, relatively accurate theoretical and numerical PAT performance prediction methods were developed.
Article
Pump manufactures normally do not provide performance curves of their pumps working as turbines, especially performance curves of trimmed impellers. Impeller trimming is necessary to adapt to a certain operating condition. Therefore, establishing the correlation of PAT’s performance curve and impeller trims is essential. In this paper, a laboratory model of a pump as turbine (PAT) open test rig was set up. Experimental research was carried out on a single stage centrifugal PAT, performance curves of original impeller, impeller after once and twice trims were acquired. Numerical simulation and analysis were performed on the PAT. The accuracy of CFD was validated through comparison between numerical and experimental data. As impeller diameter is cut down, its geometrical parameters of impeller diameter, blade wrap angle, impeller inlet width and blade inlet angle are changed. So, research on effects of the above four parameters to the performance influence of PAT were carried out using CFD. Through analysis of the predicted performance curves, the reasons for the variation of performance curves after impeller trimming were explored.