This article introduces a methodology for employees in organizations to set up and carry out their own group learning projects. It is argued that employees can use project-based learning to make their everyday learning more systematic at times, without necessarily formalizing it. The article emphasizes the specific characteristics that distinguish learning projects from other projects: a focus on the learner rather than the leader, on execution rather than planning, on continuation rather than output, on diversity rather than optimal-solution thinking. Three phases in the creation of a learning project are described: orientation, learning and optimizing, and continuation. Four ideal types of learning project are distinguished: a liberal-contractual, vertical-regulated, horizontal-organic, and external-collegiate type. The various phases and types can be used by employees (plus managers and educators) to create learning projects that fit their specific work situation.
Project-Based Learning
1
Project-Based Learning in Organizations:
Towards a Methodology for Learning in Groups
Running head: Project-Based Learning
Rob F. Poell & Ferd J. Van der Krogt
Department of Education, University of Nijmegen
PO Box 9104, 6500 HE, Nijmegen, The Netherlands
Phone: +31-24-361-2459 / 2708
Fax: +31-24-361-5978 / 6211
E-mail: R.Poell@ped.kun.nl / F.Vanderkrogt@ped.kun.nl
Abstract
This article introduces a methodology for employees in organizations to set up and carry out
their own group learning projects. It is argued that employees can use project-based learning
to make their everyday learning more systematic at times, without necessarily formalizing it.
The article emphasizes the specific characteristics that distinguish learning projects from other
projects: a focus on the learner rather than the leader, on execution rather than planning, on
continuation rather than output, on diversity rather than optimal-solution thinking. Three
phases in the creation of a learning project are described: orientation, learning and optimizing,
and continuation. Four ideal types of learning project are distinguished: a liberal-contractual,
vertical-regulated, horizontal-organic, and external-collegiate type. The various phases and
types can be used by employees (plus managers and educators) to create learning projects that
fit their specific work situation.
Keywords
Project, Learning Project, Project-Based Learning, Learning Groups, Work-Related Learning
Project-Based Learning
2
Project-Based Learning in Organizations:
Towards a Methodology for Learning in Groups
Employees learn continually within organizations. They usually do so unconsciously,
informally and incidentally during their work (Marsick & Watkins, 1990; Wenger, 1998).
Sometimes this ‘everyday learning’ is made more conscious and efficient, for example, during
courses and training. However, it is difficult to approach learning in the workplace informally
and more systematically at the same time, particularly if the aim is to connect it with formal
and course-based learning. What opportunities do employees have to make their everyday
learning more systematic, without necessarily formalizing it? Would organizing such learning
programs as group projects offer them fruitful prospects?
The aim of this article is to contribute towards a ‘methodology’ with which group learning
projects can be set up and carried out. The starting point of that methodology will be that a
wide diversity of learning projects can be created. The basic reasoning underlying the
methodology is as follows: Employees will (at particular times) wish to learn more
systematically and intensively, with others, as part of their everyday learning. One option,
then, is to set up a joint venture with others in order to create a learning project. Such projects
would mark a continuation of the ‘normal’ approach of learning during everyday work, while
they would also create their own dynamics, resulting from the common efforts of the
participants in the learning project.
It is intended in this article first to explain the concept of the ‘learning project’,
emphasizing the specific characteristics that distinguish learning projects from other projects.
Following that, three phases in learning projects will be described: the orientation phase, the
learning phase, and the continuation phase. Since there can be various kinds of learning
project, four ‘ideal’ model learning projects will be distinguished. Finally, a methodology for
the creation of learning projects will be outlined.
Project and Learning Project: Backgrounds and Description of the Concepts
Systematizing learning in a project makes sense for two reasons. First, the project is an
organizational form that is suitable for tasks that cannot easily be implemented within the
standing organization. Systematizing learning in a project stimulates participants to discover
the unique nature of learning and to realize it requires a unique approach. Working in projects
offers the necessary points of departure. The second reason is that organizing projects is to an
important extent a human endeavor. That also applies, perhaps even more so, with respect to
learning programs. Whereas previously individuals were able to create something on their
own (by making choices), nowadays mutual interdependence and interconnectedness have
made it necessary for people to go through that process together. Third, projects allow for
working in a systematic fashion, while enabling people to develop their own qualities.
However, the way in which projects are deployed in practice by their leaders, clients, teams
and managers can be problematic as well. This section reviews the key elements of projects
and then goes on to examine learning projects.
Organizing Projects: Between Routine and Improvisation
Work can be approached in diverse manners, the two extremes being working according to a
routine and improvisation. The project-based approach is an intermediate form on a broad
scale between improvisation and working according to a routine (Randolph & Posner, 1992,
Obeng, 1996; Kliem & Ludin, 1997; Lewis, 2000). In contrast to improvisation, those
Project-Based Learning
3
involved in projects attempt to increase the predictability of the result and the path towards it.
Important tools in this respect are planning and progress monitoring. In contrast to working
according to a routine, those involved in projects attempt to adhere to the specific character of
an order while acting as flexibly as possible.
There is an inherent tension between the project and the standing organization. The
decision to work in the form of a project is taken due to the very fact that the standing
organization is not deemed to be properly suited to solving the problem or implementing the
concept in question, for whatever reason that may be. Therefore, the culture and structure of
the project differ from those of the parent organization. Tensions may arise over the use of
resources, priorities, procedures, the influence of managers and project members and other
such issues. Those tensions may have positive effects, inspiring and producing dynamism, but
they may also lead to obstructive and energy-consuming conflicts. On the other hand,
coordination with the standing organization is of great importance, as the results of the project
must be put to use within it. For this reason, the involvement of the participants is crucial,
both within the project (leader, members, clients) and around the project (financiers,
suppliers, a steering group, staff in the department, management). All of these parties have
opinions about the project and stakes in it, so they will attempt to bring their influence to bear
throughout the various stages of the project.
The following project phases are often distinguished, each phase leading to a concrete
document or result:
1. Initiation: the concept, problem or challenge is formulated, in consultation between the
client and the project leader. This leads to a starting document.
2. Definition: the project group works towards a detailed formulation of its ideas and a
contract is entered into, with the client and others.
3. Design and preparation: a further elaboration of the contract takes place and a detailed
plan of action is drawn up for the project.
4. Execution: the project plan is executed, which should produce the project result.
5. Evaluation and follow-up: attention is focussed on translating the results into permanent
changes.
During the above phases, participants work together and interact in order to achieve the result
and the essential conditions that they consider necessary. These are not a given, but partly the
result of the activities of the project group in interaction with its immediate environment.
During the process, participants refine the plans and essential conditions on the basis of the
progress of the project. One of the typical characteristics of a project is that express and
intensive efforts are made to formulate the results that are being aimed for in as much detail as
possible, so that the client’s quality requirements can be satisfied. The formulation of detailed
results also improves effectiveness and efficiency, and makes it easier for the project team to
monitor progress and to refine its plans (Weiss & Wysocki, 1992; Wysocki, Beck, Crane, &
Hudson, 2000).
The Specific Nature of Learning Projects
Systematic learning programs may be viewed as projects and organized as such. In this
article, such projects are referred to as learning projects (Poell, 1998; Van der Krogt, 1998). A
learning project is:
a group of participants,
who want to learn together, systematically,
about a theme that is relevant for their own development and for their work,
and who obtain the necessary legitimacy and resources to do so.
Project-Based Learning
4
A learning project essentially consists of a group of people who cooperate for the duration of
a learning program. In most cases they also work together, but it is possible that others may be
involved or that the group members will not be working more closely together until some time
in the near future. It is crucial that the theme of the project is important for their work and
learning; they must be able to see the relevance of the theme for themselves and want to learn
about it. That does not mean that the theme has to have the same significance for every
member of the group. The group may also consist of members with different views of the
theme; for example, superiors and workers may learn together about the planning of their
work. Advisers on particular topics and on learning itself may also be part of the group, either
for the entire duration of the project or during a particular section of it. In many learning
projects, a learning adviser or trainer plays a central role and is appointed by the client as
project leader (O'Neil, 2000).
Members of a learning group have the desire to learn together. That is the aim of the
project. That does not mean that the members and the leader have clear concepts of their
learning goals and learning results from the start of the project. During the project those
aspects will be worked on, but the requirements we set must not be too high (Atkinson, 2001).
In many organizations, it would be a major step forward if a group of employees were
(expressly) to agree that they wished to focus systematically on their own learning in the form
of a learning project, and were to recognize that learning does not come of itself.
The subject about which the group members learn must be relevant for them and for the
work that is done in their organizations. The project members must develop themselves and at
the same time learn about topics that are relevant for their work. The aim is to improve their
performance as members of the work organization. Those are broad descriptions of the
requirements that are set with respect to the theme and its elaboration. During the course of
the project they must be worked out in further detail (Raelin, 1999). In essence this is a matter
of project quality, which is an important topic for project teams to deal with explicitly.
In a learning project, attention also focuses on management considerations: time, money,
quality, organization, information, and communication. Legitimacy occupies a special
position in learning projects. The place and embedding of such projects in the organization
and the acceptance and support of the actors need more attention. In many organizations,
learning is not a matter of course, and the products and results of learning projects are difficult
to establish (Ayas, 1996; DeFillippi, 2001). That is why it is of great importance that relevant
parties, both in the learning project and around it, lend their support. The cultural aspects of
learning-project creation require very careful study indeed.
Projects and Learning Projects: A Comparative Summary
Learning projects differ from 'ordinary' projects in a number of ways. The brief overview of
literature leads to the following conclusions. First, much attention in literature on projects is
devoted to management considerations. That is of course necessary, but for learning projects
an equally relevant question is which methods employees deem useful and which adjustments
are needed to existing techniques. Second, the project literature focuses heavily on the roles of
project leaders and very little on the members of project groups. However, in learning
projects, the input of those who are learning is crucial. Third, the emphasis in the literature on
projects lies firmly on the project’s output. Others, the customers, must be able to work with
the results from the project group. In learning projects, however, the members of the project
group themselves are the customers, in their capacity as learners. Finally, the project literature
takes little account of the diversity that exists in the structure and execution of projects.
Learning projects, however, can vary widely from one to another. This is because the
composition of the groups varies and learning projects take place in a wide variety of work
contexts.
Project-Based Learning
5
The Creation of Learning Projects: Three Phases
Every project must be set up in phases: the often complicated path must be split into
comprehensible parts that can be concluded with concrete results. Many phases are
distinguished in project-based work. The preparation or conception phase in particular has
been worked out in great detail and divided into a number of sub-phases. In contrast, little is
said about the execution phase (see, e.g., Weiss & Wysocki, 1992). With respect to learning
projects, a division into three phases will be maintained in order to focus much attention to the
execution or learning phase: the orientation phase, the learning phase, and the continuation
phase. Why distinguish only three phases in learning projects? The biggest difference between
this division into three phases and the divisions maintained generally in the literature lies in
the ‘conception’ phases. Activities that relate to initiative, definition, design, and preparation
have been combined into the ‘orientation’ phase. There are three reasons to do this.
The first and foremost reason relates to the place of learning projects within a work
organization and the specific character of learning projects. A learning project forms part of
the continuous learning of people in the organization. A group of learners undertake to focus
more intensely and systematically on their individual learning about a certain theme.
Normally they would be learning anyway, but during a learning project they do so explicitly
and more systematically. The difference between that and the everyday learning must not
become too great; a learning project should stimulate the participants to learn continuously
during work. The elaboration of the orientation phase into multiple elements would make the
project too ‘detached’.
A second reason is that the creation of a learning project is primarily aimed at supporting
participants in and around the project and increasing their involvement. The definition of the
project and the (psychological) contract for the project are in a relative sense much more
important than the planning of it. The participants must form a clear view of what they can do
individually and collectively in the project. That requires continual attention, not only during
the orientation phase.
A third reason is that learning projects are in the main not extensive, neither in terms of
time nor in terms of the size of the learning group. It is unnecessary to have such a strongly
differentiated orientation phase, and probably neither efficient nor effective. Those activities
can also take place during other phases. The energy of the participants is probably better
employed in the learning and continuation phases.
The Orientation Phase: From Idea to Learning Contract
The orientation phase is about devising a learning-project plan to which the participants are
willing and able to commit themselves. The main result of that phase is that the participants
can see opportunities for them to make a meaningful contribution to the project. Furthermore,
an action plan is drawn up, letting the participants know where they stand, both within the
team and in its environment. Others in the organization will then be aware of what happens in
the project and can accept it.
The participants in the project devise a project definition, elaborate on it in a project plan
and translate it into detailed working arrangements. They make clear to themselves what they
want, the opportunities that they see to achieve it, and how the necessary conditions for it can
be achieved in the project, acting together with others. The needs and opportunities of
individuals are combined with the possibilities to achieve this in the project.
The starting point is a situation where a number of people in a work organization wish to
take advantage of the opportunities to learn together about a theme relevant for their work.
The activities that must then take place relate to three elements that together must lead to a
fourth element, the learning contract.
Project-Based Learning
6
Mobilizing the Participants: From Separate Individuals to a Project Group. The
participants in the project, that is, the team members individually and the team as a whole,
reflect upon why they wish to participate in the project, what contribution they can make, and
what they are willing and able to learn. The actors must obtain clarity about how their own
views (values), possibilities and plans can be accommodated within those of the project team.
The result of this reflection is that the participants become clear about what they themselves
want in the project and what their input into it can be. On this basis, the organizational
structure of the project is put together and arrangements are made concerning the tasks and
powers of the team members and other parties involved. The culture of the project team is
also ‘shaped’ to an important extent.
Analyzing the Learning Theme: From Substantive Theme to Learning Structure. The
participants make an analysis of the problems and developments in their work and in the
organization that led to the choice of theme. That analysis produces a description of the main
principles of the learning program and the learning results that the participants should aim for.
The substantive structure of the project - the learning activities to be undertaken and how they
relate to each other - comes about in that way.
Contextualizing the Project: Facilitating the Project Conditions. The learning project
does not take place in a vacuum, but rather within a (work) organization and more
specifically, within the broader learning system of the organization in question. Participants in
the project must obtain a clear picture of that context, take measures to make connections with
the context, and in doing so create the conditions for the project to succeed. Very important
elements in this respect are the commitment of other parties in the organization and the
opportunities for utilizing existing learning systems. The activities connected with
contextualization produce a clear place for the project in the organization and the material and
immaterial conditions to allow it to function. The project obtains a clear place in the existing
learning system: how does it tie in and what new elements does it add? It is very important
that the project has sufficient legitimacy with key parties in the organization.
Drawing up a Learning Contract: From Interest to Arrangements. Working on the above
three aspects together must combine to produce a learning contract: a plan that the
participants involved consider to be feasible. The learning contract contains:
the agreement of the participants, who consider themselves bound to the plan;
arrangements on the content and organization structure of the project;
arrangements on the place of the learning project in the (standing) organization.
It will be obvious that those activities run parallel with each other and/or concur to an
important extent. It is crucial that the participants in and around the project support its
creation and are willing and able to play their roles in the project as a whole. That is why their
participation in the substantive and contextual analysis is so important: it allows them to
specify their own views and possibilities and to place them within the project.
The Learning Phase: From a Contract to Learning Results
During the orientation phase, the participants will have developed ideas about the form of the
project and what they could learn. The internal and external participants will have developed a
picture of the content and organization of the project and they will have declared themselves
to be willing to devote themselves to implementing it. Moreover, an initial elaboration of
ideas will have taken place, in the form of broad arrangements about what they will learn and
how, the tasks and responsibilities of those involved, and the procedures that they will follow.
During the learning phase, the participants put those ideas and plans into practice. However,
that does not mean that once a plan for a learning project has been devised, it must be
followed precisely as planned. The learning phase essentially consists of the execution and
optimization of the learning project. The participants begin with one section of the learning
Project-Based Learning
7
project (e.g., workplace training, a course, or an experimental change in their working
practices). They discuss their experiences together and on that basis a following section of the
learning project is carried out. Execution and optimization take place continually. The trick is
to coordinate the two activities as closely as possible with each other, and where possible to
integrate them.
Executing the Learning Project: Learning in Interaction. The members of the project
group create the program as they carry it out. They undertake learning activities with each
other and in doing so develop ideas about their work and expertise. They reflect upon their
work, give each other feedback, conduct discussions, develop new ideas, experiment during
their work, participate in training or in a course, take part in role-playing, and so forth. The
key to learning results is that those who are learning perceive that they are making progress,
that they learn to place experiences and to assign meaning to them, so that they can conduct
themselves differently in their work.
Optimizing the Learning Project: Quality Control. During the learning phase, the
participants regularly examine how the learning activities are progressing, how the procedures
that were agreed are being followed, and the extent to which the intended learning results are
being achieved. That leads the participants to refine the program, to develop new ideas
together, and to make new arrangements. The learning program consists of various sections,
that is, learning situations. Workplace and course-based learning are the main components,
which are used in combination with each other. Experiences with learning in such learning
situations may give cause to refine the program. The team continues to monitor its progress in
the program and may make choices from the options that are available. New learning
situations may have to be designed (e.g., training or role-playing) relating to a specific point.
The organization of the project team may also be changed. The opinions and views that the
team members have about the project are just as important for achieving their learning results.
During the execution of the project, those views become more detailed and will be adjusted in
view of their experiences. The participants obtain a clearer picture of their roles in the project
and the ways in which they can learn in this joint venture.
The quality of the learning project concerns three criteria: the learning views of the
participants, their work views, and its relevance for their work. Each of the participants in the
project will have their own interpretation of those criteria. In optimizing the learning project,
it is of central importance that the participants obtain a clear idea of those three criteria and
can improve the learning project in those respects.
A distinction has been maintained here between execution and optimization, but the trick is
actually to connect the two: to build on experiences in execution and use them to optimize the
quality of the learning process and the learning program.
Continuation Phase: From Results to Permanent Effects
The continuation phase is aimed at making explicit the learning experiences that have been
gained during the project and ‘building them into’ the participants, into their everyday
learning, and into the learning system of the organization, so that those experiences can be
useful over the long term. The experiences gained during the project and the results of it only
produce long lasting effects if they are ingrained into people, everyday learning, and
organizational learning systems.
The learning project is a temporary ‘joint learning venture’ aimed at learning about a work-
related theme. However, that learning does not cease once the project finishes; everyday
learning by the members of the project group goes on. Ideas and plans are developed at the
end of the learning project, in the continuation phase, in order to allow them to continue in an
optimal fashion. After the project ends, the team members and external parties must be
stimulated to follow-up on their learning in other ventures (in part with different people).
Project-Based Learning
8
Giving Fresh Impetus to Everyday Learning. During the project, the team members have
learned about a work-related theme and about their roles and strategies in the learning project.
In the continuation phase, their new knowledge about work and learning is made explicit and
adopted in follow-up activities. That may take the form of a personal learning plan or of
workplace learning. For the team members, the learning project forms part of their personal
learning plans. During the orientation phase, they have seen the extent to which their
participation in the project ties in with their individual learning plans. During the continuation
phase, that relationship is reassessed: what are the consequences of their experiences during
the project for their personal learning plans? Two aspects are important in this connection.
First, the team members examine what they have learned and in which respects they can build
upon it during the remainder of the (workplace) learning plan. Should they, for example, give
priority to other topics? Second, besides matters of content, their learning methods may also
come under examination. Experiences gained during the learning project may for example
prompt group members to make more time available for private study or to set up a study
group with a few other team members.
Improving the Organizational Learning System. There are various ways to systematize
the learning experiences gained during the learning project, to allocate them between the
participants, and to adopt them into the learning system. The most productive way is for the
participants in the learning project to communicate, consult, and cooperate with other actors
in the learning system. That may take the form of allowing them to participate in new learning
projects (as adviser, member, coach) or involving them in the preparation of learning policies.
A second way is to arrange and systematize the learning materials made available by the
learning project. During the project, new materials will usually have been developed or
existing materials will have been adapted (e.g., study assignments, work assignments, tests,
and reports). In many cases, more clarity is also obtained during the project about the roles
and responsibilities of the team participants, such as the team leader, learning adviser, line
manager, and coach. A third possibility is to bring the present (implicit) knowledge that the
participants have to expression, by means of interviews, group discussions, or surveys. That
can also take place in combination with an analysis of the project records and minutes of
meetings of the project team. Much can also be learned from the measures that were
considered with respect to optimizing the learning project. Finally, comparing various
learning projects can provide new insights into how learning projects can be set up and
executed, as well.
How Normative and Prescriptive Is this Model?
Describing three phases in learning projects, like we have done above, can lead to the
impression that every single learning project needs to be run in that systematic fashion. This,
however, is not our contention, even though we believe the model can inspire people to
organize learning projects in a more systematic way than they are used to doing. It is not our
aim to tell learners which steps they should be taking in order to engage in project-based
learning. Rather, in describing the various sub-phases that in our view make up a learning
project we hope to trigger learners to pay some more explicit attention to certain activities
they would not normally think of doing.
For example, while the orientation phase has gained a lot of attention in literature (e.g.,
Romiszowski, 1982; Robinson & Robinson, 1989; Kessels, 1993), the actual execution of the
learning project, its optimization and its continuation have drawn significantly less attention
so far. Apparently it is assumed that once a project has been designed, its execution is a matter
of following the procedures laid down on beforehand. This, however, is not how learning in
an organizational context works. No matter how well a project has been designed, during its
execution expected and unexpected changes occur in the organization, in the project context,
Project-Based Learning
9
in the perceptions and interests of learners, and so forth, that have to be taken into account
throughout (Kessels, 1999).
The issue of optimizing a learning project during its execution is not often encountered in
literature, although the much more general notion of continuous improvement has been rather
popular in the last decade (cf. De Lange-Ros, 1999). The learning-project model pays specific
and concrete attention to the question how optimization can be encouraged. As far as
continuation of learning is concerned, the most obvious references are to the transfer-of-
training literature and to ideas around personal development planning. The notion of training
transfer (e.g., Broad & Newstrom, 1992) assumes a gap between what people learn in a
training course and its application in the workplace. The concept of personal development
planning (e.g., Morgan, 2002) also tends to focus on rather formal training situations for
development to take place. Both approaches do not regard learning as an ongoing process
owned by the learner and taking place mainly in unstructured and work-based contexts.
Thinking in terms of learning projects allows for a systematization of the ongoing learning
process to a certain extent for a certain period of time.
Systematization, however, should not be taken to equal formalization. The power of
informal and incidental learning (Marsick & Watkins, 1990) would dissolve if it were to be
fully replaced by formalized pre-structured arrangements. Systematization means becoming
more explicitly aware of the opportunities for learning offered by work situations, so that
these are actively sought and may become part of one’s learning process. Rather than
prescribing what to do in what order, the learning-project model drives on the assumption that
in practice all its phases and sub-phases may be conducted to a more or less systematic
degree. It wants to help learners (and their supervisors and educators) to become aware of
ways in which their ongoing learning process can be stimulated. Moreover, it does not assume
that one type of learning project provides the best solution for every group. Rather, different
learning-project types may be used depending on the work context and the preferences of the
actors involved. Four ideal types will be described briefly in the remainder of this paper.
Four Ideal Types of Learning Project
In the above, the basic outline of a methodology for the creation of learning projects has been
presented. However, groups within organizations have various possible ways available, along
these general lines, to create very different kinds of learning project. In the following, four
ideal models will be distinguished, meaning theoretically based, diverse types of learning
project:
the liberal, contractual learning project;
the vertical, regulated learning project;
the horizontal, organic learning project;
the external, collegiate learning project.
This typology has been derived from Van der Krogt (1998) and Poell (1998). A full
elaboration of the four types is available in Poell & Van der Krogt (2002).
The Liberal, Contractual Learning Project
The individual responsibility of the members themselves is central to the liberal, contractual
learning project. They draw up their own program of learning activities, more explicitly than
they normally learn, and utilize the opportunities that the broader framework of the learning
group offers them. The individual participants negotiate with each other and with their
superiors about the program. A contract is agreed setting out in particular arrangements about
the results that are expected, as well as arrangements concerning facilities (such as time,
Project-Based Learning
10
money, and support). Individual participants can call each other to account over whether or
not they achieve the expected learning results and with regard to the support that they have
agreed to offer each other in their efforts.
The liberal, contractual type of learning project is very much informed by the self-directed
learning ability of individual group members (Brookfield, 1986). Each individual member
uses the team context to facilitate and enrich their own learning process, for which they are
self-responsible (Candy, 1991). In our idea of the liberal learning model, however, more focus
is placed on optimisation and continuation of the learning, compared to these authors.
The Vertical, Regulated Learning Project
In the vertical, regulated learning project, educators and other experts, in consultation with
line managers, play a crucial role in the preparation, execution, and evaluation of the activities
of the learning group. Much value is attached to careful planning on the basis of policy
intentions and requirements-analyses. That is carried out by the educator and the experts
beforehand, who allow themselves to be influenced in their planning by the possibilities and
wishes of the learning employees.
In the vertical, regulated type of learning project distinct overtones can be traced of the
training-for-impact approach taken by Robinson and Robinson (1989) and the notions about
structured on-the-job training of Jacobs and Jones (1995). A highly pre-structured way to
organize formal off-the-job learning is supplemented here with transfer enhancing measures
(Broad & Newstrom, 1992). The vertical model presented above, however, views learning
and transfer activities as related elements in one coherent learning program, whereas other
authors tend to emphasize the gaps between formal training by the educator and on-the-job
application by the employees.
The Horizontal, Organic Learning Project
In the horizontal, organic learning project, learners work together as a relatively autonomous
team, assisted by a process supervisor, in solving complex work-related problems to which
there is no standard approach. The members of the learning group often have an extremely
diverse range of expertise that must be gathered together in order to devise new creative ideas
or solutions. If superiors are involved, they operate in a relationship of equality with the
learners or function (in part) as process supervisors. Working as a team in an organic way
towards a common product, with a joint mission and aim, is crucial in this respect. This
organic method of learning may well be very similar to the participants’ everyday work, but
in the context of a learning project those participants are more consciously occupied than they
usually would be with making that learning explicit.
In the horizontal, organic type of learning project the early work on organizational learning
by Argyris and Schön (1978) is a key reference point. The notion of organic organizations
became very popular in the 1990s through Senge’s (1990) work on learning organizations.
More recently, literature on communities of practice (Wenger, 1998) seems to draw rather
heavily on this type of learning. These authors all focus on integrating learning with daily
work, whereas the horizontal learning model emphasizes also collaborative every-day
problem solving as an unstructured learning opportunity.
The External, Collegiate Learning Project
In the external, collegial learning project, a learning group of professionals allows itself to be
inspired by innovative insights and new methodologies developed within their own
professional branch but outside their own individual organizations. The participants often
come from several professional organizations and together with fellow professionals they
familiarize themselves with professional knowledge, insights, norms and codes that apply
Project-Based Learning
11
within their own professions. Through the learning project, they adjust their manner of
working in the light of new, scientifically based techniques, that institutions for training and
further education pass on to members of their profession.
The external, collegiate type of learning project assumes professionals are reflective
learners (Schön, 1983), in need of continual expertise development within their professional
peer group (Daley, 1999). However, the external learning model pays more attention than the
continuing professional development literature does to the ways in which professionals
appropriate new scientific methods and incorporate these in their daily work routine.
How the Four Learning-Project Types Differ
The orientation, learning, and continuation phases in the four model learning projects differ
considerably. Although the kind of activities that participants in the learning projects carry out
in the three phases are the same in all four models, the specific way in which they are
elaborated differs widely from model to model. In the liberal model, the individual learners
are the dominant actors. They maintain exchange relations with their superiors and the project
supervisor; they also involve others in shaping their own learning program, in as far as it can
enrich their own learning paths. In the vertical model, the educator and superiors are the
dominant party; they devise the learning program for the project group, in the context of
strictly regulated relationships with the management and representatives of the employees. In
the horizontal model, the learning project group, a relatively autonomous group, is dominant.
All of the parties involved work in relationships of equality towards solving complex work-
related problems. On their way they create the learning project organically and each of them
learns in this group context. Finally, in the external model learning project, the dominant
party is the professional association outside the individual organization; professional and
collegiate relationships prevail. The learning project largely takes place externally. Following
it, professionals from various organizations adjust their working methodologies to their newly
gained insights.
Towards a Methodology for the Creation of Learning Projects
The essential difference between the four models lies in the way in which the participants in
the learning group give shape to and further develop their relationships with each other. The
choices they make have far reaching consequences for the substantive profile and course of
the learning project. The central question then becomes how social groupings should be
organized between people to optimize the way in which individuals learn. If insufficient
attention is paid to that question (by educators, superiors, learners, the professional
association, and others) it is likely that the normal learning paths of the members of the
organization will correspond strongly with the way in which their daily work is organized.
And that will often be undesirable, if the aim is to ensure the development of people and
organizations. In other words, one important key to development is to focus specific attention
on shaping the relationships between the participants in the learning project (differently). That
brings us back to the earlier argument in favor of ‘removing’ learning from its everyday
context, by organizing it in project form. At the same time, it is very important to this
methodology to take proper account of the possibilities and limitations that the existing
context presents to participants in learning projects.
The learning-project framework has been used to study the process of learning program
creation by Van der Krogt (1998) and Poell (1998), including practical cases of the models
presented. For example, Poell, Tijmensen & Van der Krogt (1998) described two learning-
project cases in professional organizations aspiring to become learning organizations. The
Project-Based Learning
12
framework has also been applied in the context of peer consultation (Driehuis, 1997), integral
organization renewal (Hoogerwerf, 1998), workplace training (Harris, Simons & Bone, 2000),
project learning (Pluijmen, 2001), and public administration (Mick, 2001). The models can
first of all be used to analyze, describe and explain the process of learning program creation in
organizational contexts (Poell, Chivers, Van der Krogt & Wildemeersch, 2000). Moreover,
they can provide educators, learners and managers with ideas and alternatives to create
learning programs in their own organizational practice (e.g., Pluijmen, 2001). For instance, a
recent project brought educators and researchers together to reflect on the learning-project
strategies deployed by the educators (Poell & Van der Krogt, in preparation). Through
discussion using the learning-project models, educators became aware of the strategies they
and their colleagues used implicitly, opening up alternative routes to one another from their
own practice and from the ideal types presented by the researchers. The project also enabled
educators to experiment with new ways of organizing a learning-project and receive feedback
from colleagues and researchers.
The methodology described in this article could thus help groups to create learning projects
in various ways. The general part, contained in the middle section, sets out the basic elements
that a learning group must focus its attention on. Questions that the participants must pose
themselves in this respect were presented in three phases: the orientation phase, the learning
phase, and the continuation phase. The four models set out in the latter section can be
regarded as extreme examples of how learning projects can be set up. They can help groups to
become aware of the way(s) in which they normally learn, and the possible differences in this
respect amongst individuals, teams, departments, and organizations. They can also serve as
models to aspire to, or as tools to facilitate the discussion about this amongst those involved.
Finally, the models may also be used as diagnostic instruments to chart the developments that
take place in learning over time.
Crucial to this is of course the realization that groups have different degrees of freedom to
determine and to change the social groupings within which people learn together. The
methodology presented here may serve as a tool to give groups insight into the various
opportunities available to them in this area.
References
Argyris, C., & Schön, D. A. (1978). Organizational learning: A theory of action perspective.
Reading, MA: Addison-Wesley.
Atkinson, J. (2001). Developing teams through project-based learning. Aldershot: Gower.
Ayas, K. (1996). Professional project management: A shift towards learning and a knowledge
creating structure. International Journal of Project Management, 14(3), 131-136.
Broad, M. L., & Newstrom, J. W. (1992). Transfer of training: Action-packed strategies to
ensure high pay-off from training investments. San Francisco: Addison-Wesley.
Brookfield, S. D. (1986). Understanding and facilitating adult learning: A comprehensive
analysis of principles and effective practices. San Francisco: Jossey-Bass.
Candy, P. C. (1991). Self-direction for lifelong learning: A comprehensive guide to theory and
practice. San Francisco: Jossey-Bass.
Daley, B. J. (1999). Novice to expert: An exploration of how professionals learn. Adult
Education Quarterly, 49(4), 133-147.
DeFillippi, R. J. (2001). Project-based learning, reflective practices and learning outcomes.
Management Learning, 32(1), 5-10.
Project-Based Learning
13
Driehuis, M. (1997). De lerende adviseur: Een onderzoek naar intercollegiaal consult in
organisatieadvisering [The consultant as a learner: A study of peer consultation in
organisational consultancy]. PhD thesis, Technical University of Eindhoven, Netherlands.
Harris, R., Simons, M., & Bone, J. (2000). More than meets the eye? Rethinking the role of
the workplace trainer. Leabrook: Australian National Training Authority/NCVER.
Hoogerwerf, E. C. (1998). Opnieuw leren organiseren: Sociotechniek in actietheoretisch
perspectief [Organizing learning anew: Sociotechnical design from a theory of action
perspective]. PhD thesis, University of Nijmegen, Netherlands.
Jacobs, R. L., & Jones, M. J. (1995). Structured on-the-job training: Unleashing employee
expertise in the workplace. San Francisco: Berrett-Koehler.
Kessels, J. W. M. (1993). Towards design standards for curriculum consistency in corporate
education. PhD thesis, University of Twente, Netherlands.
Kessels, J. W. M. (1999). Verleiden tot kennisproductiviteit [Tempting into knowledge
productivity]. Inaugural lecture, University of Twente, Netherlands.
Kliem, R. L., &.Ludin, I. S. (1997). Reducing project risk. Aldershot: Gower.
Lange-Ros, D. J. de (1999). Continuous improvement in teams: The (mis)fit between
improvement and operational activities of improvement teams. PhD thesis, University of
Twente, Netherlands.
Lewis, J. P. (2000). Project planning, scheduling & control: A hands-on guide to bringing
projects in on time and on budget (3rd edition). New York: McGraw-Hill.
Marsick, V. J., & Watkins, K. E. (1990). Informal and incidental learning in the workplace.
London: Routledge.
Mick, T. D. (2001). Minority and women entrepreneurs contracting with the federal
government. PhD dissertation, University of Missouri at Kansas City.
Morgan, M. (2002). Career-Building Strategies. Management Accounting, 83(12), 38-43.
Obeng, E. (1996). Putting strategy to work: The blueprint for transforming ideas into action.
London: FT / Pitman.
O'Neil, J. (1999). Facilitating action learning: The role of the learning coach. In L. Yorks, J.
O'Neil, & V. J. Marsick (Eds.), Action learning: Successful strategies for individual, team,
and organizational development. [Advances in Developing Human Resources, no. 2.] San
Francisco: Berrett-Koehler.
Pluijmen, R. (2001). Learning-action strategies of project managers in a collaborative learning
program: An action research project into the learning activities of project managers. In O.
A. Aliaga (Ed.), Exploring the frontiers of Human Resource Development (pp. 1092-1096).
Minneapolis: University of Minnesota.
Poell, R. F. (1998), Organizing work-related learning projects: A network approach. PhD
thesis, University of Nijmegen, Netherlands.
Poell, R. F., Chivers, G. E., Van der Krogt, F. J., & Wildemeersch, D. A. (2000). Learning-
network theory: Organizing the dynamic relationships between learning and work.
Management Learning, 31(1), 25-49.
Poell, R. F., Tijmensen, E. C. M., & Van der Krogt, F. J. (1997). Can learning projects help to
develop a learning organisation? Lifelong Learning in Europe, 2(2), 67-75.
Poell, R. F., & Van der Krogt, F. J. (2002). The development of employees in work-related
learning networks: Using social networks in organisations to facilitate professional
development. In M. Pearn (Ed.), Handbook of individual development in organisations.
London: Wiley.
Poell, R. F., & Van der Krogt, F. J. (in preparation). How do HRD practitioners tailor training
to learners and their work environment? Manuscript submitted for publication.
Raelin, J. A. (1999). The design of the action project in work-based learning. Human
Resource Planning, 22 (3), 12-28.
Project-Based Learning
14
Randolph, W. A., & Posner, B. Z. (1992). Getting the job done! Managing project teams and
task forces for success. Englewood Cliffs, NJ: Prentice Hall.
Robinson, D. G., & Robinson, J. C. (1989). Training for impact: How to link training to
business needs and measure the results. San Francisco: Jossey-Bass.
Romiszowski, A. J. (1982). Designing instructional systems: Decision making in course
planning and curriculum design. London: Kogan Page.
Schön, D. A. (1983). The reflective practitioner: How professionals think in action. London:
Temple Smith.
Senge, P. M. (1990). The fifth discipline: The art and practice of the learning organization.
London: Century Business.
Van der Krogt, F. J. (1998). Learning network theory: The tension between learning systems
and work systems in organizations. Human Resource Development Quarterly, 9(2), 157-
177.
Weiss, J. W., & Wysocki, R. K. (1992). 5-Phase project management: A practical planning &
implementation guide. Reading, MA: Perseus.
Wenger, E. (1998). Communities of practice: Learning, meaning, and identity. Cambridge,
MA: University Press.
Wysocki, R. K., Beck Jr, R., Crane, D. B., & Hudson, T. (2000). Effective project
management. New York: Wiley.
... Pendekatan pembelajaran berasaskan projek mungkin sama dengan pembelajaran tindakan kerana ia juga memerlukan pekerja untuk belajar dengan melakukan satu projek tertentu (Sanger & Pavlova, 2016;Thomas, 2000;Walsh, Crockett, & Sheikholeslami, 2008). Aspek utama konsep ini adalah anggota projek harus mempunyai keinginan untuk belajar bersama (Poell & Van der Krogt, 2003). ...
... Dalam situasi pembelajaran dewasa, pembelajaran berasaskan projek membolehkan pembelajaran bersama dan kolaborasi untuk berlaku (Conlan et al., 2003), di mana ia penting dalam pembelajaran dewasa, terutamanya di tempat kerja. Selain daripada itu, pembelajaran berasaskan projek dapat membagungkan sikap tolerasi antara pekerja, meningkatkan daya pemikiran kritis, belajar pengurusan masa, dan mencari pengetahuan dalam menyelesaikan projek tersebut (Poell & Van der Krogt, 2003;Smith & Dodds, 2017). Pembelajaran berasaskan projek mempunyai modul off-project dimana pengajar atau coach akan membuat refleksi bersama perkerja dalam mengenalpasti aspek pembelajaran yang telah dilalui dalam pelaksanaan projek. ...
... , Conlan et al. (2003), (Sanger & Pavlova, 2016), Thomas (2000), Walsh et al. (2008), Poell and Van der Krogt (2003) Ciri-Ciri Pelajar: anggota projek harus mempunyai keinginan untuk belajar bersama, berdikari, bertoleransi dan mampu menguruskan projek. ...
Article
Full-text available
Students are the next generation of leaders to govern the country. However, many pressures affect their performance and life at university such as academic and social pressures. These pressures can sometimes cause stress among students. Having suicidal thoughts, taking drugs, and dropping out of college are some of the situations that might be caused by pressures and stress among students. Among all types of stress faced by students, academic stress is one of the reasons why some students fall into deeper problems such as depression and anxiety. Academic stress can come from various reasons such as lecturers, assignments, peers and much more. Thus, this paper aims to identify the academic stress level among students in Universiti Teknologi Malaysia (UTM). A total of 100 students involved in this study which require them to answer a survey regarding sources of stress. The result from the survey is analyzed to determine the level of stress according to each source of stress. The results from this study will enable students, educators and universities to observe and take action on how to help students who suffer from academic stress during their study and for future research to further explore in this issue.
... This study is developed within Kezar & Eckel framework of change in higher education, as it addresses academic change from the perspective of educational innovation management. Such management is mainly supported by the development of educational projects, since projects are considered a fundamental pillar of the institutional culture of engineering education, although project work is not an exclusive practice of engineering and extends to other areas of research and academic knowledge (Cerezo, De los Ríos, Pastor, Yagu¨e, & Otero, 2019;Pemsel & Müller, 2012;Poell & Van der Krogt, 2003). The first three strategies from Kezar & Eckel mentioned above are directly related to the items included in our study (see the first three sections of the questionnaire: Actions for Supporting educational innovation; Strategies, structures and processes; Educational Innovation Projects). ...
... The literature that supports the questionnaire design is organized around the following frameworks: Kezar & Eckel framework of change in higher education (Kezar & Eckel, 2002); world class Universities' trends for improving through innovation (Altbach, 2016;Altbach & Salmi, 2011;Cazorla & Stratta, 2017) and the organisations' project management competences (International Project Management Association, IPMA OCB model) (IPMA, 2015(IPMA, , 2016Maylor, Brady, Cooke-Davies, & Hodgson, 2006;Pemsel & Müller, 2012;Poell & Van der Krogt, 2003;Wagner, 2012). The first two frameworks have been explained in deep in Section 1.1. ...
... Definitions of PBL identify it as a kind of collaborative work carried out by a group of people within the confines of an academic program [15,16]. Other significant aspects include the need for research, the importance of self-directed work, the use of various resources, the presentation of a final report and most importantly, the meaningful internalization of competencies while working [6,17,18,19,20]. ...
... Following a set of basic demographic questions (items 1-9), there were five sections, thus: General Competencies (GC) (items[10][11][12][13][14][15][16][17][18][19][20][21][22][23][24][25][26][27], sub-divided into Group General Competencies (GGC), focusing on team work (items 10,18-22, and 24-27), and Individual General Competencies (IGC), focusing on individual learning (items 11-17, and 23); Specific Competencies (SC) (items 28-35), designed to evaluate the perceived depth of study; Transversal Competencies (TC) (items 36-40 and 50), measuring respondents' perception of having gained knowledge and/or skills transferrable to other courses in their degree; respondent's evaluation of the project (items 41-49, 51-53, and 67); and Knowledge Transfer (items 54-66). Measurement of the variables varied. ...
Preprint
Full-text available
The aim of this paper is to contribute to the body of knowledge about Project-Based Learning (PBL) methodology in higher education by describing and analysing interrelations between competencies, and their contribution to knowledge transfer (KT) and students’ rating of the project. The sample consisted of 464 students from the Universities of Huelva (N=347; 74.8%) and Murcia (N= 117; 25.2%), enrolled in the second year of a degree in either Infant or Primary Education. Data was collected through a self-administered questionnaire comprising a total of 53 items measuring General, Specific and Transversal competencies, as well as students’ rating of the project. Competencies were selected from the course programmes for the degrees in Infant and Primary Education. Preliminary results showed that competencies were moderately to highly acquired after PBL, and that students reported notable KT as well as a positive assessment of the project. KT showed a high degree of association with students’ ratings and was established as a key factor in learning and learner satisfaction in higher education.
... Ejecución de la técnica. Consiste en el desarrollo del proyecto con la técnica POL, contempla las actividades desarrolladas por los alumnos en cada una de las etapas de esta técnica, así como los conocimientos que aplicaron los alumnos en el desarrollo del proyecto (Poell y Van der Krogt, 2003). Evaluación. ...
Article
Full-text available
Este artículo presenta un estudio que tuvo por objetivo analizar el desarrollo de tres competencias matemáticas: planteamiento y resolución de problemas, comunicación y argumentación; con alumnos de segundo grado de secundaria, en una escuela pública mexicana, para identificar cómo impacta la técnica de aprendizaje orientada en proyectos (POL por sus siglas en inglés), como diseño instruccional innovador para mejorar los aprendizajes matemáticos de los estudiantes. La metodología utilizada fue el estudio de casos múltiples, aplicando instrumentos diversos tales como: el registro de bitácora, cuestionario, entrevista y análisis de proyectos aplicados a los estudiantes. Los hallazgos muestran el desarrollo de las tres competencias matemáticas al usar POL y resolver problemas de su interés y contexto, poniendo en juego un conjunto de capacidades como identificar, plantear y resolver problemas; explicando, justificando y demostrando.
... Diharapkan melalui PBL mahasiswa dalam pembelajaran pengembangan dapat memahami masalah nyata di masyarakat (real-world problem) yang harus dipecahkan melalui pendidikan nonformal, memperoleh pengalaman bermakna dan berbasis masalah nyata, mampu melakukan investigasi sehingga mereka dapat belajar konsep pendidikan nonformal yang utuh, menerapkan informasi, dan menghasilkan karya/artefak yang merepresentasikan pengetahuan yang dikuasi, dan mampu berkolaborasi di antara mahasiswa peserta didik sehingga pengetahuan dapat di-share-kan dalam masyarakat belajar (Hogue, Kapralos & Desjardins, 2011). Untuk mencapai ini, pembelajaran dengan menggunakan metode tersebut dapat dilakukan dengan tahap: (a) inisiasi masalah, konsep, dan tantangan yang dapat dikonsultasikan antara peserta didik dengan pendidik; (b) definisi, di mana mahasiswa secara berkelompok memformulasikan detail mengenai idea-ideanya dan suatu kesepakatan dibangun, antara peserta didik dan pihak lain, (c) desain dan persiapan yang mana mahasiwa membuat rencana tindakan detail digambarkan dalam proyek tertentu, (d) eksekusi atau pelaksanaan, rencana proyek dilaksanakan untuk menghasilkan produk proyek, dan (e) evaluasi dan tindak lanjut di mana perhatian difokuskan pada penerjemahan hasil ke dalam perubahan permanen (Poell & Krogt, 2003). ...
Article
Full-text available
Penelitian ini bertujuan meningkatkan kompetensi pengembangan program pendidikan nonformal bagi mahasiswa melalui pembelajaran berbasis proyek sehingga mahasiswa dapat dengan mudah memahami dan memiliki keterampilan mengembangkan program pendidikan nonformal secara bermakna. Kompetensi pengembangan program pendidikan nonformal dalam perkuliahan dipandang sulit dikuasai mahasiswa karena kompetensi ini bersifat multidisplin, memerlukan kemampuan berfikir sistematis dan membutuhkan banyak pengalaman. Penelitian tindakan kelas ini dilakukan pada mahasiswa semester 5 yang menempuh Mata Kuliah Inovasi dan Pengembangan Program PNF tahun ajaran 2018/2019. Pengumpuan data dilakukan secara kualitatif dan kuantitatif. Data yang terkumpul selanjutnya dianalisis dengan teknik analisis kuantitatif deskriptif dan teknik analisis data kualitatif. Hasil penelitian menunjukkan proses pembelajaran ini memberikan manfaat positif yang ditandai dengan proses pembelajaran menjadi lebih dinamis dan terjadi perubahan perilaku positif mahasiswa sesuai dengan tujuan pembelajaran yang diharapkan. Oleh karena itu, dipandang perlu pembelajaran berbasis proyek yang inovatif perlu dikembangkan pada rumpun ilmu pendidikan nonformal lainnya dan perkuliahan lainnnya disertai dengan penyediaan kemitraan dan dukungan sumber daya yang memadai.Improving the Competence of Developing the Nonformal Education Program for Students Through Project-Based TeachingThis study aims to improve competencies of the development of the nonformal education program to students through project-based learning so that they can easily understand and have the skills significantly. The competencies are viewed as difficult for students to master because it is multidisciplinary, requires the ability to think systematically, and needs a lot of experiences. This research is classroom action research that is conducted on 5th-semester students taking the substance of the Innovation and Development of PNF Program in the academic year 2018/2019. Data were collected qualitatively and quantitatively and then analyzed using analysis data technique both qualitatively and quantitatively. The results showed that the learning process provided positive benefits in which it was more dynamic and there was a change in student's positive behavior in accordance with the expected learning objectives. Therefore, it is necessary that innovative project-based learning needs to be developed in other non-formal education courses and accompanied by the provision of partnerships and adequate resource support.
Article
Purpose The purpose of this study is to explore the impact of knowledge management (KM) practices (knowledge creation, knowledge storage, knowledge transfer and knowledge application) and demographic and occupational factors on team learning (TL) in public enterprises in Jordan. Design/methodology/approach A convenient random sample of 389 employees working in 52 various functional teams in the Jordanian public enterprises completed a self-administrated questionnaire. Descriptive statistics, confirmatory factor analysis and hierarchical regression analysis were used to analyze the data and test the proposed hypotheses. Findings The results of this study showed that KM practices explained an additional 53% of the variance in TL above the 9% variance explained by the demographic and occupational factors (i.e. gender, work experience, age, education, occupational position, team size and participation in training on KM and TL). Notably, in the absence of the effects of KM dimensions, work experience, age, team size and “participation in training on KM and TL” were significant predictors of TL. However, after including the effects of KM dimensions in the regression analysis, only the participation in training variable, along with the KM dimensions, remained significant predictors of TL. Practical implications This study contributes to public enterprise administration by highlighting the importance of KM practices in nurturing a healthy TL climate that can ultimately enhance job performance and organizational success. Originality/value To the best of the authors’ knowledge, this study is one of the few studies in the Arab world that examines real functional teams to understand the role of KM in enhancing the practice of TL.
Book
Mehr denn je ist arbeitsbezogenes Lernen ein strategisch relevantes Thema in Unternehmen. Die Anforderungen, die aus einer dynamischen und vernetzten Arbeitswelt resultieren, fordern von Unternehmen und Beschäftigten eine permanente Weiterentwicklung. Klassische Fort- und Weiterbildungen allein reichen hierfür nicht mehr aus. Diesem Buch liegt ein breites Verständnis von Lernen zugrunde: Neben dem formalen Lernen, das nach vorgegebenen Curricula in strukturierten Lernumgebungen stattfindet und den Besuch von Weiterbildungsformaten wie Schulungen, Seminaren und Trainings umfasst, werden in diesem Band auch das informelle Lernen am Arbeitsplatz und das selbstregulierte Lernen in den Fokus genommen. Anhand von Modellen zum arbeitsbezogenen Lernen in Unternehmen und aktuellen metaanalytischen Befunden wird ein Überblick über die drei Lernformen des formalen, informellen und selbstregulierten Lernens gegeben. Zudem werden Konzepte zur lernförderlichen Arbeitsgestaltung und Etablierung einer positiven Lernkultur vorgestellt. Aufbauend auf relevanten Prozessschritten im Personalentwicklungszyklus wird ein Rahmenmodell zur Planung und Umsetzung von Programmen und Maßnahmen präsentiert, das zielgerichtet verschiedene Lernformen verknüpft. Darüber hinaus werden die Herausforderungen und Chancen aufgezeigt, die für arbeitsbezogenes Lernen aus der Digitalisierung resultieren (z. B. Microlearning), und neuere agile Lern- und Arbeitsmethoden (z. B. Scrum) ebenso wie klassische Ansätze skizziert. Praxisbeispiele aus verschiedenen Branchen illustrieren, wie arbeitsbezogenes Lernen systematisch gestaltet werden kann.
Article
Full-text available
Este estudo tem o objetivo de explorar o tema Aprendizagem Baseada em Projetos (ABPj) por meio de uma revisão descritiva da literatura, na qual são analisadas pesquisas, na perspectiva da Gestão de Projetos. Ele foi realizado no primeiro semestre de 2018 em pesquisas a bancos de dados computadorizados (Web of Science™ e Scopus). De acordo com critérios de busca relatados no texto e com a aplicação do protocolo PRISMA, obteve-se um resultado de 12 artigos científicos, para os quais se realizou análise bibliométrica e qualitativa de conteúdo. Dentre os achados da pesquisa, destacam-se os efeitos positivos na adoção de ABPj, incluindo ampliação de motivação, ambiente favorável aos trabalhos em equipe e desenvolvimento de competências organizacionais. O trabalho finaliza propondo um framework para pesquisas que objetivem estudar as contribuições recíprocas entre as áreas de Gestão de Projetos e ABPj.
Article
Full-text available
Los planes de desarrollo profesional de los docentes constituyen el mecanismo principal de actuación para la mejora de los servicios ofrecidos por las organizaciones educativas y del desempeño de las funciones del profesorado. El estudio de la transferencia de los aprendizajes desarrollados en las actividades de formación permanente al puesto de trabajo configura un problema de gran interés al tratarse de un elemento necesario para poder analizar el rendimiento de las actividades formativas. La presente investigación explora la estructura factorial condicionante de la transferencia de la formación permanente del profesorado no universitario, analiza las analogías y diferencias con otros modelos y propone un instrumento de medición adaptado a la enseñanza no universitaria. La metodología utilizada obedece a un diseño no experimental de tipo cuantitativo basado en un diseño transversal tipo encuesta. La muestra está formada por 4769 docentes no universitarios de la Región de Murcia, obtenidos mediante un muestreo no probabilístico por conveniencia. El análisis ha seguido un enfoque cuantitativo-correlacional empleando técnicas estadísticas de análisis factorial y el estudio de la consistencia interna. La investigación ha permitido proponer un modelo factorial y un instrumento de medida, validado en contenido y constructo para los factores de transferencia en la enseñanza no universitaria. Palabras clave: Entrenamiento Profesional, Transferencia de Formación, Aprendizaje Permanente, Análisis Factorial, Profesorado. Teachers' professional development plans constitute the main mechanism of action to improve the services offered by educational organizations and the performance of the functions of teachers. The study of the transfer of learning developed in permanent training activities to the job constitutes a problem of great interest as it is a necessary element to be able to analyze the performance of training activities. This research explores the factorial structure that determines the transfer of permanent training for non-university teachers, analyzes the analogies and differences with other models and proposes a measurement instrument adapted to non-university teaching. The methodology used follows a non-experimental, quantitative design based on a cross-sectional survey-type design. The sample is made up of 4,769 non-university teachers from the Region of Murcia, obtained through a non-probabilistic convenience sampling. The analysis followed a quantitative-correlational approach using statistical factor analysis techniques and the study of internal consistency. The research has made it possible to propose a
Article
There is a growing interest in educational innovation in universities at a global level, as a tool designed to create strategic changes in order to improve quality. This study evaluates the global improvement in universities as a result of educational innovation governance, as a pillar of the so-called world-class research universities and as a tool for continuous improvement in higher education. The methodology has been designed by different educational innovation groups from the Universidad Politécnica de Madrid, Universidad de Cádiz, and the International Project Management Association Spanish Board, and includes an analysis of 67 universities from 20 countries. The study is based on 32 universities in Spain, as well as 35 other international universities that carry out educational innovation activity. The results show that universities that have a more mature educational innovation governance in place, both in Spain as well as in other countries, are higher in the ranking of universities (Webometrics). These universities demonstrate a tendency to work on educational innovation projects, which are contributing to strategic changes that will permanently revitalise teaching, whilst also improving research and its links to society. FULL TEXT AVAILABLE UNTIL JULY 10 HERE: https://authors.elsevier.com/c/1d6Gh,4Mg0ZXHy
Article
Full-text available
This paper attempts to remedy the inattention heretofore paid to the action project in the work-based learning literature. It begins with the assertion that there can be no substitute for real-time experience in human resource planning and development programs. Action projects afford real-time experience by involving participants in concrete actions typically in their own organization. The projects are designed to have strategic value, thus contributing to or even challenging the goals of their organizational sponsor. While working on their project, participants engage in both individual and collective learning, results deemed as important as the business outcomes of their project intervention. The article goes into considerable detail noting the benefits but also the pitfalls of action projects.
Book
Full-text available
Ph.D. dissertation, (Radboud) University Nijmegen
Article
Full-text available
Rede Uitgesproken bij het aanvaarden van het ambt van Hoogleraar Human Resource Development aan de Faculteit der Toegepaste Onderwijskunde Universiteit Twente op donderdag 8 februari 2001 2 Mijnheer de Rector Magnificus, Zeergewaardeerde toehoorders, 'Gelido in ogni vena Scorrer mi sento il sangue, L'ombra del figlio esangue M'ingombra di terror.' 'In elke ader voel ik mijn ijskoude bloed stromen. De schaduw van mijn levenloze zoon vervult mij met ontzetting.' Ook al kun je deze Italiaanse tekst uit de achttiende eeuw van Pietro Metastasio (1698-1782) lezen, de muziek van Vivaldi geeft aan de woorden een bijzonder expressieve kracht. De manier waarop Cecilia Bartoli deze aria 'd'ombra' vertolkt, maakt onmiddellijk duidelijk dat we hier met een uitzonderlijk dramatisch moment te maken hebben. Farnace denkt dat hij voor het graf van zijn enige zoon staat. Zijn angst komt tot uiting in het glazige timbre van de strijkers, die plotseling bij het woord 'terror' uitbarsten in een forte, dat de intensiteit heeft van een schreeuw van snijdende pijn 1 . Het heeft mij geruime tijd bezig gehouden hoe het komt dat dit muziekfragment zo'n indruk op me maakt. Maar dat geldt ook voor de vraag waarom ik hetzelfde stukje graag zou willen gebruiken aan het begin van deze rede. Je zit te lezen, en dan ineens is er dat intense moment. Waarom raakt het mij, en waarom merkt een ander het niet eens op? Waarom krijg ik bij de voorbereiding van deze tekst een sterk gevoel dat dit muziekfragment mij kan helpen om iets over het voetlicht te krijgen waar ik al geruime tijd op zit te broeden? Het is een riskante opgave om jullie deelgenoot te maken van mijn zoektocht. Maar ik hoop dat ik mijn beweegredenen aannemelijk kan maken.