ArticlePDF Available

Analogy for a Concurrent Product Design, Development and Delivery (PD3) Process

Authors:

Abstract

The product environment in modem manufacturing is very complex. It consists of many elements of products, processes, and services, including information technology (IT) services (IT hardware, software, networks and communications). The design of an automobile, for example, involves 2000 to 3000 parts, and literally calls for thousands of engineers making mil- lions of design decisions over its life-cycle. None of these parts are designed and developed in isolation from each other [4].
http://cer.sagepub.com/
Concurrent Engineering
http://cer.sagepub.com/content/5/3/198
The online version of this article can be found at:
DOI: 10.1177/1063293X9700500301
1997 5: 198Concurrent Engineering
Biren Prasad
Analogy for a Concurrent Product Design, Development and Delivery (PD3) Process
Published by:
http://www.sagepublications.com
can be found at:Concurrent EngineeringAdditional services and information for
http://cer.sagepub.com/cgi/alertsEmail Alerts:
http://cer.sagepub.com/subscriptionsSubscriptions:
http://www.sagepub.com/journalsReprints.navReprints:
http://www.sagepub.com/journalsPermissions.navPermissions:
http://cer.sagepub.com/content/5/3/198.refs.htmlCitations:
What is This?
- Sep 1, 1997Version of Record >>
by Biren (Brian) Prasad on October 21, 2013cer.sagepub.comDownloaded from by Biren (Brian) Prasad on October 21, 2013cer.sagepub.comDownloaded from by Biren (Brian) Prasad on October 21, 2013cer.sagepub.comDownloaded from by Biren (Brian) Prasad on October 21, 2013cer.sagepub.comDownloaded from by Biren (Brian) Prasad on October 21, 2013cer.sagepub.comDownloaded from
198
CE CONCURRENT
ENGINEERING
Research
and
Applications
Editorial
Analogy
for
a
Concurrent
Product
Design,
Development
and
Delivery
(PD
3)
Process
Biren
Prasad
Electronic
Data
Systems
(EDS),
CERA
Institute,
P. 0.
Box
250254,
West
Bloomfield,
MI
48325-0254,
USA
1.
Introduction
The
product
environment
in
modem
manufacturing
is
very
complex.
It
consists
of
many
elements
of
products,
processes,
and
services,
including
information
technology
(IT)
services
(IT
hardware,
software,
networks
and
communications).
The
design
of
an
automobile,
for
example,
involves
2000
to
3000
parts,
and
literally
calls
for
thousands
of
engineers
making
mil-
lions
of design
decisions
over
its
life-cycle.
None
of these
parts
are
designed
and
developed
in
isolation
from
each
other
[4].
Figure
1
compares
the
process
of
a
product
design,
develop-
ment
and
delivery
(PD3)
[2]
with
a
process
of
fluid-flow
through
a
maze
of
pipes.
Each
pipe
of
an
assembly
represents
a
part
or
an
information
build-up
activity
in
a
conventional
PD3
process
[4].
Serial
engineering
process
involves
a
number
of
connected
parts
or
repeated
activities
of
an
assembly,
such
as
plan,
redo,
down-load,
up-load,
iteration,
retrieve,
store,
etc.,
which
must
be
performed
in
the
proper
sequences.
The
fluid
flowing
through
the
pipes
denotes
information
flow
of
a
PD3
3
process.
The
fluid
pressure
is
equivalent
to
needs
for
informa-
tion
build-up
in
a
PD3
process.
The
activities
or
parts
to
be
de-
signed
are
represented
by
straight
pipes.
The
cross-section
of
each
pipe
represents
the
corresponding
design
parameters.
A
typical
conventional
decision-making
step
is
shown
in
Figure
1
by
a
pipe
elbow
or
an
end-coupling.
Similar
to
how
an
end-
coupling
changes
the
direction
of
the
fluid-flow,
decision-
making
in
the
conventional
serial
process
changes
the
steps
or
parts
required
for
subsequent
information
build-up.
The
length
of
each
pipe
in
the
assembly
denotes
the
time
it
takes
to
com-
plete
or
build-up
the
necessary
information
for
the
next
serial
step
of a
PD3
process.
Each
design
decision
is
a
trade-off affect-
ing
many
other
design
decisions
or
selection
of
parameters.
Such
a
traditional
breakdown
of design
tasks,
even
though
it
re-
sembles
a
hierarchical
pattern,
is
repetitive
and
inefficient
[6].
Decision-making
in
the
conventional
PD3
process,
therefore,
can
be
very
difficult
and
total
lead
time
could
be
very
large
considering
the
magnitude
and
complexity
of the
products
and
processes
that
need
to
be
addressed.
These
complexities
are
of-
ten
compounded
by
the
presence
of
the
following
domain
fac-
tors [5] :
· Large
Interconnected
Components:
There
is
a
high
stake
on
decisions
that
must
be
made
simultaneously.
In
modem
manufacturing,
where
both
parts
and
information
move
rap-
idly
through
a
plant,
a
small
change
(say
a
material
change)
at
design-end
of a
PD3
process
can
have
a
significant
impact
on
the
production-end.
This
is
likely
whether
or
not
parts
are
stamped,
machined,
or
injection
molded.
Most
changes-
static
or
dynamic-must
be
managed
in
real
time.
0
Limited
Resources:
Most
modem
manufacturers
have
down-sized
their
resources
(7Ts,
as
shown
in
Figure
1
[1])
to
a
bare
minimum.
Resources
are
shared
to
contain
costs.
Repetitive
high
demand
of
shared
resources
increases
the
burden
of
managing
them
efficiently:
where
the
set
{T} =
[talents,
tasks,
teamwork,
techniques,
technology,
time,
tools]
and
{Tm~} is
the
allowable
stretch
of {T}.
geographical
Distributions:
Manufacturing
is
a
global
phenomena;
it
is
distributed
over
a
vast
geographical
area.
For
example,
a
part
may
be
designed
in
Detroit,
manufac-
tured
in
Kentucky,
and
assembled
in
Korea
or
Mexico.
Thus,
the
costs
of
travel,
transportation,
relocation,
com-
munication,
currency
exchange,
and
labor
agreements
are
some
of
the
additional
parameters
that
are
commonly
fac-
tored
into
the
cost
equation.
Volume
5
Number
3
September
1997
1063-293X/97/03
0198-04
$10.00/0
© 1997
Technomic
Publishing
Co.,
Inc.
199
Figure
1.
An
analogy
for
a
serial
PD3
process.
200
Figure
2.
An
analogy
for
a
concurrent
PD~
process.
201
· Many
Goals
&
Objectives:
In
most
large
companies,
there
are
sets
of
independent
goals
and
objectives,
F,,,,
devel-
oped
by
each
independent
department
or
unit.
Not
all
of
these
goals
and
objectives
are
in
agreement
with
the
rnter-
prise
goals,
mission
statements
or
its
vision,
Fe~,
assuming
the
latter
exits.
There
is
often
no
constancy-of-purpose
be-
tween
these
independently
specified
goals.
The
situation
gets
worse
if
there
are
more
than
one
strategic
business
units
(SBU),
each
having
its
own
set
of
independent
vi-
sions
or
mission
statements.
If
we
define
Goals
that
may
be
in
Conflict
=
where
big
u
stands
for
Union-of.
The
small
u
stands
for
a
unit,
and e
stands
for
an
enterprise.
The
goals
that
are
good
candidates
for
constancy-of-
purpose
are
those
for
which
intersections
of F&dquo;,
and
Fe,
are
nonzero.
Constancy-of-purpose
Goals
The
terms
u
and
i
in
File
take
a
value
as
governed
by: 1 :::; u
S
number-of-SBUs,
and
1
:5
i:5
number-of-unit-goals.
The
subscript j
in
F,,
take
a
value
as
governed
by: 1 :::; j
:5
number-of-enterprise-goals
A
method
is
a
specific
way
of
capturing
and
displaying
in-
formation
concepts
(Webster’s
New
College
Dictionary,
[7]).
Various
methods
for
CE
were
captured
on
the
basis
of
taxon-
omy
in
Chapters
1-4
of
Volume
2
[4].
In
Chapter
5
of
Concur-
rent
Engineering
Fundamentals,
Volume
1
[3],
key
success
fac-
tors
for
realizing
team
cooperation-7Cs
(Collaboration,
Commitment,
Communications,
Compromise,
Consensus,
Continuous
Improvement,
and
Coordination)
were
described.
Chapter
7
of Volume
I
contained
a
general
classification
for
in-
formation
modeling,
while
Chapter
8
of
Volume
I,
described
what
constituted
a
functional
&dquo;whole
system.&dquo;
Chapter
9
of
Volume
I
[3]
discussed
taxonomy
for
product
realization.
Product
realization
= ~
(Planning,
Design,
Process,
Production,
Manufacturing
or
Assembly,
(6)
Delivery
and
Service)
2.
A
Concurrent
Analogy
for
an
IPD
Process
Figure
I
showed
&dquo;a
fluid
flow
through
a
pipe
analogy&dquo;
for
a
serial
PD3
process.
The
same
analogy
has
been
redesigned
now
in
Figure
2
for
a
concurrent
PD3
process.
Instead
of
placing
the
control
at
the
end
of the
pipe
assembly
as
in
serial
engineering,
the
control
is
now
placed
at
each
loop-level
of
the
concurrent
product
realization
process.
This
is
called
control
by
design
at
each
loop
level.
The
configuration
of the
pipe
connections
and
their
relative
positions
along
the
vertical
direction
is
governed
by
the
taxonomy
of
product
realization
as
discussed
in
Chapter
9
of Volume
I
[3].
The
numerous
bends
and
elbow-connections
in
Figure
1
have
been
replaced
by
loops
tapped
in
at
designated
points
(and
governed
by
the
taxonomy)
along
a
vertical
tube.
The
fluid
pressure
in
the
pipe
is
created
naturally
due
to
the
gravity
force.
In
a
concurrent
PD3
process,
this
is
equivalent
to
&dquo;just-in-time&dquo;
information
build-up
for
each
loop.
Five
loops
run
concurrently
as
shown
in
Figure
2.
The
amount
of
informa-
tion
build-up
at
each
loop
level
is
governed
by
a
natural
pull
of
the
information
rather
than
a
force
&dquo;push&dquo;
found
in
the
serial
engineering
case.
There
are
many
advantages
associated
with
the
concurrent
IPD
methodology.
The
methodology
recog-
nizes
that
product
and
process
data
in
the
early
stage
of
product
development
is
fuzzy,
incomplete
and
often
uncertain
[8].
Con-
current
IPD
provides
a
taxonomy-based
CE
process
to
sort
through
this
fuzzy
set
of
information
to
establish
rationally
what
will
work
and
what
will
not.
The
methodology
balances
the
needed
reduction
in
responsiveness
(with
respect
to
time-
to-market)
against
the
risk
of
design
changes
by
using
incom-
plete
or
uncertain
information
upfront
in
the
taxonomy-based
process.
The
IPD
methodology
thus
provides
an
integral
mechanism
to
manage
the
risks
appropriately.
Concurrent
IPD
eliminates
excessive
redo,
minimizes
detours
and
iterations,
and
requires
a
leveled
work-force.
The
methodology
is
based
on
rationally
utilizing
the
resources,
and
demand-driven
is
the
main
accessing
mechanism
for
pulling
information
through
a
process
taxonomy
maze.
References
1.
Prasad,
B.
1995.
"On
Influencing
Agents
of CE,"
Concurrent
Engineering.
Research
&
Applications-An
International
Jour-
nal,
3(2):78-80,
June.
2.
Prasad,
B.
1996.
"Towards
Definitions
of
a
Concurrent
Product
Design,
Development,
and
Delivery
(PD
3)
System,"
Concurrent
Engineering.
Research
&
Applications-An
International
Jour-
nal,
4(2):102-109,
June.
3.
Prasad,
B.
1996.
Concurrent
Engineering
Fundamentals
Inte-
grated
Product
and
Process
Organization,
Volume
1,
Upper
Saddle
River,
NJ:
Prentice
Hall
PTR,
Inc.
4.
Prasad,
B.
1997.
Concurrent
Engineering
Fundamentals.
Inte-
grated
Product
Development,
Volume
2,
Upper
Saddle
River,
NJ:
Prentice
Hall
PTR,
Inc.
5.
Suri,
R.
1988.
"A
New
Perspective
on
Manufacturing
System,"
Design
and
Analysis
of
Integrated
Manufacturing
Systems,
W.
D.
Compton,
ed.,
NAE,
pp.
118.
6.
Ulrich,
K.
T.
and
S.
D.
Eppinger.
1994.
Product
Design
and
De-
velopment,
New
York:
McGraw-Hill
Inc.
7.
Webster,
A.
M.
1990.
Webster’s
New
Collegiate
Dictionary,
Springfield,
MA:
G.
&
C.
Merriam
Company.
8.
Wesner,
J.
W.,
J.
M.
Hiatt
and
D.
C.
Trimble.
1994.
Winning
with
Quality-
Applying
Quality
Principles
in
Product
Development,
Reading,
MA:
Addison-Wesley
Publishing
Company,
September.
... En el contexto de las nuevas metodologías y herramientas que conforman la Ingeniería Concurrente, el esquema director tradicional de desarrollo secuencial de las actividades debe de ser substituido por un nuevo esquema que ha venido a denominarse diseño para el ciclo de vida [Alting, 1995], que hace un énfasis especial a la producción sostenible que tenga en cuenta el medio ambiente, la salud laboral y la minimización del uso de recursos colectivos [Prasad, 1996] [Prasad, 1997], citada también como el concepto clave que define una nueva cultura industrial, la producción sostenible [Capuz y Gómez, 2002]. ...
Chapter
Full-text available
Este capítulo introduce el concepto clave de ciclo de vida para las principales entidades que intervienen en la satisfacción de las necesidades humanas, tanto en los resultados (productos y servicios) como en las actividades destinadas a su realización (proyectos y las propias organizaciones). En el primer apartado se describen las distintas entidades que intervienen en los procesos productivos. En los apartados segundo y tercero se tratan de dis-tintas visiones del ciclo de vida del producto y de sus costes asociados. En los apartados cuarto y quinto se describe el ciclo de vida y los recursos asociados a los proyectos y, de forma más general, a las entidades relacionadas con las organizaciones. En el apartado sexto se hace una reflexión sobre el concepto de desarrollo tradicional secuencial y el inconveniente de lo que se conoce como " comunicarse sobre la pared ". El capítulo termina con unas reflexiones sobre la nueva visión que el concepto de ciclo de vida da para la ingeniería concurrente y las nuevas perspectivas que se abren. 1. PRODUCTOS Y PROYECTOS Las personas y colectividades humanas realizan numerosas actividades para satisfa-cer sus necesidades que conducen a resultados conocidos como productos y servi-cios. Aunque estos términos tienen características difíciles de delimitar, podría esta-blecerse que un producto es el resultado (concluido) obtenido por un proceso de producción, mientras que un servicio está contenido en el propio proceso, aunque normalmente también suele involucrar el uso o consumo de productos obtenidos en procesos anteriores. Las organizaciones básicas que ofrecen estos productos y servicios son las empresas y las administraciones en cuyo seno se desarrollan las actividades citadas anterior-mente. Sin embargo, más allá de desarrollar estas actividades, las citadas organiza-ciones también pueden ser vistas ellas mismas como algo que debe ser inventado, definido, diseñado, construido, operado y puesto fuera de uso, de la misma forma que cualquier otro producto o servicio, aunque su arquitectura se apoya en métodos especiales con características peculiares [Bernus y Nemes, 2003].
Article
Full-text available
On Influencing Agents of CE - Editorial The most commonly referred definition of Concurrent Engineering is that of Winner [1]. Some experts recognize influencing agents of CE as forces of change [2]. We have chosen to divide forces that influence the domain of CE into seven agents (called here the 7 Ts): talents, tasks, teams, techniques, technology, time, and tools (see Figure 1). One of the primary team issues is the decomposition of tasks. The people’s issue is the composition of teams. Teams are often used to cooperatively solve the problem. Technology issues arise due to drive for competitiveness. Examples of popular technologies in CE are soft prototyping, visualization, product data management, and design for X-ability, multimedia, electronic data interchange (EDI), etc. Tools means computer software, hardware, and networks that make CE practical in today’s world of multinational corporations, multi-partner projects, and virtual corporations. From the time point of view, CE is an initiative of the product development community that has the goal of reducing the length of the product design and manufacturing cycle-time by allowing teams of engineers to develop design modules concurrently from their perspectives [3]. Training also plays an important role in CE. A popular word in the business press is “reengineering”; meaning, in short, revamp the processes by which one satisfies customers’ needs. From a business account, CE means re-engineering the product development process so that tasks are organized concurrently. The Department of Defense (DOD) and some aerospace companies refer to this process as integrated product development (IPD).
Book
Full-text available
The Concurrent Engineering approach to product design and development has two major steps: establishing the product realization process, or taxonomy, and applying this methodology to design and develop the total product system. This first volume of the two volume set articulates CE philosophy by illustrating the differences between the best methodologies and what is currently being practiced.Examines the Japanese transformation from rigid, culture-driven companies to world leaders in quality; offers an understanding of the eight primary components of concurrency and simultaneity; describes modeling the concurrent engineering environment and its five essential components; covers the development of a cooperative work-group environment spanned by four concurrent teams. The first step (theme) is establishing a concurrent product and process organization. This is referred to herein as "process taxonomy." The second step (theme) is applying this process taxonomy (or methodology) to design and develop the total product system. This is referred to as integrated product development (IPD). Each theme/step is divided into several essential parts forming major arms of the so called concurrent engineering wheel-set [Prasad, 1996a]. This two Concurrent Engineering (CE) wheel-set together defines the basic principles on which this very subject CE is founded. The first theme called product and process organization (PPO). It has nine arms (spanned into nine chapters of Volume I) of CE fundamentals Book 1. The second theme named integrated product development (lPD) has ten arms (spanned into ten chapters of Volume II) of CE Fundamentals Book 2. The materials in these two CE titles (and themes) are brought together to balance the interests of both the customers and the companies. The arms of the PPO theme are: Life-cycle Management: Process Re-engineering, Cooperative Work-groups, System Engineering, Information Modeling, The Whole System, and Product Realization Taxonomy. The arms of the IPD theme are: Total Value Management, CE Metrics and Measures, Concurrent Function Deployment, Product Development Methodology, Decision Support Systems, Intelligent Information System, Capturing Life-Cycle Values, Life-Cycle Mechanization, and IPD Deployment Methodology. In the Concurrent Engineering (CE) system, each modification of the product realization represents a taxonomic relationship among specifications (inputs, requirements and constraints), outputs, and the concept it represents [ASME/NSF, 1996] . At the beginning of the design process, the specifications are generally in abstract forms. As more and more of the specifications are satisfied, the product begins to take shape (begins to transform into a physical form).To illustrate how a full CE system will work, and to show the inner-working of its elements, the author defines this CE system as a set of two synchronized wheels. The representation is analogous to a set of synchronized wheels on a bicycle. Figure I shows this CE wheel set in the following URL: The RASSP Digest - Vol. 3, 1st. Qtr. 1996 http://www.eda.org/rassp/documents/newsletter/html/96q1/news_6.html
Article
Full-text available
This article describes a Concurrent Engineering (CE) wheel-set and explains the basic principles on which this very subject is founded. The Concurrent Engineering approach to product design and development has two major themes. The first theme is establishing a concurrent product and process organization (PPO). This is referred to herein as "process taxonomy". The second theme is applying this process taxonomy (or methodology) to design and develop the total product system. This is referred to as integrated product development (IPD). Each theme is divided into several essential parts forming major arms of the so called concurrent engineering wheel-set [Prasad, 1996a]. The first theme called product and process organization (PPO) has nine arms. The second theme named integrated product development (IPD) has ten arms. The materials in these two CE themes are brought together to balance the interests of both the customers and the companies. The arms of the PPO theme are Life-cycle Management: Process Re-engineering, Cooperative Work-groups, System Engineering, Information Modeling, The Whole System, and Product Realization Taxonomy. The arms of the IPD theme are Total Value Management, CE Metrics and Measures, Concurrent Function Deployment, Product Development Methodology, Decision Support Systems, Intelligent Information System, Capturing Life-Cycle Values, Life-Cycle Mechanization, and IPD Deployment Methodology [Prasad, 1996b]. In the Concurrent Engineering (CE) system, each modification of the product realization represents a taxonomic relationship between specifications (inputs, requirements and constraints), outputs, and the concept it represents [ASME/NSF, 1996]. At the beginning of the design process, the specifications are generally in abstract forms. As more and more of the specifications are satisfied, the product begins to take shape (begins to transform into a physical form). To illustrate how a full CE system will work, and to show the inner-working of its elements, the author defines this CE system as a set of two synchronized wheels. The representation is analogous to a set of synchronized wheels on a bicycle. Figure 1 shows this CE wheel set.
Book
Full-text available
The most complete guide to streamlining the process of bringing products to market through Concurrent Engineering (CE). This is a thorough, original guide to using Concurrent Engineering principles to develop products that meet customer needs -- as quickly and efficiently as possible. It shows how CE encompasses manufacturing competitiveness, life-cycle management, process reengineering, cooperative workgroups, systems engineering, information modeling, and product, process and organization integration. It also identifies, for the first time, 25 fundamental CE metrics and measures for simulation and analysis, product feasibility and quality assessment, design for X-ability assessment, and process quality assessment. The book describes the new process of Concurrent Function Deployment, which allows workgroups to work concurrently on conflicting values and compare notes and common checkpoints. Extensive exercises and illustrations are included throughout. As the name implies, the book describes the fundamentals of Concurrent Engineering and explains the basic principles on which this very subject is founded. The most of the materials in the book are either original ideas or their extension to CE. Most is never reported elsewhere and is based on the author's successes while practicing CE on the job, and decades of his research and learning working with electronic, automotive, aerospace and railroad industries including Ford, General Motors, Electronic Data Systems, Association of American Railroads, NASA and numerous other places abroad. Concurrent Engineering approach to product design and development has two major themes. The first theme is establishing a concurrent product and process organization. This is referred to herein as 'process taxonomy." The second theme is applying this process taxonomy (or methodology) to design and develop the total product system. This is referred to as integrated product development (IPD). Each theme is divided into several essential parts forming major chapters of this book. The first volume called integrated product and process organization has nine chapters. The second volume named integrated product development has ten chapters. The materials in these two volumes are brought together to balance the interests of both the customers and the companies. The contents of Volume One are: Manufacturing Competitiveness: Life-cycle Management, Process Reengineering, Concurrent Engineering Definitions, Cooperative Work Teams, System Engineering, Information Modeling, The Whole System, and Product Realization Taxonomy. The contents of Volume Two are: Total Value Management, CE Metrics and Measures, Concurrent Function Deployment, Integrated Product Development, Frameworks and Architectures, Decision Support System, Intelligent Information System, Capturing Life-Cycle Values, Life-Cycle Mechanization, and CE Implementation Guidelines. In Concurrent Engineering (CE) system, each modification of the product represents a taxonomical relationship between specifications (inputs, requirements, and constraints), outputs, and the concept it (the modification) represents. At the beginning of the design process, the specifications are generally in abstract forms. As more and more of the specifications are satisfied, the product begins to take shape—begins to evolve into a physical form. To illustrate how a full CE system will work, and to show the inner-working of its elements, author defines this CE system as a set of two synchronized wheels. The representation is analogous to a set of synchronized wheels of a bicycle. Figure P1 shows this CE wheel set: Concurrent Engineering Wheels The first CE wheel represents the integrated product and process organization (PPO). The second CE wheel accomplishes the integrated product development (IPD). The two wheels together harmonize the interests of the customers and the CE organization (also frequently referred as an enterprise). The contents of first wheel were described in volume I and contents of second wheel are described in volume II of the CE fundamental books. Three concentric rings represent the three essential elements of a wheel. The innermost ring of the wheels constitutes the hubs of the wheels. A hub represents four supporting "M" elements: models, methods, metrics and measures. The chapters from the two volumes that contribute to ÒMÓ elements are contained in the following table. Innermost Ring (Hub) Volume I-PPO Volume II-IPD Models Information Modeling (Chap. 7) Methods Product Realization Taxonomy (Chap. 9) IPD Deployment Methodology (Chap. 10) Metrics & Measures - CE Metrics and Measures (Chap. 2) Life-cycle mechanization and IPD deployment methodology constitute the middle ring of the IPD wheel. The two are discussed in Chapters 9 and 10 of volume II, respectively. Each sector in the outer ring represents a chapter of this book. The sectors for the first wheel are discussed in volume I. Volume I explains how the CE design process (called herein CE process taxonomy) provides a stable, repeatable process through which increased accuracy is achieved. The sectors of the second wheel are discussed in volume II. Volume II explains how a product can be designed, developed and delivered using a process-based taxonomy of volume I. A separate chapter in the books is dedicated to discussing each part of the two CE wheels. First CE Wheel: Integrated Product and Process Organization The innermost ring of the first CE wheel is a hub. The layout of hub is the same for both wheels. The hub represents four supporting “M” elements: models, methods, metrics and measures. Models refer to information modeling. Methods refer to product realization taxonomy. They are discussed in Chapters 7 and 9 of volume I, respectively. CE Metrics and Measures are discussed in Chapter 2 of volume II. The middle ring represents the CE work groups, which drives the customer and the enterprise like how a human drives a bike. The work groups are divided into four quadrants representing the four so called CE teams. These teams are: personnel team, technology team, logical team and the virtual team. They are discussed in Chapter 5 of volume I. The outer ring for each wheel is divided into eight parts. Volume I starts with an introductory chapter on manufacturing competitiveness reviewing the history and emerging trends. The remaining chapters of the book (volume I) describe CE design techniques, explain how concurrent design process can create a competitive advantage, describe CE process taxonomy, and address a number of major issues related to product and process organization. The complexity of the product design, development, and delivery (PD3) process differs depending upon the 1. Types of information and sources 2. Complexity of tasks 3. Degree of their incompleteness or ambiguity Other dimensions encountered during this PD3 process that cannot be easily accommodated using traditional process (such as serial engineering) are: 4. Timing of decision making 5. Order of decision making 6. Communication mechanism The elements of the first CE wheel define a set of systems and processes that have the ability to handle all of the above six dimensions. In the following some salient points of the volume I chapters are briefly highlighted: Manufacturing Competitiveness: Price of the product is dictated by world economy and not by oneÕs own economy or a company's market edge alone. Those companies that can quickly change to world changing market place can position themselves to complete globally. This chapter outlines what is required to become a market leader and compete globally. Successful companies have been the ones who have gained a better focus on eliminating waste, normally sneaked into their products, by understanding what drives product and process costs and, how can value be added. They have focused on product and process delivery-system—how to transform process innovations into technical success and how to leverage the implementation know-how into big commercial success. Many have chosen to emphasize high-quality flexible or agile production in product delivery rather than high-volume (mass) production. Life-cycle Management: Today, most companies are under extreme pressure to develop products within time periods that are rapidly shrinking. As the market changes so do the requirements. This has chilling effect in managing the complexity of such continuously varying product specifications and handling the changes within this shrinking time period. The ongoing success of an organization lies in its ability to: continue to evolve; quickly react to changing requirements; reinvent itself on a regular basis; and keep up with ever changing technology and innovation. Many companies are stepping up the pace of new product introduction, and are constantly learning new ways of engineering products more correctly the first time, and more often thereafter. This chapter outlines life-cycle management techniques, such as change management, and process improvement to remain globally competitive. Process Reengineering: The global marketplace of 1990s has shown no sympathy to tradition. The reality is that if the products manufactured do not meet the market needs, demand declines and profits dwindle. Many companies are finding that true increase in productivity and efficiency begins with such factors as clean and efficient process, good communication infrastructure, teamwork, a constancy of shared vision and purpose. The challenge is simply not to crank up the speed of the machines so that it outputs (per unit of time) are increased or doubled, but to change the basic machinery or process that produces the outputs. To accomplish the latter goals, this chapter describes several techniques to achieve competitive superiority such as benchmarking, CPI, organizational restructuring, renovation, process reengineering, etc. CE Techniques: The changing market conditions and international competitiveness are making the time-to-market a fast shrinking target. Over the same period, diversity and complexity of the products have increased multi-folds. Concurrency is the major force of Concurrent Engineering. Paralleling describes a “time overlap” of one or more work groups, activities, tasks, etc. This chapter describes seven CE principles to aim at: Parallel work-group; Parallel Product Decomposition; Concurrent Resource Scheduling; Concurrent Processing; Minimize Interfaces; Transparent Communication; and Quick Processing; This chapter also describes the seven forces that influence the domain of CE (called here as enabling agents or 7Ts) namely: talents, tasks, teams, techniques, technology, time and tools. Cooperative Work Groups: It has been the challenge for the design and manufacturing engineers to work together as teams to improve quality while reducing costs, weight, and lead-time. A single person, or a team of persons, is not enough to provide all the links between: human knowledge and skills; logical organization; technology; and a set of 7Cs coordination features. A number of supporting teams is required, some either virtual or at least virtually collocated. For the waltz of CE synthesis to succeed, CE teams need clear choreography. This chapter describes for the first time the four collaborative teams that are essential for managing a CE organization. Examples of collaborative features include capabilities of electronic meeting such as message-posting and interactions through voice, text, graphics and pictures. System Engineering: Most groups diligently work to optimize their subsystems, but due to lack of incentives they tend to work independently of each other. This results in a product, which is often suboptimized at each decomposed level. System engineering requires that product realization problem is viewed as a “system-centered” problem as opposed to “component- centered.” Systems Engineering does not disagree with the idea of compartments or divisions of works, but it emphasizes that the interface requirements between the divisions (inter-divisional) and across the levels should be adequately covered. That way, when the time comes to modernize other components of the system, an enterprise has the assurance that previously introduced technologies and processes will work logically in a fully integrated fashion, thereby increasing the net efficiency and profitability. Information Modeling: A successful integrated product development (IPD) requires a sufficient understanding of the product and process behaviors. One way to achieve this understanding is to use a series of reliable information models for planning, designing, optimizing and controlling each unit of an IPD process. The demands go beyond the 3-D CAD geometric modeling. The demands require schemes that can model all phases of a product's life-cycle from cradle to grave. The different aspects of product design (planning, feasibility, design, process-planning), process design (process-execution, production, manufacturing, product support), the human behavior in teamwork, and the organization or environment in which it will operate, all have to be taken into account. Five major classes of modeling schemata are discussed in this chapter. They are: 1. Product representation schemes and tools for capturing and describing the product development process and design of various interfaces, such as design-manufacturing interface. 2. Schemes for modeling physical processes, including simulation, as well as models useful for product assessments, such as DFA/DFX, manufacturability evaluation of in-progress designs. 3. Schemes for capturing (product, process, and organization structure) requirements or characteristics for setting strategic and business goals. 4. Schemes to model enterprise activities (data and work flow) in order to determine what types of functions best fit the desired profitability, responsiveness, quality and productivity goals. 5. Schemes to model team behavior, because most effective manufacturing environments involve a carefully orchestrated interplay between teams and machines. The Whole System: Often while designing an artifact, work groups forget that the product is a system. It consists of a number of subassemblies, each fulfilling a different but distinct function. A product is far more than the collection of components. Without a structure or some “constancy-of-purpose” there is no system. The central difference between a CE transformation system and any other manufacturing system, such as serial engineering, is the manner in which the tasks' distribution is stated and requirements are accomplished. In a CE transformation system, the purpose of every process step of a manufacturing system is not just to achieve a transformation but to accomplish this in an optimal and concurrent way. This chapter proposes a system-based taxonomy, which is founded on parallel scheduling of tasks. This chapter also proposes a set of breakdown structures for product, process and work to realize a drastic reduction in time and cost in product and process realizations. Product Realization Taxonomy: This constitutes a “state of series of evolution or transformation” leading to a complete design maturity. Product Realization Taxonomy involves items related to design incompleteness, product development practices, readiness feasibility, and assessing goodness. In addition, CE requires these taxonomies to have a unified “product realization base.” The enterprise integration metrics of the CE model should be well characterized and the modeling methodologies and/or associated ontology for developing them should be adequate for describing and integrating enterprise functions. The methodologies should have built-in product and service accelerators. Taxonomy comprises of the product, process descriptions, classification techniques, information concepts, representation, and transformation tasks (inputs, requirements, constraints and outputs). Specifications, describing the transformation model for product realization. They are included as part of the taxonomy descriptions. Second CE Wheel: Integrated Product Development The second CE wheel defines the integrated product development (IPD). This is discussed in this book (Volume II). IPD in this context does not imply a step-by-step serial process. Indeed, the beauty of this IPD wheel is that it offers a framework for a concurrent PD3 process. A framework within which, a CE team has flexibility to move about, fitting together bits of the jigsaw as they come together. A CE team has an opportunity to apply a variety of techniques contained in this volume (such as: Concurrent Function Deployment, Total Value Management, Metrics and Measures, etc.) And through their use, teams could avail the opportunity to achieve steady overall progress towards a finished product. Concurrent Function Deployment: The role of the organization and engineers is changing today, as is the method of doing business. Competition has driven organization to consider concepts such as time compression (fast-to-market), Concurrent Engineering, Design for X-ability, and Tools and Technology (such as Taguchi, Value Engineering) while designing and developing an artifact. Quality Function Deployment (QFD) addresses major aspects of “quality” with reference to the functions it performs but this is one of the many functions that need to be deployed. With conventional deployment, it is difficult, however, to address all aspects of Total Values Management (TVM) such as X-ability, Cost, Tools and Technology, Responsiveness and Organization issues. It is not enough to deploy just the “Quality” into the product and expect the outcome to be the World Class. TVM efforts are vital in maintaining a competitive edge in todayÕs world marketplace. CE Merits and Measures: Metrics are the basis of monitoring and measuring process improvement methodology and managing their effectiveness. Metric information assists in monitoring team progress, measuring quality of products produced, managing the effectiveness of the improved process, and providing related feedback. Individual assurances of DFX specifications (one at a time) do not capture the most important aspect of Concurrent Engineering—the system perspectives, or the trade-off across the different DFX principles. While satisfying these DFX principles in this isolated manner, only those which are not in conflict are usually met. Concurrent engineering views the design and evaluates the artifact as a system, which has a wider impact than just suboptimizing the subsystems within each domain. Total Value Management: The most acclaimed slogan for introducing a quality program in early corporate days simply was to provide the most value for the lowest cost. This changed as the competitiveness became more fierce. For example, during the introduction of traditional TQM program in 1990 “getting a quality product to market for a fair price” was the name of the game. The new paradigm for CE now is total value management (TVM). TVM mission is “ to provide the total value for the lowest cost in the least amount of time, which satisfies the customers the most and lets the company make a fair profit.” Here use of value is not just limited to quality. To provide long lasting added value, companies must change their philosophy towards things like x-ability, responsiveness, functionality, tools and technology, cost, architecture, etc. Product Development Methodology: A systematic methodology is essential in order to be able to integrate: 1. Teamwork 2. Information modeling 3. Product realization taxonomy 4. Measures of merits (called CE metrics), and quantitatively assess the effectiveness of the transformation. This may involve identification of performance metrics for measuring the product and process behaviors. Integrated product development methodology is geared to take advantage of the product realization taxonomy. Frameworks & Architectures: In order to adequately support the CE and the 4Ms (namely: modeling, methods, metrics and measurements), it is necessary to have a flexible architecture. An architecture that is openly accessible across different CE teams, information systems, platforms, and networks. Architecture consists of information contents, integrated data structures, knowledge bases, behavior and rules. An architecture not only provides an information base for easy storage, retrieval, and tracking version control, but can also be accessed by different users simultaneously, under ramp-up scheduling of parallel tasks, and in synchronization. We also need a product management system containing work HOW management capabilities integrated with the database. This is essential because in CE there exists a large degree of flexibility for parallelism that must be carefully managed in conjunction with other routine file and data management tasks. Capturing Life-cycle Intent: Most CAD/CAM tools are not really capture tools. In static representation of CAD geometry, configuration changes cannot be handled easily, particularly when parts and dimensions are linked. This has resulted in loss of configuration control, proliferation of changes to fix the errors caused by other changes, and sometimes ambiguous designs. By capturing “design intent” as opposed to “static geometry,” configuration changes could be made and controlled more effectively using the power of language constructs than through traditional CAD attributes (such as lines and surfaces). The power of a “capture” tool comes from the methods used in capturing the “design intent” initially so that the required changes can be made easily and quickly if needed. “ Life-cycle capture” refers to the definition of the physical object and its environment in some generic form. “Life-cycle intent” means representing the life-cycle capture in a form, which can be modified and iterated until all the life-cycle specifications for the product are fully satisfied. Decision Support System: In CE, cooperation is required between CE teams, management, suppliers, and customers. A knowledge based support system will help the participating teams in decision making and to reflect balanced views. Tradeoffs between conflicting requirements can be made on the basis of information obtained from sensitivity, multi-criterion objectives, simulation, or feedback. The taxonomy can be made a part of decision support system (DSS) in supporting decisions about product decomposition. By keeping track of what specifications are satisfied, teams can ensure common visibility in the state of product realization, including dispatching and monitoring of tasks, structure, corporate design histories, etc. Intelligent Information System (IIS): Another major goal of CE is to handle information intelligently in multi-mediaÑaudio, video, text, graphics. Since IIS equals CIM plus CE, with IIS, many relevant CE demands can be addressed and quickly processed. Examples include: 1. Over local or wide area networks, such as SQL, which connects remote, multiple databases and multimedia repositories. 2. Any needed information, such as recorded product designersÕ design notes, figures, decisions, etc. They can be made available on demand at the right place at the right time. 3. Any team can retrieve information in the right format and distribute it promptly to other members of the CE teams. Life-cycle Mechanization: Life-cycle mechanization equals CIM + Automation + CE. Life-cycle mechanization is arranged under a familiar acronym: CAE, for CIM, Automation, and CE. Since CAE also equals IIS plus automation, the major benefits of mechanization in CAE come from removing or breaking barriers. The three common barriers are: a. Integration (this is a term taken from CIM) b. Automation c. Cooperation (which is a term taken from CE). CE provides the decision support element, and CIM provides the framework & architecture plus the information management elements. Life-cycle Mechanization refers to the automation of life-cycle functions or creation of computerized modules that are built from one another and share the information from one another. This includes integration and seamless transfer of data between commercial computer-based engineering tools and product-specific in-house applications. This tends to reduce the dependency of many CE teams on communication links and product realization strategies, such as decomposition and concatenation. IPD Deployment Methodology: The purpose of this chapter is to offer an implementation guideline for product redesign and development through its life-cycle functions. IPD implementation is a multi-track methodology. The tracks do overlap, but still provide a structured approach to organizing product ideas and measures for concurrently performing the associated tasks. Concurrency is built in a number of ways (similar to what was discussed in volume I), depending upon the complexity of the process or the system involved. This chapter proposes a set of “Ten Commandments,” that serves to guide the product and process iterative aspects of IPD rather than just the work group collaborative aspects required during the development cycle. The CE teamwork in the center of the wheel ensures that both local or zonal iterative refinements and collaborative refinements take place during each concurrent track.
Article
Full-text available
This article describes a concurrent engineering wheel-set and explains the basic principles on which this very subject is founded. The concurrent engineering approach to product design development, and delivery (PDI) has two major themes. The first theme is establishing a concurrent product and process organization (PPO). This is referred herein as "process taxonomy"; The second theme is applying this process taxonomy (or methodology) to design and develop a total product system. This is referred to as integrated product development (IPD). Each theme is divided into several essential parts forming major arms of the so-called concur- rent engineering wheel-set [1]. The first theme called product and process organization (PPO) has nine arms. The second theme named integrated product development (IPD) has ten arms. The materials in these two CE themes are brought together to balance the interests of both the customers and the companies.
Article
Editions for 1898-1948 have title Wester`s collegiate dictionary Incluye índice
Winning with Quality-Applying Quality Principles in Product Development
  • J W Wesner
  • J M Hiatt
  • D C Trimble
Wesner, J. W., J. M. Hiatt and D. C. Trimble. 1994. Winning with Quality-Applying Quality Principles in Product Development, Reading, MA: Addison-Wesley Publishing Company, September.
A New Perspective on Manufacturing System Design and Analysis of Integrated Manufacturing Systems
  • R Suri
Suri, R. 1988. "A New Perspective on Manufacturing System," Design and Analysis of Integrated Manufacturing Systems, W. D. Compton, ed., NAE, pp. 118.