With up to 14,000 high-hazard potential dams in the US, a dam break is a serious safety hazard for downstream locations and an operational concern for dam managers. Dam break simulation using computer-based flood models require topography, generally represented using digital elevation models (DEM) as a significant input which may affect the model accuracy. Until recently, most flood model simulations were conducted deterministically without incorporating uncertainties from model parameters. A clear understanding on the spatial resolution in a probabilistic context by incorporating uncertainties in model parameters such as dam break hydrographs, is needed for comprehensive dam break modeling analysis. The objective of this study is to address the impact of spatial resolution on the relative accuracy of downstream flood hazard after a dam break event. It is hypothesized that higher spatial resolution will significantly increase the model predictive ability and the accuracy of flood hazard maps. The current study employs a two-dimensional (2D) flood model, Flood2D-GPU in a probabilistic framework to investigate these spatial resolution impacts by applying dam break simulations on Burnett Dam near Asheville, NC. The dam break hydrograph is chosen as the uncertain parameter as it adds greater source of uncertainties in most situations. Using GoldSim®, Monte Carlo modeling software, 99 stochastic dam break hydrographs representing various possible scenarios are generated. These hydrographs are input into Flood2D-GPU to produce probability weighted flood hazard maps. The probabilistic simulations are carried out for 9m, 31m, 46m, 62m and 93m spatial resolutions. The results indicate that increasing the resolution from 93m to 9m causes a slight 0.8% increase in overall flood hazard extent. Although, resolution improvement from 93m to 31m leads to increase in high-danger zone by 8.4% agreeing with the hypothesis. Analysis of relative hazard underestimation reveals that 31m grid resolution minimizes this parameter and thus is recommended for the study area. However, the results cannot be replicated to other areas and further analyses are required to confirm the findings of current study. The outcomes of this study will assist dam break modelers to enhance their Emergency Action Plans by providing recommendations for suitable spatial resolution and to avoid increased modeling time.
Content may be subject to copyright.
1
IMPACT OF SPATIAL RESOLUTION ON DOWNSTREAM FLOOD HAZARD
DUE TO DAM BREAK EVENTS USING PROBABILISTIC FLOOD MODELING
Ebrahim Ahmadisharaf1, Md Nowfel Mahmud Bhuyian2, Alfred Kalyanapu3
Abstract
With up to 14,000 high-hazard potential dams in the US, a dam break is a serious safety
hazard for downstream locations and an operational concern for dam managers. Dam break
simulation using computer-based flood models require topography, generally represented
using digital elevation models (DEM) as a significant input which may affect the model
accuracy. Until recently, most flood model simulations were conducted deterministically without
incorporating uncertainties from model parameters. A clear understanding on the spatial
resolution in a probabilistic context by incorporating uncertainties in model parameters such as
dam break hydrographs, is needed for comprehensive dam break modeling analysis. The
objective of this study is to address the impact of spatial resolution on the relative accuracy
of downstream flood hazard after a dam break event. It is hypothesized that higher spatial
resolution will significantly increase the model predictive ability and the accuracy of flood
hazard maps. The current study employs a two-dimensional (2D) flood model, Flood2D-GPU
in a probabilistic framework to investigate these spatial resolution impacts by applying dam
break simulations on Burnett Dam near Asheville, NC. The dam break hydrograph is chosen
as the uncertain parameter as it adds greater source of uncertainties in most situations. Using
GoldSim®, Monte Carlo modeling software, 99 stochastic dam break hydrographs representing
various possible scenarios are generated. These hydrographs are input into Flood2D-GPU to
produce probability weighted flood hazard maps. The probabilistic simulations are carried out
for 9m, 31m, 46m, 62m and 93m spatial resolutions. The results indicate that increasing the
resolution from 93m to 9m causes a slight 0.8% increase in overall flood hazard extent.
Although, resolution improvement from 93m to 31m leads to increase in high-danger zone by
8.4% agreeing with the hypothesis. Analysis of relative hazard underestimation reveals that
31m grid resolution minimizes this parameter and thus is recommended for the study area.
However, the results cannot be replicated to other areas and further analyses are required to
confirm the findings of current study. The outcomes of this study will assist dam break
modelers to enhance their Emergency Action Plans by providing recommendations for suitable
spatial resolution and to avoid increased modeling time.
Key Words: Spatial resolution, Flood2D-GPU, Monte Carlo Simulation, GoldSim®,
Probabilistic flood modeling, Flood hazard.
Introduction
Dam break event is a serious concern for floodplain managers all over the world. According to
-
1 PhD Student, Civil and Environmental Engineering Department, Tennessee Technological University,
eahmadish42@students.tntech.edu
2 MS Student, Civil and Environmental Engineering Department, Tennessee Technological University,
nowfel_mahmud@yahoo.com
3 Assistant Professor, Civil and Environmental Engineering Department, Tennessee Technological University,
akalyanapu@tntech.edu
2
hazard-potential dams in the US (USACE, 2013). The failure of these dams may result in a
high amount of social, environmental and economic damages. According to the Association of
State Dam Safety Officials (ASDSO), repair costs are estimated to be $50
billion and $16 billion investment is needed to repair high hazard potential dams (American
Society of Civil Engineers (ASCE), 2009). With the ASCE rating the current conditions in the
dam hazards
such as dam breaks.
Flood models are important tools in simulating a dam failure event. Available flood
models can be generally categorized into one-dimensional (1D), two-dimensional (2D) and
coupled 1D-2D models. Dam break modeling using these computer-based flood models
require terrain data which are generally represented using digital elevation models (DEM). 1D
models cannot provide sufficiently accurate inundation mapping results due to inaccuracies in
cross-section discretization and thus disabilities in flow representation in the floodplain such as
lateral flow diffusion (Kalyanapu et al., 2011; Qi and Altinakar, 2012). 2D models have
addressed this drawback by a higher order of topographic representation, desirable flood
pathways in the simulations as well as existing and planned structures (Kalyanapu et al.,
2011). Multiple sources of uncertainty are involved in dam break flood hazard mapping
problem. Previous studies generally indicate that the spatial resolution affects the model
accuracy. There have been some efforts on exploring the scaling impacts on flood modeling
results. Hardy et al. (1999) showed that spatial resolution causes a wide variation in model
performance and inundation extent predicted by 2D TELEMAC-2D model (Hervoeut and Van
Haren, 1996; Bates et al., 1995). Horritt and Bates (2001) investigated the effects of scaling
properties on a 1D LISFLOOD-FP model (Bates and De Roo, 2000) performance in inundation
mapping. Resolutions of 1000m to 10m were analyzed and the results showed that the
maximum model performance is at 100m spatial resolution and 500m resolution proved to be
sufficient for water level prediction. Cook and Merwade (2009) indicated that higher spatial
resolution and vertical accuracy of terrain model reduces the predicted inundation area using
1D HEC-RAS model (USACE, 2006) and 2D FESWMS model (Federal Highway
Administration (FHWA), 2002). Nevertheless, most of the flood simulations were conducted
based on single parameter set for a single flood simulation or limited number of simulations
without incorporating uncertainties from model inputs. Hence, a clear understanding on the
spatial resolution in a probabilistic context by incorporating the model parameter uncertainties
such as dam break hydrographs is needed for comprehensive dam break analysis. This is
because, as spatial resolution changes, it will affect the inundation extent and bulk flow
characteristics which accordingly influence the floods hazard extent. In this study the flood
hazard is defined as the potential adverse impact on human life and any downstream
developments if a dam fails (ACER, 1988). For any location, flood hazard is characterized as
low hazard, judgment and high hazard zones, depending the velocities and flood depths
simulated at that location.
The objective of this study is to address the impact of spatial resolution on the relative
accuracy of downstream flood hazard after a dam break event. It is hypothesized that higher
spatial resolution will significantly increase the model predictive ability and the accuracy of
flood hazard maps. Supported with a probabilistic dam break hydrograph simulator, numerous
dam failure scenarios are generated to incorporate various uncertainties such as time to
failure, breach width, breach side slope and final elevation of breach. The hydrographs are
employed as inputs to the 2D flood model to simulate dam break events. The general
procedure of the study by Kalyanapu et al. (2012) is followed here for probabilistic flood hazard
3
estimation and extended to dam break simulation. Downstream of the dam is classified into
different hazard zones for each spatial resolution based on the flood modeling results. This
investigation is performed on the Burnett Dam located in Swannanoa River watershed near
Asheville, North Carolina. The presented framework is flexible and can also be performed for
similar studies at different locations.
Methodology
A probabilistic dam break modeling framework is used in this study which contains the
following three modules: 1) Monte Carlo Simulation (MCS); 2) Geospatial flood modeling; and
3) Flood hazard analysis. The framework is used to model dam break for five different DEM
spatial resolutions and relative accuracy of various categories of flood hazard extent at these
spatial resolutions is analyzed. Figure 1 visualizes the schematic of framework used in this
study.
Figure 1. Probabilistic flood hazard framework schematic
In the MCS module, a dynamic simulation software GoldSim® is used to produce
stochastic dam break hydrographs based on dam break features in which each parameter is
characterized by a stochastic variable. Normal Probability Density Function (PDF) is applied
for time to total failure, breach width and final elevation of breach, and Discrete PDF is used for
breach side slope. The PDFs are visualized in Figure 2 (a) to (d). The methodology presented
by Fread (1988) is adopted herein to generate flow hydrographs which are presented in the
equations 1 to 3:
  
  
(1)
   
 
(2)
4
 
(3)
In which Qb is breach outflow, Cv is approach velocity correction factor, Ks is weir submergence
correction factor, bt is instantaneous bottom width of the breach, hw is water surface elevation,
hbt is instantaneous elevation of the breach bottom, bf is final bottom width of the breach, hd is
elevation of the top of the dam, t is time from beginning of the breach, is total failure time and
is a constant between 1 and 4. It is to be noted that the units should be in US Customary
System. The resulting hydrographs are used as randomly varying inputs to a 2D flood model
since they generally add most uncertainties into dam break modeling.
(a)
(b)
(c)
(d)
Figure 2. Probability distribution curves of: a) time to total failure; b) final bottom width of the
breach; c) final elevation of breach bottom; and d) side slope of breach width
In the geospatial flood modeling module, a 2D unsteady numerical flood model,
Flood2D-GPU (Kalyanapu et al., 2011) is employed. The model was coded in NVIDIA's CUDA
programming environment and solves the non-linear shallow water equations using a first-
order accurate upwind difference scheme to generate flood depths and velocities. Primary
datasets needed are topography, surface roughness and flow hydrograph.
A flood model realization is generated for each randomly sampled hydrograph. The
flood inundation boundary is delineated by calculating the water depth at each grid cell and
identifying inundated cells (i.e. non-zero floodwater depth) using a GIS-based post-processing
framework. Inundation probability is determined as the number of times a grid cell is flooded
divided by the total number of flood simulations (Kalyanapu et al., 2012). The outputs of this
module are GIS raster flood probability map as well as flood depth and velocity for each
stochastic hydrograph.
In the flood hazard analysis module, probabilistic spatial flood hazard maps are
generated. The maximum flood depth and velocity are estimated from flood modeling module
and are multiplied with the flood probability to create probability weighted flood hazard maps
(Kalyanapu et al., 2012). Depth-velocity curves (Figure 3), derived from Assistant
5
Commissioner Engineering and Research (ACER) (1988) are used to determine the hazard
intensity. The flood hazard level is classified into three different groups of low-danger,
judgment and high-danger zones. In the low-danger zone, the possible lives-in-jeopardy is
assumed to be zero. In the high-danger zone, it is assumed that all lives are in threat. The
judgment zone represents a zone where the lives-in-jeopardy is considered to be uncertain
and may vary between zero to total lives in threat.
Figure 3. Floodwater depth velocity hazard classification. Source: ACER (1988)
Case Study
The impact of spatial resolution on dam break is investigated on Burnett Dam in Swannanoa
River Watershed located in Buncombe County, NC. Burnett dam is a part of Asheville
municipal water supply, has reservoir area of 7 mi2, and a drainage area of 22 mi2. The total
capacity at crest of spillway is 11,600 ft3/s-day and the sea-level altitude is 2601 ft. It is
selected in this study because of its proximity to urban areas including cities of Swannanoa,
Black Mountain, and Asheville along the Swannanoa River.
There was no prior information on PMF studies on Burnett Dam to compare the
performance of Flood2D-GPU to previous studies. To address this issue, Taum Sauk Dam
break event of 2005 was used to calibrate the Flood2D-GPU. Taum Sauk dam is a
hydroelectric plant located in Reynolds County, MO. It failed on December 14th 2005 due to
prolonged minor leaks. This failure event was simulated by Flood2D-GPU using 9m DEM

accuracy and potential applicability to other case studies. Thus it is applied for the Burnett
Dam break probabilistic simulations in this study.
DEM of 9.43m spatial resolution for the area was generated from the National Map
website (http://nationalmap.gov/). Furthermore, 31.03m, 46.56m, 62.07m and 93.11m DEMs
were synthesized based on 9.43m spatial resolutions using nearest-neighbor resampling
method. Hence, total of five DEMs were produced for the analysis. These resolutions will be
henceforth referred to as 9m, 31m, 46m, 62m and 93m in the remaining of the paper.
Topographic slopes of each DEM were generated using GIS Slope Function. Range of slope
variation is represented in Figure 5. The minimum slope is zero in each resolution and the
maximum changes from 88.1% at 93m resolution to 342.5% at 9m spacing with an increasing
6
trend. 1 is used to represent the vegetation and short
grass in the study region (McCuen, 1998).
Figure 4. Location of Burnett Dam in Swannanoa River
Figure 5. Maximum ground slope variation in different spatial resolutions
Results and Discussion
As discussed in the methodology section, using 99 randomly produced hydrographs by
GoldSim model  as inputs to Flood2D-
GPU, probabilistic dam break simulations were performed. Raw outputs from the model were
processed within GIS environment for 9m, 31m, 46m, 62m and 93m spatial resolutions. Figure
0
50
100
150
200
250
300
350
400
62
46
31
9
Slope (%)
Spatial Resolution (m)
7
6 shows change in the run time with respect to number of computational cells. Higher number
of computational cells obviously represents finer spatial resolution. Total run time remarkably
increases by resolution refinement as expected (Kalyanapu et al., 2011). The increase in the
run time can be well represented by a linear equation where correlation coefficient (R2) is
99.96%. Regression analysis reveals that average of 0.4 second computational time is
required for each cell. In addition, computational times show a significant improvement
compared to a regular CPU-based 2D flood model. Same simulation would require
approximately up to 979, 147, 70, 53 and 43 days for 9m, 31m, 46m, 62m and 93m spatial
resolutions, respectively when implemented in the CPU-based version of the flood model
(rough CPU estimates based on Kalyanapu et al., 2011).
Figure 6. Maximum ground slope variation in different spatial resolutions
Preliminary outputs of Flood2D-GPU including inundation depth and velocity are
discussed here. Maximum inundation depth ranges between of 18.4 m to 31.5 m by varying
grid resolution. Flood depth of higher than 21.5 m is only observed at 9m resolution,
immediately downstream of the Burnett Dam where steep slopes are existed. This hilly area
has average slope of 9.9% and the higher the slope, the greater depth will occur. The lowest
maximum flood depth is 18.4 m and occurs at 31m resolution. Higher inundation depths than
this value often occur at steep slopes at all of the other resolutions. An interesting point that
can be concluded is that with steeper slopes, the difference between estimated flood
parameters (depth and velocity) by different DEM resolutions intensifies. Therefore,
significance of selecting a suitable DEM is highlighted in the regions with steep slopes.
Figure 7 presents the inundation area within the simulation domain. The predicted
inundation area decreases from 18.4% to 7.8% with grid resolution refinement from 93m to
9m. This is in agreement with the results of Cook and Merwade (2009) for the deterministic
simulations by both 1D HEC-RAS and 2D FESWMS models. The main reason of reduction in
inundation area is due to better terrain representation by higher resolution and loss of
topography in lower grid spacing. To give a better insight about relative change in the
inundation maps at different spatial resolutions, F statistic (Bates and De Roo, 2000) is used
as measure of fit. The parameter F can be computed by Equation 4:
  
 
 
   
(4)
0
50
100
150
200
250
300
350
0 1000000 2000000 3000000
Computational Time (hr)
Number of Computational Cells
8
Where Ai and Aj are inundated area at spatial resolutions of i and j, Ai Aj is the inundation
area predicted by both resolutions i and j, and Fi/j is the relative accuracy of resolution i in
respect with resolution j. The parameter was generally employed to determine the inundation
prediction discrepancy from observed data. However, it can be applied to determine the
discrepancy between the base map and other inundation maps attained from different
simulation scenarios in the absence of observed data (Cook and Merwade, 2009). Here it is
used to compare the inundation areas estimated by two different DEM resolutions. Finer
resolution is considered as the base map and the discrepancy of the coarser resolution from
this is quantified. Table 1 presents this parameter along with the percentage of inundation area
for different grid resolutions. Based on the table, the F statistic varies in the range of 65.5%
84.6% from 93m to 31m DEMs. The parameter is 100% for 9m apparently since it is compared
with itself.
Figure 7. Spatial variation of maximum inundation area for different spatial resolutions
Table 1. Comparison relative accuracy of inundation area predicted at different spatial
resolutions
Spatial Resolution (m) Inundation Area (%) F Statistic (%)
93 12.6 65.5
62 8.6 77.1
46 6.9 78.8
31 5.8 84.6
9 5.3 100.0
9
The resulting probability weighted flood hazard maps are presented in Figure 8.
Histogram plot of each flood hazard class at different spatial resolutions are shown in Figure 9.
Increasing the resolution from 93m to 9m leads to a minor 0.4% increase in overall flood
hazard and also a slight 0.7% increase in class extent. With improving the
resolution from 93m to 31m, high danger zone by overall hazard has been
increased by 6.8% agreeing with the hypothesis. It can be concluded that as the spatial
resolution increases, more locations are classified to a higher danger level. This could be
because, with improved spatial resolution, the grid cells that were classified as judgment
and/or low hazard are converted to high hazard zone. However, after refining the resolution
from 31m to 9m, 0.7% reduction occurs in percentage of  danger class by overall hazard.
To give a better understanding of hazard variation with DEM resolution, trend of each
danger class and overall hazard with spatial resolution was also analyzed. Figure 10 presents
the variation of different danger classes and overall hazard with grid scale. An increasing trend
high  and overall hazard can be seen by increasing the resolution which is in
accordance with the expectations.  zones show a
decreasing trend by increase in resolution from 93m and reaches a minimum and then

judgment classes. It is to be noted that these results can be because of definition of danger
classes by the reference curves applied here and other hazard classifications may change the
results. This indicates the significant role of hazard definition in the final results.
(a)
(b)
10
(c)
(d)
(e)
Figure 8. Flood hazard maps for spatial resolutions of: a) 9m; b) 31m; c) 46m; d) 62m; and e)
93m
Figure 9. Area of different hazard classes for 9m, 31m, 46m, 62m and 93m grid resolutions
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Low
Judgement
High
93m
62m
46m
31m
9m
11
Figure 10. Trend of different hazard classes with spatial resolutions
Another analysis was to investigate the hazard intensity change with respect to spatial
resolution. Spatial distribution of relative bias (underestimation/overestimation) was obtained
between each two different grid resolutions. Relative bias is considered as the change from a
lower to higher danger class. For doing so, hazard rasters were resampled to the higher
resolution cell size using nearest-neighbor approach. Relative underpredicted area for different
resolutions is presented in Figure 11. From this figure, relative underestimation does not show
any specific trend is not minimum anywhere. Therefore, an optimal grid resolution cannot be
suggested for the study area.
Figure 11. Relative underestimated area for different spatial resolutions
To investigate the effects of topography on the underestimated locations, ground slope
was generated for each resolution based on the DEMs. Relative underestimation layers were
overlaid with the topographic slope to explore the characteristics of the underpredicted cells.
Figure 12 shows the percentage of relative underestimated area for different slope ranges. The
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
0 20 40 60 80 100
Percent of Total Area
Cell Size (m)
Overall hazard
Low
Judgement
High
0
500000
1000000
1500000
2000000
2500000
3000000
3500000
93m to 62m
62m to 46m
46m to 31m
31m to 9m
Underestimated Area (m2)
Spatial Resolution Change
12
results indicate that 81.9% to 91.9% of the underestimated cells are located in the slopes of
greater than 2.5% in which 56.7% to 78.5% of them are in the slopes of greater than 5%
varying with spatial resolution. This means that more than a half of underestimations occur in
the areas with slopes greater than 5%. This highlights key role of topographic resolution in the
hilly areas. Moreover, it implies that the selection of an appropriate spatial resolution depends
on the topographic characteristics of the case study. In other words, a general advice about
the sufficient spatial resolution cannot be given based on the results of this study. Further
studies should be performed in other areas with different topographic characteristics to verify
the results of this study and to determine an adequate topographic scale for dam break
simulations. This will be useful to reach the highest model performance and also to avoid the
redundant computational time simultaneously.
Figure 12. Percent of relative underestimated cells for different slope ranges
Finally, it is to be noted that the hazard was estimated based on flood depth and
velocity here. Other parameters such as warning time which have been suggested in the
previous studies (e.g. Graham, 1999) are not taken into account which incorporates another
uncertainty to the results. This can affect the number of cells in each hazard class and
accordingly the conclusions about the trend of hazard variation with spatial resolution. Thus, it
is suggested that the same procedure being repeated in the future by using other hazard
estimation methods to verify findings of this study.
Summary and Conclusion
A probabilistic dam break simulation was carried out in order to investigate the spatial
resolution effects on downstream flood hazard. Five different spatial resolutions including 93m,
62m, 46m, 31m and 9m were used to generate spatial flood hazard maps. A 2D flood model,
Flood2D-GPU is employed in a probabilistic framework to investigate these spatial resolution
impacts by applying dam break simulations on Burnett Dam located in Buncombe County, NC.
The dam break hydrograph is chosen as the uncertain parameter as it adds greater source of
uncertainties in most situations. 99 stochastic dam break hydrographs representing various
possible dam failure scenarios are generated by GoldSim® MCS software. These hydrographs
are input into Flood2D-GPU to produce probabilistic flood hazard maps. The probabilistic
0
10
20
30
40
50
60
70
80
90
100
>2.5%
>5%
>7.5%
Percent of Relative
Underestimated Cells
Spatial Resolution Change
31m to 9m
46m to 31m
62m to 46m
93m to 62m
13
simulations were carried out for 9m, 31m, 46m, 62m and 93m spatial resolutions. The most
important findings for this study can be summarized as:
The inundation area extent predicted through Flood2d-GPU decreases with finer
spatial resolution. This is mainly due to difference in terrain description by different
resolutions of DEM.
Increasing the resolution from 93m to 9m will lead to a slight change in overall flood
hazard and high d extent.
High danger area generally increased with improving the DEM spatial resolution. It
can be concluded that as the spatial resolution increases, more locations are
classified to a higher danger level. This could be because, with improved spatial
resolution, the grid cells that were classified as judgment and/or low hazard are
converted to high hazard zone.
More than a half of relative underestimated cells are located in the areas with slopes
greater than 5%. This emphasizes the significance of topographic resolution in the
hilly environments. Therefore, a coarse terrain model is not suggested for the areas
mostly covered by steep slopes.
To provide general recommendations to dam safety officers and floodplain managers,
studies similar to the current studies need to be performed. This will be useful to reach the
highest model performance and also to avoid the redundant computational time
simultaneously.
Acknowledgment
The authors are grateful to the Center of Management Utilization and Protection of Water
Resources, Department of Civil and Environmental Engineering and the College of
Engineering at Tennessee Technological University for their support.
References
1. American Society of Civil Engineers (ASCE). 2009. Infrastructure fact sheet. available at:
http://www.infrastructurereportcard.org/2009/sites/default/files/RC2009_dams.pdf
2. Assistant CommissionerEngineering and Research (ACER). 1988. Downstream hazard
classification guidelines. US Department of the Interior, Bureau of Reclamation. Technical
Memorandum No. 11. Denver, CO.
3. Bates P. D., Anderson M. G. Hervouet J., -M. 1995. An initial comparison of two 2-
dimensional finite element codes for river flood simulation. Water Maritime and Energy,
112, 238248.
4. Bates P. D., De Roo A. P. J. 2000. A simple raster based model for flood inundation
simulation. Journal of Hydrology, 236, 54-77.
5. Cook A., Merwade V. 2009. Effect of topographic data, geometric configuration and
modeling approach on flood inundation mapping. Journal of Hydrology, 377, 131-142.
6. Federal Highway Administration 
7. Fread D. L. 1988. BREACH, an erosion model for earthen dam failures. Hydrologic
Research Laboratory, National Weather Service, NOAA.
8. Graham W. J. 1999. A procedure for estimating loss of life caused by dam failure. Report
No. DSO-99-06, Dam Safety Office, US Bureau of Reclamation, Denver, CO.
9. Hardy R J., Bates P. D., Anderson M. G. 1999. The importance of spatial resolution in
hydraulic models for floodplain environments. Journal of Hydrology, 216, 124-136.
14
10. Hervoeut J. -M., Van Haren L. 1996. Recent advances in numerical methods for fluid flow.
In: Anderson M.G., Walling D.E., Bates P.D. (Eds.). Floodplain Processes, John Wiley and
Sons, Chichester.
11. Horritt M. S., Bates P. D. 1999. Effects of spatial resolution on a raster based model of
flood flow. Journal of Hydrology, 253, 239-249.
12. Kalyanapu A. J., Shankar S., Stephens A., Judi D. R., Burian S. 2012. Monte Carlo-based
flood modelling framework for estimating probability weighted flood risk. Journal of Flood
Risk Management, 5, 37-48.
13. Kalyanapu, A. J., Shankar, S., Stephens, A., Judi, D. R., Burian, S. 2011. Assessment of
GPU computational enhancement to a 2D flood model. Journal of Environmental Modeling
and Software, 26, 1009-1016.
14. McCuen R. H. 1998. Hydrologic analysis and design. Prentice-Hall, Upper Saddle River,
NJ.
15. North Carolina Floodplian Management Program (NCFMP). 2011. NCFMP Program
Review, Appendix B. Available at: http://www.ncfloodmaps.com/program_review.htm.
16. Qi H., Altinakar M. S. 2012. GIS-based decision support system for dam break flood
management under uncertainty with two-dimensional numerical simulations. Journal of
Water Resources Planning and Management, 138, 334-341.
17. US Army Corps of Engineers (USACE). 2006. HEC-
Manual. Version 4.0 Beta, Hydrologic Engineering Center, Davis, CA.
18. US Army Corps of Engineers (USACE) 2013. National Inventory of Dams, available at:
http://geo.usace.army.mil/pgis/f?p=397:5:0::NO
... However, the evaluation of uncertainties from different sources is crucial in flood risk assessment analyses (Teng et al. 2017, Beven et al. 2018, Bates 2022, including dam-breaks (Qi and Altinakar 2012), to orient future planning efforts. Uncertainties in initial hydrological conditions, breach and inundation model structure and parameters, and topographic data ought to be considered to quantify how uncertainty propagates via the inundation hydrodynamic model and to calculate uncertainty ranges for the output flood hazard parameters (Ahmadisharaf et al. 2013, Dewals et al. 2014, Tsai et al. 2019, Willis et al. 2019, Abdedou et al. 2020, Bellos et al. 2020, Kalinina et al. 2020. Probabilistic methods are useful for this purpose because they provide quantitative information about result uncertainty by considering a variety of preselected scenarios with associated weights (Mazzoleni et al. 2014) or probabilities (D'Oria et al. 2019), or scenarios obtained by randomly sampling the relevant input parameters according to their empirical or hypothesized probability distributions (e.g. ...
... Classifications based on flooding intensity only can be used in dam-break flood analyses (e.g. Ahmadisharaf et al. 2013, Álvarez et al. 2017, Patra et al. 2019. ...
Article
Full-text available
Quantitative assessment of dam-break flood hazard is central in dam emergency action planning and is typically performed deterministically. In structural failure of concrete or masonry dams the collapse is assumed to be total and instantaneous, with the reservoir level at the spillway crest level. A probabilistic method is here proposed based on a set of dam-break scenarios characterized by different breach widths and reservoir levels in order to provide an appraisal of uncertainties in flood hazard indicators. Each scenario is attributed a weight, defined as conditional probability given a dam-break event. Probabilistic flood hazard and inundation maps are produced for the case study of the hypothetical collapse of the Mignano dam (River Arda, northern Italy), and a sampling-based global sensitivity analysis is performed. Dam-break flooding was simulated using a two-dimensional hydrodynamic model on a high-resolution mesh. The probabilistic maps inherently provide quantitative information on the uncertainty of dam-break flood hazard.
... 15.3% overestimation and 13.1% underestimation of the flood extent. The model has been successfully applied in simulation of riverine (Ahmadisharaf, Kalyanapu, & Bates, 2018;Ahmadisharaf, Kalyanapu, & Chung, 2015Ahmadisharaf, Kalyanapu, Thames, & Lillywhite, 2016;Kalyanapu et al., 2012Kalyanapu et al., , 2015Yigzaw, Hossain, & Kalyanapu, 2013) and dam break flooding (Ahmadisharaf, Bhuyian, & Kalyanapu, 2013;Kalyanapu et al., 2011). ...
... A spatial resolution of 30 m is used for the National Elevation Dataset DEM (https://nationalmap.gov/elevation.html) based on the recommendations by Ahmadisharaf et al. (2013) for the study watershed. To ensure that the DEM appropriately represents the channel geometry, we estimate the cross-1 The deterministic scenario uses a single 100-year design storm depth estimated by Bonnin et al. (2006) through a frequency analysis. ...
Article
Reliable estimation of flood loss is crucial for flood management. Since this estimation relies on models that are prone to uncertainty, it is vital to clearly understand how the uncertainties affect the appraised flood loss. This paper presents a coupled probabilistic hydrologic and hydraulic modelling framework to estimate the uncertainty of anticipated loss. A hydrologic model performs rainfall‐runoff transformation and a two‐dimensional unsteady hydraulic model simulates flood inundation. The outputs of the latter are fed into a loss estimation tool. Two sources of uncertainty—rainfall depth and antecedent moisture condition—are used to illustrate the framework on the Swannanoa River watershed in North Carolina, U.S. The impact of the uncertainty of these two sources is tracked over the hydrologic model, hydraulic model and loss estimation tool. Our case study results illustrate that the estimations on the percent affected people can be four times more uncertain than the rainfall depth and two times more than the flood extent, but its uncertainty is comparable to hydrograph attributes. The appraised structural damages are nearly two times more uncertain than the affected people. These findings, however, may only valid for a case study with hilly topography and should be cautiously extrapolated to other areas.
... It is thus very advantageous for probabilistic analyses where high computational cost is expected. The model has been successfully applied in flood hazard analysis [31][32][33], flood damage estimation [34] and investigation of the impact of land use/land cover (LULC) change on floods [35]. ...
... The Manning's roughness coefficient is found from the calibration, which was described in detail by Ahmadisharaf et al. [60]. The DEM is taken from the U.S. Geological Survey (USGS) National Elevation Dataset with a spatial resolution of 30 m based on the suggestions by Ahmadisharaf et al. [31] for the study watershed. Utilizing these input datasets, the flood parameters, depth, velocity and duration, are generated. ...
Article
Full-text available
An integrated framework is presented for sustainability-based flood hazard mapping of the Swannanoa River watershed in the state of North Carolina, U.S. The framework uses a hydrologic model for rainfall–runoff transformation, a two-dimensional unsteady hydraulic model flood simulation and a GIS-based multi-criteria decision-making technique for flood hazard mapping. Economic, social, and environmental flood hazards are taken into account. The importance of each hazard is quantified through a survey to the experts. Utilizing the proposed framework, sustainability-based flood hazard mapping is performed for the 100-year design event. As a result, the overall flood hazard is provided in each geographic location. The sensitivity of the overall hazard with respect to the weights of the three hazard components were also investigated. While the conventional flood management approach is to assess the environmental impacts of mitigation measures after a set of feasible options are selected, the presented framework incorporates the environmental impacts into the analysis concurrently with the economic and social influences. Thereby, it provides a more sustainable perspective of flood management and can greatly help the decision makers to make better-informed decisions by clearly understanding the impacts of flooding on economy, society and environment.
... However, such fully hydrodynamic models are not widely used in load interdependency analyses, primarily due to the computational effort required when running Monte Carlo simulations. Nevertheless, load interdependency analysis using a fixed grid in the 2D domain can be performed for relatively small systems or subsystems of embanked rivers [17,24]. Fast 2D models that solve simplified versions of the St. Venant equations [25,26] have also been used in load interdependency analyses [4,27]. ...
Article
Full-text available
To make informed flood risk management (FRM) decisions in large protected river systems, flood risk and hazard analyses should include the potential for dike breaching. ‘Load interdependency’ analyses attempt to include the system-wide effects of dike breaching while accounting for the uncertainty of both river loads and dike fragility. The intensive stochastic computation required for these analyses often precludes the use of complex hydraulic models, but simpler models may miss spatial inundation interactions such as flows that ‘cascade’ between compartmentalised regions and overland flows that ‘shortcut’ between river branches. The potential for these interactions in the Netherlands has previously been identified, and so a schematisation of the Dutch floodplain and protection system is here developed for use in a load interdependency analysis. The approach allows for the spatial distribution of hazard to be quantified under various scenarios and return periods. The results demonstrate the importance of including spatial inundation interactions on hazard estimation at three specific locations, and for the system in general. The general modelling approach can be used at a local scale to focus flood-risk analysis and management on the relevant causes of inundation, and at a system-wide scale to estimate the overall impact of large-scale measures.
... Therefore, the tool can be used for the estimation of the instantaneous failure of a masonry arch and gravity dams and it cannot be used for earthfill dams. This topic must be studied in the future, as the study of earthfill dam-breaks requires addressing the important uncertainties related to branch dimensions, as discussed by several past studies [47][48][49][50][51][52]. The model can provide useful information, which complements but does not replace the results from hydrodynamic simulations, for risk delineation in data-scarce environments, and transboundary regions. ...
Article
Full-text available
Mapping the delineation of areas that are flooded due to water control infrastructure failure is a critical issue. Practical difficulties often present challenges to the accurate and effective analysis of dam-break hazard areas. Such studies are expensive, lengthy, and require large volumes of incoming data and refined technical skills. The creation of cost-efficient geospatial tools provides rapid and inexpensive estimates of instantaneous dam-break (due to structural failure) flooded areas that complement, but do not replace, the results of hydrodynamic simulations. The current study implements a Geographic Information System (GIS) based method that can provide useful information regarding the delineation of dam-break flood-prone areas in both data-scarce environments and transboundary regions, in the absence of detailed studies. Moreover, the proposed tool enables, without advanced technical skills, the analysis of a wide number of case studies that support the prioritization of interventions, or, in emergency situations, the simulation of numerous initial hypotheses (e.g., the modification of initial water level/volume in the case of limited dam functionality), without incurring high computational time. The proposed model is based on the commonly available data for masonry dams, i.e., dam geometry (e.g., reservoir capacity, dam height, and crest length), and a Digital Elevation Model. The model allows for rapid and cost-effective dam-break hazard mapping by evaluating three components: (i) the dam-failure discharge hydrograph, (ii) the propagation of the flood, and (iii) the delineation of flood-prone areas. The tool exhibited high accuracy and reliability in the identification of hypothetical dam-break flood-prone areas when compared to the results of traditional hydrodynamic approaches, as applied to a dam in Basilicata (Southern Italy). In particular, the over- and under-estimation rates of the proposed tool, for the San Giuliano dam, Basilicata, were evaluated by comparing its outputs with flood inundation maps that were obtained by two traditional methods whil using a one-dimensional and a two-dimensional propagation model, resulting in a specificity value of roughly 90%. These results confirm that most parts of the flood map were correctly classified as flooded by the proposed GIS model. A sensitivity value of over 75% confirms that several zones were also correctly identified as non-flooded. Moreover, the overall effectiveness and reliability of the proposed model were evaluated, for the Gleno Dam (located in the Central Italian Alps), by comparing the results of literature studies concerning the application of monodimensional numerical models and the extent of the flooded area reconstructed by the available historical information, obtaining an accuracy of around 94%. Finally, the computational efficiency of the proposed tool was tested on a demonstrative application of 250 Italian arch and gravity dams. The results, when carried out using a PC, Pentium Intel Core i5 Processor CPU 3.2 GHz, 8 GB RAM, required about 73 min, showing the potential of such a tool applied to dam-break flood mapping for a large number of dams.
Article
Full-text available
Off-stream reservoirs are hydraulic structures that might cause severe flood damages in case of failure or improper operation. Their safety regulations usually require hydraulic studies for flood hazard and inundation zone mapping. The selection of the break point is not trivial be-cause the topography in its surroundings is commonly highly anthropic. A wrong selection would not provide the worst scenario in terms of maximum flood hazard extent. This work pre-sents a probabilistic approach based on a stochastic definition of the break point along the dyke. A number of failure scenarios are generated automatically, corresponding to different breach formations. Then, an in-cascade calculation process simulates each scenario, providing a frame-work to carry out statistical analysis. The simulation of the breach formation and the flood wave propagation is performed through a GPU parallelised two-dimensional hydraulic numerical model, which provides a probabilistic inundation zone and flood hazard mapping of all scenar-ios simulated in a suitable timeframe
Article
Sensitivity analysis determines how perturbation or variation in the values of an independent variable affects a particular dependent variable. The present study attempts to comprehend the sensitivity of the static input parameters on the accuracy of the outputs in a hydrodynamic flood model, which subsequently improves the model accuracy. Hydrodynamic flood modeling is computationally strenuous and data-intensive. Moreover, the accuracy of the flood model outputs is extremely sensitive to the quality of hydrologic and hydraulic inputs, along with a set of static parameters that are traditionally assumed and primarily used for calibration. Therefore, we focus on developing a framework for global sensitivity analysis (GSA) of static input parameters in a 1D-2D coupled hydrodynamic flood modeling system. A set of numerical experiments is conducted by perturbing various combinations of input parameters from their standard (or observed) values to generate flow hydrographs. Nonparametric probability density functions (PDFs) of the river discharge at different locations are compared to calculate the Kullback-Leibler (KL) entropy or KL-divergence, which is used to quantify the sensitivity of the input parameters. We demonstrated the proposed framework on a highly flood-prone rural catchment of the Shilabati River in West Bengal, India, and infer that the sensitivity of the static input parameters is highly dynamic, and their importance varies spatially from the upstream to the downstream of the river. However, Manning's n values of the channel and the banks are significantly sensitive irrespective of the location in the river reach. We suggest that any flood modeling exercise should accompany a GSA, which sets a guideline for the modelers to prioritize the set of sensitive static input parameters during data monitoring, collection, and retrieval. This study is the first attempt at a GSA in a 1D-2D coupled hydrodynamic flood modeling system, whose importance cannot be over-emphasized in any flood modeling platform. The proposed novel framework is generic and can be implemented prior to flood risk analyses for any floodplain management exercise. All free and commercially-available flood models can incorporate the proposed framework for a GSA as an extension toolbox.
Article
Full-text available
Flood hazard assessment is a fundamental step in flood risk mapping. Quantitative assessment requires hydrodynamic modelling of the flooding process in order to calculate the spatial distribution of suitable flood hazard indicators representative of flooding intensity and frequency, hence its potential to result in harm. Flood hazard indicators are usually defined by combining relevant flooding parameters, mainly flood depth and flow velocity, but also flooding arrival time, flooding duration, sediment or contamination load, and so forth. A flood hazard classification is commonly introduced to assign a hazard level to areas potentially subject to flooding. This article presents a systematic review of quantitative methods proposed in the scientific literature or prescribed by government authorities to assess the hazard associated with natural or anthropic flooding. Flood hazard classification methods are listed and compared by specifying their underlying approach (heuristic, conceptual, empirical), the exposed element which they were designed for (people, buildings, vehicles, etc.), and their fields of application (river overflow, dam‐break, levee breach, debris flow). Perspectives and future challenges in quantitative flood hazard analysis are also discussed. This review aims to help modellers and practitioners to select the most suitable flood hazard assessment method for the case study of interest.
Article
Prediction of design hydrographs is key in floodplain mapping using hydraulic models, which are either steady-state or unsteady. The former, which only requires an input peak, substantially overestimates the volume of water entering the floodplain compared to the more realistic dynamic case simulated by the unsteady models that require the full hydrograph. Past efforts to account for the uncertainty of boundary conditions using unsteady hydraulic modeling have largely been based on a joint flood frequency-shape analysis, with only a very limited number of studies using hydrologic modeling to produce the design hydrographs. This study therefore presents a generic probabilistic framework that couples a hydrologic model with an unsteady hydraulic model to estimate the uncertainty of flood characteristics. The framework is demonstrated on the Swannanoa River watershed in North Carolina, USA. Given its flexibility, the framework can be applied to study other sources of uncertainty in hydrologic models and other watersheds.
Article
A geographical information system (GIS)-based decision support system has been developed for dam-break flood management based on realistic two-dimensional flood simulations. With the ability of interacting with and using classified remote sensing (RS) image layers and other GIS feature layers like zoning layer, survey database, and census block boundaries, it can be used for flood damage calculations and loss-of-life estimations. It also provides a user-friendly interface that allows construction of user-defined criteria, such as stage-damage curves, running computations, and visualization of the results. The Monte Carlo Simulation method is used to take into account uncertainties in various variables and parameters, and event tree analysis is used to estimate the population dynamics. The analysis of a dam-break flood management strategy for Sinclair Dam in Milledgeville, Georgia is chosen as a case study to demonstrate the capabilities of the decision support system. The test results validated by HEC-RAS and HEC-FDA software indicate that this new system provides a very versatile and reliable environment for estimating various flood damage and may greatly enhance decision-making processes for future design of flood proofing facilities.
Article
This paper presents a study of the computational enhancement of a Graphics Processing Unit (GPU) enabled 2D flood model. The objectives are to demonstrate the significant speedup of a new GPU-enabled full dynamic wave flood model and to present the effect of model spatial resolution on its speedup. A 2D dynamic flood model based on the shallow water equations is parallelized using the GPU approach developed in NVIDIA’s Compute Unified Development Architecture (CUDA). The model is validated using observations of the Taum Sauk pump storage hydroelectric power plant dam break flood event. For the Taum Sauk flood simulation, the GPU model speedup compared to an identical CPU model implementation is 80×–88× for computational domains ranging from 65.5 k to 1.05 M cells. Thirty minutes of event time were simulated by the GPU model in 2 min, 15 times faster than real time. An important finding of the analysis of model domain size is the GPU model is not constrained by model domain extent as is the CPU model. Finally, the GPU implementation is shown to be scalable compared with the CPU version, an important characteristic for large domain flood modeling studies.
Article
Recent numerical modelling developments have made the application of two-dimensional finite element codes to the simulation of river flood inundation over reach lengths of 10-30 km a viable proposition. Currently, however, one-dimensional finite difference codes are the standard analytical tool for many engineering applications. This paper presents an initial assessment of two two-dimensional finite element codes based on their ability to predict flow and flood inundation extent over an 11 km reach of the River Culm, Devon, UK. Initial results indicate the suitability of two-dimensional finite element techniques for application to this class of problem and have allowed direct comparison of a number of computational algorithms employed by each model.
Article
ABSTRACT Risk assessments,and other dam safety studies often require that,an estimate,be made,of the,number,of fatalities,that would result from dam failure. To assist in this effort, an extensive,evaluation,of dam,failures,and,the,factors,that contributed,to loss,of life,was,conducted. Every,U.S. dam,failure,that,resulted,in more,than,50
Article
Welcome to the Hydrologic Engineering Center's River Analysis System (HEC-RAS). This software allows you to perform one-dimensional steady flow, unsteady flow, and sediment transport calculations (The current version of HEC-RAS can only perform steady flow calculations. Unsteady flow and sediment transport will be added in future versions). The HEC-RAS modeling system was developed as a part of the Hydrologic Engineering Center's 'Next Generation' (NexGen) of hydrologic engineering software. The NexGen project encompasses several aspects of hydrologic engineering, including: rainfall-runoff analysis; river hydraulics; reservoir system simulation; flood damage analysis; and real-time river forecasting for reservoir operations. This chapter discusses the general philosophy of HEC-RAS and gives you a brief overview of the capabilities of the modeling system. Documentation for HEC-RAS is discussed, as well as an overview of this manual.
Article
This study presents a new Monte Carlo-based flood inundation modelling framework for estimating probability weighted flood risk using a computationally efficient graphics processing unit (GPU) two dimensional (2D) hydraulic model. The 2D flood model is programmed in the GPU framework providing a unique ability to run numerous simulations in a short period of time, permitting the integration of 2D hydraulic modelling into Monte Carlo analysis. The framework operates by performing many 2D flood simulations of randomly sampled input parameters to develop a spatially varied flood hazard map. The probabilistic framework is demonstrated using a 1% annual probability flood event and simulating 1000 different flood simulations by randomly selected peak flows of the Swannanoa River in Buncombe County, USA. The results, in general, display benefits of probabilistic flood risk approach compared with a single simulation approach. The latter approach underestimated 28% of flood risk relative to the former. As the number of simulations increased from 1 to 1000, areas identified as low danger and judgment zone increased by 87.4% and 36.8% respectively, whereas the high danger zone increased by 9.3%. In conclusion, the new Monte Carlo flood risk modelling framework has the ability to provide improved accuracy of flood risk and greater insight into the spatial distribution of flood risk.
Article
The scaling properties of a simple raster-based flood flow model are investigated. Models of resolution varying from 1000 to 10 m are tested and predictions compared with satellite observations of inundated area and ground measurements of floodwave travel times, with a calibration strategy being used to determine channel friction coefficients. The optimum calibration is found to be stable with respect to changes in scale when the model is calibrated against the observed inundated area, the model reaching maximum performance at a resolution of 100 m, after which no improvement is seen with increasing resolution. Projecting predicted water levels onto a high resolution DEM improves performance further, and a resolution of 500 m proves adequate for predicting water levels. Predicted floodwave travel times are, however, strongly dependent on model resolution, and water storage in low lying floodplain areas near the channel is identified as an important mechanism affecting wave propagation velocity. A near channel floodplain storage version of the model is shown to be much more stable with respect to changes in scale when the model is calibrated against floodwave travel times, and shown to represent the retardation of the floodwave caused by water storage near the channel. The model cannot be calibrated to give both acceptable travel times and inundated area, and in this respect performance is poor.
Article
For many numerical modelling applications the problem of specifying an optimum mesh resolution remains unbounded and for mesh construction objective a priori rules do not exist. By contrast, the problem of specifying model parameter surfaces is largely bounded within known physical error distributions. In this paper we thus investigate the impact of varying mesh resolution on a typical non-linear finite numerical solver. Specifically, a two-dimensional finite element code which solves the Shallow Water equations was used to simulate unsteady flows in a meandering compound channel. A range of different mesh resolutions and parameter surfaces were simulated to determine relative dominance and, unlike previous studies, the effect on both bulk flow and distributed outputs were analysed. The results showed a wide variation in performance for mesh discretizations which fulfilled traditional length scale-based construction. Mesh resolution effects were at least as important as a typical calibration parameter and model response was shown to be highly complex.