Article

Flood Emergency Plans: Guidelines for Corps Dams

Authors:
To read the full-text of this research, you can request a copy directly from the author.

Abstract

Describes plan for dam failure and other large flood evacuation emergencies. Specific guidance is given for preparation of inundation maps by Corps offices for use by local cities and counties in their emergency planning. The major parts of an emergency plan and hydraulic and hydrologic analysis are presented. Originator-supplied keywords: Flood hazard, Dam failue, Safety, Evacuation, Warning, Emergency planning, Hydrology, Hydraulics.

No full-text available

Request Full-text Paper PDF

To read the full-text of this research,
you can request a copy directly from the author.

... This width equalizes to five times the breach height (5H) according to Wetmore and Fread recommendations [36]; • Based on the previous guidelines, the breach formation time should be H/40 in minutes, but it is believed this period would really be shorter. Thus, as recommended by agencies such as HEC [37] and ICOLD [38], the time of breach formation ranges from 0.1 to 0.5 h for concrete dams. Therefore, the breach full time was assumed to be 0.1 h; • ...
Article
Full-text available
Dams are built for different purposes, but failure of a dam could result in extreme disasters such as floods. The Grand Ethiopian Renaissance Dam (GERD) was mainly built for power generation, but concerns about its safety, location and site conditions have led the downstream countries to investigate the GERD’s stability. This paper aims to investigate the impact of the failure of the dam on the downstream countries using the Hydrologic Engineering Center River Analysis System (HEC-RAS). Outflow hydrographs and flood inundation maps were provided through a hypothetical dam break scenario. An unsteady flow hydrodynamic routing with a 2D model was used to simulate the failure of the dam. A sensitivity analysis study of the output’s findings against breach parameters was also performed. The breach outflow discharge increases as the breach dimension increases. However, the peak discharge decreases with increasing breach formation time. Moreover, to prepare emergency action plans, it is important to predict the inundation depth, levels, arrival of flood waves, flood coverage area and water velocity. Furthermore, the results showed that Khartoum would turn into lakes within about 10 days and flood water depth would exceed 11 m at some locations in residential areas. Moreover, the flood waves overtopped the Roseires, Sennar and Merowe dams by 11, 7 and 20 m, respectively. In addition, the level of Lake Nasser would reach 188 m above sea level and the Aswan High Dam might be in great danger.
Article
Full-text available
Failures of small dams can pose a serious threat to people and property even if the size of the schemes is relatively low. In many cases, small dams are situated in a cascade along streams, meaning that the failure of the uppermost dam may cause the dams downstream to fail. In this paper, a cascade of three small reservoirs, Lichnov II (14.6 m high), Lichnov III (10 m high), and Pocheň (8.5 m high), is the subject of the dam break analyses carried out via various methods such as empirical formulae, analogy, and hydraulic modeling. The dam-break flood routing was simulated using a shallow water flow hydraulic model. The simulations confirm that the attenuation effect of the peak discharge is governed by the flood volume, slope, and morphology of the floodplain and increases with the distance from the breached dam following an approximately exponential trend. When estimating peak discharge, empirical formulae derived for a single dam break should be applied carefully as they may underestimate the peak outflow by up to 10% in the case of a dam cascade. The attenuation volume of small reservoirs is small when compared to the flood volume, meaning that the attenuation of the peak discharge usually varies between 5–10%.
Article
Full-text available
Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melin, and Metelsky dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple onedimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.
Article
Full-text available
This paper presents a simplified approach to the characterization of the hydrograph following the partial collapse of concrete gravity dams. The proposed approach uses a simplified representation of the reservoir geometry and is based on the numerical solution of shallow water equations to study the two-dimensional evolution of the water surface within the reservoir. The numerical results are made dimensionless and reorganized so as to compute the peak discharge, the duration and the recession limb of the dam break hydrograph. The proposed practical approach provides a quite satisfactory reproduction of the computed hydrograph for a wide set of realistic situations that have been simulated in detail.
ResearchGate has not been able to resolve any references for this publication.