Notes on Continuous Process Improvement 28 April 2008
1
An outline of:
Lean Thinking
Banish Waste and Create Wealth in Your Corporation
By James P. Womack and Daniel T. Jones
New York, NY: Free Press, Simon & Schuster, Inc., 1996, Second Edition, 2003
Preface to the 2003 Edition. Forecasts are always wrong. That is why lean thinkers strive to reduce
order-to-delivery time. During the 2002 meltdown, this 1996 book went back on the Business Week bestseller
list. We have added what we have learned since 1996 in this edition. Lean Thinking is more relevant today. Lean
ideas are the single most powerful tool available for creating value and eliminating waste in any organization.
Part I: Lean Principles
Taiichi Ohno (1912 – 1990), a Toyota executive, identified seven types of waste found in any process:
Transportation. Unnecessary transport of parts under production.
Inventory. Stacks of parts waiting to be completed or finished products waiting to be shipped.
Motion. Unnecessary movement of people working on products.
Waiting. Unnecessary waiting by people to begin the next step.
Over-Processing the product with extra steps.
Over-Production of products not needed.
Defects in the product.
We have added an eighth waste: goods and services that do not meet the customer’s needs. Other authors have
added: underutilization of people
Lean Thinking is the antidote to waste. There are (5) Lean Principles:
Specify Value. Value can be defined only by the ultimate customer. Value is distorted by pre-existing
organizations, especially engineers and experts. They add complexity of no interest to the customer.
Identify the Value Stream. The Value Stream is all the actions needed to bring a product to the
customer. If the melter, forger, machiner, and assembler never talk, duplicate steps will exist.
Flow. Make the value-creating steps flow. Eliminate departments that execute a single-task process on
large batches.
Pull. Let the customer pull the product from you. Sell, one. Make one.
Pursue Perfection. There is no end to the process of reducing time, space, cost and mistakes.
Lean is doing more with less. Use the least amount of effort, energy, equipment, time, facility space, materials,
and capital – while giving customers exactly what they want.
The Prize We Can Grasp Now. Converting a batch-and-queue system to continuous flow, with pull, will:
Double labor productivity
Cut throughput time by 90%
Reduce inventory by 90%
Cut errors by 50%
Cut injuries
Notes on Continuous Process Improvement 28 April 2008
2
1: Value
A House or a Hassle-Free Experience? Doyle Wilson Homebuilder found that customers “valued” a hassle-
free design process and on-time delivery. All his processes were then re-aligned to meet this goal.
Define Value in Terms of the Whole Product. As the product flows, each firm defines value differently. Think
of air travel. Each firm – agent, airline, taxi, currency exchange, customs, immigration – defines their own
priorities, duplicates efforts, and works in disharmony with the whole process. The customer is not satisfied.
2: The Value Stream
The View from the Aisle. A value stream “map” identifies every action to design, order, and make a specific
product. Each step is then sorted into three categories: (1) those that add value, (2) those that add no value but
are currently necessary, and (3) those that add no value and can be eliminated. After the third category has been
eliminated, the second category should be addressed through flow, pull, and perfection techniques.
The Value Stream for a Carton of Cola. The British grocery chain Tesco retails products with thousands of
value streams. In the canned cola value stream, three hours of value-added activity take 319 days to perform.
3: Flow
The World of Batch-and-Queue. Five-sixths of home-building is waiting for the next set of specialists or
rework. Flow principles typically cut half the effort and the time required.
The Techniques of Flow. The 1st step is to maintain focus on the product. The 2nd step is to ignore job
boundaries and departments IOT remove impediments to continuous flow of the specific product. The 3rd step
is to rethink work practices to eliminate backflow, scrap, and stoppages IOT make the product continuously.
Takt time synchronizes the rate of production to the rate of sales. (48) bikes per day sold divided by (8)
hours of production = (6) bikes and hour, or (1) bike every ten minutes.
Flow requires all workers and machines to be capable at all times. This requires cross-training.
Flow requires workers to know the status of production at all times. This requires visual controls.
All activities can flow. Concentrate on the value stream for a specific product, eliminate organizational
barriers, and relocate and right-size tools.
4: Pull
Pull means that no one upstream should produce anything until the customer downstream asks for it. “Don’t
make anything until it is needed, then make it very quickly.” “Sell one, buy one.” “Ship one, make one.”
The Bad Old Days of Production. The Toyota bumper replacement system suffered long lead times. The
ability to get parts quickly from the next upstream producer enabled re-orders in small amounts. This is the
secret to reducing inventory. Cut lead times and inventories. Demand should instantly generate new supply.
5: Perfection
The Incremental Path. Freudenberg-NOK, a gasket manufacturer, improved a single process six times in three
years. “Why didn’t they get is right the first time?” Because perfection is continuous.
Continuous Radical and Incremental Improvement. If you are spending capital, you are doing it wrong.
Once leaders understand the first four lean principles – value specification, value stream identification, flow, and
Notes on Continuous Process Improvement 28 April 2008
3
pull – their perfection step starts with policy: a vision of the ideal process, and the step-wise goals and projects
to get there. Transparency is everything. Everyone must know what you are attempting to achieve and what area
is the first priority. The force behind this is the leader known as the change agent.
Part II: From Thinking to Action: The Lean Leap
6: The Simple Case
Lantech manufacturers stretch wrap machines. “Process Villages” – Sawing department, Machining
department, Welding department, Painting department, and Sub-assembly department – all generated long lead
times. Batches of ten were manufactured to ship one. Inventory overwhelmed the factory. Order changes created
havoc in the plant. “The more inventory you have, the less likely you will have the part you need.”
The Lean Revolution. Ron Hicks leaned Lantech. He created four cells, one for each product. He
defined standard work: on time, on spec, every time. Takt time was introduced: number of products
needed per day divided by number of hours (8/8 = 1 hour). He right-sized machines to fit inside work
cells. He implemented quick changeover to make multiple different parts with little machine downtime.
Result. Lantech cut 30% excess space, doubled product output, cut defects from 8 per product to 0.8 per
product, and cut lead time from sixteen weeks to fourteen hours. On-time shipping rose from 20 to 90%.
7: A Harder Case
The Change Agent. Art Byrne was hired as CEO of Wiremold in 1991. “CEOs are timid to change the shop
floor.” Byrne led lean training using a manual he wrote himself. He led tours of the plant to observe waste that
his managers were now able to see.
Improvements Must be Fast. Three days was Byrne’s standard.
Post a Scorecard for Each Product Team. Wiremold tracked: Productivity – sales per employee,
Service – percent delivered on-time, Inventory – turns, and Quality – mistakes.
Teach People How to See. Create a lean training function. Teach all employees the five principles of
lean: Value, Value Stream, Flow, Pull, and Perfection. Teach all employees lean techniques: standard
work, takt time, visual control, pull scheduling, and single-piece flow.
Results. Wiremold freed 50% factory floor space, eliminated a warehouse, and converted $11M of
inventory into $24M in sales. Lead time fell from four weeks to two days.
8: The Acid Test
Pratt & Whitney (P&W). In 1991, CEO Karl Krapek and cost-cutter Mark Coran leaned P&W.
Jet Engines. Founded in 1860, P&W led the aircraft engine business by 1929. When they abandoned
piston engines to gamble on jets in 1946, business soared. Production inefficiencies were overlooked.
Overcapacity. Faced with competition in the 1980s, P&W rationalized plant layout and addressed
development costs. They needed lower production costs and flexibility to react to customer needs. Why
did P&W need so much space, tools, inventory and people to get so little done? Daily output of engines
and spare parts could fit inside CEO’s office. Failure to manage assets. P&W cut people, cut managers,
and overhauled their entire production culture and processes.
The Monument of all Monuments. A “monument” is a machine or process too big to be moved and
whose scale requires operating in batch mode. Monuments are evil, generating huge amounts of waste.
P&W had an $80M grinding system, representing obsolete thinking. Although speeding up grinding
from 75 minutes to 3 minutes and eliminating multiple manual grinding jobs, in actuality grinding jobs
Notes on Continuous Process Improvement 28 April 2008
4
took longer (due to eight-hour changeovers and batch scheduling), and required more people (22
computer technicians). P&W retired the $80M monument, returned to 75-minute production.
9: Lean Thinking versus German Technik
Porche. Chairman Wendelin Wiedeking introduced lean thinking to Porche. In 1994, the first-ever Porsche
rolled off the line with nothing wrong with it.
Engineers. Porche is led by engineers, intrigued with unique solutions that are difficult to manufacture.
Workers are craftsmen. Unfortunately, much craftsmanship is waste. Tinkering with the product –
repairing and polishing raw materials, troubleshooting, re-assembling elements, repainting and re-fitting
– were thought to be necessary activities to produce a high-quality product.
Crisis. 1986 was the boom year. 1992 was the crash. Porche products were too expensive. Costs and
throughput time had to be slashed. New quality focus: “Stop fixing mistakes that should never have
been made.” Reduction in inventory: “Where is the factory? This is the warehouse!”
Just-in-Time (JIT) Game. Porche asked all their suppliers to play a simulation to learn lean concepts.
Lean concepts were critical across all firms contributing to the Porche value stream.
The Remarkable Lean Transition at Porche. In five years, through 1997, Porch doubled its
productivity, cut manufacturing space in half, cut lead time for a finished vehicle from six weeks to
three days, cut supplier defects 90%, cut inventories 90%, and cut first-time-through errors by 55%.
The German Tradition. The Germans need to stop prioritizing the engineer’s definition of value,
“voice of the engineer,” over the customer’s definition of value, “voice of the customer.” A German
weakness is a fondness for monster machines that produce large batches: paint booths are an example.
Variety and Refinement Cost. Volkswagen makes four exterior mirrors, nineteen parts each, in
seventeen colors. Nissan has four-part mirrors in four colors. Excess variety often exceeds the ability of
the customer to notice, and his willingness to pay.
10: Mighty Toyota; Tiny Showa
Showa has been transformed by its relationship with Toyota. Showa, a radiator manufacturer, had “Process
villages” for casting, cleaning, stamping, welding, painting and assembly. Each was run in batch mode with long
intervals between tool changes. Mountains of parts were transported and stored between steps.
The Initial Struggle. Taiichi Ohno, lean advisor, promised to reduce three months of inventory to three
days, double labor productivity, and halve plant space for zero capital investment. This he did.
The Final Element: Rethinking Order-Taking and Scheduling. Showa then leaned order-taking by
scheduling backwards, working to takt time, to synchronize orders with production slots, exactly four
days before shipment time. Orders with incorrect information were never passed along.
“…The Advantage of a Defiant Attitude.” Two basic lean concepts in production – automatic line
stopping when a mistake is made so no bad parts are passed forward, and a pull system to trigger the
fabrication of only those parts that are actually needed – were developed at Toyota in the 1920s and
1930s. When Taiichi Ohno led Toyota Motor engine works in1948, he had three insights. First, people
spent their time watching machines. Machines with error triggers freed up people to operate many
machines. Second, “when you have lots of inventory, you are always one part short,” so parts should
only be made if the next step needs them. Third, machines should be moved away from process villages
and into horse-shoe-shaped cells, in the exact sequence needed. Thus focus is on the product and not the
machines and their maintenance. Ohno’s favorite saying was “common sense is almost always wrong.”
Toyota Today. Lesson: high-tech automation only works if the plant can run at 100 percent output and
if the cost of indirect technical support and high-tech tools is less than the cost of direct labor saved.
Notes on Continuous Process Improvement 28 April 2008
5
11: An Action Plan
Getting Started [Months 1 – 6]
Find a Change Agent with ability and authority.
Get the Knowledge through an advisor.
Seize a Crisis or create one. Focus on fixing an obvious problem. Small wins. Don’t spend money.
Map your current value streams.
Begin as soon as possible with an important, visible activity. Convert managers with hand-on activity.
Demand Immediate Results. Everyone should see results which create psychological momentum. One
week: less planning, more doing. Identify waste and remove it. Communicate with your people by
showing results at the scene of action.
Expand Your Scope. Move from flow to pull.
Creating an Organization to Channel Your Streams [Months 6 – 24]
Reorganize Your Firm by product and value streams. Put a Change Agent in charge of each product.
Create a Lean Promotion Team.
Deal with Excess People Early.
Devise a Growth Strategy.
Remove the Anchor Draggers.
When You’ve Fixed Something, Fix It Again.
Install Business Systems to Encourage Lean Thinking [Months 24 – 48]
Create new ways to keep score.
Create new ways to reward people.
Make everything transparent so everyone can see progress.
Teach lean. Learn lean.
Right-size Your Tools to insert directly into the value stream. Large and fast is more efficient but less
effective. This wrong assumption is the cornerstone of batch-and-queue thinking.
Pay a bonus. Tie bonus amounts to the profitability of the firm.
Completing the Transformation [Months 48 – 60] Convert to bottom-up initiatives. Lean ideas are
democratic and not top-down. Layers of management can be stripped away.
The Inevitable Results of a Five-Year Commitment
Part III: Lean Enterprise
12: A Channel for the Stream; a Valley for the Channel
The Lean Enterprise. No one watches the performance of the whole value stream. Identify all actions to bring
a product to the customer, across all firms. There is no privacy. Each firm’s costs become transparent.
13: Dreaming About Perfection
Long-Distance Travel. Each organization ignores the role of the other parties. The time, cost, and comfort of
the total trip are key performance measures. What would travel times be without queues?
Notes on Continuous Process Improvement 28 April 2008
6
Medical Care is queues. Providers organize by function. What if patient time and comfort were the key
performance measures? Medical cells with right-sized equipment would flow patients. Some right-sized
equipment has already gone home with the patient, just like most office equipment has now shifted to the home.
Construction. 80% of home building is hurry-up and wait, then re-working the construction errors.
The Prize We Can Grasp Right Now. Lean thinking can boost productivity while reducing errors, inventories,
accidents, space requirements, production lead times, and costs in general. Lean thinking requires little capital.
Part IV: Epilogue
14: A Steady Advance of Lean Thinking
This chapter an updated review of Wiremold, Toyota, Porsche, Lantech, and Pratt & Whitney.
15: Institutionalizing the Revolution
An Enhanced Action Plan is the 2003 update to the 1996 plan from Chapter 11.
Getting Started [Months 1 – 6]
Find a Change Agent with ability and authority.
Get the Knowledge through an advisor. Start at the big picture before addressing small steps.
Seize a Crisis or create one. Focus on fixing an obvious problem. Small wins. Don’t spend money.
Map your current value streams. Managers need to see. Map also the flow of information going
upstream to create a closed circuit. See Rother and Shook, Leaning to See, 1998.
Analyze each step of the Current State. Does this step create value? Is this step capable, available,
flexible? Is capacity sufficient? Excessive? Does the information flow from the customer smoothly?
Every process has a box score: total lead time, value creating time, changeover time, uptime,
rework, inventory, every part made every x minutes. If this step went away, what would happen?
Envision the Future State. Draw it.
Begin as soon as possible with an important, visible activity. Convert managers with hand-on activity.
Demand Immediate Results. Everyone should see results which create psychological momentum. One
week: less planning, more doing. Identify the waste and remove it. Communicate with your people by
showing results at the scene of action.
Expand Your Scope. Move from flow to pull.
Creating an Organization to Channel Your Streams [Months 6 – 24]
Reorganize Your Firm by product and value streams. Put a Change Agent in charge of each product.
Create a Lean Promotion Team.
Deal with Excess People Early.
Devise a Growth Strategy.
Remove the Anchor Draggers.
When You’ve Fixed Something, Fix It Again.
New: Convince Your Suppliers and Customers to Take the Steps Just Described.
Install Business Systems to Encourage Lean Thinking [Months 24 – 48]
Notes on Continuous Process Improvement 28 April 2008
7
Create new ways to keep score.
Create new ways to reward people.
Make everything transparent so everyone can see progress.
Teach lean. Learn lean.
Right-size Your Tools to insert directly into the value stream. Large and fast is more efficient but less
effective. This wrong assumption is the cornerstone of batch-and-queue thinking.
Pay a bonus. Tie bonus amount to the profitability of the firm.
Completing the Transformation [Months 48 – 60] Convert to bottom-up initiatives. Lean ideas are
democratic and not top-down. Layers of management can be stripped away.
New: Convert From Top-Down Leadership to Bottom-Up Initiatives. Toyota gets brilliant results from
average managers using brilliant procedures. Competitors get mediocre results from brilliant managers using
mediocre procedures. Don’t search for brilliant managers. Perfect your processes.
The Inevitable Results of a Five-Year Commitment
Afterword: The Lean Network www.lean.org
Individuals and Organizations Who Helped
Glossary
batch-and-queue Making large lots, then sending the lot to wait in queue for the next operation.
cells The layout of machines in a tight U-shaped sequence, permitting single piece flow and
multi-machine working. Contrast with process villages.
just-in-time Producing and delivering just the right item at the right time in the right amount. Flow, pull,
and standard work are the pre-requisites.
kaizen Continuous, incremental improvement.
lead time The total time a customer must wait to receive a product after placing an order. If the order
can start production immediately, then production time and lead time are the same.
monument Any design, schedule, or technology with scale requirements necessitating that products be
brought there to wait in a queue for processing.
muda Waste. Any activity that consumes resources but creates no value.
multi-machine working
Training employees to operate multiple machines. This is essential to creating production
cells where each worker uses many machines.
process villages Grouping machines and people by type of operation performed. Contrast with cells.
queue time The time a product spends in a line awaiting the next step.
right-sized tool A design that can be fitted directly into a production cell and permit the flow of products so
the products do not need to be transported to a monument and wait in a queue.
seven muda Ohno’s original seven types of waste found in production: Transportation, Inventory,
Motion, Waiting, Over-Processing, Over-Production, and Defects
standard work A precise description of each work activity, specifying cycle time, takt time, sequence,
inventory, and standards.
Notes
Bibliography
Index
Notes on Continuous Process Improvement 28 April 2008
8
Reviewer’s Comments
In 1988 James Womack first described Toyota as a “lean” corporation. Womack and co-writer Daniel Jones
described the Toyota Production System (TPS) in The Machine That Changed the World. In 1990, the two
toured companies in Europe, North American, and Japan presenting ideas on how to convert mass production
practices to lean practices. Lean Thinking, first published in 1996, is a survey of the lean movement. It clearly
describes the waste found in mass production, explains the five principles of lean thinking, and then draws
lessons from real companies who have successfully implemented lean ideas. Lean Thinking is not a technical
how-to text on production, but an enlightened overview of top-level lean ideas and applications. This updated
edition includes lessons that the authors have collected between 1996 and 2003, especially the concept of a lean
enterprise – a collection of companies working lean together to produce a single product with the least wasted
effort and capital. The book is well-written, researched, and organized, and the authors make a strong case that
lean is universal and will benefit any organization in any endeavor. Lean thinking and practices are the single
most powerful tool for eliminating waste in any organization.
Prepared by: LtCol Brendan B. McBreen, 1st RTBn, RTR, MCRD PISC, 843-228-2467, brendan.mcbreen@usmc.mil
... One of the most commonly used methods for achieving these improvements is lean production (Liker, 2004;Emiliani, 2006), where the focus is on the ability to improve (Rother, 2009). Womack and Jones (2003) explain that a visibility where everyone can see the current production status is a critical part of the principles and techniques of lean. Building on the arguments of Womack and Jones (2003), Ortiz and Park (2011) discuss the 'visual factory' and its significance. ...
... Womack and Jones (2003) explain that a visibility where everyone can see the current production status is a critical part of the principles and techniques of lean. Building on the arguments of Womack and Jones (2003), Ortiz and Park (2011) discuss the 'visual factory' and its significance. The visual factory is about making information available, which means that the information that production personnel need to make the right decision is available at any given time and place (Parry and Turner, 2007). ...
... The visual factory is about making information available, which means that the information that production personnel need to make the right decision is available at any given time and place (Parry and Turner, 2007). According to Womack and Jones (2003), a whiteboard is a good example of visual control and of how it is possible to make information visible in such a way that all employees can see it and take the necessary measures. Parry and Turner (2007) emphasise the use of boards, claiming that the board is the hub of the improvement work. ...
... Lean Management (LM) is a management concept which is increasingly recognized worldwide [3] and frequently discussed in the literature [4] as one of the methods likely to address and significantly reduce the drawbacks and inefficiencies of the healthcare system. Lean thinking, as proposed by Womack and Jones [5], draws on the concept of lean management originally used by production organizations, e.g., Toyota [5], and was imported from the industry and implanted to healthcare following the publication of a groundbreaking book Lean Hospitals by Graban [6]. This was the first comprehensive work on the application of Lean in healthcare that the industry found convincing as it presented the benefits obtained in all clinical areas. ...
... Lean Management (LM) is a management concept which is increasingly recognized worldwide [3] and frequently discussed in the literature [4] as one of the methods likely to address and significantly reduce the drawbacks and inefficiencies of the healthcare system. Lean thinking, as proposed by Womack and Jones [5], draws on the concept of lean management originally used by production organizations, e.g., Toyota [5], and was imported from the industry and implanted to healthcare following the publication of a groundbreaking book Lean Hospitals by Graban [6]. This was the first comprehensive work on the application of Lean in healthcare that the industry found convincing as it presented the benefits obtained in all clinical areas. ...
Article
Full-text available
Background: Lean Healthcare Management is an innovative approach to process management in healthcare organizations. Despite that the Lean principles have been increasingly recognized worldwide as a tool to boost organizational performance, improve the quality of care and curb waste, the Lean methodology can be difficult to implement in some countries. This study seeks to identify the facilitators of and barriers to the implementation of Lean in the healthcare system in Poland. Material and methods: A public consultation was held among 318 representatives of stakeholder groups in the healthcare system in Poland. Data was collected using validated self-administered questionnaires. Statistical analysis was performed using the IBM SPSS Statistics 25 software. Results: The study revealed that a large share of respondents believed that the awareness of the existing organizational deficiencies in work practices among stakeholders can greatly facilitate the implementation of Lean in the healthcare system in Poland (50.9%, p < 0.05). The main barriers to the deployment of Lean include lack of awareness of the Lean methodology and its benefits (76.1%, p < 0.001); insufficient institutional support (43.7%), and lack of funding for Lean solutions (32.4%). Conclusions: Gaps in the medical curricula and education programs for healthcare professionals concerning the latest process management solutions in healthcare should be addressed in order to raise awareness of the benefits of cooperation with and the active involvement of Lean experts in applying "lean" ideas to improve the organizational performance in healthcare. It is also necessary for policy makers to be aware of the benefits of contemporary process management in healthcare and to support its implementation. Med Pr. 2023;74(1).
... The main goal of implementing the Lean Manufacturing philosophy in the enterprise is the elimination of waste (Womack & Jones, 2003). Removing sources of waste is effective when using the so-called lean manufacturing practices, which include: ...
... However, a worrying phenomenon is the decline in the involvement of middle and top management employees: line managers (stage I -11.11%, stage II -10.38%) and representatives of the top management (stage I -6.22%, stage II -5, 66%). According to the assumptions of the Lean philosophy (Womack and Jones, 2003;Gelei, et al. 2015), they should motivate and support such activities with their attitude. ...
Chapter
In this chapter, the authors highlight the benefits of using Lean Maintenance, showing and discussing obtained results from studying industrial companies and concluding about used tools and level of this concept implementation in their activity. For obtaining the base results for this work, surveys were used for research carried out in enterprises. Some questionnaires were sent to companies, in Poland, for being possible to acquire some data from their experience and results by using Lean Maintenance. As main achievements of this study, it can be concluded that levels of application of Lean Maintenance, and respective used tools, are different, when analyzed by the type of company: small, medium, or large. In most companies, the employment level of maintenance services has not changed significantly due to the implementation of Lean Maintenance. Only in large enterprises and mostly with numerical machines, the employment level of maintenance services employees decreased. Large enterprises achieved the greatest benefits from the implementation of Lean Maintenance tools.
... Third, our study contributes to the literature that evaluates JIT inventory management as an effective dimension of firms' operations. 5 Based on case studies and surveys, research has indicated that JIT inventory management, in reducing inventory holdings to minimal levels and delivering the right item at the right time, should be a valuable strategic resource for firms (Bagchi, 1988;Barlow, 2002;Voss, 1989;Womack and Jones, 2003). 6 However, prior research has not analyzed the role of talented human capital in JIT inventory management. ...
... JIT inventory management aims to reduce inventory levels by purchasing, transporting, and producing the right inventory items at the right time (Bagchi, 1988;Hall, 1983;Womack and Jones, 2003). It is of utmost importance for all required items to arrive when and where they are needed, in the exact quantity required and in usable condition. ...
Preprint
Full-text available
This study investigates whether the ability of top management teams (TMTs) influences efficient just-in-time (JIT) inventory management. Using a sample of U.S. listed firms spanning the period 1987 to 2018, our analyses, via mediation and moderation tests, show that more able TMTs enhance firm performance through efficient JIT inventory management. Our study highlights the importance of talented TMTs in contributing to efficient JIT inventory management that translates to shareholder value maximization.
... As emphasized by [10], new work systems, routines, and new behavioral patterns cannot be implemented overnight. Also, Womack and Jones [16], have explained in their studies that lean manufacturing should not be used as a panacea to solve short-term competitive problems, since the lean manufacturing can only be achieved through time. Further, lean production practices significantly enhance manufacturing performance and their study revealed that to achieve higher levels of manufacturing performance, lean duration in operation is highly impacted. ...
Conference Paper
Apparel manufacturing companies should enhance operational performance in order to deliver high quality products in lesser lead times. Lean utilization is introduced to meet this requirement. However, mere implementation of lean does not lead to higher operational performance. Present study examines the impact of lean utilization on operational performance and the effect of lean duration in the apparel industry in Sri Lanka. The study population comprises apparel manufacturers who have adopted lean as their standard of operation at least to the main value adding process for more than one year. The sample size is thirty. Three main lean construct and 16 lean practices have been tested in the study. Findings show a positive association between lean utilization and operational performance. Waste elimination is the highly utilized lean cluster in the apparel sector. The longer the lean production processes in operation, the higher the operational performance in apparel companies.
... Lean tools focus on efficiency improvement and continuous improvement of processes (Dresh, 2018). For example, according to some sources Kaizen is also perceived as a Lean tool, which customises correctly according to an organisation's need and can support continuous improvement in safety, quality, processes and productivity (Womack, Jones, 2003). At the same time, a whole improvement movement within the organisation is also named 'Kaizen'. ...
Article
Purpose: The study aim is an in-depth investigation of a Lean tools implementation sequence in an organisation as an expression of a Lean journey within that organisation. The success factors of Lean tools implementation and the relationship between them are studied. A model of Lean tools implementation in an organisation is aimed to be developed. Design/methodology/approach: A case study method is employed in this study. It is conducted in a manufacturing company from the fast-moving consumer goods (FMCG) industry. The employed method allows exploitation of a variety of techniques in the investigation process: in-depth interviews, observations, documents and data analysis. The study takes into consideration a systematic literature review and bibliometric network analysis supported by the Vosviewer software tool. Findings: The implementation of Lean Manufacturing approach, along with accompanying tools and methods, is aimed at efficiency and/or quality results of the processes within a company. Selected tools, to be successfully implemented, should support the elimination or reduction of losses related to current process flows. There are many Lean tools available, but most do not fit all organisations and all the kinds of manufacturing processes. Therefore, proper preparation before implementation is an essential issue for any organisation striving for Lean outcomes. The available Lean tools, along with their implementation sequences, are not studied comprehensively in the literature. Originality/value: An organisational-development-driven model of Lean tools implementation is elaborated, based on the literature and empirical investigations. The decision to choose the appropriate Lean tool should be guided by general organisational development. Several factors need to be considered before the implementation process, namely, capabilities, resources, gains and return on expenditure. Top management engagement, appropriate communication and listening to line employees look to be key success factors in Lean tools implementation. Keywords: Lean Manufacturing, Lean tools, Lean implementation. Category of the paper: Research paper, Case study.
Chapter
The main purpose of the article was the reduction of the machine changeover time in practical terms, on the example of a forming machine in the production process of a trunk shelf, based on the use of the SMED method. The article presented the stages of development and the foundations of the lean management concept. The description of the SMED methodology was made. A forming machine was selected in the manufacturing process of a trunk shelf. The identification and measurement of changeover times in the real model were performed. Two alternative models were proposed. The first of them was made based on the division of activities into external and internal, and the delegation of external activities to be performed by the production staff. The second alternative model included investments. The proposed and implemented improvement actions brought benefits in a reduction of the changeover time of the tested machine.
ResearchGate has not been able to resolve any references for this publication.