Muhamad Azry Khoiry

Muhamad Azry Khoiry
Universiti Kebangsaan Malaysia | ukm · Department of Civil and Structural Engineering

PhD (Civil & Structural Engineering)

About

52
Publications
96,558
Reads
How we measure 'reads'
A 'read' is counted each time someone views a publication summary (such as the title, abstract, and list of authors), clicks on a figure, or views or downloads the full-text. Learn more
521
Citations
Citations since 2017
38 Research Items
473 Citations
2017201820192020202120222023050100150
2017201820192020202120222023050100150
2017201820192020202120222023050100150
2017201820192020202120222023050100150
Additional affiliations
November 2015 - February 2016
Universiti Kebangsaan Malaysia
Position
  • PostDoc Position
April 2011 - August 2015
Universiti Kebangsaan Malaysia
Position
  • Graduate Research Assistance
Education
September 2011 - August 2015
Universiti Kebangsaan Malaysia
Field of study
  • Construction Management
May 2007 - May 2011
Universiti Kebangsaan Malaysia
Field of study
  • Civil & Structural Engineering

Publications

Publications (52)
Article
Full-text available
Various factors affect the standard method of measurement adoption in civil construction projects, especially in developing countries such as Malaysia. Hence, this study investigates the relationship between affected factors towards standard adoption using the SEM approach. As a case study, this study focused on quantity surveyors working at a cons...
Article
Full-text available
Various factors affect the standard method of measurement adoption in civil construction projects, especially in developing countries such as Malaysia. Hence, this study investigates the relationship between affected factors towards standard adoption using the SEM approach. As a case study, this study focused on quantity surveyors working at a cons...
Article
Full-text available
This study seeks a better understanding of the acceptance of geospatial technology with Light Detention and Ranging (LIDAR) in road design in a developing country, Malaysia. Existing surveying measurement methods to provide quick, accurate, and reliable information are unsuccessful in producing an expected result, especially in large areas. In addi...
Article
Full-text available
Construction is a critical sector of any economy in terms of value production, labor, and contributing to the gross national product. Managing risk is a relatively young area in Yemen’s construction sector, but it is gaining traction as building activity and competition rise. Construction firms mitigate risk by using a variety of risk management me...
Article
Full-text available
To improve the performance of the construction industry, innovative methods were introduced to make them better. Industrialised building systems (IBS) and prefabrication construction are the popular methods used and studied. However, these methods are still unable to meet the demands of the stakeholders. Design for manufacturing and assembly (DfMA)...
Article
Full-text available
The attempts to analyze the relationship between the construction industry and economic growth have integrated many different methods. The process has become to be perceived as "construction economics" analysis. It is conceptualized as a procedure where construction industries outcomes implement increasingly more relevant for nation's development b...
Article
Full-text available
The attempts to analyze the relationship between the construction industry and economic growth have integrated many different methods. The process has become to be perceived as “construction economics” analysis. It is conceptualized as a procedure where construction industries outcomes implement increasingly more relevant for nation’s development b...
Article
Productivity is one means to measure the efficiency of a construction project. Most of the problems that are always encountered in construction projects are problems related to labour productivity. Labour productivity has become part of the issues that significantly affect the construction project (CP) performance (cost, quality, and time). Labour...
Conference Paper
Full-text available
Building Information Modelling (BIM) was first introduced for vertical building projects. Infrastructure in BIM is a major transformation in the civil infrastructure industry. This type of construction has recently become more popular for infrastructure construction, whereby the construction and academia-industry are putting effort into infrastruct...
Article
Full-text available
Airborne light detection and ranging (LiDAR) surveying technology plays an important role in road design, and it is increasingly implemented in the design stage. The ability of LiDAR as a remote sensing technology to be used in non-accessible places (i.e., hilly terrain, steep slope) makes it a powerful tool, and it has the potential to provide ben...
Article
Full-text available
The objective of this research is to classify risk factors and their ranking in terms of their probability and impact on construction projects in the oil and gas sector, to test the relationship between the causes and effects of risk factors and then develop the risk map to facilitate the planning of risk response strategies. To achieve this object...
Article
Full-text available
The climate of Malaysia, which is hot and humid, has a great impact on soil-root interaction. This study aims to determine the influence of soil-root interaction in slopes, which is calculated in the form of factor of safety. A numerical slope model is studied with Vetiver grass (Vetiveria Zizanioides sp.) as the vegetative cover at a residential p...
Article
Full-text available
Abstract Purpose – The oil and gas construction projects are affected negatively by the drop in oil price in recent years. Thus, most engineering, procurement and construction (EPC) companies are opting to optimize the project mainly to mitigate the source of risks in construction to achieve the project expectation. Risk factors cause a threat to t...
Article
Full-text available
Purpose Construction projects in the oil and gas sector are greatly affected by external risk factors, especially those related to the economy, politics, security and stability factors. Hence, this research aimed to investigate the fundamental relationship between the external risk factors and their effects on the construction project success using...
Article
Full-text available
Purpose-Project failure is the result of one or a combination of several causes of risk factors that are very important to identify for effective performance. This study aims to focus on studying the fundamental relationship between internal risk factors and the negative effect on oil and gas project success in Yemen using the partial least square...
Article
Full-text available
Building Information Modelling (BIM) is a major transformation in the building industry. The construction is seen among the best solutions to overcome too many problems faced in conventional industry construction. Conventional construction is associated with two-dimensional (2D) drawing technology while BIM used three-dimensional (3D) model and eac...
Article
This article articulates a framework suitable to use when making a decision about student seating arrangement in the classroom at school level as a research aim. The decision makers should establish what are the potential types of seating arrangement? Then evaluate them in terms of its contribution, significance, and impact to the student learning...
Article
Full-text available
Purpose This study aims to identify and assess the significant risks in Yemen oil and gas construction projects based on their risk rating (impact and probability) by using probability–impact matrix (PIM). Design/methodology/approach In total, 51 risk factors that might affect construction projects in the oil and gas sector are defined through a d...
Article
Purpose Teaching and learning processes are conducted formally in a classroom as the main learning space for schooling system, where it should be implemented effectively to achieve a desired level of satisfaction and comfort for the students. To encourage and sustain students’ motivation for continuous learning, specifically at secondary school lev...
Research
Full-text available
This study aims to investigate the risk factors in construction projects in oil and gas processing facilities in Yemen and serves as a case study for developing countries. By using a questionnaire, data were collected from 201 project managers and engineers employed in different sectors in the oil and gas industry in Yemen. The survey analysis base...
Article
In this study a conceptual framework will allow design teams to have an appropriate balance between economic, social and environmental issues, changing the way construction practitioners think about the information they use when assessing building projects, thereby facilitating the sustainability of building industry. In view of the increasing sign...
Article
Productivity in a construction project closely related to the labour. The productivity of construction industry has a significant impact on the cost and profitability. A variety of previous studies on the identification of the factors that affect construction labour productivity (CLP) has been carried out by researchers in many countries. This stud...
Article
Full-text available
Risk factors are unique in every of the construction projects are facing today. This research is conducted to identify and assess the relative importance of the significant risk factors contributing to cost and time overrun in oil and gas construction project in Yemen. Usually, construction projects affected by risk factors during the project lifec...
Research
Risk factors are unique in every of the construction projects are facing today. This research is conducted to identify and assess the relative importance of the significant risk factors contributing to cost and time overrun in oil and gas construction project in Yemen. Usually, construction projects affected by risk factors during the project lifec...
Article
Full-text available
Students learning in educational institutions is associated with classroom environment which normally equipped with physical aspects consists of furniture, air-conditioning, fan, lamp, whiteboard, soft board and etc. The effectiveness and efficiency of learning process in the classroom may not be measured only through the students’ ability and capa...
Article
Full-text available
Construction delays have become endemic in Libya. It is imperative to create awareness of the extent to which such delays can adversely affect project delivery, especially with regard to road construction projects. It is clear that the Libyan road construction industry also faces the issue of not being able to complete projects within the allocated...
Article
Full-text available
Indoor Air Quality (IAQ) is an essential matter in achieving students' satisfaction for the learning process. Building's orientation is a factor that may encourage sufficient natural ventilation for the classroom occupants. Inadequate ventilation is an issue for most existing classrooms. The purpose of this paper is to analyze the accuracy of natur...
Article
Full-text available
Transportation infrastructure, specifically road projects, is the backbone of economic and social development of many countries. Successful road infrastructure projects are delivered with reduced cost, on time. Factors contributing to Construction delay in road construction projects in Libya were identified and ranked through a questionnaire survey...
Article
Full-text available
Delays have always been a major concern in road construction projects throughout the world, with significant financial and social impacts for stakeholders, and the occurrence of schedule delays has a serious impact on project investment, efficiency, cost, and reputation. Libya is one of the countries faces all these delay issues. This study explore...
Article
Full-text available
Material storage management focuses on starting material into the built-up site to be recorded, the material layout and stored over a certain period until it is taken out of the storage area to the work site and the process is repeated. The emergence of new technologies that are not integrated and have no efficient management methods as well as ine...
Article
Full-text available
Construction is an important industry to determine the development of a country. However, this industry faced delay issues caused by various factors that affect proper construction project. Hence, minimizing delay in construction should be focused on overcoming the delay issue. Thus, the objective of this study is to critically review the main crit...
Article
Full-text available
Delays have always been a major concern in road construction projects throughout the world, with significant financial and social impacts for stakeholders, and the occurrence of schedule delays has a serious impact on project investment, efficiency, cost, and reputation. Libya is one of the countries faces all these delay issues. This study explore...
Article
Full-text available
Coping with delays is an ever-present challenge for construction projects throughout the world, and both practitioners and researchers have focused their attention on ways to prevent them or to mitigate their effects. Civil engineering projects in Libya, too, especially projects involving road construction, constantly face construction delays. This...
Article
An evaluation on the effectiveness of Problem Based Learning (PBL) for the course Materials Technology was carried out using various measuring tools and assessment. This paper evaluated the efficacy of the PBL method implemented through students’ feedback in the Teaching and Supervision Evaluation System (SPPP) and examination. The SPPP is an indir...
Article
Full-text available
This paper discusses the effectiveness of the industrial training from the perspective of students who have undergone 12 weeks of industrial training. A questionnaire was distributed to 47 Third Year students at the Civil and Structural Engineering Department (JKAS), Faculty of Engineering and Built Environment, Universiti Kebangsaan Malaysia (UKM)...
Conference Paper
Full-text available
Students' skills and competency serve as a vital requirement that can contribute to their marketability. It can be directly formed in lectures or indirectly through exposure and competition students engaged in. To build and nurture the skills and competency of the students in the Civil and Structural Engineering Department, a bridge model competiti...
Article
Full-text available
The rising awareness of the importance of professional skills for engineering students has led to increased attention given by engineering schools to developing the critical thinking skills of students. Thus, this study discusses proposed methods implemented in the teaching and learning process in concrete laboratory experiments. A combination of p...
Article
Full-text available
Students' understanding of foundational concepts in fundamental courses is important as it is a pre-requirement for proceeding to any advanced and specific courses in any degree programme. Despite high passing rates in most universities, students actually do not really have a good understanding of the course content, especially in fundamental cours...
Article
Full-text available
A rising awareness of the importance of professional skills for engineering students has led to increased attention being paid in engineering schools to the development of students’ psychomotor skills. In the past, assessment of psychomotor skills was seen as being less important than assessment of knowledge and cognitive skills. Thus, this study d...
Article
Full-text available
The development of an infrastructure requires a planned and effective construction management including the construction of the university. To obtain a good ranking, the universities should provide comprehensive physical facilities and infrastructure. This study is to investigate the construction process to know the causes behind the delay process...
Conference Paper
Full-text available
Construction delay is a common problem in the construction industry all over the world. Many researchers seeking the causes of delay in order to reduce the probability of delay to occur. Most researcher identified causes of delay in construction to reduce the possibility of construction project to continued delay. This study is to obtain the holist...
Conference Paper
Full-text available
Measurements on students' understanding in the fundamental courses of Civil & Structural Engineering Program is an important step in determining the level of student achievement before they can proceed to advanced courses. Hence, this paper presents the level of students' understanding in the examination of the fundamental courses at the Department...
Article
Full-text available
The delay in construction project completion is a common phenomenon that occurs in the construction industry, especially where the government projects are concerned. This survey will center on the Ninth Malaysia Plan project delay as evidenced in the Universiti Kebangsaan Malaysia campus. It will generally examine delay-related issues, which includ...
Article
Full-text available
The process of accreditation by Engineering Accreditation Council Malaysia (EAC) and BEM is purely based on manual of Engineering Programme Accreditation Manual. This process consumes high commitment, cost and time by academicians and support staff in preparing the document that may divert their attention from performing their real task of teaching...
Article
Full-text available
Everybody needs a house as shelter, either by renting or owning one. In order to have a good place called home, the location normally will be the priority in the list. Recently Bandar Baru Bangi which is recognized as Malay Elite Town has the significantly shown an increase in house prices starting from the mid 90's. Thus, this area is the main foc...
Article
Full-text available
In Malaysia, housing construction industry is moving towards quality.Many construction companies have implemented several Quality Management System (QMS) for instance ISO 9001 and TQM in managing projects to ensure the quality of products. However, aspect of quality in newly built housing are remains an issue. Thus, a survey had been conducted amon...
Article
Full-text available
Delay can be defined as time overrun or extension of time to complete the project. Construction delay is something that cannot avoided especially in government agencies in Malaysia. Therefore delay is a situation when the actual progress of a construction project is slower than the planned schedule or late completion of the projects. The causes of...

Network

Cited By

Projects

Project (1)
Project
To develop a guideline that can be use by R&R operators to implement sustainable elements in the current and future R&R. The elements are (sustainable waste management, composting, biogas, rainwater harvesting, green roof and sustainable building materials and energy saving.