
Marian Bosch-Rekveldt- PhD
- Professor (Associate) at Delft University of Technology
Marian Bosch-Rekveldt
- PhD
- Professor (Associate) at Delft University of Technology
About
56
Publications
33,697
Reads
How we measure 'reads'
A 'read' is counted each time someone views a publication summary (such as the title, abstract, and list of authors), clicks on a figure, or views or downloads the full-text. Learn more
1,373
Citations
Introduction
Marian Bosch-Rekveldt currently works at the Faculty of Civil Engineering and Geosciences, Delft University of Technology. Marian does research in Qualitative Social Research, Civil Engineering and Industrial Engineering.
Her main research interests include:
- Improving project performance of large engineering projects
- Managing project complexity
- Flexible project management
- Fit-for-purpose project management
Current institution
Additional affiliations
February 2013 - present
Publications
Publications (56)
A suitable approach to grand challenges? Governance of integrated urban transformations implies dealing with complexity and uncertainty
In this article, we draw lessons from the set-up and contractual and relational governance of an integrated urban transformation. We investigated whether and how the approach of this grand challenge in the built en...
Literature aimed at practitioners recommends dedicated Steering
Committees for oversight of a project. However, most scientific research
focusses on project governance in general or the role of the single owner.
This paper adds to literature by inductively exploring the formation and the
functioning of a Project Steering Committees, based on ex...
Flood defences are often situated in public spaces and are mostly multi‐functional, multi‐financed and multi‐managed. Cooperation in flood defence asset management is important because roles and responsibilities are fragmented within and between organisations. This complex context calls for mutual understanding from responsible role‐holders. Resear...
Flood defences are in practice often multi‐used, multi‐managed and multi‐financed. Flood defence asset management contains technical, organizational and spatial complex issues involving multiple organizations. In the literature, little attention has been given to the conditions for successful cooperation between organizations in flood defence asset...
In today’s construction projects, which are getting more complex as a consequence of especially technical, organizational, and external aspects, complexities are considered a major source of risks. Moreover, risks may turn to complexity-creating elements and propagate additional risks through a bidirectional interaction. Complex construction projec...
Collaboration can bring multiple benefits to projects. Real collaboration appears, however, complex to implement. So far, there is no scientific agreement on the importance of the formal and relational (behavioural) sides of project collaboration. Through a qualitative study of two collaborating teams in large engineering and construction projects...
SchedulingScheduling of a construction projectConstruction project can be done by using the Critical Path Method
Critical path method (CPM) in case the projectProject is composed of interrelated activitiesActivity that can be combined through a network. Given uncertainties nowadays and the related need for projectProject schedule adaptations, the q...
Purpose
The purpose of this paper is to investigate the Last-Planner-System’s impact on project cultures in terms of partnering.
Design/methodology/approach
A case study was performed using multiple data gathering approaches. The project cultures of three projects not applying the Last-Planner-System were compared with three projects that apply th...
This paper presents the findings from a study of the breakdown of project success criteria. An exploration of the evolution of studies on the success of engineering projects over decades was the basis for a project success definition proposal. Using a comprehensive literature review of success criteria for engineering projects, a list of 133 differ...
This study investigates the factors affecting the integration of sustainabilitySustainability into the project managementProject management of infrastructure projectsInfrastructure project, specifically highway projectsProject during early phases. The research was drawn upon previous studies in order to develop a sustainabilitySustainabilityframewo...
Heeding recent calls for more studies on the relationship between projects and institutions, this paper reports on a collaborative case study to shed light on the recursive relations of large-scale projects and their institutional fields. Given the industry as the field-level institution, this study explores how two project organizations experience...
Heeding recent calls for more studies on the relationship between projects and institutions, this paper reports on a collaborative case study to shed light on the recursive relations of large-scale projects and their institutional fields. Given the industry as the field-level institution, this study explores how two project organizations experience...
This paper examines the current state of project cultures in the German turnkey construction industry and the ideal project cultures in terms of partnering from the perspective of various key stakeholders (i.e., Investors, General Contractors, (Sub-)Contractors and Designers). To investigate the current and ideal cultures, data were gathered among...
Project-focused structures in infrastructure endeavors involve the execution of simultaneous efforts with shared resources. This research highlights to what end such organizational structure is complex to manage. The study focuses on project governance structures’ impact over project-oriented organizations, particularly by exploring the ineffective...
Current literature shows that poor cost performance in projects has become routine. Research on cost performance has mostly focused on one of the involved parties, either the client or the contractor. Not many research efforts discuss the cost contingency performance of projects. This research discusses the cost performance and cost contingency of...
The current literature discusses the methods to estimate the costs and cost contingency. The literature also distinguishes “known unknowns” and “unknown unknowns” contingencies. Little is written, however, about the evolvement of total project cost estimates during the preconstruction phase of construction projects. Moreover, not many studies are i...
The goal of this study is to identify, classify, explore, and understand decision-making complexity elements in major infrastructure projects (MIPs). This article puts forward systematic definitions of decision making, decision-making quality, and decision-making complexity. Based on literature reviews and an in-depth case analysis of Hong Kong-Zhu...
Increased project complexity, project dynamics and changes in clients’ requirements are a few examples that suggest the necessity for flexibility in project management in order to deliver successful projects. Despite the fact that literature suggests adding flexibility to project management, there is no existing framework that provides a practical...
Purpose
The purpose of this paper is to study the effect of project management flexibility in early project phases on end-project performance including its mediating role on the effect of complexity over project performance.
Design/methodology/approach
Out of 13 hypotheses, 6 hypotheses regarding the relationships between areas of flexibility and...
Although sustainability is on the agenda of many countries and agencies, it is still a great challenge to properly integrate sustainability into major infrastructure projects, like tunnels. This is remarkable, as it is commonly accepted that the construction and operation of these civil infrastructures have a heavy impact on environmental, economic...
The main aim of this study is to gain insights into project management professionals’ perception of how project success can be achieved. The Q-methodology was followed in this research. Based on an extensive literature review and validation through expert judgment, a framework consisting of 33 factors increasing the likelihood of success was develo...
The literature on risk management acknowledges a growing number of Risk Maturity Models (RMM). However, for the construction sector, there is no validated RMM that is based on both theory and experts’ opinions. In this article, a Generic RMM (GRMM), inspired by the EFQM model, is developed and validated to remedy this shortcoming. The GRMM uses a l...
At this stage, construction industry is known for bad project performances and a culture
characterized by adversarial behaviours. The Last Planner System (LPS) is designed to
improve these circumstances through the enhancement of workflow reliability by involving
various disciplines in joint planning processes and a culture of collaboration. How t...
Literature defines two main streams in project management: mechanistic and organic. Mechanistic reflects the traditional waterfall approach and organic reflects a more adaptive approach. The organic approach became known by the awareness of dynamic project environment and changing requirements. The organic approach is characterized by flexibility....
Construction projects are bounded with uncertainties and therefore, the occurrence of risks in these projects is unavoidable. Literature confirms that risk management increases the possibility of project success. A Risk Maturity Model (RMM) is a tool, which can help projects measuring the maturity of risk management and plan for risk management imp...
Increasing complexity of projects is mentioned as one of the reasons for project failure—still. This paper presents a comparative research to investigate how project complexity was perceived by project practitioners in different industry sectors. Five sectors were included: process industry, construction industry, ICT, high-tech product development...
A lot has been written about the notion of project success, in terms of criteria and factors, but still projects fail to a large extent. It is assumed that this has to do with contextual influences: not all "known" success factors are equally important in the practice of all projects. Therefore the perspectives of project practitioners on project s...
Purpose
We argue that public project managers do not consider the iron triangle (cost, quality and schedule) primary important in measuring the success of their projects. To investigate which success criteria are important to public project managers, we interviewed 26 Dutch project managers who are employed by the government and who are responsibl...
Despite the vast amount of research on project success, there is no consensus on what activities can lead to that. The reason might be related to a limited understanding of contextual factors influencing success. The main aim of this paper is to explore the factors which are influential in achieving the success of construction projects in three sec...
Though different forms of public–private partnerships exist, in the organizational structure of most forms a public and a private project organization can be derived, resulting in two collaborating project organizations. The literature on project management however mostly considers one project organization. The literature on public–private partners...
Public and private project managers contribute to the success of Large Infrastructure Projects. Considering the public client, so far researchers have been looking at him in a passive role with respect to project success. The focus of this exploratory research is what public project managers who are actively involved in the project, consider projec...
Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project complexity. In this paper we aim to understand if the im...
Public opposition is one of the main political, and less predictable, risks of large-scale energy infrastructure projects. External stakeholder management has become indispensable to the governance of risk in such projects. We integrate insights on public engagement from policy and planning studies with the field of project management to contribute...
This chapter investigates drivers of complexity in engineering projects. Based upon literature and empirical data, the TOE (technical, organizational, external) framework is developed, which captures the drivers of complexity in engineering projects. The empirical data was gathered by means of case studies in which interviews were held with three p...
Project success, both the determination and the achievement, is a widely discussed subject. Literature seems to agree on one thing: whether a project is considered a success depends on the perspective taken to judge it. But how the public project manager determines the success of his project is not clearly discussed in literature. In 2013 we conduc...
Construction projects are becoming more complex and the corresponding contracts (DBFM/DBFMO) are becoming more common. These forms of contracts and the complexity of the projects require a different approach in collaboration of the parties involved. Different parties, amongst which subsidiaries, have to work together on these complex undertakings....
Amongst the students from the Master program Construction Management and Engineering in TU Delft, a clear trend was recognized in the application of Q-methodology in their Master Theses. Although Q-methodology as a research method is already known for decades, lots of academics as well as practitioners are not very familiar with this method. This a...
This paper presents a framework for characterising project complexity in large engineering projects, which can be used to adapt the front–end development phase of engineering projects to the particular complexity. Recently, a large number of project complexity related papers were published, demonstrating the evident importance of “complexity” in cu...
Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear.
To improve the overall project performance, this study focuses on identifying the potential causes of complexity...
This study investigates the relevance of certain parameters for virtual testing of the driver's side OOP problem and attempts to answer the following questions: Which level of detail is needed in the airbag models to assess occupants' injury values for OOP scenarios? What is the influence of the airbag cover on the occupant response for OOP situati...
In Europe approximately 1250 children younger than 15 years of age die in traffic each year. The number of children severely injured in traffic is dramatically higher. Within the ECE-R44 regulation the safety of children in cars has been regulated by means of certification of child restraint systems (CRS). Much has been achieved, but further reduct...
This paper presents the value of "smart" restraint systems in mitigating the injury risk to occupant's in a greater range of impact conditions than those presently considered in current regulatory and consumer impact tests. The work was carried out under the European 5 th framework project PRISM (Proposed Reduction of car crash Injuries through imp...