Jati Hatmoko

Jati Hatmoko
  • Doctor of Philosophy
  • Lecturer at Diponegoro University

About

81
Publications
77,248
Reads
How we measure 'reads'
A 'read' is counted each time someone views a publication summary (such as the title, abstract, and list of authors), clicks on a figure, or views or downloads the full-text. Learn more
452
Citations
Introduction
Dr. Jati Utomo Dwi Hatmoko, is a senior lecturer in Civil Engineering Department of Diponegoro University (UNDIP), Indonesia. He finished his master and PhD in Construction Management from Newcastle University, UK. His research interests include sustainable construction, lean construction, Building Information Modelling (BIM), construction supply chain management, risk management, public private partnership (PPP), etc. He has published in journals and been actively involved in peer reviewing several international journals. His research has been funded by government bodies, such as Ministry of Public Works and Construction Services Development Board, Ministry of Research and Higher education. He is currently running two joint research projects with Loughborough University, UK funded by Newt
Current institution
Diponegoro University
Current position
  • Lecturer

Publications

Publications (81)
Article
Full-text available
This study reviews the utilization and effectiveness of green building assessment tools in Indonesia by systematically analyzing four primary tools: EDGE, Greenship Existing Building, Greenship New Building, and MAGC. Using the PRISMA methodology, articles published between 2019 and 2024 were selected, and a bibliometric analysis was conducted with...
Presentation
Full-text available
In general, there are two alternatives to road pavement construction, namely flexible pavement and rigid pavement, and a combination of both (composite pavement). The aims of this study are to conduct a literature review to determine the extent of previous research that has been carried out, specifically how to calculate the amount of embodied ener...
Presentation
Full-text available
This study uses a systematic mapping study (SMS) method, which is quite popular among researchers, and was chosen because it is still rarely used for literature reviews on LCA in road infrastructure projects. The aims of this study are to systematically map research on the use of LCA to calculate energy and emissions in road infrastructure projects...
Article
Full-text available
This study investigates the environmental impacts of road construction and explores strategies to promote green technologies in Indonesia. Traditional road construction methods, particularly those using asphalt and cement, have signiicant energy consumption and greenhouse gas emissions. This study conducted a thorough literature review to investiga...
Presentation
Full-text available
This study reviews the utilization and effectiveness of green building assessment tools in Indonesia by systematically analyzing four primary tools: EDGE, Greenship Existing Building, Greenship New Building, and MAGC. Using the PRISMA methodology, articles published between 2019 and 2024 were selected, and a bibliometric analysis was conducted with...
Presentation
Full-text available
This study investigates the environmental impacts of road construction and explores strategies to promote green technologies in Indonesia. Traditional road construction methods, particularly those using asphalt and cement, have significant energy consumption and greenhouse gas emissions. This study conducted a thorough literature review to investig...
Article
Full-text available
Penggunaan informasi volume dari Building Information Modeling (BIM) pada proyek konstruksi di Indonesia belum efektif dalam meningkatkan kinerja pengendalian anggaran meskipun BIM telah menunjukkan dampaknya terhadap peningkatan kinerja proyek konstruksi bangunan. Salah satu upaya yang dilakukan untuk meningkatkan efektivitas penggunaan informasi...
Conference Paper
Full-text available
Semarang City, the capital of Central Java Province, is divided into three parts based on its topography: hills, lowlands, and coastal areas. As a result, the city is at risk of natural disasters. According to BNPB data from 2014 to 2023, Semarang City has the second-highest disaster history in Central Java Province, with 741 disaster events record...
Article
Full-text available
Amidst the pressing issue of the climate crisis, the concern of housing backlog requires sustained and intensive growth in housing construction. To address this challenge while also considering environmental impacts, the Indonesian Government has prepared various strategies, one of which involves adopting a modular construction approach. This metho...
Article
Full-text available
Bangunan cagar budaya merupakan bangunan yang butuh perlakuan khusus agar bangunan tersebut tidak kehilangan nilai fungsi dan aspek keselamatan konstruksinya. Seiring waktu bangunan cagar budaya mengalami perubahan fungsi, namun kerap kali perubahan fungsi pada bangunan tersebut tidak memperhatikan aspek keselamatan konstruksi. Penelitian ini bertu...
Article
Full-text available
Erection girder is one of the determinants of the success of bridge and road work, so in its implementation, it is of concern to many parties. Apart from lifting work that uses heavy equipment with a large capacity, it is also due to the high risk of erection work. Since using heavy equipment as a tool for the erection girder, then closely related...
Article
Severalmetrics in the supply chain performance assessment system cannot be uncovered by merely putting a strategy into action. Meanwhile, the balanced scorecard strategynecessitates the incorporation of numerous measures derived from the implementation of strategies,ultimately guidingthe business towardits long-term orientation. The same is true fo...
Article
Full-text available
Construction projects in the construction sector are often faced with the issue of risk uncertainty. Risk has significant value because it has a high level of consequences if not properly managed, whether it brings opportunities or results in losses. Effective risk control plays an important role in preventing delays at the time of project implemen...
Article
Full-text available
The International Roughness Index (IRI) is a widely used measure of pavement roughness that has important implications for vehicle safety, ride quality, and road maintenance. Over the years, many research studies have been conducted on IRI, but the literature is dispersed and lacks an overall research mapping. To address this issue, a Systematic Li...
Article
Full-text available
Kajian ini bertujuan untuk mengevaluasi sekaligus mendalami tingkat kematangan implementasi BIM pada suatu organisasi yang mengelola proyek infrastruktur. Pengumpulan data diperoleh dari 19 proyek infrastruktur di salah satu BUMN karya di Indonesia yang memiliki karakteristik berbeda melalui kuesioner self assessment terhadap kondisi penggunaan BIM...
Article
Full-text available
Potential accidents can occur at any time, including educational activities at a university. Twenty-four cases of accidents at universities in Indonesia, in the form of collapsing building components and fires, have been recorded in the last decade. There is a need for colleges to be ready to implement a Construction Safety Management System in the...
Article
Delays in construction projects are generally understood to be the sole responsibility of the contractor. In fact, these delays can also be caused by factors that actually are the responsibility of the owner, resulting in project completion exceeding the contract target date. As a result, the contractors can be affected and suffer losses due to del...
Article
Full-text available
Projects at the brownfield location cannot be separated from potential hazards related to geotechnical conditions and the existing project site. The construction phase is carried out at a location in the middle of an already operating factory. Lack of understanding of site characteristics and minimal use of the technology used can result in the pro...
Article
Jembatan menjadi media transportasi utama untuk menghubungkan suatu daerah yang terpisah oleh sungai, rel kereta, atau lembah. Analisis jembatan digunakan untuk mengetahui gaya – gaya yang terjadi dan dapat menghindari terjadinya musibah runtuhnya jembatan. Pada penelitian ini bertujuan untuk mengetahu beban maksimum, tegangan, lendutan dan momen c...
Conference Paper
In its business exercises, the development administration industry is done along with numerous gatherings. Where these exercises are interconnected and this relationship can be executed into a store network. The upper hand of the development business is controlled by the upper hand between production network organizations. In the mean time, concent...
Chapter
Full-text available
Mengingat industri konstruksi dan pendukungnya merupakan pengeksploitasi sumber daya alam dan pengguna energi terbesar yang berdampak negatif pada lingkungan, maka desain dan konstruksi bangunan harus dilaksanakan dengan meminimalkan dampak negatif terhadap lingkungan. Total energi dalam siklus hidup bangunan mencakup embodied energi, operational e...
Chapter
The Indonesian state also assesses that construction is an important part of the development of a country. Concern about the negative impact of construction waste is increasing every year and encourages the development of green or sustainable buildings. Reverse supply chain aims to obtain a production output from an end-of-life process that is envi...
Article
Full-text available
Global construction industry for construction 3D printing(3DP) is a novel technique that has started since 3DP innovation in 1981 while still, this technique has undergone a challenge in Indonesia and Malaysia's construction industry. Applying 3DP in the construction industry has given various benefits more than the conventional construction way. T...
Article
Full-text available
Over the last few decades, flood hazards have had a greater impact on society, meaning that communities increasingly need to work together to enhance their resilience. Literature suggests that preparedness to flooding events is generally low as most individuals do not take protective actions. Therefore, there is a need to stimulate individuals’ act...
Article
Full-text available
Kendala umum pada pengadaan material konstruksi adalah keterlambatan pengiriman material akibat ketersediaan stok. Penerapan manajemen rantai pasok yang efektif mampu mencegah terjadinya keterlambatan pengiriman material. Maksud dari penelitian ini adalah untuk membangun model simulasi manajemen rantai pasok berbasis agen dalam penyediaan material...
Article
As an effort to maintain and improve its national road condition with a strict budget, the Government of Indonesia has implemented various types of contract in road maintenance. One of the road maintenance contract, i.e. performanced based contract (PBC), allows the contractor to design, build, and maintain the road and use performance measures as...
Article
Full-text available
The operation and maintenance phase is one of the most important and longest phase in the green building life cycle. In this phase, the existence of internal support and facilitating that is oriented towards sustainable green management can have a major impact on building performance. Its existence is both a support and a catalyst for other process...
Article
Full-text available
LCA has been utilized over the past two decades to estimate the environmental impacts of pavement in infrastructures. The purpose of this study is to systematically map research on the use of LCA to calculate energy and emissions in road infrastructure projects. The research method is carried out by a literature review, in terms of systematic mappi...
Article
Full-text available
The construction industries had a significant role as emission gas contributors through direct activities, such as the construction process, the operation and demolition of the building, and indirect activities, which is the designing process to decide the types of materials and the shapes of the building. This paper aimed to create an embodied and...
Article
In pavement structures that are often submerged by water, the damage to pavement is often caused by the loss of bonds or adhesions between the aggregate and asphalt, the type of damage that occurs due to the loss of adhesion between the aggregate and asphalt is the exfoliation of asphalt granules so that the road is cracked and corrugated. To reduc...
Article
Full-text available
Construction activities gradually consume energy during their life cycle, namely material extrusion, transportation, production, assembly line, installation, demolition and disposal. This research aimed to identify research about energy such as embodied and operational energy. Operational energy is energy that is used during building life cycle to...
Conference Paper
Full-text available
Roads have significant impacts on the environment, economy and society, and the choice of pavement thus has broad implications. All phases of road development, from construction to operations, consume a vast amount of resources and produce waste and emissions. This study aims to examine energy consumption and greenhouse gas (GHG) emissions of a roa...
Article
Full-text available
The number of road construction projects continues to grow, potentially causing more impacts on the environment. This research analyses the impacts of road construction projects of flexible and rigid pavement by adopting the Life Cycle Impact Assessment (LCIA) approach, and by means of the Eco-Indicator 99 (EI99). The impact values at the productio...
Article
Full-text available
The use of disaster insurance for public infrastructure is still uncommon in Indonesia, including in Semarang. The success of the adoption of disaster insurance for public infrastructure is inevitably dependent on the acceptance of stakeholders. The aim of this study is to analyse the power and interest of stakeholders towards the use of disaster i...
Article
Full-text available
Risks are inevitable during the construction phase of a project. In particular, contractors may respond to the project risks by accepting, avoiding, mitigating, or transferring the risks to other parties. This study aims to explore the use of insurance as one of the risk response mechanisms by contractors. Data were collected through observation of...
Article
Full-text available
Flood is a disaster that has the biggest threat, in terms of the number of victims or losses. Semarang City is a city that is classified as a flood prone area, this is due to the geographical location in the lowlands and highlands. The impact of the flood disaster caused damage and losses from various sectors of public infrastructure including the...
Conference Paper
Full-text available
At the initiation and design stage, the stakeholders (owners and planners) are faced with the choice to determine which type of pavement will be used in accordance with the budget provided yet they must also consider for the long-life maintenance and the environmental aspect the of the road pavement project. One indicator of an environmentally frie...
Conference Paper
Full-text available
While sustainable green infrastructure research has progressed substantially in the last decade, there has been a lack of study mapping on the developments of existing research publications in this area. This research aims to systematically review and map the development of existing publications during the period of 2009-2019 using the Scientometri...
Article
Full-text available
At the initiation and design stage, the stakeholders (owners and planners) are faced with the choice to determine which type of pavement will be used in accordance with the budget provided yet they must also consider for the long-life maintenance and the environmental aspect the of the road pavement project. One indicator of an environmentally frie...
Article
Full-text available
Construction industry has a vital role in Indonesia’s economic growth. Infrastructure projects have been the priorities in the past five years consistent with RPJMN (National Medium Term Development Plan). It’s evident in the percentage of contribution of the construction industry, i.e. 10.2%, to Gross Domestic Product (PDB) and 6.34 million employ...
Article
Full-text available
Various piles driving equipment can be used for piling in building projects. In densely populated urban area, more environmentally friendly pile driving equipment, such as hydraulic static pile driver (HSPD) is therefore needed. There are important factors influence the HSPD productivity that are implied in treatment of pile in soil, such as soil t...
Article
Full-text available
Delays have been identified as one of the significant risks in oil and gas projects. A sound risk analysis is, therefore, one of the critical factors for the success of the projects. The aim of this research was to measure the impact of delay risks on the completion time of an oil and gas project in Indonesia as a case study. Data of relevant delay...
Article
Full-text available
Purpose Recent years saw a paradigm shift from ex post (reactive) to ex ante (proactive) approaches (e.g. insurance) to disaster risk financing for building resilience of communities in developing countries. To facilitate adoption, the approaches should be adapted so that they can be technically feasible and culturally desirable to the local contex...
Article
Full-text available
One of the ways to reduce the negative impact of construction projects on the environment is reducing energy consumption. This study aims to calculate the energy consumption of a bridge construction project on the conventional beam girder and the precast girder. Data collection was carried out on the Salatiga-Surakarta toll road bridge project pack...
Article
Full-text available
All construction activities will inevitably produce CO2 emissions from the production process of materials, transportation, the usage of plant and equipment, the construction process, up to building demolition. Therefore, it is very important to understand the construction process and the amount of CO2 emissions released at each stage of the constr...
Article
Full-text available
One of the problems that often arise in housing projects is time delay, which may results in an increase in construction costs. This delay can be attributed to deficiencies in site management, ineffective communication strategies, and a lack of coordination between stakeholders. Lean construction is a method that can be used to improve the construc...
Article
Full-text available
Many construction practitioners in developed countries are already aware of reducing and managing construction waste. In Indonesia, it has not yet become a primary concern. Typically, the priority still focuses on how to win competitions instead and finish them on time with some profits. Whereas, the volume of waste in the world continues to grow d...
Article
Full-text available
Some buildings have no clear and structured maintenance. Currently building maintenance is mostly done when there has been damage or system instability attached to the building. Besides that, there are still not many buildings that have data about the age of use of each particular facility, for example plumbing, lights, faucets, telephones, and pas...
Article
Full-text available
More than 80% of oil and gas projects around the world experience delays, which may result in huge financial implications to the contractors and the owners. Therefore, it is important to manage delay risks factors to meet the target of project completion dates. The purpose of this study was to map delay risk factors of Engineering, Procurement, Con...
Article
Full-text available
To achieve the target of 100% drinking water service, Central Java Provincial Government holds regional water supply system (SPAM) programmes in Central Java, one of which is Keburejo regional water supply system (Kebumen and Purworejo). During the development phase, it was delayed due to project cost overrun, which later promotes an option for Pub...
Article
Full-text available
Numerous fast-growing coastal cities in the Global South are exposed to coastal, fluvial and pluvial floods, as a consequence of decades-long rapid urbanisation and weak enforcement of planning regulations. Integrating Blue–Green Infrastructure (BGI) concepts into the development of the urban landscape has the potential to increase flood resilience...
Article
Full-text available
To sustainably eradicate corruption, extraordinary efforts are needed particularly in the context of construction projects. In this study, the state losses in government-funded construction projects in Indonesia is analyzed. Research data were collected through field observations for types of work that were not completed per technical specification...
Article
Full-text available
A comprehensive plan is required to anticipate risks in a construction project. In practice, however, anticipated or unanticipated risks may eventually lead to delays in the project completion date. The aim of this research is to quantify the delay risk potential of a road project during the construction phase. A project at Batang-Kendal road has c...
Article
Full-text available
Precast concrete has typically long lead time, starting from order placement, production stage, to delivery to project site, all of which requires good supply chain management. As a consequence, the risks of its supply chains are inevitable and must be anticipated to ensure the success of a project. The aim of this research is to assess the risks o...
Article
Full-text available
The development of information technology continues to evolve to respond the increasing demand and challenges in the construction industry. Building Information Modelling (BIM) emerges in recent years as the fresh solution to make the project lifecycle more efficient by encouraging collaborative working of all stakeholders involved in the construct...
Article
Full-text available
High rainfall leads to flood vulnerability and potentially leads to the failure of road pavement which affects the economic loss for the people. However, such road pavement failures need to be studied more deeply to be able to distinguish whether the failure is solely due to flood natural disaster or other factors, such as overloading and poor cons...
Article
Full-text available
The increasing need for bridge infrastructure in Indonesia requires an efficient and lean construction process. The aim of this research to evaluate the use of precast concrete elements on bridges based on the Design for Manufacture and Assembly (DfMA) criteria. DfMA is a principle design that considers the process of manufacture and assembly compo...
Article
Full-text available
Road infrastructure in Indonesia is mainly dominated by flexible pavement type. Its construction process, however, has raised concerns in terms of its environment impacts. This study aims to track and measure the carbon footprint of flexible pavement. The objectives are to map the construction process in relation to greenhouse gas (GHG) emissions,...
Article
Full-text available
Delays may occur during pre-construction or construction phases, or both. The aim of this research is to develop a prototype of an early warning system of delay risks for public projects in pre-construction phase (EWaSDRiP). These delays are attributed to owner, consultant, project characteristics, and external factors. Data was collected through l...
Article
Full-text available
Last Planner System (LPS) is one of Lean Construction’s tools for scheduling to enhance project’s reliability, productivity, and performance. It has already been widely adopted in many developed countries and shown benefits, such as shorter duration, less rework, and better communication. Despite its benefits, the use of LPS is almost unheard of in...
Article
Full-text available
p>Sektor konstruksi diketahui memberikan dampak cukup besar bagi lingkungan. Sektor konstruksi berkontribusi menghasilkan emisi gas karbon lebih dari 40%, menggunakan material dari alam yang jumlahnya cukup besar, menyumbangkan limbah, serta mengurangi daerah untuk resapan air dan area hijau. Atas dasar inilah dalam kerangka pembangunan berkelanjut...
Article
Full-text available
Delays related to materials are one of main problems of construction project. An effective supply chain management has a significant role in preventing this type of delay. The aim of this research is develop risk simulation model of construction supply chain in buildings. The materials include steel bars, steel profiles, formwork, and precast concr...
Article
Full-text available
While the need for water supply infrastructure development keeps increasing, many local governments of Indonesia are facing problems related to limited funding. This condition opens up an opportunity for private sector to invest in water supply infrastructure projects through Public Private Partnership (PPP) scheme. As this scheme is relatively new...
Article
Full-text available
While green building (GB) implementation in Indonesia is still in its infancy, Singapore has long been recognized as one of top leaders in GB implementation in the world. With a sustainable vision of “greening 80% of all buildings in Singapore before 2030” and a national policy called “Green Mark Scheme,” it has successfully achieved more than 30%...
Article
Full-text available
Rapid urban growth has caused an increase of infrastructure and building construction projects in recent years in terms of project scale and number. Many of which certainly involve the construction of deep foundation, including pile foundation. In particularly densely populated urban areas, the need for more environmentally friendly pile driving eq...
Article
Full-text available
By nature, government and private projects have different characteristics, which influence client performance. This research aims to compare performance of government and private clients in construction projects as perceived by contractors. Six client performance indicators were used, i.e. understanding of project requirements, financial, decision...
Article
Full-text available
While most research looks at the client satisfaction in the construction industry, contractor satisfaction towards client performance is also an important issue. The performance of contractors and clients are inter-reliant, and their interactions fundamentally determine the overall project performance. This research aims to analyze the level of con...
Article
Full-text available
The lean construction frameworks have been developed for years to enhance the poor performance of Indonesian project delivery system which influenced by the waste of non-value adding activities. Never the less most of the developments were limited on working process and lack in people empowerment. Toyota Way which integrate working process optimiza...
Article
Full-text available
Risks at construction are borned by some parties. Each party carries the risks in accordance to their respective and responsibilites in the project. In Semarang-Solo Highway Project Section 1 (Tembalang-Gedawang), which was built in 2010 until 2011, the risks are borned by each stakeholder in the project, such as contractor, owner, consultant of pl...
Article
Full-text available
Constructability is the integration of expertise for the planning and designing process of a project. Constrcutabilty implementation better starts from planning phase; therefore, this phase has major influence for the whole project. This research is aimed to evaluate the constructability implementation on design bid build project and design and bui...
Article
Full-text available
The detailed description of residential defects in years 2010 – 2011 of Citra Garden Residence in Indonesia was studied. Defect data were collected from interviews that have been carried out to the field supervisor and to the customer service in Citra Garden Residence. The defects observed were mainly on leakage that comes from the tile, natural st...
Article
Full-text available
Construction supply chains encompass the flows of materials, labour, information, plant, equipment and temporary works that originate from a variety of different parties. The impact of various supply chain management practices on project performance has been measured, through a combination of a survey and the development of simulation models. Preli...

Network

Cited By