Daniel Wilhelmus Adityatama

Daniel Wilhelmus Adityatama
  • University of Auckland

About

60
Publications
36,429
Reads
How we measure 'reads'
A 'read' is counted each time someone views a publication summary (such as the title, abstract, and list of authors), clicks on a figure, or views or downloads the full-text. Learn more
102
Citations
Introduction
Daniel Wilhelmus Adityatama currently studies at the Department of Engineering Science, University of Auckland.
Current institution
University of Auckland
Education
July 2017 - November 2019
University of Auckland
Field of study
  • Geothermal Engineering
July 2009 - August 2013
University of Indonesia
Field of study
  • Metallurgy and Materials Engineering

Publications

Publications (60)
Article
A geothermal resource typically experiences a production decline caused by exploitation activities. Once the power generation from the resource reaches its subeconomic threshold, the production activities might be abandoned, and the production wells are converted into idle wells. However, idle geothermal wells still have thermal energy from the geo...
Conference Paper
Full-text available
The development of geothermal energy as a clean and sustainable energy source in Indonesia faces significant challenges due to the high costs associated with drilling. This paper provides a detailed analysis of geothermal drilling costs in Indonesia by examining actual and historical data from various projects. The study addresses the difficulties...
Conference Paper
Full-text available
Indonesia has set an ambitious target to achieve net-zero emissions by 2060, with geothermal energy slated to play a pivotal role in this transition. Despite ranking as the world's second-largest geothermal producer, boasting a potential capacity of 23 GW, current utilization stands at a mere 2.3 GW, representing only 10% of the total potential. Th...
Conference Paper
Full-text available
Indonesia's geological landscape, predominantly shaped by subduction zone volcanoes, harbors high-temperature geothermal resources concentrated in areas such as Sumatra and Java. The study confirms that the majority of developed geothermal fields in Indonesia fall into the high-temperature category and are predominantly liquid-dominated. However, a...
Conference Paper
Full-text available
The selection of an appropriate drilling rig is crucial for the success of geothermal exploration projects, as it directly influences both operational efficiency and cost. This paper delves into the critical factors and decision-making criteria for selecting drilling rigs in the context of geothermal exploration, emphasizing the importance of makin...
Conference Paper
Full-text available
Workover duration planning holds significant importance in minimizing non-productive time and preventing cost overruns. To achieve the optimal operational duration, it is imperative to acquire data pertaining to previous workover performances. This data encompasses various aspects, including the type and size of scaling, the length of the damaged c...
Conference Paper
Full-text available
The direct application/direct use of geothermal energy involves using the heat energy from the Earth's interior immediately, bypassing the need to convert it into electricity or other energy forms. This approach to harnessing geothermal energy is increasingly recognized for its sustainability and renewable nature, offering a promising solution to d...
Conference Paper
Full-text available
Indonesia plans to increase the geothermal power plant installed capacity to 5,700 MW in 2030, more than double the current capacity. This accelerated development plan will put geothermal stakeholders in a dilemma, whether to directly develop the field on a large scale or staged manner. Directly developing geothermal fields on a large scale gener...
Conference Paper
Full-text available
Indonesia possesses abundant geothermal potential, ranking among the world's leading countries with total reserve of 23.36 Gigawatts; however, only 2.29 Gigawatts are currently exploited. Unfortunately, geothermal projects in Indonesia frequently encounter difficulties in reaching the production phase due to a complex interplay of economic, technic...
Conference Paper
Full-text available
Indonesia's low-medium temperature geothermal potential, specifically in the 160°C to 200°C temperature range, presents an attractive opportunity for geothermal energy development. Several geothermal sites, like Ulubelu, Kotamobagu, Cisolok-Cisukarame, and Rantau Dedap, exhibit diverse characteristics such as outflow systems and fault-controlled sy...
Conference Paper
Full-text available
Indonesia is ranked as the second-largest geothermal energy producer globally, with a potential resource of 24 GW. However, the country has only utilized a meager 2.356 MW, equivalent to roughly 10% of its total potential. In line with this, the Government of Indonesia has set a target to significantly increase its geothermal utilization for power...
Conference Paper
Full-text available
A geothermal resource typically experiences a production decline caused by exploitation activities. Once the power generation from the resource reaches its subeconomic threshold, the production activities might be abandoned, and the production wells are converted into idle wells. However, idle geothermal wells still have thermal energy from the geo...
Conference Paper
Full-text available
Indonesia has been known as one of the largest geothermal energy potentials which are currently in the effort to accelerating geothermal development to meet with target of renewable energy in the Indonesia energy mix, to boost this program, exploratio n project would become main program of Government of Indonesia to achieve the targets. Geothermal...
Conference Paper
Full-text available
Geothermal project development can only be reached when most affected stakeholders support the project. This may include the geothermal developer, local community, local government, central government or policy makers, the offtake purchaser, and mass media. It is widely known that it is not easy in Indonesia to get support from local communities, w...
Conference Paper
Full-text available
The 2030 national target of Indonesia geothermal energy development will boost many drilling activities in various geothermal prospects, especially in the eastern part of Indonesia. In some cases, geothermal developers in Indonesia, when planning drilling operations, are too focused on rig equipment and well construction and tend to simplify matter...
Conference Paper
Full-text available
Geothermal energy can be utilized for other direct use applications such as bathing, heating, drying agriculture products, and tourism objects. As one of the countries with vast geothermal energy potential, Indonesia can take advantage of its geothermal energy resources for both indirect and direct use. Unfortunately, geothermal direct use applicat...
Conference Paper
Full-text available
The current conventional geothermal power generation typically involves the extraction of geothermal fluid from the subsurface to the production facility on the surface. Therefore, a commercial geothermal production well needs to encounter high enough temperature, benign fluid, and sufficient permeability to allow the geothermal fluid to flow. Howe...
Conference Paper
Full-text available
Keywords: thermodynamic analysis, organic rankine cycle, kalina cycle, back pressure turbine, levelized cost of electricity. ABS TRACT Binary cycle using Organic Rankine Cycle or Kalina Cycle System has been applied in geothermal and some other industrial processes to recover waste energy to generate electricity. Two units of the power plants in Fl...
Conference Paper
Full-text available
Drilling is one of the most significant cost contributors in oil and gas or geothermal projects. Therefore, geothermal developers should plan thoroughly and adequately monitor the drilling cost to optimize the entire geothermal development cost. Many previous studies have argued that drilling teams can achieve cost optimization when the risk mitiga...
Conference Paper
Full-text available
Geothermal for power generation offers clean and reliable energy compared to other renewable energy such as solar and wind. However, its sustainability is depending on how the reservoir was managed during exploitation. Improper field management strategy may lead to rapidly declining reservoir pressure and production. Devising a proper field and r...
Conference Paper
Full-text available
ABS TRACT Indonesia has announced that it aims to reach net zero emissions target by 2060. Geothermal energy, as a clean and low-carbon sustainable energy source with abundant reserves is critical for decreasing greenhouse gas emissions and encouraging energy structure transformation. Geothermal energy campaign was usually as clean energy because t...
Conference Paper
Full-text available
Waiwera is a new open-source, parallelised geothermal reservoir simulator developed through a collaboration between the University of Auckland (UoA) and GNS Science. It is designed to address the current and future challenges of modelling geothermal systems. The Waiwera development was part of the New Zealand Geothermal Supermodels programme to dev...
Article
Full-text available
The global increase of carbon emissions needs to be reduced to keep incremental global warming below 2 degrees. However, in the last decades, Indonesia’s energy supply and demand have been highly dependent on fossil fuels, contributing to high carbon emissions. Most of the non-renewable energy demand comes from transportation and electrification. W...
Article
Full-text available
The island of Flores has a lot of geothermal potentials, so it is often called the geothermal island. However, there have been many rejections on the island of Flores, one of which is in the Mataloko Geothermal Working Area (WKP). This can be problematic if future geothermal development is about to take place in Mataloko. One alternative that has b...
Conference Paper
Full-text available
Starting at Kamojang Field, the application of slimhole well for geothermal exploration drilling in Indonesia was executed in the 1920s. This implementation was only considerably carried out around the 1920s-1990s. For the past 20 years, slimhole drilling has been infrequent to be executed in Indonesia. Lack of uncertainty and risk of exploration d...
Conference Paper
Full-text available
Indonesia is one of the countries that has the largest geothermal energy potential in the world that can be managed to achieve energy security targets in the future. The first recorded geothermal energy discussion in Indonesia was during the Dutch colonial rule, in 1918, by J.Z. van Dijk, which most likely lead to the geothermal exploration project...
Conference Paper
Full-text available
Drilling is one of the key activities on geothermal and petroleum projects that could face hazards such as kick and blowout. Those conditions are hazardous to the equipment and personnel on the drilling site, thus the drilling personnel should be prepared to apply any well control technique to prevent the kick becoming blowout. The current conditio...
Conference Paper
Full-text available
Government of Indonesia through RUPTL 2021 targets to have around 5,700 M W of geothermal power plant installed capacity in 2030, more than double its current installed capacity. The resource areas are spread throughout the country, and a big part of them is greenfield areas without prior detailed exploration. A low cost and fit for purpose explora...
Conference Paper
Full-text available
Early analytical methods for pressure transient analysis (PTA) commonly assume uniform rock properties over a large reservoir. However, geothermal systems are not homogeneous and often consist of natural fissures and fractures, allowing fluid transport. With the standard PTA methods, it is difficult to represent a fractured reservoir adequately or...
Conference Paper
The island of Flores has a lot of geothermal potentials, so it is often called the geothermal island. However, there have been many rejections on the island of Flores, one of which is in the Mataloko Geothermal Working Area (WKP). This can be problematic if future geothermal development is about to take place in Mataloko. One alternative that has b...
Conference Paper
Full-text available
Most of the non-renewable energy demand comes from transportation and electrification, which, in drilling activity, is produced by diesel engines for mobilization, drilling operation and site electrification. Carbon emissions reduction is part of the policy of several giant energy companies to achieve net-zero emissions to support environmental s...
Conference Paper
Full-text available
It is widely known that drilling costs are one of the largest cost components in a geothermal development project. The drilling costs may increase significantly when the drilling days become prolonged due to many non-productive-time (NPT) event. Since geothermal drilling targets lost circulation zones at reservoir depth, the chance of getting stuck...
Conference Paper
Full-text available
Indonesia, as one of the countries with the biggest potential for geothermal energy in the world, is currently trying to increase geothermal energy utilization from installed capacity of 1,700 MW to 7000 MW in 2025. One of the challenges identified in developing geothermal energy in Indonesia is the lack of skilled labor or experts to run a geother...
Conference Paper
Full-text available
In developing a geothermal exploration strategy, as mentioned in many scientific publications, the selection of resource assessment methods become very crucial due to the high uncertainty level of this stage. Of the various resource assessment methods available in the industry today, the volumetric method is the most often used in Indonesia during...
Conference Paper
Full-text available
The exploration phase comes intending to prove the presence of a geothermal system underneath the earth's surface. The resource proving process can only be confirmed by conducting drilling activity. Several alternative well sizes known in the geothermal industry are big hole, standard hole, and slimhole. Drilling rigs used in slimhole drilling are...
Article
Full-text available
Drilling is one of the major cost components in geothermal exploration and development. Effective and cost-efficient drilling significantly contribute to the success of geothermal development. Key factors in reducing drilling costs are optimising operations, utilising manpower to its fullest potential, and also benchmarking with other drilling acti...
Conference Paper
Full-text available
Drilling for geothermal activity in Indonesia has been growing in recent years. Many energy companies have entered the geothermal industry in Indonesia. These newly established companies usually have limited geothermal knowledge on their team. Most of them use Integrated Project Management (IPM) and Integrated Drilling Service (IDS) contract types...
Conference Paper
Full-text available
Stuck pipe is a common problem in geothermal drilling operations. Stuck pipe can lead to extra cost due to lost-in-hole tools, sidetrack, fishing operation, and cost due to prolonged total drilling operation/campaign. The commonly faced dilemma in mitigating stuck pipe is to decide whether to continue with the attempts to free the pipe or cut the p...
Conference Paper
Full-text available
Geothermal wellhead shall be designed to operate during the life of the well. In a hot, acidic, and corrosive geothermal operating conditions, the selection of wellhead completion is critical. The purpose of this study is to compare the conformity of the two wellhead completion designs for application in Indonesia: expansion spool completion and ca...
Conference Paper
Full-text available
Project management software such as Microsoft Project or Oracle Primavera is commonly used in civil or Engineering, Procurement, and Construction (EPC) project. However, it is not that common to find the project management software to be fully utilized for a drilling project. This paper describes the common features of project management software,...
Article
Full-text available
Indonesia is currently the second largest geothermal installed capacity in the world, with around 1948,5 MW installed capacity. However, this achievement is still far from the Indonesian Government’s target of 7000 MW installed capacity in 2025. Thus, it requires a lot of efforts, supporting policies, and a great deal of competent human resources t...
Article
Full-text available
Indonesia memiliki banyak ladang minyak tua dengan komposisi air terproduksi yang tinggi, dimana air terproduksi ini masih dapat dipergunakan untuk kegunaan lain. Salah satu kegunaan dari air terproduksi dengan temperature cukup tinggi ini adalah untuk pembangkit listrik dengan Siklus Rankine Organik (Organic Rankine Cycle / ORC). Gagasan untuk pen...
Article
Geothermal reservoirs can undergo a transition from single-phase to two-phase or vice versa in their natural setting and during production. Some of these reservoirs can also contain considerable amounts of non-condensable gases, mainly (>90%) CO2. Thus, multi-phase and multi-component effects often complicate the analysis of geothermal well tests a...
Conference Paper
Full-text available
Indonesia is currently the second largest geothermal installed capacity in the world, with around 1948,5 MW installed capacity. However, this achievement is still far from the Indonesian Government’s target of 7000 MW installed capacity in 2025. Thus, it requires a lot of efforts, supporting policies, and a great deal of competent human resources t...
Conference Paper
Full-text available
Indonesia has vast geothermal energy potential, estimated at around 27,000 MWe or about 40% of world geothermal reserves (IEA, 2008). However, up to 2017, Indonesia’s geothermal power plant installed capacity was only 1,805 MWe or 6% of this estimated potential. To keep up with high growth of electricity demand while trying to reduce the use of fos...
Conference Paper
Full-text available
Indonesia has an established petroleum industry dates back from 1870 when the first oil well drilled in Majalengka. The long history of petroleum exploration and production in Indonesia has resulted in an established petroleum industry with a lot of local expert. Thus, a wide availability of expert and professional in petroleum industry can be util...
Article
Full-text available
Indonesia adalah salah satu negara berkembang yang memiliki tidak hanya potensi sumber daya energi yang besar tapi juga laju pertumbuhan penduduk yang cukup tinggi. Untuk dapat memenuhi kebutuhan masyarakat dan industri, Indonesia memerlukan pasokan energi yang cukup besar di mana saat ini konsumsi energi Indonesia masih sangat tergantung pada sumb...
Conference Paper
Drilling is one of the critical components that significantly impact geothermal project development cost. In general, there are two major risks associated with drilling, consisting of resource risks and other risks. Resource risks are mainly associated with temperature and permeability. A robust conceptual model built from reliable data is necessar...
Conference Paper
Full-text available
One of the challenge identified in developing geothermal energy in Indonesia is the rejection by local community that can lead to significant delay in project delivery, especially in early phase of exploration. The current common practices by many geothermal developers in Indonesia to engage local community are by holding socialization event, and i...
Preprint
One of the challenge identified in developing geothermal energy in Indonesia is the rejection by local community that can lead to significant delay in project delivery, especially in early phase of exploration. The current common practices by many geothermal developers in Indonesia to engage local community are by holding socialization event, and i...
Preprint
The uncertainty associated with natural geothermal resource in the subsurface is always recognized as the biggest risk in geothermal project, especially in the early exploration phase. This high risk mainly caused by the significant up-front drilling cost combined with insufficient information to properly plan the exploration well target. In Indone...

Network

Cited By