Publications (54)
This work developed a hybrid optimization algorithm called Combinatorial Optimization with a Coordinate Search Method, which allows for finding the optimal locations and capacities of distributed generation plants in an electrical distribution network. The algorithm was validated in the IEEE 69-bus test system, compared with the Elephant Herding Op...
An experimental investigation was carried out to determine the influence of misalignment on the functional dynamic parameters of a 250 kW DC motor in a steel plant. The objective was to determine the most sensitive online symptom parameters to the alignment condition of the 250 kW GH280 PK DC motor of a steel plant. To do this, it was necessary to...
Recibido: 4 de marzo de 2023 Aceptado: 12 de mayo de 2023 _________________________________________________________________________________________ Resumen Se realizó una investigación experimental para la determinación de la influencia del desalineamiento en los parámetros dinámicos funcionales de un motor de corriente continua de 250 kW en una pl...
El uso de las fuentes renovables de energía se ha incrementado exponencialmente a nivel mundial. Cuba ha implementado un
plan hasta el 2030 donde las fuentes renovables juegan un papel fundamental dentro de la matriz energética nacional. La política con respecto a la instalación de centrales fotovoltaicas ha sido conectar pequeñas centrales de hast...
Resumen Los transformadores de fuerza (TF) son parte principal de los costos de un sistema electroenergético (SE), por lo que debe controlarse su estado, envejecimiento y vida remanente, para valorar su condición actual y futura, algo importante para tomar decisiones de operación, mantenimiento o inversiones, favoreciendo el uso óptimo de las finan...
Maintenance approaches have been evolving from reactive to a preferred proactive conception with operational reliability as a new implemented strategy. This scenario suggests that a review of conceptual basis is needed. The paper resumes the study carried out with the main objective of building a new concept of operational reliability. Bibliographi...
RESUMEN En la actualidad el mantenimiento ha pasado de una concepción reactiva a una proactiva en donde la confiabilidad operacional es una de las nuevas estrategias que se implementa. En este trabajo se resume la investigación realizada para construir un nuevo concepto de confiabilidad operacional. Se utilizaron los métodos de análisis bibliográfi...
A proposal of hierarchization technology applied to technological systems is the main subject of this research, focused on biopharmaceutical enterprises. Such classification hierarchizes the universe of assets involved in production process, according to new trends in maintenance. Methods such as surveying and mathematical modeling were used to obt...
The paper presents a risk-based model to coordinate the generators preventive maintenance of an isolated
distributed Power System with wind generation presence. The model coordinates preventive maintenance
minimizing the risk of loss of load probability in the Power System. The risk is estimated with a sequential
Markov Chain Monte Carlo (MCMC) sim...
Resumen El trabajo tuvo como objetivo proponer una tecnología para la jerarquización de los sistemas y activos tecnológicos para empresas biofarmacéuticas, la misma se implementó en una empresa biofarmacéutica. Esta clasificación jerarquiza el universo de activos que intervienen en el proceso productivo, acorde a las nuevas tendencias en el manteni...
Se trata el uso de las relaciones CO2/CO en la determinación del tiempo de vida útil y remanente de los transformadores de fuerza, mediante la evaluación de su Grado de Polimerización y se estudia la utilización del análisis de derivados furánicos
disueltos en el aceite en la caracterización del aislamiento sólido de los equipos, afirmándose finalm...
Power electronic development determines the introduction of nonlinear devices in electric power systems. Introduction of nonlinear devices increase current harmonics in transmission and distribution power systems. Distribution transformers and feeders increase power losses and their nominal parameters are reduced. The present work introduces a proc...
Power Electronic development determines introduction of nonlinear devices in Electric Power Systems. Introduction of nonlinear devices increase current harmonics in Transmission and Distribution Power Systems. Distribution transformers and feeders increase power losses and their nominal parameters are reduced. Present work introduces a procedure to...
The use of devices based on power electronics, which are sources of harmonic distortion, lead to electric networks to become receivers of non-sinusoidal voltages and/or currents. Among the equipment that has suffered a considerable impact due to distorted currents are the distribution transformers whose performance is strongly related to the type o...
Como los transformadores de fuerza (TF) son parte principal de los costos de un sistema electroenergético, debe controlarse su estado, envejecimiento y vida remanente, para valorar su condición actual y futura, algo importante en la toma de decisiones de operación, mantenimiento o inversiones, que favorecen un uso óptimo de las finanzas y aseguran...
RESUMEN La Unidad Empresarial Básica (UEB) Soterrada es la entidad encargada de velar por el correcto funcionamiento y desarrollo de las redes soterradas de La Habana. Dicha entidad se encuentra en la actualidad implementando tareas de mantenimiento predictivas basadas en el monitoreo periódico de la condición de los equipos que constituyen la red...
RESUMEN En este trabajo se emplea una base de datos con valores de resistencia a compresión de 1974 testigos obtenidos de 160 informes de diagnóstico sobre estructuras construidas en La Habana en el siglo XX, realizados por dos entidades de la ciudad, la ENIA y el CIDC desde 1998 hasta 2017; para caracterizar la resistencia a compresión de los horm...
RESUMEN En este trabajo se emplea una base de datos con valores de resistencia a compresión de 1974 testigos obtenidos de 160 informes de diagnóstico sobre estructuras construidas en La Habana en el siglo XX, realizados por dos entidades de la ciudad, la ENIA y el CIDC desde 1998 hasta 2017; para caracterizar la resistencia a compresión de los horm...
In this paper, a model for the management of partial maintenance to high voltage breakers is proposed, regarding the integration of different variables that have some degree of uncertainty (visual inspection, historical data, wear of the main contacts) through the Fuzzy Rough Sets Theory tool. Therefore, that is the basis for the creation of a new...
To demonstrate the non-existence of a mathematical model that involves the 4 elements of operational reliability was the subject of this work. The methods of tabular analysis by reference fields were used, consisting of the grouping, by means of an Excel sheet, of the references used for their analysis and from the use of the Minitab, to perform a...
The objective of the work was to program the generator preventive maintenance of a power system with an optimization model that minimizes the cost of operation and maintenance. A quadratic function is used to model the operation cost of the units, and for the maintenance a linear function, both depend on the demand of the system. The programming pr...
En el presente trabajo se realiza una revisión bibliográfica de la gestión del mantenimiento enfocado a la confiabilidad y a las fallas en interruptores de potencia. Se valoran los posibles parámetros a utilizar en la gestión del mantenimiento de acuerdo a los estudios internacionales, a las normas y procedimientos de operación vigentes en las sube...
El objetivo principal de esta investigación fue determinar si se requiere fortalecer la competencia profesional en ingeniería de mantenimiento en la formación del ingeniero eléctrico del Instituto Tecnológico de Santo Domingo de acuerdo con las tendencias actuales de la ingeniería de mantenimiento y requerimientos del mercado laboral de estos profe...
El objetivo principal de esta investigación fue determinar si se requiere fortalecer la competencia profesional en ingeniería de mantenimiento en la formación del ingeniero eléctrico del Instituto Tecnológico de Santo Domingo de acuerdo con las tendencias actuales de la ingeniería de mantenimiento y requerimientos del mercado laboral de estos profe...
The study presented in this research schedule the Preventive Maintenance (PM) of Power Generation System (PGS) by means of an optimization algorithm that minimizes the cost of operation and maintenance of the PGS according to a previously conceived planning. A quadratic function is used to model the operation cost of the generator units, and for th...
The objective of the present study was to do a design of Dupont Availability Method and compare it with the Total Equipment Effectiveness indicator to support decision making in maintenance. In the same one was made a comparison where the historical data of the year 2015 of a plant of generation of purified water. The mathematical models that chara...
The study presented in this research schedule the Preventive Maintenance (PM) of Power Generation System (PGS) by means of an optimization algorithm that minimizes the cost of operation and maintenance of the PGS according to a previously conceived planning. A quadratic function is used to model the operation cost of the generator units, and for th...
The design of robust data-based fault diagnostic systems can be formulated in terms of classification tasks. A diagnostic classifier designed to effectively minimize the false and missing alarm rates resulting from noise, uncertainty, and unknown disturbances while maintaining a relatively high performance can be defined as robust. This paper prese...
Resumen
El objetivo de este trabajo fue diseñar el Método de Disponibilidad Dupont para compararlo con el indicador de la Efectividad Total del Equipamiento como apoyo a la toma de decisiones en el mantenimiento. En el mismo se realizó una comparación donde se utilizaron los datos históricos del año 2015 de una planta de generación de agua purific...
This paper has the goal to propose a procedure to design an instrument base on interview to assess the state of the management maintenance in the bio-products plants. On describe the methodology to do the validation thought by test of validation and reliability. This instrument, allows knowing with 90,8 % of reliability based on the information the...
Resumen El trabajo de investigación pretende evaluar la función de riesgo de un Sistema de Generación Eléctrica (SGE) con alta penetración eólica mediante el método de Simulación de Monte Carlo Secuencial (SMCS), el cual permite calcular indicadores que caracterizan el rendimiento del SGE con valores medios esperados. En la investigación se utiliza...
RESUMEN El presente trabajo de investigación pretende evaluar la función de riesgo de un Sistema de Generación Eléctrica (SGE) con penetración eólica mediante el método de Simulación de Monte Carlo Secuencial (SMCS), el cual permite calcular indicadores que caracterizan el rendimiento del SGE con valores medios esperados. En la investigación se uti...
RESUMEN En el presente trabajo se propone un procedimiento para diseñar un instrumento tipo encuesta para estimar el estado de la gestión del mantenimiento en plantas de bioproductos. Se describe la metodología para su validación, por medio de las pruebas de validez y confiabilidad, obteniéndose un instrumento que permite conocer el estado de mante...
In the present paper necessary elements to obtain a model in order to achieve criticality and complexity for equipment and technological systems in electric power plants are proposed. This kind of model allows the possibility of establish priority orders to care the assets over real basis. Nowadays the classification of assets made in power plants...
El presente trabajo de investigación pretende evaluar la confiabilidad de un Sistema de Generación Eléctrica (SGE) con fuentes hidráulicas limitadas y alta penetración eólica mediante el método de Simulación de Monte Carlo Secuencial (SMCS), el cual permite calcular indicadores que caracterizan el rendimiento o la función del SGE con valores medios...
Resumen/Abstract En el presente artículo se proponen los elementos necesarios para la obtención de un modelo que permita determinar la Criticidad y complejidad de los equipos y sistemas tecnológicos en las centrales eléctricas con la intención de tener la posibilidad de establecer órdenes de prioridad para la atención a los mismos sobre bases reale...
This chapter assesses the reliability of a generation system (HL-I) using the Monte Carlo Non-Sequential (MCNS) simulation method and probabilistic indicators, as well as the static sense of a secured generation-transmission system (HL-II) on the basis of its voltage stability. For the purpose of mathematically modeling the system’s adequacy, two-s...
Circuit breakers serve to connect and disconnect electric circuits under any operation conditions. Improving circuit breaker reliability is important for the correct operation of electric power systems. In this paper, we use one of the existing methods for the analysis of reliability in devices and components according to Norsok Standard Z-013. The...
Propiciar el aprendizaje permanente, a través de es
tudios de postgrado que fomenten un
enfoque transdisciplinar, en los programas de educ
ación superior, fue un reclamo a la
universidad del nuevo siglo, en la conferencia mund
ial auspiciada por la UNESCO,
celebrada en parís en 1998. Esta educación se diseñ
a en la lógica de las prácticas
profe...
Resumen En este trabajo se ha investigado el efecto de la austenitización y el borurado simultáneos, a 950 o C, en la microestructura, la microdureza Vickers y el espesor de la capa borurada en medio líquido de un hierro nodular austemperizado no aleado. Se demostró que es posible obtener una capa de boruros de hierro muy bien estructurada con la m...
RESUMEN En el presente trabajo se analiza la confiabilidad de un subsistema de líneas de transmisión eléctrica basándose en el cálculo de la disponibilidad como magnitud de mayor generalidad, capaz de relacionar las variables aleatorias X i .-tiempo (en horas) de operación hasta el fallo de la línea i y W i .-tiempo (en horas) de restauración del s...
La gestión del mantenimiento en las subestaciones eléctricas, así como en los interruptores de potencia ha evolucionado en el transcurso de los años de acuerdo a los equipos de medición de parámetros eléctricos y a las filosofías de mantenimiento mundial. El presente trabajo trata dichos avances desde una visión diferente, se utiliza la inteligenci...
En este trabajo se caracteriza el proceso de lavado de las ampolletas en la Empresa Laboratorios AICA. Se estudian las variables que intervienen en las condiciones operacionales de las máquinas lavadoras y se propone para un activo específico el cambio de su punto opera- cional en función del ahorro de los agentes de limpieza (agua para inyección y...
This work describes some methods for the reliability analysis, such as the instantaneous failure rate, the average failure rate, statistical tools and other techniques that are used to improve the lifetime of equipment and components. The high voltage breakers installed in a substation are analyzed according to these considerations to determine the...
This work describes some methods for the reliability analysis, such as the instantaneous failure rate, the average failure rate, statistical tools and other techniques that are used to improve the lifetime of equipment and components. The high voltage breakers installed in a substation are analyzed according to these considerations to determine the...
At present time some companies in Cuba and worldwide have incorporated the technology of Reliability Centered Maintenance (RCM) for the significant benefits that generally reported once implemented. Since 2011 the Underground Basic Managerial Unit (UEB) implement this technology seeks to reduce maintenance costs and increase availability of Havana...
En el 2004, Cuba pone en marcha un nuevo programa que consiste en un esquema de generación eléctrica distribuida que emplea la instalación de emplazamientos compuestos por grupos electrógenos, que operan con diesel o fuel-oil, constituyendo uno de los más profundos cambios conceptuales en esta esfera. El presente trabajo tiene como objetivo la obte...
Resumen En este trabajo se propone un procedimiento para verificar la factibilidad de aplicación de una metodología para realizar el análisis de criticidad y complejidad y así priorizar una atención especial a la gama de activos que intervienen en el proceso productivo de las plantas de bioproductos y mejorar la confiabilidad de estos activos, acor...
El presente trabajo trata sobre la utilización de métodos multicriteriales para mejorar la calidad del suministro de energía eléctrica mediante la selección adecuada de la variante más óptima de mantenimiento de los interruptores de potencia.
Las diferentes variantes, se analizan partiendo del sistema de mantenimiento por diagnóstico y pueden ser v...
En la actualidad existen diferentes enfoques del mantenimiento con los cuales se ha logrado muy buenos resultados a nivel mundial, ejemplo de esto es el Mantenimiento Centrado en la Confiabilidad (RCM), el cual constituye un sistema avanzado de gestión, que con una correcta implementación garantiza la eficiencia y eficacia del mantenimiento. Basado...
This paper is about the use of multi-criterial methods with the objective of improving the electric power supply by means of the selection of the best high voltage breaker maintenance variant. These different variants are analyzed based on the diagnostic maintenance system and they can be valued bearing in mind the criteria use by the manufactures,...
En el presente trabajo abordamos el tema de la gestión del mantenimiento de interruptores de potencia desde otra óptica totalmente diferente, el uso de la lógica difusa para la toma de decisiones. Se hace referencia a las diferentes reglas usadas en la lógica difusa, a sus membresías, procesos de inferencia y los métodos para la defussificación. Fi...
This paper is about the use of multi-criterial methods with
the objective of improving the electric power supply by means of the selection
of the best high voltage breaker maintenance variant. These different
variants are analyzed based on the diagnostic maintenance system and
they can be valued bearing in mind the criteria use by the manufactures,...