Figure 7 - available via license: Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Content may be subject to copyright.
We demolish an old embroidery building and rebuild it in the same area. The selected design is built together with the Karen spending ten days.
Source publication
The study of the participatory process in architectural design has been discussed for decades, in which the user is directly involved in the design and decision-making in the design process. The collaborative design process is not just a way to influence building form, but it also indicates the dimensions of users and participants. From academic co...
Context in source publication
Context 1
... the design was finalized, the craftsmen in participation with the students finalized a construction plan and agreed on particular joinery systems for the structure. Furthermore, building the structure was also done by the collaboration of locals and students, which has resulted in the completion of the structure within only ten days (see Figure 7). The final product was shaped with respect to all opinions, especially of those who will be regularly occupying the space (Figure 8). ...
Similar publications
The cost ratio of steel to concrete exceeding 100 in most of the RCC structures, alternative materials for replacing steel are underway to develop a sustainable built environment. Bamboo has been in housing industry since time memorial as a standalone structural member for lighter loads of roofing and wall cladding units. It has been tested for its...
The cost ratio of steel to concrete exceeding 100 in most of the RCC structures, alternative materials for replacing steel are underway to develop a sustainable built environment. Bamboo has been in housing industry since time memorial as a standalone structural member for lighter loads of roofing and wall cladding units. It has been tested for its...