GrEta is an innovative simulation project, what was constructed in Szabó-Szoba R&D Laboratory at Széchenyi University Győr, for modelling the nature of flexible production processes. It is one of the best ways to demonstrate the most commonly occurring logistics phenomena in series of mass production on the learning-by-doing way. As the latest deve...
Context in source publication
Context 1
... When the container is full it is moved, with the card still attached, to the staging area waiting to be withdrawn by the assembly cell. A two-card system is illustrated in Figure 5 and is necessary when the two sequential operations are not close. This system uses a conveyance card and a production card. ...