Figure 1 - available via license: Creative Commons Attribution 3.0 Unported
Content may be subject to copyright.
The overall component of the trip in this study

The overall component of the trip in this study

Context in source publication

Context 1
... its implementation, Soekarno-Hatta International Airport Train and Skytrain are two interconnected modes of transportation in the Integrated Building as can be seen on Figure 1. The ...

Similar publications

Article
Full-text available
This paper considers flight price discrimination between different aircraft types in an analysis of airport congestion under a Stackelberg game. In addition, we introduce a method to determine the specific total flight volume under which there should be no congestion toll because there is no congestion when total flight volume is low. Furthermore,...
Article
Full-text available
Wake separation is crucial to aircraft landing safety and is an important factor in airport operational efficiency. The near-ground evolution characteristics of wake vortices form the foundation of the wake separation system design. In this study, we analysed the near-ground evolution of vortices in the wake of a domestic aircraft ARJ21 initialised...

Citations

... Passengers arriving by train must board the Skytrain or shuttle buses from the "Integrated Building" to finally get to their intended terminals. A 2019 study reflects the problem of integrating the time between SHARL and Skytrain arrivals, specifically for flights arriving after 23:00, whose passengers cannot continue their journey by SHARL, although the Skytrain is still operating by that time [21]. In-airport connection difficulties are exacerbated because none of the Skytrain stops are located within any of the three terminal buildings. ...
Article
Full-text available
Airport rail links have long been acknowledged as a crucial component of the modern transportation system. Their attractiveness among air travellers stems from their convenience, speed, and environmental benefits. Despite their advantages, these services often face several occupancy problems that hinder their effectiveness and efficiency. Soekarno-Hatta airport rail link’s operation in 2018-2022 has been marked by low occupancy. This study aims to assess the realisations of several critical attributes of a successful airport rail link service according to TRB studies in the context of the Soekarno-Hatta airport rail link. In this context, it was shown that only four of the seven key attributes have met the minimal level to attain such goals. Despite numerous strategies undertaken during the period, which coincides with the COVID-19 pandemic, most fall under the operating or service adjustments category. The minimal realisations of the seven key attributes confirm the low occupancy levels, yet efforts to increase the ridership were limited during the pandemic. These findings provide avenues for a more successful transfer of operations from PT Railink to PT Kereta Commuter Indonesia with the clear intention of boosting the rail link’s ridership. Alongside several expansion plans by the Directorate General of Railways, the findings shall help public policymakers promote a modal shift and pave the way towards a broader integration with other modes of public transportation in the Jabodetabek region.