Copy reference, caption or embed code

Fig 4 - Building Information Modeling and Integrated Project Delivery in the Commercial Construction Industry: A Conceptual Study

Fig.4. The Macleamy Curve (2004)  
The Macleamy Curve (2004)  
Go to figure page
Reference
Caption
Embed code