Copy reference, caption or embed code

Figure 5 - Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning

Figure 5 Scheme of excavator operation during excavation of coal and waste interlayers
Scheme of excavator operation during excavation of coal and waste interlayers
Go to figure page
Reference
Caption
Embed code