Figure 5 - available via license: Creative Commons Attribution 4.0 International
Content may be subject to copyright.
Source publication
The process of creating a geological block model as the basis for a further detailed design and planning of mining operations is a very responsible task. Errors made during this initial process are transferred to all other phases of the mining project. Certainly, one of the most important decisions for the modelling process is the choice of the app...
Context in source publication
Context 1
... is important to note that the excavation of coal at the open pit ,,Ugljevik East 1", implies a methodology of selective excavation, by hydraulic excavators with smaller bucket volumes (due to better selective work). Selective digging of coal, in the excavator block, is done in a certain order of digging from bench top to bottom, as shown in Figure 5. First, coal is excavated in the upper part of the block (bench) until contact with the waste interlayer in the maximum length of the mining block and loaded into the truck, then the waste interlayer is dug and loaded directly into the truck. ...
Similar publications
Understanding the structure and mineralogical composition of a region is an essential step in mining, both during exploration (before mining) and in the mining process. During exploration, sparse but high-quality data are gathered to assess the overall orebody. During the mining process, boundary positions and material properties are refined as the...
Citations
The production plan of an open-pit mine depends on the block model, so it's crucial to determine the appropriate method and size for partitioning it. This study proposes a new method based on a closed shell three-dimensional geological model for determining block model size in open-pit mines. Instead of using regular block models, the shell model is directly cut, and the discrete geological body is referred to as the "mining model." Mining parameters and the shovel-truck's performance are integrated into the method. Bench height determines the Z-axis size, bench slope angle determines the inclination angle, and shovel width determines the X-axis size of the block model. The operation efficiency of the shovel-truck considers the probability distribution of simultaneous operations, allowing the determination of the Y-axis size of block models for different types of shovels. The developed "Mining Model" module in the software "Life Cycle Mining System" is used for practical implementation. By comparing the results with traditional block models, the superiority of the proposed method is demonstrated. This study provides a more accurate model for optimizing the production plan of open-pit mines throughout their life cycle.