Renewable projects in the Canaries during 2011-2018.

Renewable projects in the Canaries during 2011-2018.

Source publication
Preprint
Full-text available
This Draft about the Point Absorber research and perspective within the Canaries Ocean Wave Energy sector was peer-reviewed and funded, though neither the conference was attended, nor the work defended. Intention hereby is to provide further entries and additional information about its current status, as well as to share at a glance eventual R & D...

Context in source publication

Context 1
... (Dual Mass-Spring-Damper MSD [42]. Besides, there is another option available from the dynamic point of view, which is the definition and simulation of so called bistable PA mechanisms. These consist of additional MSD within the PTO system, which allow to cover a wider frequency range, while in theory capable of absorbing more energy. Agreeing to Fig. (1), and noting many projects are still being "incubated", the reader is adressed to [43] Still, question from the abstract remains how to improve the levelized cost of energy (LCOE). For this, there are recent references, which approach the matter with certain experience degree and consistency [44]- ...