Copy reference, caption or embed code
- The Management of Railway Operations during the Planned Interruption of Railway Infrastructure
Performance of operators on the Czech infrastructure manager network in 2019–2023 in millions of train kilometers (authors, according to [41]).
Go to figure page
Reference
The Management of Railway Operations during the Planned Interruption of Railway Infrastructure - Scientific Figure on ResearchGate. Available from: https://www.researchgate.net/figure/Performance-of-operators-on-the-Czech-infrastructure-manager-network-in-2019-2023-in_fig1_382477952 [accessed 14 Jun 2025]
Caption
Performance of operators on the Czech infrastructure manager network in 2019–2023 in millions of train kilometers (authors, according to [41]).
Embed code
<a href="https://www.researchgate.net/figure/Performance-of-operators-on-the-Czech-infrastructure-manager-network-in-2019-2023-in_fig1_382477952"><img src="https://www.researchgate.net/publication/382477952/figure/fig1/AS:11431281371579620@1744384325720/Performance-of-operators-on-the-Czech-infrastructure-manager-network-in-2019-2023-in.tif" alt="Performance of operators on the Czech infrastructure manager network in 2019–2023 in millions of train kilometers (authors, according to [41])."/></a>
or
Discover by subject area
Recruit researchers
Join for free
Login
Email
Tip:
Most researchers use their institutional email address as their ResearchGate login
Password
Forgot password?
Keep me logged in
Log in
or
Continue with Google
Welcome back! Please log in.
Email
· Hint
Tip:
Most researchers use their institutional email address as their ResearchGate login
Password
Forgot password?
Keep me logged in
Log in
or
Continue with Google
No account?
Sign up