Figure 11 - uploaded by Sedat Esen
Content may be subject to copyright.
Source publication
JSC AK Altynalmas engaged Esen Mining Consulting Pty Ltd (EMC) to conduct a drill-to-mill plant optimization project to determine what opportunities exist to increase the mill throughput and improve the overall mine and concentrator performance. The scope of the project included in-situ ore body characterization, drill and blast improvements, run-o...
Contexts in source publication
Context 1
... Electronic initiation technique with multiple initiation points should be adopted where possible to move ore into ore and waste into waste ( Figure 11). ...
Context 2
... blast timing can achieve highly efficient separation between ore and waste. Figure 11 shows the results from blast 310_003. The audit also identified that there has been significant blast movement into the pit void causing the berms to be filled (reducing the catch bench capacity) and loss of ore (in the case of ore blasting). ...