Main Divisions and Responsibilities of the Estates Department.

Main Divisions and Responsibilities of the Estates Department.

Source publication
Article
Full-text available
The creation and management of buildings over their lifecycle involves the cooperation of many organizations, which broadly fall into a client domain and AEC (architecture, engineering, construction) domain. While this mix of expertise is essential, the ineffective management of the boundaries between these organizations can undermine building life...

Contexts in source publication

Context 1
... Estates Department is organized into four divisions: Capital Development (CD), Maintenance and Improvements, Facilities Management, and Customer Services and Administration. The relevant sub-teams of these divisions and their key responsibilities are summarized in Table 3. Provides a customer services function for the department in its interactions with other sections of the University; it also provides administrative services for the department A good proportion of staff in the department have backgrounds in AEC professions and trades. ...
Context 2
... role of various divisions in the asset development and management process is illustrated in Figure 4. The framework of the RIBA (Royal Institution of British Architects) Plan of Work [53] is used to map out the involvement of each division according to their roles described in Table 3. Different teams are responsible for different stages in the process, with varying degrees of involvement by external consultants and contractors. ...
Context 3
... although the PM team had the expertise to perform the information processing function, they did not have the political or financial authority to make quick decisions-this was left to individual fire authorities and led to delays in the process. In Case 2, the boundary spanning roles were somehow divided between different teams (Table 3 and Figure 4): for projects over a certain threshold, the planning team within the CD division liaises with users (and other internal teams such as facilities management), develops the brief and initiates negotiations with (and most often appoints) external AEC firms; the capital projects team then takes over the detailed implementation of the project. While this "division of labor" makes for efficiency (and supports Aldrich and Herker's view of multiple roles [54]), it nonetheless creates further boundaries, which can lead to problems in effectively managing building information as Case 2 suggests. ...

Similar publications

Article
Full-text available
In this paper, we review three different approaches to disclosure and privacy: a) an individualistic approach, which emphasizes an individual’s control over information access and flow, b) a networked approach focused on information flow in horizontal relations between people, and c) an institutional approach concerned with public and societal priv...

Citations

... Though construction has one of the most diverse stakeholder types, studies on this topic remain limited. Studies investigating stakeholders in relation to a building lifecycle include the development of an interface between client and Architecture, Engineering and Construction (AEC) [137], the influence of key stakeholders [138], and the role of facilities manager [139]. Finally, a limited number of literature reviews on the building lifecycle focused on the green Building Information Modeling (BIM) [140], integrative lean and sustainability [141], and life cycle Ö . ...
Article
Full-text available
Circular Economy requires a closed-loop material cycle and seeks ways to apply circular principles. However, existing lifecycle approaches not only omit the early stages to observe such principles but fail to reflect the evolving nature of the building lifecycle. This study develops the first Circular Building Lifecycle Framework, namely Inception to Circulation, by (i) clarifying the R principles, (ii) differentiating lifecycle approaches, (iii) unifying fragmented building lifecycle stages, and (iv) integrating R principles with building lifecycle stages. The study found that most studies focused on three lifecycle stages (design, construction, operation), and no study covered all seven lifecycle stages as opposed to the proposed framework. The linear nature of the current building lifecycle is proven as most studies considered none of the R principles, in which 22 R principles were clarified into 14 R principles. Addressing such issues, a novel framework of seven stages (Inception, Feasibility & Planning, Design, Construction, Handover, Operation, and Circulation) is developed with R principles. The framework establishes a platform to facilitate industry stakeholder collaboration and guidance on applying R practices to the building lifecycle. The study made contributions by developing circular building lifecycle stages, exemplified R principle implementation, and a path for policymakers and industry professionals toward a circular transformation. The framework has the potential to be utilized by future studies to assess the circularity of building investments. Additionally, its multidirectional structure enables modifying different performance dimensions or metrics in line with stakeholder interest contributing to the collaborative platform needed for a circular economy.
... These services work closely with external sustainment service providers in 'architecture, engineering, construction' and are integrated with the building's life cycle management. 2 Sustainment activities also have broader implications. De Almeida and Borsato 3 examined the impact of recycling and depletion of resources in sustaining operations while minimising the impact on the environment and the economy. ...
Article
Full-text available
Major assets such as buildings, infrastructure and defence systems are long term investments that require many outsourced sustainment activities to maintain satisfactory performances over their service life. When multiplied by the number of years that the sustainment is planned to be undertaken, the contracting cost is high. Many business processes are established to govern these asset sustainment activities and eventually become the source of inefficiency. This paper analyses the performance of these processes using a performance driven approach. Combined with input data of requests for engineering change in similar assets, this paper evaluates a new business process redesigned from an existing process to achieve significant savings in total cost of ownership as well as improving other non-financial performance indicators.
... Architecture, engineering, and construction (AEC) projects are portrayed as evolving, iterative, information-rich, labour-oriented, hazardous, and risky (Ballard 2000;Zaneldin et al. 2001;Sun and Meng 2009;Othman 2012). Typically, the AEC project life cycle divides into seven stages: client requirements briefing, conceptual design, detailed design, construction, handover, operation, and maintenance (Evbuomwan and Anumba 1998;Kamara 2013). Several stakeholders from different domains such as architectural, structural, mechanical, electrical, plumbing, execution, and so on play a dominant role at each stage of the project. ...
Article
Managing changes has become a critical issue in the construction industry in recent years. Changes are inevitable throughout the lifecycle of the construction project. Understanding change causes and effects can support project teams to manage changes proactively. Although various research articles are published in this field, a comprehensive and systematic overview of change causes and effects is missing due to different terminologies and perspectives, lack of distinction between generic and project-specific causes, and lack of validation with industry experts. Therefore, the objective of this study is to identify and classify change causes and effects in construction projects. A multi-case study research method is utilised to achieve the objective of the study. The study provides two contributions to the body of knowledge of change management. First, a comprehensive list of 85 change causes and 45 change effects which are identified from the literature and multi-case study are presented. Around 3951 changes from 19 construction projects are investigated to identify causes and effects. Second, a taxonomy is proposed to classify change causes and effects. The proposed taxonomy consists of three levels with an increasing level of detail of the change cause and effect and it can support project teams to develop strategies to eliminate or minimise changes in the construction project.
... Variations of the building lifecycle depend on the type of project, the type of client, and on the delivery system. Often, the building lifecycle is simply broken down into the following main phases: project inception or brief, design, construction, and operation and maintenance [23][24][25][26][27]. Even if there exist several differences between process maps or plans of work, the core phases are the same [27]. ...
Article
Full-text available
Decision making is a relevant task in the building construction sector, and various systems and methods for decision support are emerging. By means of a systematic literature review, this article identifies the methods for decision making in building construction and the lifecycle phases for which decision support systems are proposed. The selected articles are analyzed and grouped according to the adopted decision-making methods and the defined lifecycle phases. The findings show that multiple criteria decision analysis is the most used method for decision support in building construction and that the construction phase is the most addressed phase within the relevant existing works. The findings related to the construction phase are further refined by grouping the articles into application areas and by reviewing in detail the proposed methods therein. The scarce availability of data and project cases is identified as the most common barrier for the successful development and implementation of decision support systems in the building construction sector. This work provides a basis for scientists and practitioners for identifying suitable methods for decision-making support in a specific lifecycle phase of a building.
... Hensel (2013 p. 26) posited that the BP stems mainly from the depth of the connection between form and function, and often coincides with the related art, and science or the relation between building and users. Kamara (2013) defined BP. as "the extent to which a building supports the immediate and changing needs of its users, and how its impact on society and the environment is optimised." The current research agree with the last definition of BP is how far a building fulfils the current and future needs of its users, and its effect on society and the context in which it is used. ...
Thesis
Intelligent systems (IS) are seen as a vital component in improving building performance. The research reported in this thesis explored the potential role of such systems in improving the performance of courtyard house types in Baghdad, Iraq. The Iraqi government’s intention to refurbish those courtyard houses that possess significant historical architectural value was based on modifying the ambient social and environmental condition to protect the occupants. The benefits of IS are generally to: provide environmental control and system control, reduce running costs, improve operational effectiveness and energy efficiency, maintenance/building upkeep, reliability/dependability, and last but not least monitoring and observation. However, the majority of IS research and development has been on commercial and office buildings, and although there were applications in dwelling houses, their potential benefit for certain house types, for example courtyard houses, has not been well understood. Against the background of the possible refurbishment of the courtyard house, the aim of this research is to explore the potential role of intelligent systems in improving the performance of the courtyard house type in Baghdad, Iraq. The main objectives of this research were to: (1) investigate the characteristics and features of the traditional courtyard house in Iraq, (2) investigate the meaning, nature and application of intelligent systems in buildings, (3) investigate the lifestyle of current users of traditional courtyard houses and how these buildings support their needs, (4) examine the potential role of IS in improving the performance of courtyard houses, and (5) make recommendations on the possible applications of IS to courtyard houses. Various research methods and strategies were adopted to achieve the defined aim of this research. These methods include an extensive literature review in both the areas of the courtyard house and intelligent buildings, and a case study was collected the data from two main sources through: (1) semi-structured interviews with twenty five architects and twenty four occupants, and (2) physical survey and observation of the traditional courtyard house type in the Al-Kadhimiya historic area. The qualitative method was used to analysis the data collection. Abstract The findings from the study identified the following new themes which provide the basis for exploring the research question: (1) Architectural value - key feature through the passive system of the traditional courtyard house type in the Al-Kadhimiya, (2) Limitation of space use, some spaces were not used, and the residents felt as if they were paralyzed at these times and (3) Requirement for new systems in this house type. It is concluded that the key features of the traditional courtyard house type are passive systems which support the lifestyle by achieving thermal comfort. Adding simple IS as applications which are integrated and wireless, with an actuator, will certainly help the residents enhance the house performance in Al-Kadhimiya. This will be done by: developing the level of control over the environment, reducing the environmental challenges, decreasing the social struggles, and supporting the response to the environment. This study contributes to the role of ISs in enhancing the performance of the traditional courtyard house. For the current users, these roles are achieved through three major steps: (1) the nature of IS in traditional courtyard house, (2) The priority of systems; (3) Using the courtyard house as a container for intelligent systems. Future users are likely to have a different lifestyle and so the level of intelligence may change; thus, the potential need for ISs might change too due to the type of IS and its operation. A clean air recirculation module is one application to be used in the traditional courtyard house type in Al-Kadhimiya, which can be selected to enhance house performance.
... A natural stage of developing the built environment is the creation of a method for promoting building performance across as wide a range of environmental and energy criteria as possible (Kua and Lee 2002). Building performance means what in the building needs support immediately or change for users, with optimization of the impact on society and the environment (Kamara, 2013). ...
Article
Full-text available
The traditional courtyard house in Iraq generally and Baghdad in particular has distinct characteristics. However, there are several reasons underlying the decline of the environmental performance of this type of house. Focusing on this decline, the main objective of this study is to explore how active systems can enhance the existing environmental performance of the traditional courtyard house. The framework of this investigation focuses on two points: first, it seeks to clarify the existing system and, second, it investigates the existing need to add new systems. To achieve these objectives, interviews with 25 architects and 24 occupants of traditional courtyard houses, alongside 12 physical surveys in the Al-Kadhimiya historical area as a case study, are discussed, based on a qualitative method. The research revealed the interplay between the passive and active systems, and the efficiency of technology in enhancing the traditional environmental performance through improving the level of comfort and increasing the response to the environment.
Article
Full-text available
In 2011, a UK government mandate stated that all public-sector construction projects must conform to BIM level 2. As the owner of one of the largest estate portfolios in Europe the NHS will be heavily impacted by the introduction of the BIM mandate. The aim of this article is to explore how prepared NHS facilities managers (FM) are for the introduction of the BIM 2016 mandate. To do this an online questionnaire survey and face to face interviews were conducted to identify NHS FM professionals' awareness, understanding, experience, and opinions of BIM and organisational readiness. Analysis of the primary data shows that NHS FM professionals are underprepared to engage fully with BIM in a competent manner with many failing to demonstrate knowledge of the fundamental principles of BIM. By developing an understanding of NHS FM professionals current skills, knowledge, experience and opinions with regards to BIM this article aims to help future studies understand what key elements should be considered by public sector organisations when establishing a BIM for FM implementation framework.