Copy reference, caption or embed code

Figure 4 - Studies regarding the safety in operation of Râpa Albastră reservoir Studii privind siguranţă în exploatare a acumulării Râpa Albastră

Figure 4. Dam body plan view with the location of the measuring installations.
Dam body plan view with the location of the measuring installations.
Go to figure page
Reference
Caption
Embed code