Figure 8 - uploaded by Julius von Kügelgen
Content may be subject to copyright.
BTC and BEC evolution on CIFAR10 with utilizing diagonal confusion matrix elements only.

BTC and BEC evolution on CIFAR10 with utilizing diagonal confusion matrix elements only.

Source publication
Preprint
Full-text available
When machine learning systems meet real world applications, accuracy is only one of several requirements. In this paper, we assay a complementary perspective originating from the increasing availability of pre-trained and regularly improving state-of-the-art models. While new improved models develop at a fast pace, downstream tasks vary more slowly...

Similar publications

Preprint
Full-text available
Allowing organizations to share their data for training of machine learning (ML) models without unintended information leakage is an open problem in practice. A promising technique for this still-open problem is to train models on the encoded data. Our approach, called Privately Encoded Open Datasets with Public Labels (PEOPL), uses a certain class...
Technical Report
Full-text available
This note shows that the demand-driven input-output (IO) quantity model developed by Wassily Leontief may also be interpreted as the almost unknown revenue-pull IO price model measured in value terms, instead of in prices. This new interpretation opens up hitherto unused possibilities to simulate interindustry demand-driven inflationary processes.
Preprint
Full-text available
Differential privacy has emerged as a popular privacy framework for providing privacy preserving noisy query answers based on statistical properties of databases. It guarantees that the distribution of noisy query answers changes very little with the addition or deletion of any tuple. Differential enjoys popular reputation that providing privacy wi...
Article
Full-text available
Determining a reasonable project duration is one of the most critical activities required by project owner agencies for successful project letting and delivery. Most owner agencies, specifically in the highway sector, mainly rely on schedulers’ judgment and experience in determining the sequence of construction activities to estimate the required a...
Preprint
Full-text available
This paper describes the results of a wave tank test campaign of a 1/49 scaled SATH 10MW INNWIND floating platform. The Software-in-the-Loop (SiL) hybrid method was used to include the wind turbine thrust and the in-plane rotor moments My – Mz. Experimental results are compared with a numerical model developed in OpenFAST of the floating wind turbi...