-
Journal of Oral Pathology & Medicine - J ORAL PATHOL MED. 01/2009; 38(7):584-590.
-
[show abstract]
[hide abstract]
ABSTRACT: UML (unified modeling language) is the de facto standard model representation language in software engineering. We believe that automated contradiction detection and repair of UML become very important as UML has been widely used. In this paper, we propose a debugging system using logic programming paradigm for UML class diagram with class attributes, multiplicity, generalization relation and disjoint relation. We propose a translation method of a UML class diagram into a logic program, and using a meta-interpreter we can find (set-inclusion-based) minimal sets of rules which leads to contradiction. Then, we use a minimal hitting set algorithm developed by one of the authors to show minimal sets of deletion of rules in order to avoid contradiction
Automated Software Engineering, 2006. ASE '06. 21st IEEE/ACM International Conference on; 10/2006
-
[show abstract]
[hide abstract]
ABSTRACT: We report structural, magnetic and high-temperature thermoelectric properties of Delafossite-type oxide, CuCr<sub>1-x</sub>Mg<sub>x</sub>O <sub>2</sub> (0⩽ x ⩽0.05). Lattice parameter, c, linearly decreases with increasing Mg concentration in the range, 0⩽ x ⩽ 0.03. This decrease is mainly caused by the shrinking of O-Cu-O dumbbells which connect the CdI<sub>2</sub>-type (Cr/Mg)O<sub>2</sub> slabs. Magnetic susceptibility measurements indicate that Cr<sup>3+</sup> is in the high spin state in the paramagnetic phase above 25 K. Electrical resistivity, ρ, of CuCr<sub>1-x</sub>Mg<sub>x</sub>O<sub>2</sub> exhibits semiconducting behavior (dρ/dT < 0) in the range from 350 K to 1100 K and becomes lower through the partial substitution of Mg <sup>2+</sup> for Cr<sup>3+</sup> in 0 ⩽ x ⩽ 0.03. Due to positive Seebeck coefficients, S, of these oxides, it is natural to assume that the dominant charge carriers of CuCr<sub>1-x</sub>Mg<sub>x </sub>O<sub>2</sub> are positive holes. Experimental values of S at 1100 K have consistency with the theoretical values predicted from Koshibae's formula. From the linear S vs. lnσ plot, it is estimated that the observed power factor, S<sup>2</sup>σ, reaches the maximum value around x = 0.03 in this system. The thermal conductivity, κ, for CuCr<sub>1-x</sub>Mg<sub>x</sub>O<sub>2</sub> ranges from 6 to 10 W·m<sup>-1</sup>·<sup>-1</sup> at 300 K. The maximum dimensionless figure of merit, ZT = S<sup>2</sup>T/ρκ, of the sample with x = 0.03 is 0.04 at 950 K
Thermoelectrics, 2006. ICT '06. 25th International Conference on; 09/2006
-
[show abstract]
[hide abstract]
ABSTRACT: Twin MONOS is a CMOS-based dual bit nitride storage flash memory technology which offers low cost, high performance and low power.
Non-Volatile Memory Technology Symposium, 2004; 12/2004
-
[show abstract]
[hide abstract]
ABSTRACT: The advances in semiconductor manufacturing, EDA tools, and VLSI design technologies are enabling circuit designs with increasingly higher speed and density. However, this trend is causing the on-chip power distribution network to experience larger dynamic voltage fluctuations due to dynamic voltage drop, L di/dt noise, and/or LC resonance. As a result, the analysis of power-integrity, as well as the evaluation and calibration of the analysis methodology, has become a major challenge in designing high-performance circuits. An innovative vectorless dynamic power-ground noise analysis approach is discussed in this paper. This approach addresses full-chip complexity with transistor-level accuracy. This analysis approach demonstrated very good correlation with an on-chip supply noise measurement in 0.13-μm CMOS technology, capable of achieving 100 μV/100 ps resolution.
Custom Integrated Circuits Conference, 2004. Proceedings of the IEEE 2004; 11/2004
-
[show abstract]
[hide abstract]
ABSTRACT: We have first reported on a 94-channel wide-band WSL installed in a 22-pin butterfly package with a multi-wavelength locker. We could realize 40-nm operation in the L-band for an 8-DFB arrayed monolithic WSL by covering 5 nm per DF3-LD. By using a monolithically integrated WSL and minimizing the number of components on the wavelength locker we could install all function in a 12.7-mm × 20.8-mm standard butterfly package. This WSL module with a stable-wavelength operation and uniform locking performance is a promising development to provide a large degree of flexibility in DWDM system design.
Optical Fiber Communication Conference and Exhibit, 2002. OFC 2002; 04/2002
-
[show abstract]
[hide abstract]
ABSTRACT: The movable mask is a device that cuts off spent
electrons/positrons near the beam orbit and reduces background of the
detector. For the KEKB, sixteen movable masks had been installed for
each ring. The originally designed masks, however, had severe troubles
of heating, arcing and vacuum leaks. Several kinds of improved masks had
been designed partially employing RF technologies in dealing with HOM
and were installed to the ring step by step. The latest masks are
working almost as expected now. Here the problems of movable masks so
far are summarized and the structure of the latest movable masks and
their status are presented
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001; 02/2001
-
T. Suwada,
N. Akasaka,
A. Enomoto,
Y. Ogawa,
J. Flanagan,
H. Fukuma,
Y. Funakoshi,
K. Furukawa,
T. Ieiri,
N. Iida,
T. Kamitani,
M. Kikuchi,
T. Matsumoto,
T. Nakamura,
Y. Ohnishi,
S. Ohsawa, K. Satoh,
M. Suetake,
H. Koiso,
K. Oide
[show abstract]
[hide abstract]
ABSTRACT: The KEKB injector linac was completely upgraded for the KEK
B-Factory (KEKB) project in March, 1998. Many difficulties have been
overcome during the elaborate commissioning of the upgraded linac since
the end of 1997. The 3.5-GeV positron and 8-GeV electron beams have been
injected to the KEKB rings with good performance. Much effort has also
been continuing to stabilize the intensity and quality of the beams.
Some experimental results on the beam stability issues am shown together
with the recent operation status in this report. A beam test on a new
scheme of a two-bunch injection was started in order to increase the
positron intensity since March, 2001
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001; 02/2001
-
Y.J. Tang,
T. Kato,
N. Hayakawa,
Y. Yokomizu,
T. Matsumura,
H. Okubo,
Y. Kito,
K. Miyake,
T. Kumano,
W. Satoh, K. Satoh
[show abstract]
[hide abstract]
ABSTRACT: A "prospective power transmission model system integrated under superconducting environment", abbreviated to PROMISE, has been constructed to verify the technical possibility of superconducting power transmission for the next generation. PROMISE is composed of a superconducting transformer, a superconducting fault current limiter and superconducting power cable of length 5 m. These three superconducting apparatus are enclosed together in a long scale cryostat to be kept at the liquid helium temperature of 4.2 K. The major insulation is provided by liquid helium. PROMISE withstands an AC voltage of 6 kV for 2 minutes with quite low partial discharge. A voltage-current synthetic test has proved that PROMISE has a transmission capability of 6,000 V-1,000 kVA. The fault current limiter actually limits overcurrent and prevents the other apparatus from quenching. Quench current level coordination is actually realized in PROMISE.
IEEE Transactions on Appiled Superconductivity 07/1995; · 1.04 Impact Factor
-
[show abstract]
[hide abstract]
ABSTRACT: The authors discuss the concept of operation, administration, and
maintenance (OA&M) systems of the transmission media network in
large single-mode (SM) optical fiber loops to be constructed in the next
century. The structure of efficient OA&M systems for large-scale
networks is described. The optical fiber loop OA&M system has three
layers. The functions in these layers are investigated. The
characteristics of the optical fiber loop are outlined. The loop has
sensors and matrix switches, and it can remotely and automatically be
operated, administered, and maintained through a remote switching
module, a supervisory module, and an automatic testing module. As the
first stage in the introduction of the OA&M systems, the automatic
testing system has been developed. This system can realize automatic
tests and in-service measurement of optical fibers
Global Telecommunications Conference, 1990, and Exhibition. 'Communications: Connecting the Future', GLOBECOM '90., IEEE; 01/1991
-
[show abstract]
[hide abstract]
ABSTRACT: A multibeam mobile satellite communications system presently under
study, called the dynamic channel assigned multibeam satellite system
(DCMS system), is described. The compact mobile terminals proposed to
realize this system are also described. Evaluations of propagation
characteristics and mobile terminals performance and various application
experiments are being carried out
Communications, 1988. ICC '88. Digital Technology - Spanning the Universe. Conference Record., IEEE International Conference on; 07/1988
-