Anticipation for Efficient Electricity Transmission Network Investments

HAL, Post-Print 01/2008;
Source: RePEc

ABSTRACT This paper proposes a model and preliminary results to evaluate the efficiency of anticipating the connection of power plants with shorter construction duration than the time needed to obtain the right to upgrade the network and finally to do this reinforcement. This evaluation is made in presence of a cost of anticipation related to the study of the project of network investment and to the administrative procedures needed to obtain the building agreement. This model compares a proactive TSO that anticipates the connection of new generators and then the required network reinforcement, with a reactive one that does not make any anticipation but that may then face greater congestion while the network is being reinforced. The efficiency of these behaviors is measured in terms of social cost. We find out that there exists a limit of probability for the connection of generators beyond which a proactive TSO is more efficient than a reactive one. Evaluated on a realistic case of connection, this limit of probability is found quite low, which indicates that the proactive behavior for a TSO shall generally be the optimal one.

0 0
 · 
0 Bookmarks
 · 
55 Views
  • Source
    Article: Proactive planning and valuation of transmission investments in restructured electricity markets
    Journal of Regulatory Economics 02/2006; 30(3):358-387. · 0.84 Impact Factor
  • Article: Wind energy planning in England, Wales and Denmark: Factors influencing project success
    [show abstract] [hide abstract]
    ABSTRACT: Land-use planning poses a significant barrier to the further development of on-shore wind energy in many countries. There has been increasing discussion regarding the use of public participation in the planning process in order to address concerns of local residents and ease conflicts. This research explores the dynamics of the planning process for wind energy in England, Wales and Denmark in order to better understand the factors influencing project success. Through 18 in-depth case studies, it investigates the degree of local community participation in the planning process and the stability of the network of individuals and organisations involved in the project to determine their relationship to the public's acceptance of the project and the planning outcome. The study draws on the frameworks of public participation in planning and actor-network theories in order to develop indicators of the level of community involvement and network formation for each case. The analysis discusses predictions made by the theoretical approaches as to the importance of these variables to the success of new projects. The results indicate that projects with high levels of participatory planning are more likely to be publicly accepted and successful. In addition, stable supporting networks are more likely to form. The presence of a stable network of supporters is not found to be related to project acceptance and success; however, the absence of a stable network of opponents is found to be necessary for project acceptance and success in receiving planning permission.
    Energy Policy.
  • Generation technology mix in competitive electricity markets" in Investments frame and incentives in the electrical industry. Jm Glachant . 2006. Lévêque F

Full-text (2 Sources)

View
11 Downloads
Available from
7 Dec 2012

Keywords

administrative procedures
 
anticipation
 
building agreement
 
efficient
 
generators
 
network investment
 
new generators
 
optimal
 
power plants
 
preliminary results
 
proactive behavior
 
proactive TSO
 
reactive
 
realistic case
 
required network reinforcement
 
shorter construction duration