Improving project outcomes through operational reliability: A conceptual model

University of Bradford, School of Management, Emm Lane, Bradford, West Yorkshire, BD9 4JL, UK
International Journal of Project Management (Impact Factor: 2.44). 11/2009; 27(8):765-775. DOI: 10.1016/j.ijproman.2009.02.006


The work reported here is part of an on-going research effort concerned with developing a methodology to improve the outcomes of projects involving complex information systems. To facilitate the study, previous research concerned with high reliability organisations (HRO) is examined. An analysis of this literature is used to develop a conceptual model that explains how highly reliable operational capabilities are achieved and maintained. Cases of catastrophic failures are evaluated using this paradigm to illustrate its utility as an analytical research tool and its potential as a systemic framework for evaluating the operational capability of organisations prior to project initiation.

Download full-text


Available from: Roger Beach, Jun 06, 2014
  • Source
    • "" If the answer is on the order of tens of thousands of times the organization is " high reliability " .' High Reliability Organisations are characterised by seven specific characteristics that allow them to achieve high levels of reliability (e.g. Tranfield et al., 2003; Hopkins, 2007; Sullivan & Beach, 2009; Saleh et al., 2010; Lekka & Sugden, 2011; Sutcliffe, 2011): a culture of continuous learning, commitment to results and safety, flexible structures, in-built systems and human redundancy, outstanding technology, effective communication, and reward systems for reporting failures. To this end, as part of our analysis we also examine whether the aircraft accidents could have been avoided if those involved had adopted the attributes of, and operated as, HROs. "
    [Show abstract] [Hide abstract]
    ABSTRACT: We investigate through-life accountability in product–service systems, based on the analysis of the official investigation reports of 17 commercial aircraft accidents. Our analysis suggests that agency theory has the potential to address issues of confusing accountabilities between the stakeholders if mechanisms are in place to align the interests of principals (manufacturers) and agents (customers). The results indicate that servitized manufacturers operating in safety-critical environments should help their customers operate as ‘high-reliability organisations’. Finally, organisations need to shift their focus from ‘flexible structures’ to ‘a balance between human and systems redundancy’, as they move from more to less hierarchical structures.
    22nd EurOMA Conference, Neuchatel, Switzerland; 06/2015
  • [Show abstract] [Hide abstract]
    ABSTRACT: On the basis of analyzing differentiation between complex project crisis and risk, it studies complex characteristics of the complex project. It builds a grid-based complex project crisis management system according to complex project gird elements division and complex project crisis management procedure based on grid technology. It explains the functions of each subsystem and explores safety strategies of grid-based complex project crisis management system. It puts forward a new method to manage complex project crisis applying grid technology.
  • [Show abstract] [Hide abstract]
    ABSTRACT: Prior project management research has identified a wide variety of measures that describe the outcomes of a project and the input characteristics that impact outcomes. In practice however, project schedules are still used as the sole project performance measure in some firms. Although the use of project schedules is still a good practice for some companies, for other companies the use of project schedules as the sole project performance measure can result in industrial projects falling behind schedule and coming in over-budget. In order to examine how the evaluation of project performance can be improved, a two-step approach is documented that was used to design a new project performance evaluation system at Honeywell Federal Manufacturing & Technologies (FM&T) that would enable managers to audit a project and determine where improvements could be made. Lessons learned from the development of a project performance evaluation system at Honeywell Federal Manufacturing & Technologies are then discussed.
    International Journal of Project Management 02/2011; 29(2):155–164. DOI:10.1016/j.ijproman.2010.02.010 · 2.44 Impact Factor
Show more